CN110644343A - 一种坑凹不平的混凝土桥面沥青铺装层快速清除方法 - Google Patents
一种坑凹不平的混凝土桥面沥青铺装层快速清除方法 Download PDFInfo
- Publication number
- CN110644343A CN110644343A CN201910866338.8A CN201910866338A CN110644343A CN 110644343 A CN110644343 A CN 110644343A CN 201910866338 A CN201910866338 A CN 201910866338A CN 110644343 A CN110644343 A CN 110644343A
- Authority
- CN
- China
- Prior art keywords
- asphalt pavement
- pavement layer
- milling
- thickness
- concrete bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000010426 asphalt Substances 0.000 title claims abstract description 77
- 239000004567 concrete Substances 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000003801 milling Methods 0.000 claims abstract description 71
- 238000004140 cleaning Methods 0.000 claims abstract description 18
- 230000009471 action Effects 0.000 claims abstract description 7
- 238000005192 partition Methods 0.000 claims abstract description 5
- 239000002893 slag Substances 0.000 claims description 19
- 239000000463 material Substances 0.000 claims description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 241000282326 Felis catus Species 0.000 claims description 3
- 241001417527 Pempheridae Species 0.000 claims description 3
- 239000000843 powder Substances 0.000 claims description 3
- 238000011084 recovery Methods 0.000 claims description 3
- 239000007921 spray Substances 0.000 claims description 3
- 238000005507 spraying Methods 0.000 claims description 3
- 238000007780 powder milling Methods 0.000 claims description 2
- 230000035939 shock Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 230000032258 transport Effects 0.000 description 6
- 230000008569 process Effects 0.000 description 4
- 238000000926 separation method Methods 0.000 description 4
- 239000011384 asphalt concrete Substances 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 201000010099 disease Diseases 0.000 description 2
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 2
- 238000005336 cracking Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002791 soaking Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
- E01C23/12—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for taking-up, tearing-up, or full-depth breaking-up paving, e.g. sett extractor
- E01C23/121—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for taking-up, tearing-up, or full-depth breaking-up paving, e.g. sett extractor with non-powered tools, e.g. rippers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/30—Auxiliary apparatus, e.g. for thawing, cracking, blowing-up, or other preparatory treatment of the soil
- E02F5/305—Arrangements for breaking-up hard ground
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Road Repair (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910866338.8A CN110644343B (zh) | 2019-09-12 | 2019-09-12 | 一种坑凹不平的混凝土桥面沥青铺装层快速清除方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910866338.8A CN110644343B (zh) | 2019-09-12 | 2019-09-12 | 一种坑凹不平的混凝土桥面沥青铺装层快速清除方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110644343A true CN110644343A (zh) | 2020-01-03 |
CN110644343B CN110644343B (zh) | 2021-08-10 |
Family
ID=68991315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910866338.8A Active CN110644343B (zh) | 2019-09-12 | 2019-09-12 | 一种坑凹不平的混凝土桥面沥青铺装层快速清除方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110644343B (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0728871A1 (de) * | 1995-02-24 | 1996-08-28 | GfB Gesellschaft für Bauwerksabdichtungen mbH | Verfahren zur Instandsetzung der Deckschicht von Fahrbahnen mit Gussasphalt |
CN201141114Y (zh) * | 2007-11-08 | 2008-10-29 | 王征 | 小型履带式路面铣刨机 |
CN202610866U (zh) * | 2012-04-28 | 2012-12-19 | 安徽惊天液压智控股份有限公司 | 液压式横轴铣刨头 |
CN107059581A (zh) * | 2017-05-05 | 2017-08-18 | 乌海市公路工程有限公司 | 一种空心板梁桥桥面的养护维修方法 |
CN107083737A (zh) * | 2017-06-19 | 2017-08-22 | 侯忠备 | 一种铣刨机浮动收料装置 |
CN107268406A (zh) * | 2016-03-31 | 2017-10-20 | 宝马格有限公司 | 用于去除地面材料的地面铣刨机、特别是道路铣刨机和用于运行地面铣刨机的方法 |
CN108643037A (zh) * | 2018-04-25 | 2018-10-12 | 广州市市政工程设计研究总院 | 一种桥梁沥青路面结构及建造方法 |
CN208219382U (zh) * | 2018-04-17 | 2018-12-11 | 武汉市市政建设集团有限公司 | 道路破碎装置 |
CN209368652U (zh) * | 2018-11-13 | 2019-09-10 | 苏州五元素机械制造有限公司 | 一种新型铣刨凿刀体 |
-
2019
- 2019-09-12 CN CN201910866338.8A patent/CN110644343B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0728871A1 (de) * | 1995-02-24 | 1996-08-28 | GfB Gesellschaft für Bauwerksabdichtungen mbH | Verfahren zur Instandsetzung der Deckschicht von Fahrbahnen mit Gussasphalt |
CN201141114Y (zh) * | 2007-11-08 | 2008-10-29 | 王征 | 小型履带式路面铣刨机 |
CN202610866U (zh) * | 2012-04-28 | 2012-12-19 | 安徽惊天液压智控股份有限公司 | 液压式横轴铣刨头 |
CN107268406A (zh) * | 2016-03-31 | 2017-10-20 | 宝马格有限公司 | 用于去除地面材料的地面铣刨机、特别是道路铣刨机和用于运行地面铣刨机的方法 |
CN107059581A (zh) * | 2017-05-05 | 2017-08-18 | 乌海市公路工程有限公司 | 一种空心板梁桥桥面的养护维修方法 |
CN107083737A (zh) * | 2017-06-19 | 2017-08-22 | 侯忠备 | 一种铣刨机浮动收料装置 |
CN208219382U (zh) * | 2018-04-17 | 2018-12-11 | 武汉市市政建设集团有限公司 | 道路破碎装置 |
CN108643037A (zh) * | 2018-04-25 | 2018-10-12 | 广州市市政工程设计研究总院 | 一种桥梁沥青路面结构及建造方法 |
CN209368652U (zh) * | 2018-11-13 | 2019-09-10 | 苏州五元素机械制造有限公司 | 一种新型铣刨凿刀体 |
Also Published As
Publication number | Publication date |
---|---|
CN110644343B (zh) | 2021-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108708305B (zh) | 一种低墩桥梁拆除的施工方法 | |
US20090052987A1 (en) | Milling Drum | |
NO338286B1 (no) | Sandwichskraperlist med hardmetallkjerne | |
CN109208493B (zh) | 一种跨线单箱多室现浇钢筋混凝土桥梁上部结构拆除施工方法 | |
CN110644343B (zh) | 一种坑凹不平的混凝土桥面沥青铺装层快速清除方法 | |
WO2011124887A2 (en) | Pot hole repairing machine | |
CN113187502B (zh) | 一种钻爆法隧道施工的出渣方法 | |
CN110644344B (zh) | 一种厚度不均的桥面沥青铺装层快速清除方法 | |
JP5009637B2 (ja) | 既設道路橋の舗装補修工事における残存防水層の除去方法 | |
EP4034710B1 (en) | Road working machine with egress lighting system | |
US20090084002A1 (en) | Walking beam system, tire system and method for using the walking beam system and the tire system | |
US6651293B2 (en) | Apparatus for processing a pavement surface utilizing pressurized water | |
CN102979032A (zh) | 起撬收集沥青路面旧料的方法 | |
JP2001082071A (ja) | トンネル拡幅工法および装置 | |
CN110671120A (zh) | 一种敞开式外护盾掘进装置及坍塌巷道掘进方法 | |
CN113944476A (zh) | 一种适用于硬岩悬臂掘进机施工方法 | |
CN114541807A (zh) | 一种钢筋混凝土结构静态破除施工方法 | |
JPH09242108A (ja) | 油圧ショベルの作業装置 | |
CN107034776A (zh) | 一种桥面铺装混凝土的破除方法 | |
KR102650955B1 (ko) | 후타부 제거를 위한 절삭 시스템 및 이를 이용한 후타부 제거 공법 | |
JPH0921108A (ja) | 舗装道路用の掘削作業車 | |
CN116024926A (zh) | 一种钢桥面环氧沥青清除方法 | |
CN218042366U (zh) | 一种用于土地整理的深翻平地机设备 | |
JP2001081714A (ja) | アスファルト舗装版の取壊し方法及びその装置 | |
CN109306667A (zh) | 一种双曲拱桥拱上填料拆除施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240826 Address after: 443000 No. 36 Lanwu street, Point Military District, Yichang City, Hubei Province Patentee after: Yichang Yangtze River Bridge Construction and Operation Group Co.,Ltd. Country or region after: China Patentee after: THE SEVENTH ENGINEERING CO., LTD. OF CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Address before: No.8, Chunxiao Road, economic and Technological Development Zone, Wuhan, Hubei Province, 430056 Patentee before: THE SEVENTH ENGINEERING CO., LTD. OF CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Country or region before: China |