CN109750841A - A kind of distributing platform system of tube structure construction - Google Patents

A kind of distributing platform system of tube structure construction Download PDF

Info

Publication number
CN109750841A
CN109750841A CN201910035589.1A CN201910035589A CN109750841A CN 109750841 A CN109750841 A CN 109750841A CN 201910035589 A CN201910035589 A CN 201910035589A CN 109750841 A CN109750841 A CN 109750841A
Authority
CN
China
Prior art keywords
distributing platform
construction
pulley
dumping
split type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910035589.1A
Other languages
Chinese (zh)
Other versions
CN109750841B (en
Inventor
徐磊
朱毅敏
张星波
陆庆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN201910035589.1A priority Critical patent/CN109750841B/en
Publication of CN109750841A publication Critical patent/CN109750841A/en
Application granted granted Critical
Publication of CN109750841B publication Critical patent/CN109750841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention provides a kind of distributing platform system of tube structure construction, anti-tilt device of the invention includes anti-dumping pulley, anti-dumping guide rail and crown wall pulley, for preventing accentric support Split assembled distributing platform system from toppling risk.Vertical anti-dumping guide rail can be set close to the horizontal structure side of super high-rise building Core Walls Structure in interior tub, and anti-dumping pulley is arranged in horizontal structure edge in super high-rise building Core Walls Structure elevator according to requirement of engineering, be stuck in anti-dumping pulley on anti-dumping guide rail.In addition, if close to the vertically arranged arterial highway crown wall pulley in the wall body structure side in split type interior tub, the anti-dumping pulley cooperation crown wall idler wheel symmetrically and evenly arranged provides the two-way effective lateral restraint of distributing platform system, guarantees the safe construction of distributing platform system.

Description

A kind of distributing platform system of tube structure construction
Technical field
The present invention relates to a kind of distributing platform systems of tube structure construction.
Background technique
The height of super high-rise building Core Walls Structure is generally at 5 meters or more.Super high-rise building Core Walls Structure concrete distributing is usually adopted Distributing mode is combined with hard tube hose or using the whole material distributing machine cloth to climb in hydraulic steel platform, stability is poor.Hard tube is soft Pipe combination cloth form is simple and crude, need to put into considerable amount of labour;The disadvantage of steel platform material distributing machine be it is whole climb it is hydraulic Steel platform involves great expense, and construction cost is big, needs at the top of concrete pumping to Core Walls Structure through the level above steel platform top beam Pipe accesses material distributing machine, makes troubles to construction personnel's walking in steel platform.
Summary of the invention
The purpose of the present invention is to provide a kind of distributing platform systems of tube structure construction, are able to solve existing cloth The problem of platform stabilization difference.
To solve the above problems, the present invention provides a kind of distributing platform system of tube structure construction, comprising:
It is set to the wall body structure of the two sides of the super high-rise building Core Walls Structure of construction;
It is set to the lifting rail at the top of the wall body structure;
The distributing platform being set on the lifting rail;
The material distributing machine being set on the distributing platform;
Split type interior tub, each split type inner cylinder set up the super high-rise building Core Walls Structure and wall knot for being placed in the construction Between structure, the top of each split type interior tub is connect with the distributing platform, and the lower part of each split type interior tub is prolonged Extend to the super high-rise building core tube region of construction;
The crown wall pulley being disposed in proximity in the split type interior tub in each of described wall body structure side, the crown wall pulley are used When the distributing platform climbs along the lifting rail, the split type interior tub for driving the distributing platform to be connected is described in Wall body structure climbs together;
The anti-dumping guide rail being disposed in proximity in the split type interior tub in each of super high-rise building Core Walls Structure side;
The anti-dumping pulley being set on the edge of the horizontal structure of the super high-rise building Core Walls Structure of construction, and be stuck in point In anti-dumping guide rail in body formula in tub, when the anti-dumping pulley climbs for the distributing platform along the lifting rail, band The split type interior tub that the distributing platform is connected is moved to climb together along the anti-dumping guide rail;
It is set to the telescopic plug-type channel on the distributing platform.
Further, in above system, further includes:
The steel construction bracket being disposed in proximity in the split type interior tub in each of described wall body structure side, the steel construction ox Leg is set to the lower section of the crown wall pulley;
It is set to reserving hole on the wall body structure, the split type interior tub is climbed to after predeterminated position, the steel Structure bracket is set up in the reserving hole.
Further, in above system, the concrete of the reserving hole, which is shelved, is provided with pre-buried angle member on face.
Further, in above system, the anti-dumping guide rail is I-steel.
It further, further include two embedded steel tubes being embedded in the horizontal structure in above system, wherein The anti-dumping pulley is reliably connected simultaneously with two embedded steel tubes, and two embedded steel tubes are abscissused face interval along horizontal structure Distribution.
It further, further include vertical pump line and horizontal pump line in above system, wherein
The vertical pump line arranges that the vertical pump line passes through the one 90 degree of bend pipe and the cloth along the wall body structure One end of horizontal pump line below the top beam of platform connects;
The other end of the horizontal pump line is connect with one end of the 2nd 90 degree of bend pipe, the other end of the 2nd 90 degree of bend pipe It is connect after being passed through upwards between the top beam lattice of distributing platform gear with the material distributing machine.
Further, in above system, the plug-type channel includes:
For the channel flase floor of people's walking;
The sliding rail being connect with the channel flase floor;
It is set to the mobile idler pulley of the sliding rail lower part, the mobile idler pulley is stuck in the girder steel of distributing platform, and The mobile idler pulley is limited by the section steel beam in split type interior tub and distributing platform, and the section steel beam is along the sliding rail The spacing in direction is the movable distance of the mobile idler pulley.
Compared with prior art, anti-tilt device of the invention includes anti-dumping pulley, anti-dumping guide rail and crown wall pulley, for preventing Only accentric support Split assembled distributing platform system is toppled risk.It can be in super high-rise building Core Walls Structure elevator according to work Journey needs, and vertical anti-dumping guide rail is arranged close to the horizontal structure side of super high-rise building Core Walls Structure in interior tub, and anti-dumping is sliding Wheel is arranged in horizontal structure edge, is stuck in anti-dumping pulley on anti-dumping guide rail.In addition, close to institute in split type interior tub If stating the vertically arranged arterial highway crown wall pulley in wall body structure side, the anti-dumping pulley cooperation crown wall idler wheel symmetrically and evenly arranged is provided The two-way effective lateral restraint of distributing platform system guarantees the safe construction of distributing platform system.
Detailed description of the invention
Fig. 1 is the structure chart of the distributing platform system of the tube structure construction of one embodiment of the invention;
Fig. 2 is the amplification assumption diagram of the steel construction bracket in Fig. 1;
Fig. 3 is the amplification assumption diagram of the crown wall pulley in Fig. 1;
Fig. 4 is the amplification assumption diagram of the anti-dumping pulley in Fig. 1;
Fig. 5 is the cross section structure figure of the anti-dumping pulley of one embodiment of the invention;
Fig. 6 is the vertical pump line of one embodiment of the invention and the structure chart of horizontal pump line;
Fig. 7 is the amplification assumption diagram in the telescopic plug-type channel in Fig. 1;
Fig. 8 is the construction profile in the telescopic plug-type channel of one embodiment of the invention;
Fig. 9 is the amplification assumption diagram in the telescopic plug-type channel of one embodiment of the invention.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
As shown in Fig. 1~8, the present invention provides a kind of distributing platform system of tube structure construction, comprising:
It is set to the wall body structure 4 of the two sides of the super high-rise building Core Walls Structure of construction;
As shown in Figure 1, the super high-rise building Core Walls Structure of the construction may include complete layer 1, conservation layer 2 and construction layer 3;
It is set to the lifting rail 5 at the top of the wall body structure 4;
The distributing platform 6 being set on the lifting rail 5;
The material distributing machine 7 being set on the distributing platform 6;
Split type interior tub 8, each split type interior tub 8 are set to the super high-rise building Core Walls Structure and wall of the construction Between structure 4, the top of each split type interior tub 8 is connect with the distributing platform 6, each split type interior tub 8 Lower part extends to the super high-rise building core tube region of construction;
The crown wall pulley 9 being disposed in proximity in the split type interior tub 8 in each of described 4 side of wall body structure, the crown wall are sliding When wheel 9 climbs for the distributing platform along the lifting rail, the split type interior tub that drives the distributing platform to be connected It climbs together along the wall body structure;
The anti-dumping guide rail 10 being disposed in proximity in the split type interior tub 8 in each of super high-rise building Core Walls Structure side;
The anti-dumping pulley 12 being set on the edge of the horizontal structure 11 of the super high-rise building Core Walls Structure of construction, anti-dumping Pulley 12 is stuck in the anti-dumping guide rail 10 in split type interior tub 8, and the anti-dumping pulley 12 is for the distributing platform 6 along described When lifting rail 5 climbs, the split type interior tub 8 for driving the distributing platform 6 to be connected is climbed together along the anti-dumping guide rail 10 It rises;
It is set to the telescopic plug-type channel on the distributing platform 6.
Here, anti-tilt device of the invention includes anti-dumping pulley, anti-dumping guide rail and crown wall pulley, for preventing accentric support Split assembled distributing platform system is toppled risk.Can in super high-rise building Core Walls Structure elevator according to requirement of engineering, Vertical anti-dumping guide rail is arranged close to the horizontal structure side of super high-rise building Core Walls Structure in interior tub, and anti-dumping pulley is arranged in water Flat structure edge is stuck in anti-dumping pulley on anti-dumping guide rail.In addition, close to the wall body structure in split type interior tub If the vertically arranged arterial highway crown wall pulley in side, the anti-dumping pulley cooperation crown wall idler wheel symmetrically and evenly arranged provides distributing platform system The two-way effective lateral restraint of system guarantees the safe construction of distributing platform system.
Anti-dumping idler wheel is fixed on to the horizontal structure outer edge of super high-rise building Core Walls Structure, and is stuck in split type interior tub Anti-dumping guide rail in, cooperate in crown wall pulley in tub, form two-way effective lateral restraint, guarantee that distributing platform works normally With the safety and stability of climb mode.
Distributing platform system uses the novel vertical multiple tracks anti-tilt device of horizontal bidirectional, the advantage of doing so is that using several The lateral rigidity of layer horizontal structure, preventing independent tall and big interior tub from lateral displacement occurs causes to topple, and guarantees two-way stable, just Normal work of climbing.It can be realized two-way effective anti-dumping of accentric support Split assembled distributing platform system.
In the composition of distributing platform system of the invention, if there are horizontal structure in super high-rise building Core Walls Structure, system can It is made of split type interior tub, lifting rail, anti-tilt device, distributing platform and material distributing machine;If in super high-rise building Core Walls Structure not There are horizontal structure, then the maximum difference of plateform system, which can be its split type interior tub and is connected by combination bottom beam, forms entirety Unit.
As shown in Fig. 2, in one embodiment of distributing platform system that tube structure of the invention is constructed, further includes:
The steel construction bracket 13 being disposed in proximity in the split type interior tub 8 in each of described 4 side of wall body structure, the steel knot Structure bracket 13 is set to the lower section of the crown wall pulley 9;
It is set to reserving hole 14 on the wall body structure, the split type interior tub is climbed to after predeterminated position, described Steel construction bracket 13 is set up in the reserving hole 14.
Here, steel construction bracket is arranged by the lower section of crown wall pulley, may be implemented the split type interior tub climb to Split type interior tub reliably shelves and fixes after predeterminated position.
In addition, accentric support of the present invention in split type interior tub, bottom beam after being climbed every time due to distributing platform system It stops absolute altitude not to be consistent with flooring absolute altitude, be arranged if being arranged to shelve supporting point and will increase additional construction on horizontal structure Expense, fee of material, labour cost are applied, therefore the bottom of distributing platform system support bracket is provided entirely in interior tub close to vertical wall The side of body is held on wall body structure in reserving hole, and distributing platform load is transferred directly to Core Walls Structure shear wall, such nothing It need to be installed on horizontal structure and additionally temporarily shelve structure, substantially reduce the construction cost of distributing platform system.In Super High core Horizontal section concrete pumping under platform is realized in heart tube construction, is offered convenience to the walking of construction personnel on platform, is improved safety Property.
As shown in Fig. 2, in one embodiment of distributing platform system that tube structure of the invention is constructed, the reserving hole 14 Concrete shelve and be provided with pre-buried angle member 15 on face.
Here, the concrete of reserving hole, which is shelved, increases pre-buried angle member on face, local bearing capacity is improved, concrete is prevented Generation office crushes bad.
In one embodiment of distributing platform system of tube structure construction of the invention, the anti-dumping guide rail is I-steel, with Guarantee the reliability of guide rail.
It as shown in Figures 4 and 5, further include pre-buried in one embodiment of distributing platform system of tube structure of the invention construction Two embedded steel tubes 16 in the horizontal structure, wherein the anti-dumping pulley 12 carries out simultaneously with two embedded steel tubes 16 It is reliably connected, two embedded steel tubes 16 are spaced apart along 11 normal section of horizontal structure, and the fixed form of this anti-dumping pulley can Stronger more reliable two-way horizontal constraint is provided to anti-dumping guide rail, guarantees stability.
As shown in fig. 6, further including vertical pump line in one embodiment of distributing platform system that tube structure of the invention is constructed 20 and horizontal pump line 21, wherein
The vertical pump line 20 arranges along the wall body structure, the vertical pump line 20 by the one 90 degree of bend pipe with it is described One end of horizontal pump line 21 below the top beam of distributing platform connects;
The other end of the horizontal pump line 21 is connect with one end of the 2nd 90 degree of bend pipe, the 2nd 90 degree of bend pipe it is another End is connect after passing through upwards between the top beam lattice of distributing platform 6 gear with the material distributing machine 7.
Here, being minimized to make concrete horizontal pump line on traditional construction platform avoid construction personnel's track route Horizontal pump line is completed conversion by interference below distributing platform.Horizontal pump line can be fixed under the top beam of distributing platform system It on the edge of a wing, is converted by right-angle elbow pipe, pump line is passed through between the lattice of top beam gear, accesses cloth motor spindle.
The punching pump line arrangement of material distributing machine of the invention are as follows: the vertical pump line along the wall body structure passes through first 90 degree of bend pipes are connect with the horizontal pump line below the top beam of the distributing platform, and horizontal pump line is fixed on the top of the distributing platform It on lower flange of girder edge, then is converted by the 2nd 90 degree of bend pipe between the top beam lattice of distributing platform gear and is passed through upwards, be directly accessed cloth Material machine.
Horizontal pump line is fixed under platform the walking disorder that can further remove on platform, improves working security, The lateral rigidity for efficiently using permanent horizontal structure keeps system platform steady operation and can climb, and reduces distributing platform Construction cost integrates operation side, the management difficulty at the scene of reducing.This pump line arrangement is avoided applying on distributing platform The track route of worker person realizes the noiseless independent operating of pumping construction and cloth construction, fully ensures that construction production safety.
As shown in figs. 7-9, described plug-type in one embodiment of distributing platform system of tube structure of the invention construction Channel includes:
For the channel flase floor 17 of people's walking;
The sliding rail 18 being connect with the channel flase floor;
It is set to the mobile idler pulley 19 of 18 lower part of sliding rail, the mobile idler pulley 19 is stuck in the steel of distributing platform 6 Liang Zhong, and the mobile idler pulley is limited by the section steel beam in split type interior tub and distributing platform 6, the section steel beam is described in The spacing L in sliding rail direction is the movable distance of the mobile idler pulley 19.
The present invention is provided with and the plug-type channel between other Core Walls Structures, distributing platform and adjacent core cylinder inner cylinder mould bases Traffic between system can be connected by plug-type channel, and the channel flase floor in the plug-type channel is reliably connected in push-and-pull Guide rail, sliding rail is slided by being stuck in the mobile idler pulley of the girder steel of distributing platform, and mobile idler pulley passes through split type interior tub With on distributing platform section steel beam limit, spacing of the section steel beam along the sliding rail direction be plug-type channel can Distance of stretch out and draw back, plug-type channel greatly improve construction personnel distributing platform system and other inner cylinder formwork systems of Core Walls Structure it Between walking it is convenient, guarantee construction safety.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the invention is also intended to include including these modification and variations.

Claims (7)

1. a kind of distributing platform system of tube structure construction characterized by comprising
It is set to the wall body structure of the two sides of the super high-rise building Core Walls Structure of construction;
It is set to the lifting rail at the top of the wall body structure;
The distributing platform being set on the lifting rail;
The material distributing machine being set on the distributing platform;
Split type interior tub, each split type inner cylinder set up the super high-rise building Core Walls Structure for being placed in the construction and wall body structure it Between, the top of each split type interior tub is connect with the distributing platform, and the lower part of each split type interior tub extends to The super high-rise building core tube region of construction;
The crown wall pulley being disposed in proximity in the split type interior tub in each of described wall body structure side, the crown wall pulley are used for institute When stating distributing platform and climbing along the lifting rail, the split type interior tub for driving the distributing platform to be connected is along the wall Structure is climbed together;
The anti-dumping guide rail being disposed in proximity in the split type interior tub in each of super high-rise building Core Walls Structure side;
The anti-dumping pulley being set on the edge of the horizontal structure of the super high-rise building Core Walls Structure of construction, and be stuck in split type In anti-dumping guide rail in interior tub, when the anti-dumping pulley climbs for the distributing platform along the lifting rail, institute is driven The split type interior tub that distributing platform is connected is stated to climb together along the anti-dumping guide rail;
It is set to the telescopic plug-type channel on the distributing platform.
2. the distributing platform system of tube structure construction as described in claim 1, which is characterized in that further include:
The steel construction bracket being disposed in proximity in the split type interior tub in each of described wall body structure side, the steel construction bracket are set It is placed in the lower section of the crown wall pulley;
It is set to reserving hole on the wall body structure, the split type interior tub is climbed to after predeterminated position, the steel construction Bracket is set up in the reserving hole.
3. the distributing platform system of tube structure construction as claimed in claim 2, which is characterized in that the reserving hole mixes Solidifying soil, which is shelved, is provided with pre-buried angle member on face.
4. the distributing platform system of tube structure construction as described in claim 1, which is characterized in that the anti-dumping guide rail is work Word steel.
5. the distributing platform system of tube structure as described in claim 1 construction, which is characterized in that further include be embedded in it is described Two embedded steel tubes in horizontal structure, wherein the anti-dumping pulley is connect with two embedded steel tubes respectively, two embedded steel tubes It is spaced apart along horizontal structure normal section.
6. the distributing platform system of tube structure as described in claim 1 construction, which is characterized in that further include vertical pump line and Horizontal pump line, wherein
The vertical pump line arranges that the vertical pump line passes through the one 90 degree of bend pipe and the distributing platform along the wall body structure Top beam below horizontal pump line one end connection;
The other end of the horizontal pump line is connect with one end of the 2nd 90 degree of bend pipe, and the other end of the 2nd 90 degree of bend pipe is from cloth It is connect after being passed through upwards between the top beam lattice gear of material platform with the material distributing machine.
7. the distributing platform system of tube structure construction as described in claim 1, which is characterized in that the plug-type channel packet It includes:
For the channel flase floor of people's walking;
The sliding rail being connect with the channel flase floor;
It is set to the mobile idler pulley of the sliding rail lower part, the mobile idler pulley is stuck in the girder steel of distributing platform, and described Mobile idler pulley is limited by the section steel beam in split type interior tub and distributing platform, and the section steel beam is along the sliding rail direction Spacing be the mobile idler pulley movable distance.
CN201910035589.1A 2019-01-15 2019-01-15 Material distribution platform system for barrel structure construction Active CN109750841B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910035589.1A CN109750841B (en) 2019-01-15 2019-01-15 Material distribution platform system for barrel structure construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910035589.1A CN109750841B (en) 2019-01-15 2019-01-15 Material distribution platform system for barrel structure construction

Publications (2)

Publication Number Publication Date
CN109750841A true CN109750841A (en) 2019-05-14
CN109750841B CN109750841B (en) 2024-02-13

Family

ID=66405610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910035589.1A Active CN109750841B (en) 2019-01-15 2019-01-15 Material distribution platform system for barrel structure construction

Country Status (1)

Country Link
CN (1) CN109750841B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565937A (en) * 2019-09-02 2019-12-13 上海建工一建集团有限公司 Door type integral lifting steel platform

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013185277A1 (en) * 2012-06-11 2013-12-19 浙江省建工集团有限责任公司 Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN203514814U (en) * 2013-10-11 2014-04-02 卓越置业集团有限公司 Overhead building putting-up machine
CN105735481A (en) * 2016-03-01 2016-07-06 中国建筑第八工程局有限公司 High-rise building core tube jacking platform climbing and thermal insulating device and construction method thereof
CN106907001A (en) * 2017-01-17 2017-06-30 上海建工建集团有限公司 Combined type heavy-duty self-crawling type tubular construction operation platform and construction method
CN107035156A (en) * 2017-04-19 2017-08-11 上海建工建集团有限公司 Core Walls Structure horizontal structure self-crawling type protective platform
CN108104475A (en) * 2017-11-24 2018-06-01 上海建工集团股份有限公司 Self-crawling type floor inner concrete cloth is equipped and its construction method
CN209799394U (en) * 2019-01-15 2019-12-17 上海建工一建集团有限公司 Cloth platform system for barrel structure construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013185277A1 (en) * 2012-06-11 2013-12-19 浙江省建工集团有限责任公司 Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN203514814U (en) * 2013-10-11 2014-04-02 卓越置业集团有限公司 Overhead building putting-up machine
CN105735481A (en) * 2016-03-01 2016-07-06 中国建筑第八工程局有限公司 High-rise building core tube jacking platform climbing and thermal insulating device and construction method thereof
CN106907001A (en) * 2017-01-17 2017-06-30 上海建工建集团有限公司 Combined type heavy-duty self-crawling type tubular construction operation platform and construction method
CN107035156A (en) * 2017-04-19 2017-08-11 上海建工建集团有限公司 Core Walls Structure horizontal structure self-crawling type protective platform
CN108104475A (en) * 2017-11-24 2018-06-01 上海建工集团股份有限公司 Self-crawling type floor inner concrete cloth is equipped and its construction method
CN209799394U (en) * 2019-01-15 2019-12-17 上海建工一建集团有限公司 Cloth platform system for barrel structure construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565937A (en) * 2019-09-02 2019-12-13 上海建工一建集团有限公司 Door type integral lifting steel platform

Also Published As

Publication number Publication date
CN109750841B (en) 2024-02-13

Similar Documents

Publication Publication Date Title
CN109750840A (en) The installation method of distributing platform system for the construction of Super High tube structure
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN209323962U (en) A kind of hybrid power system steel platform mould bases climbs system
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
KR102109969B1 (en) A work bogie for tunnel work
CN105016223A (en) Cross beam supporting system used for tower crane
CN109838098A (en) Distributing platform system for the construction of Super High tube structure
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN109750842A (en) A kind of installation method of the distributing platform system of tube structure construction
CN103726421A (en) Height and span adjustable track paver for metro construction
CN104060541B (en) A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN109750841A (en) A kind of distributing platform system of tube structure construction
CN208168301U (en) A kind of stable type construction slipper bracket
CN204848050U (en) A crossbeam braced system for tower crane
CN207554961U (en) A kind of long distance pipeline steep slope region stringing mechanism
CN209799394U (en) Cloth platform system for barrel structure construction
CN210289172U (en) Material distribution platform system for construction of super high-rise tubular structure
CN213418443U (en) Self-climbing type elevator shaft operation platform
CN105217420A (en) A kind of device for short range transport
CN204780925U (en) City gate hole type inclined shaft slipform platform truck pulls removal structure
CN203961317U (en) Slip list Pin and many truss structures moulding bed
CN204938802U (en) For the rail supported system of tower crane
CN203257074U (en) Operation platform of elevator shaft
CN203257106U (en) Multifunctional power-driven walking type walking system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant