CN109931082A - 盾构机过中间风井后负环管片的无损拆除方法 - Google Patents

盾构机过中间风井后负环管片的无损拆除方法 Download PDF

Info

Publication number
CN109931082A
CN109931082A CN201910318149.7A CN201910318149A CN109931082A CN 109931082 A CN109931082 A CN 109931082A CN 201910318149 A CN201910318149 A CN 201910318149A CN 109931082 A CN109931082 A CN 109931082A
Authority
CN
China
Prior art keywords
jurisdiction
endless tube
section
dismounting
tube piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910318149.7A
Other languages
English (en)
Inventor
赵军磊
张帆
许�鹏
殷爱国
刘豹
宋娟娟
张小水
毛三华
陈记忠
廖家全
沈光磊
李衡
承元涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Seventh Group Co Ltd
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
China Railway Seventh Group Co Ltd
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Seventh Group Co Ltd, Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical China Railway Seventh Group Co Ltd
Priority to CN201910318149.7A priority Critical patent/CN109931082A/zh
Publication of CN109931082A publication Critical patent/CN109931082A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种盾构机过中间风井后负环管片的无损拆除方法,包括以下具体步骤:第一步,运送管片的管片车和作业平台就位,用螺栓将第1环的顶部管片和专用拆除吊具连在一起,然后分别拆除顶部管片与相邻管片之间的连接螺栓;启动专用拆除吊具将顶管片吊放至管片车上;第二步,重复第一步,依次将第1环负环管片的其余管片拆除并叠放在管片车,管片车将第1环的负环管片运出;第三步,重复第一步和第二步,依次拆除其余环的负环管片。本发明只需2~3个工人配合即可将负环管片拆除,节约人力;同时,工人只需辅助将将管片与吊环组件连在一起或将管片从吊环组件上拆除,工作量少,拆除效率高,拆卸下来的管片叠放在管片车上,降低了破损率。

Description

盾构机过中间风井后负环管片的无损拆除方法
技术领域
本发明涉及城市轨道工程,尤其是涉及一种盾构机过中间风井后负环管片的无损拆除方法。
背景技术
随着国内地铁建设的大规模开展,盾构法隧道施工技术由于具有安全、快捷、适应性广等优点而被广泛用于地铁隧道施工中。当盾构区间较长时,隧道内会设置具有通风集水功能的中间风井,盾构施工中,盾构机掘进到此处时,不能采用常规的掘进方式通过,通常采用空推法推过风井处隧道,即在盾构始发时,在盾构机的反力架与盾构千斤顶之间安装负环管片(即临时管片),为盾构机提供掘进向前推进的作用力,当盾构机的盾尾通过中间风井后则需要拆除负环管片。传统的拆除方法为人工拆除,在拆除过程中至少需要5~6个工人配合才能将管片一一拆除,劳动强度大、浪费人力,并且由于负环管片的外径与风井之间的间隙较小(一般小于1.0m),拆除空间小,增加了人工拆除的工作难度,拆除效率低且存在安全隐患,还可能造成管片损毁。
发明内容
本发明目的在于提供一种盾构机过中间风井后负环管片的无损拆除方法,不仅减少工人劳动强度,提高了拆除效率,还保证了负环管片拆除作业的安全性。
为实现上述目的,本发明采取下述技术方案:
本发明所述盾构机过中间风井后负环管片的无损拆除方法,包括以下具体步骤:
第一步,运送管片的管片车和作业平台就位,用螺栓将第1环的顶部管片和专用拆除吊具连在一起,然后分别拆除顶部管片与相邻管片之间的连接螺栓;启动专用拆除吊具将顶管片吊放至管片车上;
第二步,重复第一步操作,按照自上而下、左右对称的拆除顺序依次将第1环负环管片的其余管片拆除并叠放在管片车,管片车将第1环的负环管片运出;
第三步,重复第一步和第二步拆除步骤,依次拆除其余环的负环管片。
所述专用拆除吊具包括固连在风井中板上的轨道和滑动设置在所述轨道上的电动葫芦,在所述电动葫芦的吊钩上钩挂有由吊环和连接钢板构成吊环组件,所述连接钢板下部开设有安装孔。
所述轨道为工字钢。
与传统人工拆除方法相比,本发明优点在于只需2~3个工人配合即可完负环管片的拆除作业,节约人力;在拆除作业时,工人只需将管片与吊环组件连在一起或将管片从吊环组件上拆除,减少了工作量,劳动强度小,提高了拆除效率;同时由于工人无需抬吊管片,保证了工人的人身安全;电动葫芦自动起吊管片,拆卸下来的管片叠放在管片车上,降低了负环管片的破损率。
附图说明
图1是本发明的结构示意图。
图2是本发明吊环组件的结构示意图。
具体实施方式
下面结合具体实施方式对本发明作更进一步的说明。
如图1、图2所示,本发明提供了一种负环管片专用拆除吊具,包括固连在风井中板上的轨道1(轨道1为工字钢)和滑动设置在轨道1上的电动葫芦2,在电动葫芦2的吊钩3上钩挂有由吊环4和连接钢板5构成吊环组件,连接钢板5下部开设有安装孔6,用螺栓将管片与安装孔6连在一起即可将待拆除管片钩挂在电动葫芦2上,无需反复拆卸吊环4,提高了拆除效率。
本发明盾构机过中间风井后负环管片的无损拆除方法,在拆除时将作业平台7焊接在渣土车8上,将运送管片的管片车9上挂接在渣土车8上,方便作业,具体包括以下步骤:
第一步,拆除负环管片前,预先安装专用拆除吊具,具体为:风井施工中,在风井中板上预埋钢板,并在预埋钢板上焊接工字钢,最后将电动葫芦2安装在工字钢上,完成专用拆除吊具的安装作业;
第二步,管片车9和作业平台7就位(作业平台位于第1环下方,管片车位于第1环后方),用螺栓将第1环的顶部管片和专用拆除吊具的连接钢板5连在一起,然后分别拆除顶部管片与相邻管片之间的连接螺栓;启动渣土车将管片车9移动至第1环下方,具体如图1所示,然后启动电动葫芦2将顶部管片吊起脱离第1环负环管片后,电动葫芦2下降将顶部管片吊放至管片车9上(实际拆除作业时,也可以启动电动葫芦2沿工字钢1移动至管片车9上方,再将管片下放至管片车9上),人工拆卸顶部管片与连接钢板5之间的螺栓,启动电动葫芦2和渣土车7复位,完成第1环顶部管片的拆除作业;
第三步,重复第二步,按照自上而下、左右对称的拆除顺序依次将第1环负环管片的剩余管片拆除并叠放在管片车9上;待完全将第1环负环管片拆除后,启动渣土车将第1环的管片运出中间风井;
第四步,重复第二步和第三步,依次拆除其余环负环管片。

Claims (3)

1.一种盾构机过中间风井后负环管片的无损拆除方法,其特征在于:包括以下具体步骤:
第一步,运送管片的管片车和作业平台就位,用螺栓将第1环的顶部管片和专用拆除吊具连在一起,然后分别拆除顶部管片与相邻管片之间的连接螺栓;启动专用拆除吊具将顶管片吊放至管片车上;
第二步,重复第一步操作,按照自上而下、左右对称的拆除顺序依次将第1环负环管片的其余管片拆除并叠放在管片车,管片车将第1环的负环管片运出;
第三步,重复第一步和第二步拆除步骤,依次拆除其余环的负环管片。
2.根据权利要求1所述盾构机过中间风井后负环管片的无损拆除方法,其特征在于:所述专用拆除吊具包括固连在风井中板上的轨道和滑动设置在所述轨道上的电动葫芦,在所述电动葫芦的吊钩上钩挂有由吊环和连接钢板构成吊环组件,所述连接钢板下部开设有安装孔。
3.根据权利要求2所述盾构机过中间风井后负环管片的无损拆除方法,其特征在于:所述轨道为工字钢。
CN201910318149.7A 2019-04-19 2019-04-19 盾构机过中间风井后负环管片的无损拆除方法 Pending CN109931082A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910318149.7A CN109931082A (zh) 2019-04-19 2019-04-19 盾构机过中间风井后负环管片的无损拆除方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910318149.7A CN109931082A (zh) 2019-04-19 2019-04-19 盾构机过中间风井后负环管片的无损拆除方法

Publications (1)

Publication Number Publication Date
CN109931082A true CN109931082A (zh) 2019-06-25

Family

ID=66990454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910318149.7A Pending CN109931082A (zh) 2019-04-19 2019-04-19 盾构机过中间风井后负环管片的无损拆除方法

Country Status (1)

Country Link
CN (1) CN109931082A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318777A (zh) * 2019-07-16 2019-10-11 中国葛洲坝集团基础工程有限公司 盾构负环管片拆运方法
CN110552725A (zh) * 2019-09-12 2019-12-10 中铁十二局集团有限公司 盾构管片运输养护车
CN111350523A (zh) * 2020-03-27 2020-06-30 中建八局轨道交通建设有限公司 用于有限空间内负环拆除的施工方法及装置
CN111608686A (zh) * 2020-05-29 2020-09-01 中铁工程装备集团有限公司 一种管片拼装系统及其工作方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3288344B2 (ja) * 1999-07-02 2002-06-04 鹿島建設株式会社 仮組セグメント撤去方法
CN202560235U (zh) * 2012-03-29 2012-11-28 中建交通建设集团有限公司 成型盾构隧道下部管片拆除装置
CN202560241U (zh) * 2012-03-29 2012-11-28 中建交通建设集团有限公司 成型盾构隧道顶部管片拆除装置
CN105781590A (zh) * 2016-02-27 2016-07-20 中交公局第三工程有限公司 Tbm用接收洞负环拆除工艺
CN108625884A (zh) * 2018-03-08 2018-10-09 中交第二航务工程局有限公司 密闭式中间风井负环管片拆除的施工方法
CN109184756A (zh) * 2018-10-17 2019-01-11 中建八局轨道交通建设有限公司 用于盾构暗挖通道内拆除负环管片的装置及方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3288344B2 (ja) * 1999-07-02 2002-06-04 鹿島建設株式会社 仮組セグメント撤去方法
CN202560235U (zh) * 2012-03-29 2012-11-28 中建交通建设集团有限公司 成型盾构隧道下部管片拆除装置
CN202560241U (zh) * 2012-03-29 2012-11-28 中建交通建设集团有限公司 成型盾构隧道顶部管片拆除装置
CN105781590A (zh) * 2016-02-27 2016-07-20 中交公局第三工程有限公司 Tbm用接收洞负环拆除工艺
CN108625884A (zh) * 2018-03-08 2018-10-09 中交第二航务工程局有限公司 密闭式中间风井负环管片拆除的施工方法
CN109184756A (zh) * 2018-10-17 2019-01-11 中建八局轨道交通建设有限公司 用于盾构暗挖通道内拆除负环管片的装置及方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王锡军等: "地铁盾构穿越暗挖风道施工技术", 《建筑技术 》 *
郑永军等: "盾构旁通道过站施工关键技术研究", 《市政技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318777A (zh) * 2019-07-16 2019-10-11 中国葛洲坝集团基础工程有限公司 盾构负环管片拆运方法
CN110552725A (zh) * 2019-09-12 2019-12-10 中铁十二局集团有限公司 盾构管片运输养护车
CN110552725B (zh) * 2019-09-12 2021-05-25 中铁十二局集团有限公司 盾构管片运输养护车
CN111350523A (zh) * 2020-03-27 2020-06-30 中建八局轨道交通建设有限公司 用于有限空间内负环拆除的施工方法及装置
CN111350523B (zh) * 2020-03-27 2021-07-13 中建八局轨道交通建设有限公司 用于有限空间内负环拆除的施工方法及装置
CN111608686A (zh) * 2020-05-29 2020-09-01 中铁工程装备集团有限公司 一种管片拼装系统及其工作方法
CN111608686B (zh) * 2020-05-29 2022-02-22 中铁工程装备集团有限公司 一种管片拼装系统及其工作方法

Similar Documents

Publication Publication Date Title
CN109931082A (zh) 盾构机过中间风井后负环管片的无损拆除方法
CN108756909B (zh) 一种狭小空间盾构机拆解的施工方法
CN109441459B (zh) 一种土压平衡式盾构分体始发侧方出土施工方法
CN105781590B (zh) Tbm用接收洞负环拆除工艺
CN109097516A (zh) 高炉大修工程更换高炉炉壳的施工方法
CN105780646A (zh) 一种自动行走的桥梁检修设备
CN105569692A (zh) 一种隧道防水板挂布焊接台车
CN108625884A (zh) 密闭式中间风井负环管片拆除的施工方法
CN104818858B (zh) 室内重型电气柜吊装方法
CN205330690U (zh) 一种隧道防水板挂布焊接台车
CN208137458U (zh) 建筑施工卸料平台
CN205241086U (zh) 模板吊装和安拆用炮车
CN105984821B (zh) 一种按需使用的风电机组舱内起吊装置
CN110145317A (zh) 一种盾构机过站施工方法
CN204371359U (zh) 一种用于隧道水沟电缆槽砼灌注施工的台车
CN207973408U (zh) 一种隧洞内简易起吊装置
CN102311057A (zh) 浮吊回转支撑拆卸方法
CN108083110A (zh) 滑触线安装方法及拆除方法
CN206635664U (zh) 一种挂篮自动前移装置
CN111188624B (zh) 一种盾构密闭始发方法
CN104179126B (zh) 市政高架防撞墙的施工方法
CN110230500B (zh) 一种在海底隧道内进行单护盾双模式tbm拆机的方法
CN208594308U (zh) 一种大型高炉大修炉内废料清理系统
CN208563132U (zh) 一种u型渡槽槽身弧形内模滑动装置
CN206645746U (zh) 一种烧结机台车快速拉出装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Yajun

Inventor after: Chen Jizhong

Inventor after: Liao Jiaquan

Inventor after: Shen Guanglei

Inventor after: Li Heng

Inventor after: Cheng Yuantao

Inventor after: Zhao Junlei

Inventor after: Zhang Fan

Inventor after: Xu Peng

Inventor after: Yin Aiguo

Inventor after: Liu Bao

Inventor after: Song Juanjuan

Inventor after: Zhang Xiaoshui

Inventor after: Mao Sanhua

Inventor before: Zhao Junlei

Inventor before: Liao Jiaquan

Inventor before: Shen Guanglei

Inventor before: Li Heng

Inventor before: Cheng Yuantao

Inventor before: Zhang Fan

Inventor before: Xu Peng

Inventor before: Yin Aiguo

Inventor before: Liu Bao

Inventor before: Song Juanjuan

Inventor before: Zhang Xiaoshui

Inventor before: Mao Sanhua

Inventor before: Chen Jizhong

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190625

RJ01 Rejection of invention patent application after publication