CN203961317U - Slip list Pin and many truss structures moulding bed - Google Patents
Slip list Pin and many truss structures moulding bed Download PDFInfo
- Publication number
- CN203961317U CN203961317U CN201320834619.3U CN201320834619U CN203961317U CN 203961317 U CN203961317 U CN 203961317U CN 201320834619 U CN201320834619 U CN 201320834619U CN 203961317 U CN203961317 U CN 203961317U
- Authority
- CN
- China
- Prior art keywords
- moulding bed
- truss
- pulling mechanism
- track
- truss structures
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to Building class, particularly relates to the slip moulding bed of single Pin and many truss structures assembling use.Slip list Pin and many truss structures moulding bed, comprise track, moulding bed, truss, pulling mechanism, and track is provided with moulding bed, takes dress truss on moulding bed, and on track, opposite side is also provided with pulling mechanism, and pulling mechanism connects moulding bed by wire rope.The utility model can be according to place need designed path shift position, other position assembling truss outside truss installation site, by pulling mechanism, pull truss to move to truss installation site again, the utility model can rationally utilize space, place, avoids truss installation site to carry out the drawback of truss assembling inconvenience; By slippage equipment is set, crane hoisting equipment is hoisted in position not, can reduce the lifting capacity of lifting appliance, cost-saving.
Description
Technical field
The utility model relates to Building class, particularly relates to the slip moulding bed of single Pin and many truss structures assembling use.
Background technology
In order to meet large scale structure and the equipment engineering phase construction requirement when newly-built or the overhaul, to solve the problems such as production site restriction simultaneously, adopt modular construction technology to become construction necessary.When the truss especially adopting in super-huge building is installed and builds, plane object stream is most important.Sometimes because place insufficient space can not directly lift on truss position, design a kind of movably planar system and seem very important.
Summary of the invention
For addressing the above problem, the utility model provides a kind of slip list Pin and many truss structures moulding bed, and no longer assemble truss installation site, in plane site, assembles, then slippage is installed to truss position, can effectively solve the problem of truss installing space deficiency.
For achieving the above object, the utility model provides a kind of slip list Pin and many truss structures moulding bed, it comprises track, moulding bed, truss, pulling mechanism, described track is provided with moulding bed, on moulding bed, take dress truss, on described track, opposite side is also provided with pulling mechanism, and described pulling mechanism connects moulding bed by wire rope.
Described pulling mechanism comprises Lever Blocks or hoist engine.
The crab-bolt of mating formation under described track plate, crab-bolt plate and ground are chemical species anchorings, moulding bed and interorbital arrange tetrafluoroethene plate.
Described moulding bed comprises the moulding bed of horizontal direction, the moulding bed of vertical direction, and the moulding bed of vertical direction and the moulding bed of horizontal direction support by oblique ribs.
Described oblique ribs angle is 45-60 degree.
Use the utility model effect remarkable: what the utility model can be according to place needs designed path shift position, other position assembling truss outside truss installation site, by pulling mechanism, pull truss to move to truss installation site again, the utility model can rationally utilize space, place, avoids truss installation site to carry out the drawback of truss assembling inconvenience.By slippage equipment is set, crane gear lifting is hoisted in position not, can reduce the lifting capacity of lifting appliance, cost-saving.
Accompanying drawing explanation
Fig. 1 is moulding bed and the truss schematic diagram of slip list Pin and many truss structures moulding bed;
Fig. 2 is the structural representation of slip list Pin and many truss structures moulding bed.
1-track in figure, 2-moulding bed, 3-truss, 4-pulling mechanism.
The specific embodiment
embodiment 1
Slip list Pin and many truss structures 3, moulding bed 2, it comprises track 1, moulding bed 2, truss 3, pulling mechanism 4, and track 1 is provided with moulding bed 2, takes dress truss 3 on moulding bed 2, and on track 1, opposite side is also provided with pulling mechanism 4, and pulling mechanism 4 connects moulding bed 2 by wire rope.
General assembling track 1, moulding bed 2, truss 3 pass through following steps:
The first step: track 1 is laid: in consolidation shed ground basis, treat orientation and the size of slippage main couple 3, pre-designed slippage circuit, and utilize apparatus measures unwrapping wire on base plate to indicate.According to related request spacing, on base plate, accomplish fluently chemical anchor bolts, i-beam track is laid in crab-bolt plate top, track 1 adopts billet leveling, both sides horizontal slide rail axis is answered keeping parallelism, misalignment of axe is not more than 4mm, and the whole discrepancy in elevation is not more than 5mm, and amount of deflection is not more than 2mm, and with plate firm welding, between i-beam track, welded H section steel is firm across a certain distance mutually.
Second step: moulding bed setting: square box moulding bed 2 on the i-beam track laying in advance, this moulding bed 2 is double does assembled and slippage.And padded in advance tetrafluoroethene plate with i-beam track 1 contact node district below horizontal box moulding bed 2.
The 3rd step: truss lower edge is assembled, correction: utilize QUY260 crawler crane truss 3 lower chord members to be winched to above the moulding bed 2 laying in advance outside the venue, before QUY260 crawler crane pine hook, truss 3 members are proofreaied and correct and put in place, and oblique support is set in both sides in time after loose hook fixes, guarantee that truss 3 members are reliable and stable on moulding bed 1.
The 4th step: the large component assembly of lower edge and welding: after lower-chord panel point lifting puts in place, then lift another large-scale lower chord member, and weld after assembled correction.And in truss 3 both sides, front and back, support system is set and guarantees truss 3 stability and safety.
The 5th step: the assembled correction of middle web member: after truss 3 lower edge rod members are all installed and welded, start the middle web member of lifting and welding, when assembled web member, reliable support must be set, especially diagonal web member, guarantee that Stability Analysis of Structures is reliable on the one hand, another aspect guarantees that its diagonal web member is not out of shape because amount of deflection is excessive.
The 6th step: the assembled correction of winding up: truss 3 web members carry out the installation of corresponding moulding bed 2 after all installing and having welded in time, and in centre, be symmetrical arranged four vertical casing moulding bed bracing frame systems, reliable and stable during the component assembly of guaranteeing to wind up welding.
The 7th step: wind up and install and welding: chord member on assembled residue truss 3 on moulding bed 2, install after firm welding, must the reliable diagonal brace of multiple tracks be set in truss 3 both sides and fix, guarantee that truss does not topple.
The 8th step: truss welding and slippage: single Pin main couple 3 welds and detects a flaw after acceptance(check) above ground moulding bed 2, in the middle of being about to, four vertical casing moulding bed bracing frame systems are removed, before removing, reliable oblique ribs is set above both sides box moulding bed 2, and before and after truss 3 glide directions, both sides arrange reliable pulling device, while guaranteeing truss 3 slippage, stablize and do not topple.
Article two, on track 1, relevant position arranges assembly pulley and traction cucurbit, and track 1 end face is polished smooth, surface roughness reaches 1.6, and spread butter, sufficient lubrication, two arranged outside postive stop baffles below box moulding bed, the upper tetrafluoroethene plate of pad in baffle plate, track 1 welding in two of inner sides arranges two cover side direction pulleys.Guarantee truss 3 smooth slippage and safety.Before truss 3 slippages, towing point is set, each, two tracks, adopt Lever Blocks or hoist engine to draw, and are equipped with four door guide roller groups, and hauling speed should not be greater than 0.3m/min; During slippage, the asynchronous value in two ends should not be greater than 30mm.
embodiment 2
The setting of the present embodiment explanation slippage place setting and sliding rail 1.
1, slippage place arranges
This engineering B truss is taked A near axis list Pin main couple 3 assembled completing, and single truss structure 3 horizontal slidings, to the upright projection region of specified design installation position, amount to two truss structures 3 between slippage B axle and A ~ B axle.
The main assembled place of moulding bed 2 and slippage place are positioned between (2/7 axle ~ 1/8 axle)/A ~ B axle, in this region and part north and south expanded scope, must will in place, clean out, and remove the obstructions such as relevant civil engineering, guarantee that levelling of the land totally reaches truss slippage requirement.
2, the setting of sliding rail
B truss slippage need be laid four Pin I50c GB i iron altogether, from A axis to B axis laying length, is about 20m.Slippage is symmetrical two tracks 1, and between two i iron of every track 1, spacing 1m arranges H200*150*4.5*6 shaped steel and is welded and fixed.
Sliding rail below arranges expansion bolt on civil engineering concrete floor, along orbital direction spacing 500mm, arranges, and expansion bolt buried plate top and i-beam track 1 firm welding, specification plane should be greater than 300mm*300mm.
This engineering B three Pin main couple sizes are different, integral body is distributed in echelon by B axle to A axle, track 1 must be measured setting-out before laying in advance, according to the upright projection at design and installation position, position laying, after the first truss structure 3 slippages, during slippage the 2nd Pin, must re-start measurement setting-out, according to the location of main couple 3, sliding rail 1 be finely tuned, retighten and lay firmly.Guarantee that as far as possible it is upright projection in place and that install below that truss 3 slippages put in place, reduces the work of readjusting orientation.
Claims (5)
1. slip list Pin and many truss structures moulding bed, it is characterized in that: it comprises track, moulding bed, truss, pulling mechanism, described track is provided with moulding bed, takes dress truss on moulding bed, on described track, opposite side is also provided with pulling mechanism, and described pulling mechanism connects moulding bed by wire rope.
2. slip list Pin according to claim 1 and many truss structures moulding bed, is characterized in that: described pulling mechanism comprises Lever Blocks or hoist engine.
3. slip list Pin according to claim 1 and many truss structures moulding bed, is characterized in that: the crab-bolt of mating formation under described track plate, and crab-bolt plate and ground are chemical species anchorings, moulding bed and interorbital arrange tetrafluoroethene plate.
4. slip list Pin according to claim 1 and many truss structures moulding bed, is characterized in that: described moulding bed comprises the moulding bed of horizontal direction, the moulding bed of vertical direction, and the moulding bed of vertical direction and the moulding bed of horizontal direction support by oblique ribs.
5. slip list Pin according to claim 4 and many truss structures moulding bed, is characterized in that: described oblique ribs angle is 45-60 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320834619.3U CN203961317U (en) | 2013-12-18 | 2013-12-18 | Slip list Pin and many truss structures moulding bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320834619.3U CN203961317U (en) | 2013-12-18 | 2013-12-18 | Slip list Pin and many truss structures moulding bed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203961317U true CN203961317U (en) | 2014-11-26 |
Family
ID=51921918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320834619.3U Expired - Fee Related CN203961317U (en) | 2013-12-18 | 2013-12-18 | Slip list Pin and many truss structures moulding bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203961317U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104863374A (en) * | 2015-04-27 | 2015-08-26 | 中国建筑第八工程局有限公司 | Slip mechanism of long-span steel structure and slip method of same |
CN111042539A (en) * | 2019-12-02 | 2020-04-21 | 中建钢构有限公司 | Single-point support installation construction method for large-span steel structure truss |
CN111379424A (en) * | 2020-03-05 | 2020-07-07 | 广州建筑股份有限公司 | Anti-overturning device and method for planar structure sliding construction |
CN115405115A (en) * | 2022-09-30 | 2022-11-29 | 中建八局第二建设有限公司 | Slidable assembled jig frame and application method |
-
2013
- 2013-12-18 CN CN201320834619.3U patent/CN203961317U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104863374A (en) * | 2015-04-27 | 2015-08-26 | 中国建筑第八工程局有限公司 | Slip mechanism of long-span steel structure and slip method of same |
CN104863374B (en) * | 2015-04-27 | 2017-03-29 | 中国建筑第八工程局有限公司 | Large-span steel slipping mechanism and its gliding method |
CN111042539A (en) * | 2019-12-02 | 2020-04-21 | 中建钢构有限公司 | Single-point support installation construction method for large-span steel structure truss |
CN111042539B (en) * | 2019-12-02 | 2022-06-24 | 中建钢构工程有限公司 | Single-point support installation construction method for large-span steel structure truss |
CN111379424A (en) * | 2020-03-05 | 2020-07-07 | 广州建筑股份有限公司 | Anti-overturning device and method for planar structure sliding construction |
CN115405115A (en) * | 2022-09-30 | 2022-11-29 | 中建八局第二建设有限公司 | Slidable assembled jig frame and application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104088449B (en) | Safe and fast double-track construction platform of super high-rise curtain wall | |
CN101899905B (en) | Hoisting slide devices and hoisting slide equipment | |
CN104060844A (en) | Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof | |
CN105000482B (en) | Tower crane with walking mechanism | |
CN103821087B (en) | Prefabricated bridge Steel Space pipe concrete truss combination beams and construction method | |
CN203821720U (en) | High-altitude large roof panel installing tool trolley | |
CN203961317U (en) | Slip list Pin and many truss structures moulding bed | |
CN111038940A (en) | Rail mounted is used for hoist and mount traction system of transportation | |
CN208995928U (en) | A kind of multi-functional erection crane suitable for composite beam construction | |
CN202416882U (en) | Track for slippage installation of large-span pipe truss | |
CN102190249B (en) | Method for hoisting equipment positioned at bottom of multilayer frame platform | |
CN212251443U (en) | Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN105019664A (en) | High-altitude sliding installation method for box room type electric room | |
CN108396749B (en) | Installation system and installation method of steel support in foundation pit | |
CN201850076U (en) | Gate-shaped stand rod hoist of contact network | |
CN103291078B (en) | A kind of steel girder erection equipment | |
CN204282843U (en) | The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction | |
CN202627483U (en) | Pressure weight type railless slip form | |
CN202482772U (en) | Collapse-proof stop block mounting system for railway bridge | |
CN201857761U (en) | Hoisting and sliding device and hoisting and sliding equipment | |
CN211711873U (en) | Rail mounted is used for hoist and mount traction system of transportation | |
CN202705923U (en) | Assembling platform installed close to bridge abutment roadbed | |
CN102535277B (en) | Device for completely moving railway turnout | |
CN105625732A (en) | Supporting-free construction method of ultrahigh overhung steel-structure truss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141126 Termination date: 20181218 |