CN110284432A - 一种高填方区先施后填桥台施工方法 - Google Patents

一种高填方区先施后填桥台施工方法 Download PDF

Info

Publication number
CN110284432A
CN110284432A CN201910479889.9A CN201910479889A CN110284432A CN 110284432 A CN110284432 A CN 110284432A CN 201910479889 A CN201910479889 A CN 201910479889A CN 110284432 A CN110284432 A CN 110284432A
Authority
CN
China
Prior art keywords
pile foundation
construction
barricade
abutment
rubble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910479889.9A
Other languages
English (en)
Other versions
CN110284432B (zh
Inventor
李玲玉
陈松洲
李志文
黄灿
吕金明
张立爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Original Assignee
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Cross-Channel Bridge South Engineering Co Ltd, Road and Bridge International Co Ltd filed Critical Middle Cross-Channel Bridge South Engineering Co Ltd
Priority to CN201910479889.9A priority Critical patent/CN110284432B/zh
Publication of CN110284432A publication Critical patent/CN110284432A/zh
Application granted granted Critical
Publication of CN110284432B publication Critical patent/CN110284432B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明提供一种高填方区先施后填桥台施工方法,首先施工桩基原地面以下部分;然后采用露天桩基作业施工桩基地面以上部分;桩基施工完成后,在桩基外围分层浇筑钢筋混凝土挡墙,每层挡墙浇筑完成后,在挡墙与桩间采用碎石分层填筑,每层碎石使用小型打夯机夯实,然后再施工一层挡墙,再回填碎石,依次循环,直至设计标高;在已施工的挡墙、填筑碎石及桩基顶上施工承台及桥台台身。本发明能大幅提高桥台施工进度,保证桥梁整体工期。工程后期在挡墙外侧填方区逐步回填石渣至设计标高,以保证填方区质量。

Description

一种高填方区先施后填桥台施工方法
技术领域
本发明属于桥梁施工技术领域,涉及桥梁桥台的施工方法,具体涉及一种桥台位于高填方区的先施后填桥台施工方法。
背景技术
在山区修建桥梁时,部分桥台设计在高填方区,填方高度高,填方面积大,需方量多。传统的桥台施工方法是先填筑到设计标高后,再采用冲击钻冲孔施工桩基,在桩基顶施工承台及桥台台身。上述方法的施工进度依赖于填方进度。实际施工中,为保护环境,一般是采用同一工程项目的隧道开挖施工或路基挖方弃渣进行填筑,受填方材料来源限制,施工过程中经常需要等待填方材料,要达到满足钻孔施工的填筑高度,一般需要较长时间,对工期要求紧的项目,采用上述方法会导致施工周期长,严重影响整体项目工程进度。
发明内容
本发明的目的在于针对现有的先填后筑桥台施工方法存在的工期长、效率低问题,提供一种先施后填的桥台施工方法,在施工质量满足规范要求的前提下,缩短桥台的施工周期,并且为今后同类工程建设施工提供借鉴。
本发明的技术方案如下:
一种高填方区先施后填桥台施工方法,其特征在于包括以下步骤:
(1)地面以下桩基施工:在高填方桥台施工区,首先对原地面进行清表作业,测设桩基位置,安放冲击钻进行冲孔作业,施工桩基地面以下部分;
(2)地面以上桩基施工:待原地面以下的桩基施工完进行后,再破除桩头,绑扎原地面以上桩基钢筋,安装桩基模板,进行露天桩基作业,直至桩基标高达到设计要求;
(3)施工防护结构及填筑桩间碎石:在桩基外围距离承台投影边缘1m的距离浇筑钢筋混凝土挡墙,挡墙分层浇筑,每次砌筑高度为2m;每层挡墙浇筑完成后,在挡墙与桩间采用碎石分层填筑,每层填筑厚度为30cm,使用小型打夯机夯实,压实度≥93%;然后再施工高度为2m挡墙,再回填碎石,依次循环,直至设计标高;
(4)施工桥台:在已施工的挡墙、填筑碎石及桩基顶上施工承台及桥台台身;
(5)工程后期在挡墙外侧填方区逐步回填石渣至设计标高。
本发明在桩基施工方面,桩基地下部分和地上部分分开施工,地上部分采用露天桩基施工工艺,不依赖于填筑基础,桩基施工快;在填筑方面,先在桩基周围采用混凝土防护结构,在防护结构和桩基之间填筑碎石并夯实,大大减少了填方量,可大幅缩短桥台施工工期,以保证桥梁上部结构施工进度。后期再对防护结构外围逐步回填,施工工艺简单,施工质量能满足要求。
附图说明
图1是本发明的桥台施工区立面图;
图2是图1中的A-A截面图。
具体实施方式
以下通过一个具体实施例对本发明的实现方法进行说明。
本实施例中,桥台位于高填方区,填方区的石渣来源于隧道出渣。由于隧道每天出渣量少,若将整体填方区填筑到设计高度,需要很长时间。为了不影响本项目桥梁工期,决定采用先施工桥台,后期再将石渣弃在桥台周围的施工方法,具体实施方式如下:
(1)本实施例中,桥台桩基有6根,首先采用普通钻孔桩施工方法施工6根桩基地面以下部分。首先在高填方桥台施工区,对原地面1进行清表作业,测设6根桩基2的位置,采用冲击钻进行冲孔作业,施工桩基2地面以下部分。
(2)然后采用露天桩基施工方法施工桩基地面以上部分。在桩基2地面以下的部分施工完进行后,再破除桩头,绑扎原地面以上桩基钢筋,安装桩基模板,进行露天桩基作业,直至桩基标高达到设计要求;
(3)施工防护结构及填筑桩间碎石:在桩基2外围距离承台3投影边缘1m的距离浇筑钢筋混凝土挡墙4,挡墙4分层浇筑,每次砌筑高度为2m;每层挡墙浇筑完成后,在挡墙与桩间采用碎石5分层填筑,每层填筑厚度为30cm,使用小型打夯机夯实,压实度≥93%;然后再施工高度为2m挡墙,再回填碎石,依次循环,直至设计标高;
(4)施工桥台:在已施工的挡墙4、填筑碎石5及桩基2顶上施工承台3及桥台台身6。
(5)桥台施工完成后,进行桥梁上部结构施工。后期将隧道施工石渣弃在挡墙外侧填方区进行回填,至设计填方标高。
本发明的挡墙厚度根据承受的侧压进行设计,在本实施例中,挡墙底部宽度设计为0.8m,顶部宽度0.5m。

Claims (2)

1.一种高填方区先施后填桥台施工方法,其特征在于包括以下步骤:
(1)地面以下桩基施工:在高填方桥台施工区,首先对原地面进行清表作业,测设桩基位置,安放冲击钻进行冲孔作业,施工桩基地面以下部分;
(2)地面以上桩基施工:待原地面以下的桩基施工完进行后,再破除桩头,绑扎原地面以上桩基钢筋,安装桩基模板,进行露天桩基作业,直至桩基标高达到设计要求;
(3)施工防护结构及填筑桩间碎石:在桩基外围距离承台投影边缘1m的距离浇筑钢筋混凝土挡墙,挡墙分层浇筑,每次砌筑高度为2m;每层挡墙浇筑完成后,在挡墙与桩间采用碎石分层填筑,每层填筑厚度为30cm,使用小型打夯机夯实,压实度≥93%;然后再施工高度为2m挡墙,再回填碎石,依次循环,直至设计标高;
(4)施工桥台:在已施工的挡墙、填筑碎石及桩基顶上施工承台及桥台台身;
(5)工程后期在挡墙外侧填方区逐步回填石渣至设计标高。
2.根据权利要求1所述的高填方区先施后填桥台施工方法,其特征在于:所述挡墙底部宽度0.8m,顶部宽度0.5m。
CN201910479889.9A 2019-06-04 2019-06-04 一种高填方区先施后填桥台施工方法 Active CN110284432B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910479889.9A CN110284432B (zh) 2019-06-04 2019-06-04 一种高填方区先施后填桥台施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910479889.9A CN110284432B (zh) 2019-06-04 2019-06-04 一种高填方区先施后填桥台施工方法

Publications (2)

Publication Number Publication Date
CN110284432A true CN110284432A (zh) 2019-09-27
CN110284432B CN110284432B (zh) 2021-06-08

Family

ID=68003250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910479889.9A Active CN110284432B (zh) 2019-06-04 2019-06-04 一种高填方区先施后填桥台施工方法

Country Status (1)

Country Link
CN (1) CN110284432B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779014A (zh) * 2020-06-30 2020-10-16 中铁二院工程集团有限责任公司 一种临河陡坡桥梁高承台围护结构及施工方法
CN111827097A (zh) * 2020-07-06 2020-10-27 上海崇明水利工程有限公司 一种拼接式钢筋砼桥桥台结构

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09209364A (ja) * 1996-02-06 1997-08-12 Fujita Corp 盛土の造成方法
CN1570291A (zh) * 2004-04-23 2005-01-26 贵阳铝镁设计研究院 高填方区地基桩的制作方法
CN102587385A (zh) * 2011-12-30 2012-07-18 青建集团股份公司 一种换填淤泥质软土的基坑支护方法
CN102797265A (zh) * 2012-09-01 2012-11-28 中铁二院工程集团有限责任公司 顺层边坡桥梁敦台防护结构
CN202989942U (zh) * 2012-12-18 2013-06-12 内蒙古电力勘测设计院 一种针对于软弱土或高回填土区围墙基础构造
KR20130073577A (ko) * 2011-12-23 2013-07-03 주식회사 이산 널말뚝식 복합 모듈러 교대 및 그의 시공 방법
CN103215950A (zh) * 2013-05-06 2013-07-24 中国建筑第八工程局有限公司 回填区桩基接长施工方法
JP2013159960A (ja) * 2012-02-06 2013-08-19 Takenaka Komuten Co Ltd シートパイル引抜部充填方法
CN104328797A (zh) * 2014-09-25 2015-02-04 陕西华山路桥工程有限公司 高边坡大曲线挡墙砌筑施工工法
CN105421485A (zh) * 2015-10-30 2016-03-23 杭州江润科技有限公司 一种高填方预制现浇组合式桩板墙防护结构的施工方法
CN105735345A (zh) * 2016-04-01 2016-07-06 自贡市城市规划设计研究院有限责任公司 一种复合式支挡结构及其采用该支挡结构的施工方法
CN205894118U (zh) * 2016-08-02 2017-01-18 中铁三局集团有限公司 一种桥墩防护结构
CN206157746U (zh) * 2017-01-12 2017-05-10 西安中交公路岩土工程有限责任公司 碎石土边坡支护结构
CN106930319A (zh) * 2017-05-03 2017-07-07 中冶沈勘工程技术有限公司 一种高边坡框架式挡土墙及其施工方法
CN206448284U (zh) * 2016-12-30 2017-08-29 上海宏波工程咨询管理有限公司 适用于软土地基上的围堰结构
CN107100180A (zh) * 2017-06-29 2017-08-29 湖南工业大学 超高轻型支挡结构及治理高填方、高边坡工程的方法
CN107724401A (zh) * 2017-09-15 2018-02-23 浙江申诚环境工程有限公司 桥墩基坑的施工方法
KR20190004625A (ko) * 2017-07-04 2019-01-14 (주)지비건설 개량형 교량구조
CN109339065A (zh) * 2018-12-11 2019-02-15 中国建筑局(集团)有限公司 一种深水裸露基岩密排桩支护施工承台的方法
CN208650073U (zh) * 2018-08-06 2019-03-26 合肥市市政设计研究总院有限公司 明挖法水底隧道钢板桩围堰构造

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09209364A (ja) * 1996-02-06 1997-08-12 Fujita Corp 盛土の造成方法
CN1570291A (zh) * 2004-04-23 2005-01-26 贵阳铝镁设计研究院 高填方区地基桩的制作方法
KR20130073577A (ko) * 2011-12-23 2013-07-03 주식회사 이산 널말뚝식 복합 모듈러 교대 및 그의 시공 방법
CN102587385A (zh) * 2011-12-30 2012-07-18 青建集团股份公司 一种换填淤泥质软土的基坑支护方法
JP2013159960A (ja) * 2012-02-06 2013-08-19 Takenaka Komuten Co Ltd シートパイル引抜部充填方法
CN102797265A (zh) * 2012-09-01 2012-11-28 中铁二院工程集团有限责任公司 顺层边坡桥梁敦台防护结构
CN202989942U (zh) * 2012-12-18 2013-06-12 内蒙古电力勘测设计院 一种针对于软弱土或高回填土区围墙基础构造
CN103215950A (zh) * 2013-05-06 2013-07-24 中国建筑第八工程局有限公司 回填区桩基接长施工方法
CN104328797A (zh) * 2014-09-25 2015-02-04 陕西华山路桥工程有限公司 高边坡大曲线挡墙砌筑施工工法
CN105421485A (zh) * 2015-10-30 2016-03-23 杭州江润科技有限公司 一种高填方预制现浇组合式桩板墙防护结构的施工方法
CN105735345A (zh) * 2016-04-01 2016-07-06 自贡市城市规划设计研究院有限责任公司 一种复合式支挡结构及其采用该支挡结构的施工方法
CN205894118U (zh) * 2016-08-02 2017-01-18 中铁三局集团有限公司 一种桥墩防护结构
CN206448284U (zh) * 2016-12-30 2017-08-29 上海宏波工程咨询管理有限公司 适用于软土地基上的围堰结构
CN206157746U (zh) * 2017-01-12 2017-05-10 西安中交公路岩土工程有限责任公司 碎石土边坡支护结构
CN106930319A (zh) * 2017-05-03 2017-07-07 中冶沈勘工程技术有限公司 一种高边坡框架式挡土墙及其施工方法
CN107100180A (zh) * 2017-06-29 2017-08-29 湖南工业大学 超高轻型支挡结构及治理高填方、高边坡工程的方法
KR20190004625A (ko) * 2017-07-04 2019-01-14 (주)지비건설 개량형 교량구조
CN107724401A (zh) * 2017-09-15 2018-02-23 浙江申诚环境工程有限公司 桥墩基坑的施工方法
CN208650073U (zh) * 2018-08-06 2019-03-26 合肥市市政设计研究总院有限公司 明挖法水底隧道钢板桩围堰构造
CN109339065A (zh) * 2018-12-11 2019-02-15 中国建筑局(集团)有限公司 一种深水裸露基岩密排桩支护施工承台的方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779014A (zh) * 2020-06-30 2020-10-16 中铁二院工程集团有限责任公司 一种临河陡坡桥梁高承台围护结构及施工方法
CN111827097A (zh) * 2020-07-06 2020-10-27 上海崇明水利工程有限公司 一种拼接式钢筋砼桥桥台结构

Also Published As

Publication number Publication date
CN110284432B (zh) 2021-06-08

Similar Documents

Publication Publication Date Title
CN103485336B (zh) 一种串珠式岩溶地区钻孔桩钻孔施工方法
CN1837506B (zh) 一种在运营中的隧道上方开挖箱形结构的施工方法
CN104153389A (zh) 预制装配式地铁车站施工方法
CN102352590A (zh) 采用桩板式挡墙进行高填方路基拼接的方法
CN110055948A (zh) 一种深大岩溶地基处理方法和装置
CN110284432A (zh) 一种高填方区先施后填桥台施工方法
Wood Tunnels for roads and motorways
CN110847207A (zh) 地铁隧道穿越既有桥桩新建桥梁的构造及施工方法
JP5843413B1 (ja) 既設トンネルの盤下げ工法
CN109024572A (zh) 一种旋挖桩施工方法
CN105421488B (zh) 地下复合围护体系中基础底板换撑的施工方法
CN110344439A (zh) 一种后置式挡土墙泄水孔的施工方法
CN113818430B (zh) 一种富水层淤泥地质水泥搅拌桩施工方法
CN103790148A (zh) 一种湿陷性黄土地基的联合处理施工方法
CN114411745A (zh) 钢管桩桩端后注浆装置及其施工方法
CN109629590A (zh) 岩石地区建筑桩基承台的施工方法
CN113266003A (zh) 一种深厚垃圾杂填土的复合地基及其施工工艺、设备
CN110144903A (zh) 一种基坑支护遇防空洞的施工工法
CN110804961A (zh) 一种实腹式石拱桥加固方法及加固结构
Littlechild et al. Shaft grouting of deep foundations in Hong Kong
CN113882353B (zh) 一种极限赛道复杂地质下多桩型转换处置结构及其工法
CN216839456U (zh) 钢管桩桩端后注浆装置
Welsh et al. Advances in grouting technology
Lim et al. Construction of the linkway underneath the existing Outram Park Station
CN113944182B (zh) 一种高级极限赛道复杂地质条件下加固处理施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant