CN1570291A - 高填方区地基桩的制作方法 - Google Patents

高填方区地基桩的制作方法 Download PDF

Info

Publication number
CN1570291A
CN1570291A CN 200410022389 CN200410022389A CN1570291A CN 1570291 A CN1570291 A CN 1570291A CN 200410022389 CN200410022389 CN 200410022389 CN 200410022389 A CN200410022389 A CN 200410022389A CN 1570291 A CN1570291 A CN 1570291A
Authority
CN
China
Prior art keywords
stake
cup
backfill
pile
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410022389
Other languages
English (en)
Other versions
CN1320215C (zh
Inventor
张建飞
江朝洋
王绍华
郑莆
袁赤
段建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNB2004100223896A priority Critical patent/CN1320215C/zh
Publication of CN1570291A publication Critical patent/CN1570291A/zh
Application granted granted Critical
Publication of CN1320215C publication Critical patent/CN1320215C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种高填方区地基桩的制作方法,在回填土之前先在自然地表下挖出桩孔,并在桩孔中制作出钢筋混凝土底桩,同时在底桩的上端预先制作出一个插接杯口,并在插接杯口中预先插入上部连接桩的钢筋,然后按常规要求进行场地回填土,回填土完毕后,再在插接杯口上方的回填土中挖出桩孔,并将插接杯口中的泥渣清理干净,然后在插接杯口中以及回填土中挖好的桩孔中制作出钢筋混凝土连接桩,使连接桩与底桩连接为一个整体。本发明与现有技术相比,本发明具有施工容易、造价低、施工速度快、劳动量较少、安全性较高的优点,本发明特别适合于高填方区作为制作长深孔桩施工使用。

Description

高填方区地基桩的制作方法
技术领域:
本发明涉及一种高填方区地基桩的制作方法,属于土建工程技术领域。
背景技术:
目前,现有技术中广泛采用先在自然地表上回填土后,再挖出桩孔,然后再制作出钢筋混凝土地基桩的方法,这种制作地基桩的方法,对于在高填方地区将失去其速度快、造价低的优点,因为根据《建筑桩基技术规范JGJ94-94》3.4.7.1条“对于填土建筑场地,先填土并保证填土的密实度,等填土地面沉降基本稳定后成桩”,而沉降基本稳定是需要数月甚至一年的时间,会大大延误工期:又根据该规范6.2.13.2条“每日开工前必须检测井下的有毒有害气体,并应有足够的安全防护措施。桩孔开挖深度超过10m时,应有专门向井下送风的设备,风量不宜少于25L/S”,由此可知挖孔愈深造价愈高,实践表明,20m深桩孔单价是10m深桩孔单价的1.62倍。因此现有的地基桩的制作方法用于高填土区施工时,不仅存在着施工速度慢、造价高的缺点,而且还存在着劳动量大、施工困难、安全隐患多的缺点。
发明内容:
本发明的目的是:提供一种施工容易、造价低、施工速度快、劳动量较少、安全性较高的、并且适合于高填方区施工使用的高填方区地基桩的制作方法,以克服现有技术的不足。
本发明是这样实现的:在回填土之前先在自然地表下挖出桩孔,并在桩孔中制作出钢筋混凝土底桩,同时在底桩的上端预先制作出一个插接杯口,并在插接杯口中预先插入上部连接桩的钢筋,然后按常规要求进行场地回填土,回填土完毕后,再在插接杯口上方的回填土中挖出桩孔,并将插接杯口中的泥渣清理干净,然后在插接杯口中以及回填土中挖好的桩孔中制作出钢筋混凝土连接桩,使连接桩与底桩连接为一个整体。
在连接桩的上端还可再预制出插接杯口,并在插接杯口中预先插入上部连接桩的钢筋,然后再进行另一次回填土,回填土完毕后,再在插接杯口上方的回填土中挖出桩孔,并且在插接杯口中再制作出又一节钢筋混凝土连接桩。
在最上一节钢筋混凝土连接桩的上端设有与房柱连接的柱基承台;在插接杯口的混凝土初凝前将杯口内壁预先拉毛;在回填土前预先向杯口内填满便于挖出的砂子;为减少回填土的沉降,在回填土中挖桩孔时,最好过一个雨季的时间后再开挖桩孔。
由于采用了上述技术方案,本发明在回填土前即可开挖桩孔,并且无论需要制作多长的地基桩,其每次所需挖的桩孔都比较浅,从而大大减少了挖桩孔的工作量,并且使施工非常容易。因此,本发明与现有技术相比,本发明具有施工容易、造价低、施工速度快、劳动量较少、安全性较高的优点,本发明特别适合于高填方区作为制作长深孔桩施工使用。
附图说明:
附图1为本发明带有插接杯口桩的结构示意图;
附图2为本发明在高填方区施工时的示意图。
具体实施方式:
本发明的实施例:在进行人工回填土(7)之前,先在石灰岩(8)上的自然地表下的粘土(9)中挖出桩孔,并在桩孔中按常规制作工艺制作出钢筋混凝土底桩(1),同时在底桩(1)的上端预先制作出一个插接杯口(2),并在插接杯口(2)中预先插入上部连接桩的钢筋(3),然后按常规要求进行场地回填土,回填土按施工要求完毕后,再在插接杯口(2)的上方的回填土中挖出一个桩孔,并将插接杯口(2)中的泥渣清理干净,然后在插接杯口中以及挖好的桩孔中再按常规钢筋混凝土桩的制作工艺制作出钢筋混凝土连接桩(4),使连接桩(4)与底桩(1)连接为一个整体即成。
当需要制作25米或25米以上长度的地基桩时,可考虑制作2~3节以上的连接桩,即在连接桩的上端还可再预制出插接杯口,并在插接杯口中预先插入上部连接桩的钢筋,然后再进行另一次回填土,回填土完毕后,再在插接杯口上方的回填土中挖出桩孔,并且在插接杯口和挖出的桩孔中再制作出又一节钢筋混凝土连接桩,如此类推,即可制作出所需长度的地基桩。
在制作出最上一节钢筋混凝土连接桩时,可在其上端同时制作出能与房柱(6)连接的柱基承台(5);为了连接更加牢固,施工时,可在插接杯口(2)的混凝土初凝前将杯口内壁预先拉毛,这样有利于上下两根桩的浇注连接,并且在上下两桩的连接部位最好采用高一级标号的混凝土;为了减轻二次开挖时清扫插接杯口的工作量,在回填土前预先向插接杯口内填满便于挖出的砂子,其砂子中的含泥量最好小于5%,这样可以大大减轻二次开挖后清扫插接杯口内的工作量,其砂子被挖出后还可再利用;为减少回填土的沉降,在回填土中挖桩孔时,最好过一个雨季的时间(即1~3个月的时间)后再开挖桩孔。

Claims (6)

1、一种高填方区地基桩的制作方法,其特征在于:在回填土之前先在自然地表下挖出桩孔,并在桩孔中制作出钢筋混凝土底桩,同时在底桩的上端预先制作出一个插接杯口,并在插接杯口中预先插入上部连接桩的钢筋,然后按常规要求进行场地回填土,回填土完毕后,再在插接杯口上方的回填土中挖出桩孔,并将插接杯口中的泥渣清理干净,然后在插接杯口中以及回填土中挖好的桩孔中制作出钢筋混凝土连接桩,使连接桩与底桩连接为一个整体。
2、根据权利要求1所述的高填方区地基桩的制作方法,其特征在于:在连接桩的上端还可再预制出插接杯口,并在插接杯口中预先插入上部连接桩的钢筋,然后再进行另一次回填土,回填土完毕后,再在插接杯口上方的回填土中挖出桩孔,并且在插接杯口中再制作出又一节钢筋混凝土连接桩。
3、根据权利要求1或2所述的高填方区地基桩的制作方法,其特征在于:在最上一节钢筋混凝土连接桩的上端设有与房柱连接的柱基承台。
4、根据权利要求1或2所述的高填方区地基桩的制作方法,其特征在于:在插接杯口的混凝土初凝前将杯口内壁预先拉毛。
5、根据权利要求1或2所述的高填方区地基桩的制作方法,其特征在于:在回填土前预先向杯口内填满便于挖出的砂子。
6、根据权利要求1或2所述的高填方区地基桩的制作方法,其特征在于:为减少回填土的沉降,在回填土中挖桩孔时,最好过一个雨季的时间后再开挖桩孔。
CNB2004100223896A 2004-04-23 2004-04-23 高填方区地基桩的制作方法 Expired - Fee Related CN1320215C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100223896A CN1320215C (zh) 2004-04-23 2004-04-23 高填方区地基桩的制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100223896A CN1320215C (zh) 2004-04-23 2004-04-23 高填方区地基桩的制作方法

Publications (2)

Publication Number Publication Date
CN1570291A true CN1570291A (zh) 2005-01-26
CN1320215C CN1320215C (zh) 2007-06-06

Family

ID=34480080

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100223896A Expired - Fee Related CN1320215C (zh) 2004-04-23 2004-04-23 高填方区地基桩的制作方法

Country Status (1)

Country Link
CN (1) CN1320215C (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104697504A (zh) * 2015-03-19 2015-06-10 昌陆建筑工程集团有限公司 高填方土体分层沉降观测方法及装置
CN105735335A (zh) * 2015-12-31 2016-07-06 上海建工五建集团有限公司 基桩施工方法及基桩结构
CN110284432A (zh) * 2019-06-04 2019-09-27 中交路桥建设有限公司 一种高填方区先施后填桥台施工方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5230841B2 (zh) * 1974-05-24 1977-08-11
CN1066902A (zh) * 1992-06-13 1992-12-09 孔清华 高效干取土灌注桩成桩方法及装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104697504A (zh) * 2015-03-19 2015-06-10 昌陆建筑工程集团有限公司 高填方土体分层沉降观测方法及装置
CN104697504B (zh) * 2015-03-19 2017-02-01 昌陆建筑工程集团有限公司 高填方土体分层沉降观测方法及装置
CN105735335A (zh) * 2015-12-31 2016-07-06 上海建工五建集团有限公司 基桩施工方法及基桩结构
CN110284432A (zh) * 2019-06-04 2019-09-27 中交路桥建设有限公司 一种高填方区先施后填桥台施工方法

Also Published As

Publication number Publication date
CN1320215C (zh) 2007-06-06

Similar Documents

Publication Publication Date Title
CN103215960B (zh) 高聚物垂直支护体系注浆方法
CN102561402B (zh) 盖挖逆作单建式地下人防工程顶板与墙施工缝的处理方法
CN105714759B (zh) 城市渣土场防范液化崩溃的排渗和加固方法
CN105821889A (zh) 基于地下水位控制的黄土台塬滑坡综合治理方法
CN101078217A (zh) 一种砂石山地住宅基础的修整施工方法
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN104532853A (zh) 型钢水泥土桩+易破除锚杆+自动监测预警的深基坑支护方法及系统
CN102041814A (zh) 新型复合桩(地)基础及使用方法
CN101029490B (zh) 一种岩/土体边坡的防护与治理方法
CN204825867U (zh) 一种作为暗挖车库立柱的复合桩结构
CN204780975U (zh) 用于中压配电线路的四回路终端钢管杆掏挖锚桩复合基础
CN107476315A (zh) 一种针对紧邻型基坑的预制式构件及其施工方法
CN1320215C (zh) 高填方区地基桩的制作方法
CN103015430A (zh) 长螺旋压灌水泥土型钢桩基坑止水支护方法
CN201635765U (zh) 用于高速公路下伏采空区的投沙器
CN201158823Y (zh) 可回收式冲击钻钢管降水井
CN100564702C (zh) 一种稳定水量的矩形渗渠构筑方法
CN210151776U (zh) 一种衡重式挡土墙的结构
CN201268857Y (zh) 清土铲
CN201952776U (zh) 护岸结构
CN1058541C (zh) 人字型挡土墙施工方法
CN204780976U (zh) 用于中压配电线路的双回路终端钢管杆掏挖锚桩复合基础
CN110374139A (zh) 一种盖挖逆作施工的地下空间结构的施工方法
CN205329670U (zh) 软土地基的雨水促渗系统
CN201588210U (zh) 带有地源热泵pe管的灌注桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110722

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110722

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070606

Termination date: 20150423

EXPY Termination of patent right or utility model