CN110284432A - 一种高填方区先施后填桥台施工方法 - Google Patents
一种高填方区先施后填桥台施工方法 Download PDFInfo
- Publication number
- CN110284432A CN110284432A CN201910479889.9A CN201910479889A CN110284432A CN 110284432 A CN110284432 A CN 110284432A CN 201910479889 A CN201910479889 A CN 201910479889A CN 110284432 A CN110284432 A CN 110284432A
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- construction
- barricade
- abutment
- rubble
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明提供一种高填方区先施后填桥台施工方法,首先施工桩基原地面以下部分;然后采用露天桩基作业施工桩基地面以上部分;桩基施工完成后,在桩基外围分层浇筑钢筋混凝土挡墙,每层挡墙浇筑完成后,在挡墙与桩间采用碎石分层填筑,每层碎石使用小型打夯机夯实,然后再施工一层挡墙,再回填碎石,依次循环,直至设计标高;在已施工的挡墙、填筑碎石及桩基顶上施工承台及桥台台身。本发明能大幅提高桥台施工进度,保证桥梁整体工期。工程后期在挡墙外侧填方区逐步回填石渣至设计标高,以保证填方区质量。
Description
技术领域
本发明属于桥梁施工技术领域,涉及桥梁桥台的施工方法,具体涉及一种桥台位于高填方区的先施后填桥台施工方法。
背景技术
在山区修建桥梁时,部分桥台设计在高填方区,填方高度高,填方面积大,需方量多。传统的桥台施工方法是先填筑到设计标高后,再采用冲击钻冲孔施工桩基,在桩基顶施工承台及桥台台身。上述方法的施工进度依赖于填方进度。实际施工中,为保护环境,一般是采用同一工程项目的隧道开挖施工或路基挖方弃渣进行填筑,受填方材料来源限制,施工过程中经常需要等待填方材料,要达到满足钻孔施工的填筑高度,一般需要较长时间,对工期要求紧的项目,采用上述方法会导致施工周期长,严重影响整体项目工程进度。
发明内容
本发明的目的在于针对现有的先填后筑桥台施工方法存在的工期长、效率低问题,提供一种先施后填的桥台施工方法,在施工质量满足规范要求的前提下,缩短桥台的施工周期,并且为今后同类工程建设施工提供借鉴。
本发明的技术方案如下:
一种高填方区先施后填桥台施工方法,其特征在于包括以下步骤:
(1)地面以下桩基施工:在高填方桥台施工区,首先对原地面进行清表作业,测设桩基位置,安放冲击钻进行冲孔作业,施工桩基地面以下部分;
(2)地面以上桩基施工:待原地面以下的桩基施工完进行后,再破除桩头,绑扎原地面以上桩基钢筋,安装桩基模板,进行露天桩基作业,直至桩基标高达到设计要求;
(3)施工防护结构及填筑桩间碎石:在桩基外围距离承台投影边缘1m的距离浇筑钢筋混凝土挡墙,挡墙分层浇筑,每次砌筑高度为2m;每层挡墙浇筑完成后,在挡墙与桩间采用碎石分层填筑,每层填筑厚度为30cm,使用小型打夯机夯实,压实度≥93%;然后再施工高度为2m挡墙,再回填碎石,依次循环,直至设计标高;
(4)施工桥台:在已施工的挡墙、填筑碎石及桩基顶上施工承台及桥台台身;
(5)工程后期在挡墙外侧填方区逐步回填石渣至设计标高。
本发明在桩基施工方面,桩基地下部分和地上部分分开施工,地上部分采用露天桩基施工工艺,不依赖于填筑基础,桩基施工快;在填筑方面,先在桩基周围采用混凝土防护结构,在防护结构和桩基之间填筑碎石并夯实,大大减少了填方量,可大幅缩短桥台施工工期,以保证桥梁上部结构施工进度。后期再对防护结构外围逐步回填,施工工艺简单,施工质量能满足要求。
附图说明
图1是本发明的桥台施工区立面图;
图2是图1中的A-A截面图。
具体实施方式
以下通过一个具体实施例对本发明的实现方法进行说明。
本实施例中,桥台位于高填方区,填方区的石渣来源于隧道出渣。由于隧道每天出渣量少,若将整体填方区填筑到设计高度,需要很长时间。为了不影响本项目桥梁工期,决定采用先施工桥台,后期再将石渣弃在桥台周围的施工方法,具体实施方式如下:
(1)本实施例中,桥台桩基有6根,首先采用普通钻孔桩施工方法施工6根桩基地面以下部分。首先在高填方桥台施工区,对原地面1进行清表作业,测设6根桩基2的位置,采用冲击钻进行冲孔作业,施工桩基2地面以下部分。
(2)然后采用露天桩基施工方法施工桩基地面以上部分。在桩基2地面以下的部分施工完进行后,再破除桩头,绑扎原地面以上桩基钢筋,安装桩基模板,进行露天桩基作业,直至桩基标高达到设计要求;
(3)施工防护结构及填筑桩间碎石:在桩基2外围距离承台3投影边缘1m的距离浇筑钢筋混凝土挡墙4,挡墙4分层浇筑,每次砌筑高度为2m;每层挡墙浇筑完成后,在挡墙与桩间采用碎石5分层填筑,每层填筑厚度为30cm,使用小型打夯机夯实,压实度≥93%;然后再施工高度为2m挡墙,再回填碎石,依次循环,直至设计标高;
(4)施工桥台:在已施工的挡墙4、填筑碎石5及桩基2顶上施工承台3及桥台台身6。
(5)桥台施工完成后,进行桥梁上部结构施工。后期将隧道施工石渣弃在挡墙外侧填方区进行回填,至设计填方标高。
本发明的挡墙厚度根据承受的侧压进行设计,在本实施例中,挡墙底部宽度设计为0.8m,顶部宽度0.5m。
Claims (2)
1.一种高填方区先施后填桥台施工方法,其特征在于包括以下步骤:
(1)地面以下桩基施工:在高填方桥台施工区,首先对原地面进行清表作业,测设桩基位置,安放冲击钻进行冲孔作业,施工桩基地面以下部分;
(2)地面以上桩基施工:待原地面以下的桩基施工完进行后,再破除桩头,绑扎原地面以上桩基钢筋,安装桩基模板,进行露天桩基作业,直至桩基标高达到设计要求;
(3)施工防护结构及填筑桩间碎石:在桩基外围距离承台投影边缘1m的距离浇筑钢筋混凝土挡墙,挡墙分层浇筑,每次砌筑高度为2m;每层挡墙浇筑完成后,在挡墙与桩间采用碎石分层填筑,每层填筑厚度为30cm,使用小型打夯机夯实,压实度≥93%;然后再施工高度为2m挡墙,再回填碎石,依次循环,直至设计标高;
(4)施工桥台:在已施工的挡墙、填筑碎石及桩基顶上施工承台及桥台台身;
(5)工程后期在挡墙外侧填方区逐步回填石渣至设计标高。
2.根据权利要求1所述的高填方区先施后填桥台施工方法,其特征在于:所述挡墙底部宽度0.8m,顶部宽度0.5m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910479889.9A CN110284432B (zh) | 2019-06-04 | 2019-06-04 | 一种高填方区先施后填桥台施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910479889.9A CN110284432B (zh) | 2019-06-04 | 2019-06-04 | 一种高填方区先施后填桥台施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110284432A true CN110284432A (zh) | 2019-09-27 |
CN110284432B CN110284432B (zh) | 2021-06-08 |
Family
ID=68003250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910479889.9A Active CN110284432B (zh) | 2019-06-04 | 2019-06-04 | 一种高填方区先施后填桥台施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110284432B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111779014A (zh) * | 2020-06-30 | 2020-10-16 | 中铁二院工程集团有限责任公司 | 一种临河陡坡桥梁高承台围护结构及施工方法 |
CN111827097A (zh) * | 2020-07-06 | 2020-10-27 | 上海崇明水利工程有限公司 | 一种拼接式钢筋砼桥桥台结构 |
Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09209364A (ja) * | 1996-02-06 | 1997-08-12 | Fujita Corp | 盛土の造成方法 |
CN1570291A (zh) * | 2004-04-23 | 2005-01-26 | 贵阳铝镁设计研究院 | 高填方区地基桩的制作方法 |
CN102587385A (zh) * | 2011-12-30 | 2012-07-18 | 青建集团股份公司 | 一种换填淤泥质软土的基坑支护方法 |
CN102797265A (zh) * | 2012-09-01 | 2012-11-28 | 中铁二院工程集团有限责任公司 | 顺层边坡桥梁敦台防护结构 |
CN202989942U (zh) * | 2012-12-18 | 2013-06-12 | 内蒙古电力勘测设计院 | 一种针对于软弱土或高回填土区围墙基础构造 |
KR20130073577A (ko) * | 2011-12-23 | 2013-07-03 | 주식회사 이산 | 널말뚝식 복합 모듈러 교대 및 그의 시공 방법 |
CN103215950A (zh) * | 2013-05-06 | 2013-07-24 | 中国建筑第八工程局有限公司 | 回填区桩基接长施工方法 |
JP2013159960A (ja) * | 2012-02-06 | 2013-08-19 | Takenaka Komuten Co Ltd | シートパイル引抜部充填方法 |
CN104328797A (zh) * | 2014-09-25 | 2015-02-04 | 陕西华山路桥工程有限公司 | 高边坡大曲线挡墙砌筑施工工法 |
CN105421485A (zh) * | 2015-10-30 | 2016-03-23 | 杭州江润科技有限公司 | 一种高填方预制现浇组合式桩板墙防护结构的施工方法 |
CN105735345A (zh) * | 2016-04-01 | 2016-07-06 | 自贡市城市规划设计研究院有限责任公司 | 一种复合式支挡结构及其采用该支挡结构的施工方法 |
CN205894118U (zh) * | 2016-08-02 | 2017-01-18 | 中铁三局集团有限公司 | 一种桥墩防护结构 |
CN206157746U (zh) * | 2017-01-12 | 2017-05-10 | 西安中交公路岩土工程有限责任公司 | 碎石土边坡支护结构 |
CN106930319A (zh) * | 2017-05-03 | 2017-07-07 | 中冶沈勘工程技术有限公司 | 一种高边坡框架式挡土墙及其施工方法 |
CN206448284U (zh) * | 2016-12-30 | 2017-08-29 | 上海宏波工程咨询管理有限公司 | 适用于软土地基上的围堰结构 |
CN107100180A (zh) * | 2017-06-29 | 2017-08-29 | 湖南工业大学 | 超高轻型支挡结构及治理高填方、高边坡工程的方法 |
CN107724401A (zh) * | 2017-09-15 | 2018-02-23 | 浙江申诚环境工程有限公司 | 桥墩基坑的施工方法 |
KR20190004625A (ko) * | 2017-07-04 | 2019-01-14 | (주)지비건설 | 개량형 교량구조 |
CN109339065A (zh) * | 2018-12-11 | 2019-02-15 | 中国建筑局(集团)有限公司 | 一种深水裸露基岩密排桩支护施工承台的方法 |
CN208650073U (zh) * | 2018-08-06 | 2019-03-26 | 合肥市市政设计研究总院有限公司 | 明挖法水底隧道钢板桩围堰构造 |
-
2019
- 2019-06-04 CN CN201910479889.9A patent/CN110284432B/zh active Active
Patent Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09209364A (ja) * | 1996-02-06 | 1997-08-12 | Fujita Corp | 盛土の造成方法 |
CN1570291A (zh) * | 2004-04-23 | 2005-01-26 | 贵阳铝镁设计研究院 | 高填方区地基桩的制作方法 |
KR20130073577A (ko) * | 2011-12-23 | 2013-07-03 | 주식회사 이산 | 널말뚝식 복합 모듈러 교대 및 그의 시공 방법 |
CN102587385A (zh) * | 2011-12-30 | 2012-07-18 | 青建集团股份公司 | 一种换填淤泥质软土的基坑支护方法 |
JP2013159960A (ja) * | 2012-02-06 | 2013-08-19 | Takenaka Komuten Co Ltd | シートパイル引抜部充填方法 |
CN102797265A (zh) * | 2012-09-01 | 2012-11-28 | 中铁二院工程集团有限责任公司 | 顺层边坡桥梁敦台防护结构 |
CN202989942U (zh) * | 2012-12-18 | 2013-06-12 | 内蒙古电力勘测设计院 | 一种针对于软弱土或高回填土区围墙基础构造 |
CN103215950A (zh) * | 2013-05-06 | 2013-07-24 | 中国建筑第八工程局有限公司 | 回填区桩基接长施工方法 |
CN104328797A (zh) * | 2014-09-25 | 2015-02-04 | 陕西华山路桥工程有限公司 | 高边坡大曲线挡墙砌筑施工工法 |
CN105421485A (zh) * | 2015-10-30 | 2016-03-23 | 杭州江润科技有限公司 | 一种高填方预制现浇组合式桩板墙防护结构的施工方法 |
CN105735345A (zh) * | 2016-04-01 | 2016-07-06 | 自贡市城市规划设计研究院有限责任公司 | 一种复合式支挡结构及其采用该支挡结构的施工方法 |
CN205894118U (zh) * | 2016-08-02 | 2017-01-18 | 中铁三局集团有限公司 | 一种桥墩防护结构 |
CN206448284U (zh) * | 2016-12-30 | 2017-08-29 | 上海宏波工程咨询管理有限公司 | 适用于软土地基上的围堰结构 |
CN206157746U (zh) * | 2017-01-12 | 2017-05-10 | 西安中交公路岩土工程有限责任公司 | 碎石土边坡支护结构 |
CN106930319A (zh) * | 2017-05-03 | 2017-07-07 | 中冶沈勘工程技术有限公司 | 一种高边坡框架式挡土墙及其施工方法 |
CN107100180A (zh) * | 2017-06-29 | 2017-08-29 | 湖南工业大学 | 超高轻型支挡结构及治理高填方、高边坡工程的方法 |
KR20190004625A (ko) * | 2017-07-04 | 2019-01-14 | (주)지비건설 | 개량형 교량구조 |
CN107724401A (zh) * | 2017-09-15 | 2018-02-23 | 浙江申诚环境工程有限公司 | 桥墩基坑的施工方法 |
CN208650073U (zh) * | 2018-08-06 | 2019-03-26 | 合肥市市政设计研究总院有限公司 | 明挖法水底隧道钢板桩围堰构造 |
CN109339065A (zh) * | 2018-12-11 | 2019-02-15 | 中国建筑局(集团)有限公司 | 一种深水裸露基岩密排桩支护施工承台的方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111779014A (zh) * | 2020-06-30 | 2020-10-16 | 中铁二院工程集团有限责任公司 | 一种临河陡坡桥梁高承台围护结构及施工方法 |
CN111827097A (zh) * | 2020-07-06 | 2020-10-27 | 上海崇明水利工程有限公司 | 一种拼接式钢筋砼桥桥台结构 |
Also Published As
Publication number | Publication date |
---|---|
CN110284432B (zh) | 2021-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103485336B (zh) | 一种串珠式岩溶地区钻孔桩钻孔施工方法 | |
CN1837506B (zh) | 一种在运营中的隧道上方开挖箱形结构的施工方法 | |
CN104153389A (zh) | 预制装配式地铁车站施工方法 | |
CN102352590A (zh) | 采用桩板式挡墙进行高填方路基拼接的方法 | |
CN110055948A (zh) | 一种深大岩溶地基处理方法和装置 | |
CN110284432A (zh) | 一种高填方区先施后填桥台施工方法 | |
Wood | Tunnels for roads and motorways | |
CN110847207A (zh) | 地铁隧道穿越既有桥桩新建桥梁的构造及施工方法 | |
JP5843413B1 (ja) | 既設トンネルの盤下げ工法 | |
CN109024572A (zh) | 一种旋挖桩施工方法 | |
CN105421488B (zh) | 地下复合围护体系中基础底板换撑的施工方法 | |
CN110344439A (zh) | 一种后置式挡土墙泄水孔的施工方法 | |
CN113818430B (zh) | 一种富水层淤泥地质水泥搅拌桩施工方法 | |
CN103790148A (zh) | 一种湿陷性黄土地基的联合处理施工方法 | |
CN114411745A (zh) | 钢管桩桩端后注浆装置及其施工方法 | |
CN109629590A (zh) | 岩石地区建筑桩基承台的施工方法 | |
CN113266003A (zh) | 一种深厚垃圾杂填土的复合地基及其施工工艺、设备 | |
CN110144903A (zh) | 一种基坑支护遇防空洞的施工工法 | |
CN110804961A (zh) | 一种实腹式石拱桥加固方法及加固结构 | |
Littlechild et al. | Shaft grouting of deep foundations in Hong Kong | |
CN113882353B (zh) | 一种极限赛道复杂地质下多桩型转换处置结构及其工法 | |
CN216839456U (zh) | 钢管桩桩端后注浆装置 | |
Welsh et al. | Advances in grouting technology | |
Lim et al. | Construction of the linkway underneath the existing Outram Park Station | |
CN113944182B (zh) | 一种高级极限赛道复杂地质条件下加固处理施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |