CN109750878A - A kind of hanging parking lot - Google Patents
A kind of hanging parking lot Download PDFInfo
- Publication number
- CN109750878A CN109750878A CN201711081662.6A CN201711081662A CN109750878A CN 109750878 A CN109750878 A CN 109750878A CN 201711081662 A CN201711081662 A CN 201711081662A CN 109750878 A CN109750878 A CN 109750878A
- Authority
- CN
- China
- Prior art keywords
- parking
- parking lot
- vehicle
- hanging
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The invention discloses a kind of hanging parking lots, and including the parking lot ontology constructed by steel construction being located on two-direction road channel, the parking lot ontology successively includes be open to traffic layer and the multiple parking tiers for parking for passing vehicle from bottom to up;The layer that is open to traffic is equipped with the parking island that vehicle enters and leaves parking tier among two-direction road channel, and series connection is equipped with multiple lifting devices on the parking island, and the lifting device is equipped with parking chassis, and the parking chassis vehicle is simultaneously equipped with the mobile device of limitation vehicle;The lifting device it is described be open to traffic between layer and the parking tier go up and down, transport vehicle and enter or leave the parking tier.The present invention makes full use of existing landform, surface condition, provides a large amount of parking stalls, not only saves space, but also avoids bringing a negative impact urban highway traffic and people's row.
Description
Technical field
The present invention relates to a kind of parking lot, in particular to a kind of hanging parking lot.
Background technique
It is well known that the parking difficulty problem of China grows in intensity, especially public parking position is even more wretched insufficiency, occupies road
Road parking becomes universal phenomenon.Parking difficulty causes driving to be more difficult again, caused by traffic congestion and chaotic, become social concerns, hundred
Surname care, the focal issue of government's urgent need to resolve.According to an international practice, the ratio on car ownership and parking stall should be 1:
Between 1.2-1.4,1.4 are taken to be calculated herein, the year two thousand twenty Chinese automobile position demand is 349,170,000, Science in Future in China parking lot
Notch is still very big, and parking lot demand is very big.
Most of the parking lot of public place of today is directly to be parked in ground, and it is public that Surface parking lots waste city very much
Land resource often will cause traffic congestion, or even cause various traffic accidents, and people's public life is made to be affected.Ground
Lower parking lot can solve a part of congestion problems, but the construction of underground parking needs greatly with relative remission resource problem
Cost, some underground parkings even there are security risks.Although many places start to develop parking systems at this stage,
These parking systems still occupy city community land resource, are unable to satisfy the demand of city commercial close quarters, also,
There is a problem that it is many other, for example, vehicle enter and leave it is more troublesome, efficiency is lower, and time consumption is big, and security performance is unstable.
Summary of the invention
The present invention is to solve technical problem present in well-known technique and provide that a kind of both to have efficiently used air resource fast
The hanging parking lot of victory parking.
The technical scheme adopted by the present invention to solve the technical problems existing in the known art is that a kind of flame-out in flight
, including the parking lot ontology constructed by steel construction in road, road (or former communal facility functional layer), the parking lot
Ontology successively includes the layer that is open to traffic (or former communal facility functional layer) for passing vehicle and multiple is used to park from bottom to up
Parking tier;The layer that is open to traffic (or former communal facility functional layer) in the channel between be equipped with the parking island that vehicle enters and leaves parking tier, institute
It states series connection on parking island and is equipped with multiple lifting devices, the lifting device is equipped with parking chassis, parking chassis carrying vehicle
And be equipped with the mobile device of limitation vehicle;The lifting device is in the layer that is open to traffic (or former communal facility functional layer) and institute
It states and is gone up and down between parking tier, transport vehicle and enter or leave the parking tier.
Further, the two sides of the lifting device are equipped with vehicle in and out port.
Further, the two sides on the parking island are respectively equipped with parking entrance, the parking entrance and two-way lane phase
Linking.
Further, the parking tier is equipped with the transfer dress for being connected and shifting vehicle to parking stall with the parking chassis
It sets, vehicle is put into or is removed the parking chassis by the transfer device.
Further, the transfer device is comb-tooth-type intelligent robot.
Further, at least one automobile-lifting device external, at least one automobile liter that is located at the parking lot sheet
Falling unit is located in the parking lot ontology.
It further, is traction elevator positioned at the external automobile-lifting device of the parking lot sheet;Positioned at described
The intrinsic automobile-lifting device in parking lot is hydraulic elevator.
It further, is that door is arranged in opposite face positioned at the automobile-lifting device of the parking lot ontology, an elevator is double
Door.
Further, the parking lot ontology further includes the manned vertical lift and stair for entering and leaving parking tier.
Further, parking lot ontology two sides are equipped with the overpass across two-direction road channel.
Further, described to be open to traffic between layer and the parking tier equipped with business layer.
The advantages and positive effects of the present invention are: the present invention using large span, overhead, fabricated steel knot in the sky
Building parking ontology, (or former communal facility functional layer) sets up parking island among two-way lane, and maximization reduces and occupies road
(or former communal facility functional layer) lateral surface area, and region is quickly dredged as vehicle discrepancy garage and vehicle, it realizes fast
Victory, which is dredged, enters and leaves garage vehicle flowrate, does not impact to other vehicles of the traveling on road.The lifting device is set as pair
Face double exit and entrance is driven out to automobile elvator to be more convenient driver, greatly shortens the waiting time that automobile enters and leaves garage;?
The parking island is equipped with multiple lifting devices;Lifting device bilateral enters and leaves, and vehicle is facilitated to circulate inside garage parking, with
Improve the utilization rate in garage.
Overpass, bridge floor height and one layer of parking building same height are set in conjunction with garage parking bottom, both guarantee to cross the street people in this way
Normal pass is flowed, and can provide convenient for the people stopped, that is, parking building can be gone out by overline bridge by having stopped vehicle.Setting evacuation
Stair and vertical lift guarantee that the parking stream of people can quickly reach one layer of spatial parking building.Combinable existing urban road,
The entrance etc. of community is configured, and suitable position is selected to connect with status road, makes full use of existing landform item
Part provides a large amount of parking stalls, not only saves space, but also avoids bringing a negative impact urban highway traffic and people's row.The present invention is complete
It is complete to adapt to the big requirement of Public Parking bicycle parking amount of flow, it can solve urban center domain, old street difficulty is removed, no land for building
It is the problem of parking lot can not be set, applied widely, it can be used for the entrance overhead in city two-way lane overhead, community
Deng construction parking lot.
Detailed description of the invention
Fig. 1 is the traffic above-ground evacuation schematic diagram of the layer that is open to traffic of the invention;
Fig. 2 is parking tier floor map of the invention;
Fig. 3 is the side structure schematic diagram parallel with runway of the invention;
Fig. 4 is the side structure schematic diagram vertical with runway of the invention.
In figure: 1, pavement;2, non-motorized lane;3, elevator is drawn;4, manned vertical lift;5-1, positive lane;
5-2, reversed lane;6-1, positive lane parking outlet;6-2, the parking outlet of reversed lane;7-1, positive lane parking entrance;
7-2, reversed lane parking entrance;8, hydraulic elevator;9, parking island;10, traffic light;11, stair;12, zebra stripes;
15, parking stall;16, transfer device;17, transfer parking stall;18, steel structure frame column;19, parking tier;20, business layer;21, lead to
Deck.
Specific embodiment
In order to further understand the content, features and effects of the present invention, hereby enumerating following embodiment, and cooperate attached drawing
Detailed description are as follows:
Referring to Figure 1 to Fig. 4, a kind of hanging parking lot, including be located on two-direction road channel by steel construction building
Parking lot ontology, the parking lot ontology successively include the layer 21 and multiple for mooring of being open to traffic for passing vehicle from bottom to up
The parking tier 19 of vehicle;The layer 21 that is open to traffic is equipped with the parking island 9 that vehicle enters and leaves parking tier 19, institute among two-direction road channel
It states parking island 9 and is equipped with multiple lifting devices, the lifting device is equipped with parking chassis, parking chassis vehicle
And it is equipped with the mobile device of limitation vehicle;The lifting device it is described be open to traffic between layer 21 and the parking tier 19 go up and down, transport
Vehicle is sent to enter or leave the parking tier 19.Parking ontology is constructed using large span, overhead, fabricated steel knot in the sky,
It is located at the two sides of two-way road in the steel structure frame column 18 for the layer 21 that is open to traffic, keeps open to traffic without hindrance, in two-way lane
Between set up parking island, realize most preferably dredges enter and leave garage vehicle flowrate.Settable carriage is integrally formed with the parking chassis, limit
Vehicle processed is mobile;A variety of devices such as lifting block can also be set on the parking chassis, carry out fixed vehicle, limit transport
Vehicle moves in lifting process.
Two-way road may include pavement 1, non-motorized lane 2 and runway;It is reversed lane positioned at 9 left side of parking island
5-2 is positive lane 5-1 positioned at 9 right side of parking island.Can the road both ends of direction of travel at the ontology of parking lot also
Equipped with traffic light 10, and at road both ends, zebra stripes 12 are set.It is described to be open to traffic between layer 21 and the parking tier 19 and set
There is business layer 20.In parking lot, the roof of ontology can also be equipped with outdoor business layer.
Further, the two sides of the lifting device can be equipped with vehicle in and out port.It is double out that lifting device is set as opposite
Entrance facilitates vehicles while passing lifting device, greatly shortens the waiting time that automobile enters garage.
Further, the parking island 9 can be respectively equipped with parking entrance in the two sides towards two-direction road channel, described
Parking entrance is mutually connected with two-way lane.It is that positive lane is stopped that wherein the parking island 9 is connected with forward direction lane 5-1
Vehicle exports 6-1 and positive lane parking entrance 7-1;It is reversed vehicle that wherein the parking island 9 is connected with reversed lane 5-2
Stop entrance 7-2 for road parking outlet 6-2 and reversed lane.
Further, the parking tier 19, which can be equipped with, is connected and shifts the shifting of vehicle to parking stall 15 with the parking chassis
Device 16 is sent, vehicle is put into or is removed the parking chassis by the transfer device 16.The parking tier 19 can be equipped with several rows
The parking stall 15 of column and middle conversion transit wagon position 17.Further, the transfer device 16 can be comb-tooth-type intelligence machine
People.Vehicle is transplanted in free parking space 15 by comb-tooth-type intelligent robot 16 automatically, direct using comb-tooth-type intelligent robot
Carrying vehicle, without carrying out sweep exchange, vehicle access speed is fast, it is high-efficient, save the time.
Further, but to be located at the parking lot sheet external at least one lifting device, but at least one lifting dress
Setting in the parking lot ontology.Vehicle is parked or taken convenient for circulation in this way, accelerates cut-off velocity.
It further, can be traction elevator 3 positioned at the external lifting device of the parking lot sheet;Stop positioned at described
The intrinsic lifting device in parking lot can be hydraulic elevator 8.
To guarantee that the parking stream of people can quickly reach ground, and fire prevention and easy to maintain, the parking lot ontology can also wrap
Include the manned vertical lift 4 and stair 11 into parking tier 19;And parking lot ontology two sides can be equipped with and cross over two-way row
The overpass of vehicle passage.Overpass, bridge floor height and one layer of parking building same height are set in conjunction with garage parking bottom, so both
Guarantee street crossing stream of people's normal pass, and can for parking people provide it is convenient, that is, stopped vehicle can by overline bridge go out parking
Building.
And shopping centre further is set up using the air resource in parking lot, and further, the layer 21 and described of being open to traffic
Business layer 20 can be equipped between parking tier 19.And outdoor business layer can be equipped on the parking tier 19.
Embodiment described above is merely to illustrate technical idea and feature of the invention, in the art its object is to make
Technical staff it will be appreciated that the contents of the present invention and implement accordingly, patent of the invention only cannot be limited with the present embodiment
Range, i.e., same changes or modifications made by all disclosed spirit, still falls in the scope of the patents of the invention.
Claims (10)
1. a kind of hanging parking lot, which is characterized in that including the parking lot constructed by steel construction being located on two-direction road channel
Ontology, the parking lot ontology successively include be open to traffic layer and the multiple parkings for parking for passing vehicle from bottom to up
Layer;The layer that is open to traffic is equipped with the parking island that vehicle enters and leaves the parking tier among two-direction road channel, sets on the parking island
There are the multiple lifting devices of series connection, the lifting device is equipped with parking chassis, and the parking chassis vehicle is simultaneously equipped with limitation
The mobile device of vehicle;The lifting device it is described be open to traffic between layer and the parking tier go up and down, transport vehicle enter or from
Open the parking tier.
2. hanging parking lot according to claim 1, which is characterized in that the two sides of the lifting device are equipped with vehicle and go out
Entrance.
3. hanging parking lot according to claim 1, which is characterized in that it is described parking island two sides be respectively equipped with stop into
Mouthful, the parking entrance is mutually connected with two-way lane.
4. hanging parking lot according to claim 1, which is characterized in that the parking tier is equipped with to be held in the mouth with the parking chassis
The transfer device of vehicle to parking stall is connect and shifts, vehicle is put into or is removed the parking chassis by the transfer device.
5. hanging parking lot according to claim 4, which is characterized in that the transfer device is 360 degree rotation disk and comb
Tooth-like intelligent robot.
6. hanging parking lot according to claim 1, which is characterized in that at least one lifting device is located at the parking
This is external for field, at least one lifting device is located in the parking lot ontology.
7. hanging parking lot according to claim 6, which is characterized in that the lifting external positioned at the parking lot sheet
Device is traction elevator;It is hydraulic elevator positioned at the intrinsic lifting device in the parking lot.
8. hanging parking lot according to claim 1, which is characterized in that the parking lot ontology further includes entering and leaving parking tier
Manned vertical lift and stair.
9. hanging parking lot according to claim 1, which is characterized in that parking lot ontology two sides are equipped with across two-way
The overpass in driving channel.
10. hanging parking lot according to claim 1, which is characterized in that it is described be open to traffic between layer and the parking tier set
There is business layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711081662.6A CN109750878A (en) | 2017-11-07 | 2017-11-07 | A kind of hanging parking lot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711081662.6A CN109750878A (en) | 2017-11-07 | 2017-11-07 | A kind of hanging parking lot |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109750878A true CN109750878A (en) | 2019-05-14 |
Family
ID=66400803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711081662.6A Pending CN109750878A (en) | 2017-11-07 | 2017-11-07 | A kind of hanging parking lot |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109750878A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07158306A (en) * | 1993-12-06 | 1995-06-20 | Kajima Corp | Self-advancing type-mechanical type combination type multistory parking space |
CN1242463A (en) * | 1998-07-22 | 2000-01-26 | 贺伯台 | Method for and building of vehicle parking under road |
CN101418537A (en) * | 2008-12-04 | 2009-04-29 | 张立胜 | Road buffering island and use thereof |
CN102747860A (en) * | 2012-07-11 | 2012-10-24 | 陈仁多 | Urban road overhead garden type electric skip-floor parking business building |
CN105951549A (en) * | 2016-07-12 | 2016-09-21 | 吕雅南 | Multifunctional cross flyover |
CN205857855U (en) * | 2016-08-12 | 2017-01-04 | 杨大平 | Road high efficiency smart garage parking |
-
2017
- 2017-11-07 CN CN201711081662.6A patent/CN109750878A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07158306A (en) * | 1993-12-06 | 1995-06-20 | Kajima Corp | Self-advancing type-mechanical type combination type multistory parking space |
CN1242463A (en) * | 1998-07-22 | 2000-01-26 | 贺伯台 | Method for and building of vehicle parking under road |
CN101418537A (en) * | 2008-12-04 | 2009-04-29 | 张立胜 | Road buffering island and use thereof |
CN102747860A (en) * | 2012-07-11 | 2012-10-24 | 陈仁多 | Urban road overhead garden type electric skip-floor parking business building |
CN105951549A (en) * | 2016-07-12 | 2016-09-21 | 吕雅南 | Multifunctional cross flyover |
CN205857855U (en) * | 2016-08-12 | 2017-01-04 | 杨大平 | Road high efficiency smart garage parking |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202520031U (en) | Overhead vehicle directly-entering type stereo garage stretched across road in busy area | |
CN106088743A (en) | Multi-storied garage across road overhead and the using method of overpass composite unit structure | |
WO2014071543A1 (en) | Municipal crossroads structure | |
CN201050023Y (en) | Overhead parking space | |
CN100410446C (en) | Communication facility with integrated function of pedestrian street crossing fast public transit and parking and method thereof | |
CN109267438A (en) | A kind of control method of tidal type automatic Pilot BRT | |
CN102747661B (en) | Based on the structure and uses thereof of the torsional mode overpass bridge in urban road | |
CN202431033U (en) | Multi-storey parking lot with spiral lanes | |
CN202099708U (en) | Novel low overpass for road intersection | |
CN110158510A (en) | A kind of pedestrains safety crossing facilities and control method | |
CN205365599U (en) | Overhead bus of contactless power supply | |
CN204530358U (en) | Track, crossroad is without intersection current traffic system continuously | |
WO2018072293A1 (en) | Smart green highway system | |
CN102127886A (en) | Multifunctional tunnel and road parking area | |
CN104562880A (en) | Interchange crossing designed for pedestrians walking on ground, cars running above or under ground level, and mutual accommodation only among cars on same road | |
CN209686174U (en) | Overhead system annular bus platform | |
CN204676382U (en) | People walks level land car and walks up and down only this bus and to give in each other intersection | |
CN109750878A (en) | A kind of hanging parking lot | |
CN103255940A (en) | Elevator-car-carrying driver-driving direct-parking type simple stereoscopic garage crossing above roads in prosperous areas | |
CN200943172Y (en) | Low-span all-intercommunicating overpass | |
CN210797135U (en) | Single-line small overhead traffic system | |
CN209324085U (en) | Overhead parking field | |
CN101033600A (en) | Traffic facility and method combining road crossing and fast public transport | |
CN208329776U (en) | A kind of multiplayer stereo carport | |
CN201648901U (en) | Road traffic system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190514 |