CN111158320A - 区域使用规划系统、区域使用规划方法及区域使用规划装置 - Google Patents

区域使用规划系统、区域使用规划方法及区域使用规划装置 Download PDF

Info

Publication number
CN111158320A
CN111158320A CN201911011623.8A CN201911011623A CN111158320A CN 111158320 A CN111158320 A CN 111158320A CN 201911011623 A CN201911011623 A CN 201911011623A CN 111158320 A CN111158320 A CN 111158320A
Authority
CN
China
Prior art keywords
area
information
usage
unit
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911011623.8A
Other languages
English (en)
Chinese (zh)
Inventor
田中将贵
友部笃志
桥本薰
濑谷裕之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN111158320A publication Critical patent/CN111158320A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32085Layout of factory, facility, cell, production system planning
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Manufacturing & Machinery (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Automation & Control Theory (AREA)
  • Educational Administration (AREA)
  • General Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
CN201911011623.8A 2018-11-08 2019-10-23 区域使用规划系统、区域使用规划方法及区域使用规划装置 Pending CN111158320A (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018-210178 2018-11-08
JP2018210178A JP7101099B2 (ja) 2018-11-08 2018-11-08 エリア利用計画システム、エリア利用計画方法、及びエリア利用計画装置

Publications (1)

Publication Number Publication Date
CN111158320A true CN111158320A (zh) 2020-05-15

Family

ID=70555802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911011623.8A Pending CN111158320A (zh) 2018-11-08 2019-10-23 区域使用规划系统、区域使用规划方法及区域使用规划装置

Country Status (2)

Country Link
JP (1) JP7101099B2 (ja)
CN (1) CN111158320A (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112183792A (zh) * 2020-09-09 2021-01-05 远光软件股份有限公司 一种预定空闲办公区域的方法、装置和办公区域管理系统
CN112733346A (zh) * 2020-12-31 2021-04-30 博迈科海洋工程股份有限公司 一种电气操作间宜人化区域规划方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022014040A1 (ja) * 2020-07-17 2022-01-20 三菱電機株式会社 移設容易性判断装置および移設容易性判断方法
CN112436967B (zh) * 2020-11-17 2022-07-29 北京航空航天大学杭州创新研究院 工业互联网设备异常后的安全处理方法和装置

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005100092A (ja) * 2003-09-25 2005-04-14 Sony Corp 半導体生産シミュレーション方法および半導体生産シミュレーションプログラム
US20120035975A1 (en) * 2010-08-04 2012-02-09 Hitachi, Ltd. Method and apparatus for creating work plan
JP2012103804A (ja) * 2010-11-08 2012-05-31 Mitsubishi Heavy Ind Ltd 場所計画装置および場所計画方法
JP2014170469A (ja) * 2013-03-05 2014-09-18 Mitsubishi Heavy Ind Ltd 作業場所計画装置、作業場所計画プログラム、及び作業場所計画方法
CN104063529A (zh) * 2013-03-22 2014-09-24 上海电气集团股份有限公司 一种数字化汽车工厂布局规划仿真的方法
CN104951861A (zh) * 2014-03-31 2015-09-30 富士通株式会社 生产计划的显示方法、支持方法、显示设备以及支持设备
CN104950834A (zh) * 2014-03-28 2015-09-30 富士通株式会社 生产计划准备支持方法和生产计划准备支持设备
CN106169130A (zh) * 2015-05-21 2016-11-30 富士施乐株式会社 计划管理系统和计划管理方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001195116A (ja) * 2000-01-12 2001-07-19 Nkk Corp 作業場所最適化スケジューリング方法およびその装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005100092A (ja) * 2003-09-25 2005-04-14 Sony Corp 半導体生産シミュレーション方法および半導体生産シミュレーションプログラム
US20120035975A1 (en) * 2010-08-04 2012-02-09 Hitachi, Ltd. Method and apparatus for creating work plan
JP2012103804A (ja) * 2010-11-08 2012-05-31 Mitsubishi Heavy Ind Ltd 場所計画装置および場所計画方法
JP2014170469A (ja) * 2013-03-05 2014-09-18 Mitsubishi Heavy Ind Ltd 作業場所計画装置、作業場所計画プログラム、及び作業場所計画方法
CN104063529A (zh) * 2013-03-22 2014-09-24 上海电气集团股份有限公司 一种数字化汽车工厂布局规划仿真的方法
CN104950834A (zh) * 2014-03-28 2015-09-30 富士通株式会社 生产计划准备支持方法和生产计划准备支持设备
CN104951861A (zh) * 2014-03-31 2015-09-30 富士通株式会社 生产计划的显示方法、支持方法、显示设备以及支持设备
CN106169130A (zh) * 2015-05-21 2016-11-30 富士施乐株式会社 计划管理系统和计划管理方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112183792A (zh) * 2020-09-09 2021-01-05 远光软件股份有限公司 一种预定空闲办公区域的方法、装置和办公区域管理系统
CN112733346A (zh) * 2020-12-31 2021-04-30 博迈科海洋工程股份有限公司 一种电气操作间宜人化区域规划方法

Also Published As

Publication number Publication date
JP7101099B2 (ja) 2022-07-14
JP2020077212A (ja) 2020-05-21

Similar Documents

Publication Publication Date Title
CN111158320A (zh) 区域使用规划系统、区域使用规划方法及区域使用规划装置
US6233493B1 (en) Computer-implemented product development planning method
JP6869166B2 (ja) 生産計画立案装置、及び生産計画立案方法
JP4736651B2 (ja) 受注・見込み生産混流時の生産計画方法および生産計画システム
US20030033187A1 (en) Project management system
US5471408A (en) Method for optimizing resource allocation and an apparatus using the method
CN103678585A (zh) 一种用户数据筛选的方法和系统
JP2020113276A (ja) 部品取集を管理するための方法、コンピュータプログラム及び管理システム
JP5439275B2 (ja) 情報処理装置、原価見通し算出方法、および原価見通し算出プログラム
US11341292B2 (en) Production plan supporting apparatus and method
CN106560850B (zh) 计划生成装置以及计划生成方法
JP6836530B2 (ja) 計算機システム及び系統構成の管理方法
JP2013122733A (ja) 生産計画プログラム及び生産計画装置
JP2019008501A (ja) 生産管理システムおよび生産管理方法
JP7111909B2 (ja) プロジェクト管理装置、プロジェクト管理方法、及び記録媒体
JP2017182797A (ja) 所要量計算装置、所要量計算方法、および、所要量計算プログラム
JP5244662B2 (ja) 生産管理システムと代替bom構成展開方法およびプログラム
JP3976640B2 (ja) 情報処理装置、情報処理方法及びプログラム
Tsai et al. A mathematical programming approach to analyze the activity-based costing product-mix decision with capacity expansions
JPH06162037A (ja) 生産計画の立案方式
JP2019219713A (ja) 生産計画立案装置、生産計画立案方法およびプログラム
JP7193431B2 (ja) スケジューリング装置、スケジューリング方法及び記憶媒体
JPH04184602A (ja) 生産計画作成システムおよび生産計画作成方法
JPH0710486B2 (ja) 多品種生産スケジュール作成装置
US20240013113A1 (en) Method and system for automatic establishment of optimal schedule for construction project

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination