CN201635765U - 用于高速公路下伏采空区的投沙器 - Google Patents

用于高速公路下伏采空区的投沙器 Download PDF

Info

Publication number
CN201635765U
CN201635765U CN2010201488594U CN201020148859U CN201635765U CN 201635765 U CN201635765 U CN 201635765U CN 2010201488594 U CN2010201488594 U CN 2010201488594U CN 201020148859 U CN201020148859 U CN 201020148859U CN 201635765 U CN201635765 U CN 201635765U
Authority
CN
China
Prior art keywords
pipe
throwing
grouting
sand
tremie pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201488594U
Other languages
English (en)
Inventor
黄俊文
肖均
全孝
高文宗
舒亮
Original Assignee
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN2010201488594U priority Critical patent/CN201635765U/zh
Application granted granted Critical
Publication of CN201635765U publication Critical patent/CN201635765U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种用于高速公路下伏采空区的投沙器,该投沙器包括下料管(1)、注浆管(2)及排气管(3),所述注浆管(2)与所述下料管(1)的连接端设置在距离下料管(1)进口10-15cm处,注浆管(2)与下料管(1)上端成45-90度夹角,所述下料管(1)进口连接有投沙漏斗(4),该投沙漏斗(4)为锥形,锥形上开口大小为0.2-0.5m2,所述出气管(3)设置在所述下料管(1)上。本实用新型结构简单、效果明显,能大大降低注浆投沙劳动轻强度的同时还提高了投沙效率。

Description

用于高速公路下伏采空区的投沙器
技术领域
本实用新型属于地质灾害整治领域,具体是针对风积沙地区高速公路下伏房柱式开采采空区治理采用水泥、粉煤灰、风积沙填充时使用的投沙器。
背景技术
采空区治理一般采用充填法,是以全部充填采空区支撑覆岩,以彻底消除隐患,常采用注浆充填、水力充填、干砌片石充填、浆砌片石充填和开挖回填法等,其中以注浆法应用最广泛、效果最好。
注浆充填是从地面钻孔至地下采空区或破碎岩体内实施注浆,通过浆液凝结后形成的结石来充填和加固采空区。该方法适用于不同的埋深且不具备洞内人工施工条件的采空区;
采空区注浆治理工程常采用水泥、粉煤灰、粘土、砂等材料进行充填加固,同时可掺入石屑或矿渣、碎石、卵石等具有一定强度的骨料。
注浆充填施工方法现有常用方法是先采用钻孔内投干料充填,后在钻孔内注浆的施工方法。
对于地处黄土高原向草原荒漠的过度地带,公路沿线存在大量廉价的风积沙。采空区注浆填充可考虑采用廉价的天然风积沙,不仅能大大节省充填料的购买和运输成本,同时还避免过多的砂石料开采,减少对环境的破坏和污染。
为此,需充分利用浆液的流动性将风积沙带入采空区,并完全充填满。但采用浆液与风积沙直接拌合,不仅大大增加了拌合的人工、机械设备费用,而且也无配套的注浆泵进行压注。
综上所述,需用解决在孔口注浆与投沙同时进行的技术问题。
实用新型内容
本实用新型的目的在于提供了一种注浆和投沙能同时进行的投沙器,充分利用注浆中浆液的流动性将风积沙带入采空区,在提高注浆投沙效率的同时还降低了劳动强度。
本实用新型的技术方案如下:
用于高速公路下伏采空区的投沙器,该投沙器包括下料管、注浆管及排气管,所述注浆管与所述下料管的连接端设置在距离下料管进口10-15cm处,注浆管与下料管上端成45-90度夹角,所述下料管进口连接有投沙漏斗,该投沙漏斗为锥形,锥形上开口大小为0.2-0.5m2,所述出气管设置在所述下料管上。
采用上述结构,将下料管周围原地面下挖,使投沙器投沙漏斗顶面基本与原地面齐平,方便装载机铲运送沙,注浆管接注浆泵,通过该注浆管往采空区注浆,同时通过投沙漏斗往下料管送沙,利用风积沙的自重下沙的同时充分利用浆液的流动性将风积沙带入,减少人工劳动强度,提高风积沙的注入含量。该结构使风积沙的投沙量占总注浆量的平均含量由30%提高到50%,日注浆投沙量也成倍的增长,取得了显著的经济社会效益。
在注浆孔内需结束注浆,加压封孔时。取下放料漏斗,旋上带压力表的堵头,进行压力注浆即可。
所述投沙漏斗为圆锥体形或正方体锥形,锥体直径或边长为50-70cm。
所述投沙漏斗与下料管进口通过丝扣连接。
有益效果:本实用新型结构简单、效果明显,能大大降低注浆投沙劳动轻强度的同时还提高了投沙效率。
附图说明
本实用新型将通过例子并参照附图的方式说明,其中:
图1为本实用新型的结构示意图。
具体实施方式
实施例:如图1所示:用于高速公路下伏采空区的投沙器,该投沙器包括下料管1、注浆管2及排气管3,所述注浆管2与所述下料管1的连接端设置在距离下料管1进口10-15cm处,注浆管2与下料管1上端成45-90度夹角,所述下料管1进口连接有投沙漏斗4,该投沙漏斗4为锥形,锥形上开口大小为0.2-0.5m2,所述排气管3设置在所述下料管1上。
所述投沙漏斗4为圆锥体形或正方体锥形,锥体直径或边长为50-70cm。
所述投沙漏斗4与下料管1进口通过丝扣连接。

Claims (3)

1.用于高速公路下伏采空区的投沙器,其特征在于:该投沙器包括下料管(1)、注浆管(2)及排气管(3),所述注浆管(2)与所述下料管(1)的连接端设置在距离下料管(1)进口10-15cm处,注浆管(2)与下料管(1)上端成45-90度夹角,所述下料管(1)进口连接有投沙漏斗(4),该投沙漏斗(4)为锥形,锥形上开口大小为0.2-0.5m2,所述出气管(3)设置在所述下料管(1)上。
2.根据权利要求1所述的用于高速公路下伏采空区的投沙器,其特征在于:所述投沙漏斗(4)为圆锥体形或正方体锥形,锥体直径或边长为50-70cm。
3.根据权利要求1所述的用于高速公路下伏采空区的投沙器,其特征在于:所述投沙漏斗(4)与下料管(1)进口通过丝扣连接。
CN2010201488594U 2010-04-02 2010-04-02 用于高速公路下伏采空区的投沙器 Expired - Lifetime CN201635765U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201488594U CN201635765U (zh) 2010-04-02 2010-04-02 用于高速公路下伏采空区的投沙器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201488594U CN201635765U (zh) 2010-04-02 2010-04-02 用于高速公路下伏采空区的投沙器

Publications (1)

Publication Number Publication Date
CN201635765U true CN201635765U (zh) 2010-11-17

Family

ID=43080254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201488594U Expired - Lifetime CN201635765U (zh) 2010-04-02 2010-04-02 用于高速公路下伏采空区的投沙器

Country Status (1)

Country Link
CN (1) CN201635765U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330567A (zh) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 公路采空区注浆处治方法
WO2015168972A1 (zh) * 2014-05-07 2015-11-12 中国矿业大学 西部沙漠化矿区浅埋煤层的风积沙空场充填方法
CN111535297A (zh) * 2020-05-19 2020-08-14 河北建设勘察研究院有限公司 一种填料注浆充填基岩层地下空洞的方法以及一种水力充填装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330567A (zh) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 公路采空区注浆处治方法
WO2015168972A1 (zh) * 2014-05-07 2015-11-12 中国矿业大学 西部沙漠化矿区浅埋煤层的风积沙空场充填方法
CN111535297A (zh) * 2020-05-19 2020-08-14 河北建设勘察研究院有限公司 一种填料注浆充填基岩层地下空洞的方法以及一种水力充填装置

Similar Documents

Publication Publication Date Title
CN102121395B (zh) 低渗透单一煤层瓦斯综合治理一体化的方法
CN104534167B (zh) 触变泥浆的减阻方法
CN104612134A (zh) 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN109208625B (zh) 一种地下桩基础溶洞加强加固种山施工方法
CN101806059B (zh) 高速公路下伏采空区地表钻孔注浆投沙工艺
CN104818707B (zh) 应用棉花秸秆固结和固化疏浚淤泥、新吹填土的方法
CN105174886A (zh) 一种适用于超长距离泵送的灰岩含水层注浆改造材料
CN102400694A (zh) 盾构隧道与矿山法隧道结合部的加固方法
CN102839650A (zh) 一种钻灌一体、自上而下、高压冲挤灌浆系统
CN205422773U (zh) 一种新型中空注浆锚杆
CN109538295A (zh) 密封矿区地下水库系统
CN108797621A (zh) 一种在富水深卵砾漂石地层超前预注浆的止水结构及其施工方法
CN103321228B (zh) 一种高水材料地裂缝充填系统及充填治理方法
CN207597376U (zh) 滩涂围垦吹填淤泥夹砂层地基加固结构
CN201635765U (zh) 用于高速公路下伏采空区的投沙器
CN111676987A (zh) 振冲浆夯法建筑肥槽回填施工方法
CN206204972U (zh) 一种兼作井点降水的预制管桩
CN104762957A (zh) 一种螺旋成孔夯扩cfg桩的施工方法
CN109577988A (zh) 一种金属矿山盲斜竖井井筒平行施工方法
CN202124863U (zh) 螺旋锚掏挖复合基础
CN208472716U (zh) 裂隙地质防漏浆钻孔灌注桩结构
CN203603155U (zh) 新型双液注浆端头混合装置
CN207485469U (zh) 一种轻型灵活的挡墙支护结构
CN203742622U (zh) 一种构建承载结构的防渗组件
CN104895078A (zh) 一种以端承受力为主的预制桩的施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160108

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address before: 610031 Ma Jia 10, Huayuan Road, Sichuan, Chengdu

Patentee before: China Railway Erju Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20101117