CN105421485A - 一种高填方预制现浇组合式桩板墙防护结构的施工方法 - Google Patents
一种高填方预制现浇组合式桩板墙防护结构的施工方法 Download PDFInfo
- Publication number
- CN105421485A CN105421485A CN201510721311.1A CN201510721311A CN105421485A CN 105421485 A CN105421485 A CN 105421485A CN 201510721311 A CN201510721311 A CN 201510721311A CN 105421485 A CN105421485 A CN 105421485A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- construction
- breast boards
- pile
- bent cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
- E02D29/0233—Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510721311.1A CN105421485B (zh) | 2015-10-30 | 2015-10-30 | 一种高填方预制现浇组合式桩板墙防护结构的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510721311.1A CN105421485B (zh) | 2015-10-30 | 2015-10-30 | 一种高填方预制现浇组合式桩板墙防护结构的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105421485A true CN105421485A (zh) | 2016-03-23 |
CN105421485B CN105421485B (zh) | 2017-05-10 |
Family
ID=55499996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510721311.1A Active CN105421485B (zh) | 2015-10-30 | 2015-10-30 | 一种高填方预制现浇组合式桩板墙防护结构的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421485B (zh) |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105993673A (zh) * | 2016-07-08 | 2016-10-12 | 三峡大学 | 一种垂直绿化桩板墙及其构建方法 |
CN106088106A (zh) * | 2016-08-11 | 2016-11-09 | 湖南卓工建材科技有限公司 | 一种预制装配式生态型挡土支护结构 |
CN106192884A (zh) * | 2016-09-07 | 2016-12-07 | 蒋安美 | 一种水利工程挡土墙 |
CN106638675A (zh) * | 2017-01-11 | 2017-05-10 | 重庆建工住宅建设有限公司 | 一种逆作型钢及竹夹板挡土施工方法 |
CN106836244A (zh) * | 2017-01-17 | 2017-06-13 | 浙江工业大学 | 一种抗滑桩与格宾高挡墙联合防护陡坡路基的方法 |
CN107059915A (zh) * | 2017-01-20 | 2017-08-18 | 中铁二院工程集团有限责任公司 | 一种适用于填方地段直立收坡的轻型支挡构造 |
CN108103867A (zh) * | 2018-01-02 | 2018-06-01 | 兰州理工大学 | 一种带有道路系统的棚洞式抗滑结构及施工方法 |
CN108589769A (zh) * | 2018-05-07 | 2018-09-28 | 安徽省公路桥梁工程有限公司 | 一种超长嵌岩t形组合式柱板高挡墙施工方法 |
CN108842812A (zh) * | 2018-05-28 | 2018-11-20 | 中建八局第三建设有限公司 | 一种手凿肌理挡土墙施工方法 |
CN109371987A (zh) * | 2018-10-17 | 2019-02-22 | 中建六局安装工程有限公司 | 一种回填土层中预应力锚索抗滑桩支护综合施工方法 |
CN109750568A (zh) * | 2019-03-12 | 2019-05-14 | 中国电建集团中南勘测设计研究院有限公司 | 一种具有桩基盖梁的路基结构及其施工方法 |
CN110284432A (zh) * | 2019-06-04 | 2019-09-27 | 中交路桥建设有限公司 | 一种高填方区先施后填桥台施工方法 |
CN111997069A (zh) * | 2020-09-07 | 2020-11-27 | 哈尔滨工业大学 | 一种装配式预制挡板圆桩桩板墙及其施工方法 |
CN112031002A (zh) * | 2020-09-08 | 2020-12-04 | 浙江世润建创科技发展有限公司 | 桩承式生态护坡及施工方法 |
CN113308956A (zh) * | 2021-05-17 | 2021-08-27 | 浙大城市学院 | 桩承式锚杆泡沫混凝土路堤结构的施工方法 |
CN113308955A (zh) * | 2021-05-17 | 2021-08-27 | 浙大城市学院 | 现浇混凝土全防护泡沫轻质土拼宽路堤的施工方法 |
CN113356243A (zh) * | 2021-07-02 | 2021-09-07 | 西安建筑科技大学 | 用于冻土地区的边坡支护锚固施工方法 |
CN113737775A (zh) * | 2021-08-23 | 2021-12-03 | 中咨华科交通建设技术有限公司 | 装配式生态板桩墙及其施工方法 |
CN114000388A (zh) * | 2021-11-18 | 2022-02-01 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | 一种多年冻土区防边坡溜坍路基结构 |
CN114263211A (zh) * | 2021-12-30 | 2022-04-01 | 王开明 | 一种挡土墙及其构建方法 |
CN114592537A (zh) * | 2022-03-22 | 2022-06-07 | 中国电建集团昆明勘测设计研究院有限公司 | 一种适用于填方边坡的桩板挡墙结构及施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0336327A (en) * | 1989-07-01 | 1991-02-18 | Tokyu Constr Co Ltd | Block for stone pile protecting wall |
US6048138A (en) * | 1998-10-05 | 2000-04-11 | The Reinforced Earth Company | Concealed crash wall in combination with mechanically stabilized earth construction |
JP2003328374A (ja) * | 2002-05-10 | 2003-11-19 | Showa Concrete Ind Co Ltd | 擁壁構造物 |
KR20060110162A (ko) * | 2005-04-19 | 2006-10-24 | 황익현 | 조립식 수직벽 구조 및 그 시공방법 |
CN101298780A (zh) * | 2008-06-23 | 2008-11-05 | 云南省公路规划勘察设计院 | 一种高轻型锚索桩板墙及其施工方法 |
KR20090066562A (ko) * | 2007-12-20 | 2009-06-24 | 재단법인 포항산업과학연구원 | 수직 프리스트레싱 프리캐스트 옹벽 및 그 시공 방법 |
CN104389320A (zh) * | 2014-11-17 | 2015-03-04 | 杭州江润科技有限公司 | 桩基础锚索预应力高挡墙施工方法 |
-
2015
- 2015-10-30 CN CN201510721311.1A patent/CN105421485B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0336327A (en) * | 1989-07-01 | 1991-02-18 | Tokyu Constr Co Ltd | Block for stone pile protecting wall |
US6048138A (en) * | 1998-10-05 | 2000-04-11 | The Reinforced Earth Company | Concealed crash wall in combination with mechanically stabilized earth construction |
JP2003328374A (ja) * | 2002-05-10 | 2003-11-19 | Showa Concrete Ind Co Ltd | 擁壁構造物 |
KR20060110162A (ko) * | 2005-04-19 | 2006-10-24 | 황익현 | 조립식 수직벽 구조 및 그 시공방법 |
KR20090066562A (ko) * | 2007-12-20 | 2009-06-24 | 재단법인 포항산업과학연구원 | 수직 프리스트레싱 프리캐스트 옹벽 및 그 시공 방법 |
CN101298780A (zh) * | 2008-06-23 | 2008-11-05 | 云南省公路规划勘察设计院 | 一种高轻型锚索桩板墙及其施工方法 |
CN104389320A (zh) * | 2014-11-17 | 2015-03-04 | 杭州江润科技有限公司 | 桩基础锚索预应力高挡墙施工方法 |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105993673A (zh) * | 2016-07-08 | 2016-10-12 | 三峡大学 | 一种垂直绿化桩板墙及其构建方法 |
CN106088106A (zh) * | 2016-08-11 | 2016-11-09 | 湖南卓工建材科技有限公司 | 一种预制装配式生态型挡土支护结构 |
CN106192884A (zh) * | 2016-09-07 | 2016-12-07 | 蒋安美 | 一种水利工程挡土墙 |
CN106638675A (zh) * | 2017-01-11 | 2017-05-10 | 重庆建工住宅建设有限公司 | 一种逆作型钢及竹夹板挡土施工方法 |
CN106836244A (zh) * | 2017-01-17 | 2017-06-13 | 浙江工业大学 | 一种抗滑桩与格宾高挡墙联合防护陡坡路基的方法 |
CN107059915A (zh) * | 2017-01-20 | 2017-08-18 | 中铁二院工程集团有限责任公司 | 一种适用于填方地段直立收坡的轻型支挡构造 |
CN108103867A (zh) * | 2018-01-02 | 2018-06-01 | 兰州理工大学 | 一种带有道路系统的棚洞式抗滑结构及施工方法 |
CN108589769A (zh) * | 2018-05-07 | 2018-09-28 | 安徽省公路桥梁工程有限公司 | 一种超长嵌岩t形组合式柱板高挡墙施工方法 |
CN108842812A (zh) * | 2018-05-28 | 2018-11-20 | 中建八局第三建设有限公司 | 一种手凿肌理挡土墙施工方法 |
CN109371987A (zh) * | 2018-10-17 | 2019-02-22 | 中建六局安装工程有限公司 | 一种回填土层中预应力锚索抗滑桩支护综合施工方法 |
CN109750568A (zh) * | 2019-03-12 | 2019-05-14 | 中国电建集团中南勘测设计研究院有限公司 | 一种具有桩基盖梁的路基结构及其施工方法 |
CN110284432A (zh) * | 2019-06-04 | 2019-09-27 | 中交路桥建设有限公司 | 一种高填方区先施后填桥台施工方法 |
CN111997069A (zh) * | 2020-09-07 | 2020-11-27 | 哈尔滨工业大学 | 一种装配式预制挡板圆桩桩板墙及其施工方法 |
CN112031002A (zh) * | 2020-09-08 | 2020-12-04 | 浙江世润建创科技发展有限公司 | 桩承式生态护坡及施工方法 |
CN113308956A (zh) * | 2021-05-17 | 2021-08-27 | 浙大城市学院 | 桩承式锚杆泡沫混凝土路堤结构的施工方法 |
CN113308955A (zh) * | 2021-05-17 | 2021-08-27 | 浙大城市学院 | 现浇混凝土全防护泡沫轻质土拼宽路堤的施工方法 |
CN113356243A (zh) * | 2021-07-02 | 2021-09-07 | 西安建筑科技大学 | 用于冻土地区的边坡支护锚固施工方法 |
CN113737775A (zh) * | 2021-08-23 | 2021-12-03 | 中咨华科交通建设技术有限公司 | 装配式生态板桩墙及其施工方法 |
CN113737775B (zh) * | 2021-08-23 | 2022-08-12 | 中咨华科交通建设技术有限公司 | 装配式生态板桩墙及其施工方法 |
CN114000388A (zh) * | 2021-11-18 | 2022-02-01 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | 一种多年冻土区防边坡溜坍路基结构 |
CN114263211A (zh) * | 2021-12-30 | 2022-04-01 | 王开明 | 一种挡土墙及其构建方法 |
CN114592537A (zh) * | 2022-03-22 | 2022-06-07 | 中国电建集团昆明勘测设计研究院有限公司 | 一种适用于填方边坡的桩板挡墙结构及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105421485B (zh) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421485B (zh) | 一种高填方预制现浇组合式桩板墙防护结构的施工方法 | |
CN205116217U (zh) | 一种高填方预制现浇组合式桩板墙防护结构 | |
CN109026064B (zh) | 一种大跨度连拱隧道半明半暗的施工方法 | |
CN109750571B (zh) | 一种道路塌方应急与永久支挡一体化结构及施工方法 | |
CN108343071A (zh) | 一种钢板桩组合灌注桩的基坑支护结构及施工方法 | |
CN203729324U (zh) | 一种锚杆格构式挡墙结构 | |
CN205387720U (zh) | 超高路堤的双排圆桩桩基三级轻型支挡结构 | |
CN113308953A (zh) | 利用既有挡墙的泡沫混凝土拼宽路堤的施工方法 | |
CN111706366A (zh) | 一种穿越大型全充填溶洞的隧道衬砌结构及施工方法 | |
CN111254772A (zh) | 一种适用于悬崖峭壁路段老路扩宽的大悬挑结构及施工方法 | |
CN101838957B (zh) | 整体式t形外悬臂道路及其施工方法 | |
CN113308955B (zh) | 现浇混凝土全防护泡沫轻质土拼宽路堤的施工方法 | |
CN103835310A (zh) | 一种框格式重力挡土墙 | |
CN105821902B (zh) | 竖直格构式轻型钢筋混凝土生态挡墙施工方法 | |
CN104358273A (zh) | 一种现浇预制组合式挡土墙结构的施工方法 | |
CN204551521U (zh) | 一种抗滑桩桩间板墙的现浇施工结构 | |
CN211922133U (zh) | 一种适用于悬崖峭壁路段老路扩宽的大悬挑结构 | |
CN211772495U (zh) | 一种修建于高陡山坡上的轻型路堤结构 | |
CN208632891U (zh) | 一种轻质砌块生态防护结构 | |
CN105464128A (zh) | 预应力锚索装配式桩板墙防护施工方法 | |
CN111441820A (zh) | 深埋中心水沟与泄水洞组合的隧道排水结构及施工方法 | |
CN111705576A (zh) | 一种采用高密度eps填料的陡坡高填路基结构 | |
CN111304988A (zh) | 一种修建于高陡山坡上的轻型路堤结构与施工方法 | |
CN212534162U (zh) | 微型群桩边坡加固结构 | |
CN215330015U (zh) | 一种装配式隧道洞门结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Song Fabao Inventor after: Cheng Guohong Inventor after: Zhao Dehui Inventor after: Ji Wenjin Inventor after: Lai Zhile Inventor after: Gu Chaoren Inventor after: Jia Lingjie Inventor after: Li Yimiao Inventor before: Wang Xinquan |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170207 Address after: 310006 Jiande Road, Zhejiang, Hangzhou No. 8 Applicant after: Hangzhou Institute of Communications Planning and Design & Research Address before: 310015 Hangzhou, Gongshu District Wanda Commercial Center, building 3, room 3, unit 1901, room Applicant before: Hangzhou Jiang Run Science and Technology Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |