CN105735481A - High-rise building core tube jacking platform climbing and thermal insulating device and construction method thereof - Google Patents
High-rise building core tube jacking platform climbing and thermal insulating device and construction method thereof Download PDFInfo
- Publication number
- CN105735481A CN105735481A CN201610113675.6A CN201610113675A CN105735481A CN 105735481 A CN105735481 A CN 105735481A CN 201610113675 A CN201610113675 A CN 201610113675A CN 105735481 A CN105735481 A CN 105735481A
- Authority
- CN
- China
- Prior art keywords
- climbs
- vertical structure
- core tube
- hanger
- rise building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 63
- 230000009194 climbing Effects 0.000 title abstract description 8
- 238000009413 insulation Methods 0.000 claims description 29
- 238000010792 warming Methods 0.000 claims description 18
- 238000000034 method Methods 0.000 claims description 9
- 230000000630 rising effect Effects 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000004321 preservation Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3511—Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B2001/3572—Extraordinary methods of construction, e.g. lift-slab, jack-block using templates or jigs to set out buildings or parts thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Acoustics & Sound (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a high-rise building core tube jacking platform climbing and thermal insulating device and a construction method thereof. The climbing and thermal insulating device comprises a jacking platform and hanging racks hung onto the lower portion of the jacking platform. The bottom ends of the hanging racks are provided with climbing and heat insulating structures for conducting heat preservation on vertical structures formed through pouring. By adopting the climbing and thermal insulating device, band molds are formed on the vertical structures of a core tube to maintain the vertical structures in time after construction of the vertical structures, so that the vertical concrete maintenance progress keeps up with the construction and building speed of the vertical structures, and the concrete quality of the vertical structures is further improved.
Description
Technical field
The present invention relates to one to climb attemperator, be specifically related to a kind of climb attemperator and construction method thereof suitable in core tube of high-rise building construction.
Background technology
Along with the raising of scientific and technological progress and construction technology, Super High heavy construction gets more and more, and Super High core wall structure horizontal structure often separates construction with vertical structure, and Core Walls Structure vertical structure adopts the formwork system-integral jacking platform that can certainly climb.
Can coordinate and consult shown in Fig. 1, integral jacking platform realizes the construction to vertical structure by lower hanger body, and lower hanger body is Construction of Steel Structure layer N+2, reinforcement construction layer N+1, concrete lift N and body of wall conservation layer N-1 (from top to bottom distinguishing successively) from vertical functionally subregion.
But, integral jacking platform carries out the prestissimo of vertical structure construction can reach every layer 3.5 days, this allows for the curing in the mold time (especially in the winter time) to construction vertical structure body of wall far from catching up with construction speed, therefore, under lifting platform, in the short time, repeatedly climb the curing time of rear lower vertical structure body of wall far from enough meeting construction requirement, and then the concrete quality of vertical structure is difficult to be guaranteed.
Summary of the invention
For overcoming the defect existing for prior art, a kind of core tube of high-rise building lifting platform is now provided to climb attemperator and construction method thereof, with the problem how it being formed in time curing in the mold after Core Walls Structure vertical structure is constructed, vertical concrete maintenance is made to catch up with self construction speed, thus improving the concrete quality of vertical structure further.
For achieving the above object, present invention firstly provides a kind of core tube of high-rise building lifting platform to climb attemperator, including lifting platform and the hanger under hanging on lifting platform, the bottom of hanger is provided with the insulation construction that climbs and forms insulation for the vertical structure built.
Preferably, this insulation construction that climbs includes:
Support, is fixedly arranged on the bottom of hanger and extends to the two sides of vertical structure;
Lifting rail, vertically the two sides of structure drive and are connected on support;
Warming plate, is fixedly arranged on lifting rail and is close to the two sides of vertical structure.
Core tube of high-rise building lifting platform of the present invention climbs the having the beneficial effects that of attemperator,
Utilize the lifting platform being originally used for building vertical structure and hanger that the insulation construction that climbs is installed, wherein, the support of insulation construction of climbing is fixedly arranged on the bottom of hanger, build the lifting of height by the lifting rail on support with vertical structure and rise, so that the vertical structure after building can be formed insulation to better ensure that pouring quality by warming plate on lifting rail in time.
Preferably, the bottom of hanger has the workbench extended to vertical structure, support is quadra, the top of quadra hang on workbench, one end that workbench extends to vertical structure is provided with drag-line, drag-line oblique pull, on hanger, has installed tripod between top and bottom and the lifting rail of quadra respectively.
Preferably, support is provided with motor, and with gear on motor, the back side of lifting rail is provided with sawtooth, and gear engagement is connected on the sawtooth of lifting rail, and then is controlled the rising of lifting rail by motor.
Preferably, the back side of every piece of warming plate is respectively provided on two sides with two lifting rails, and each lifting rail is equipped with a motor and a gear.
For realizing above-mentioned purpose better, the present invention also provides for a kind of core tube of high-rise building lifting platform and climbs heat insulating construction method, including following construction procedure:
Utilize the lifting platform being arranged at above construction, first under described lifting platform, hang multiple hanger for building vertical structure, the insulation construction that climbs is set then at the bottom of hanger and forms insulation for the vertical structure built.
Preferably, arrange described in the insulation construction that climbs include following construction procedure: the fixed support extended to vertical structure two sides in the bottom of hanger;
The vertically two sides of structure, drive lifting rail and are connected on support;
On lifting rail, fixed warming plate is to be close to the vertical structure after building.
Core tube of high-rise building lifting platform of the present invention climbs the having the beneficial effects that of heat insulating construction method,
Utilize the lifting platform being originally used for building vertical structure and hanger that the insulation construction that climbs is installed, wherein, the support of insulation construction of climbing is fixedly arranged on the bottom of hanger, build the lifting of height by the lifting rail on support with vertical structure and rise, so that the new vertical structure after building can be formed insulation to better ensure that pouring quality by warming plate on lifting rail in time.
Preferably, the insulation construction that climbs described in arranging is further comprising the steps of: arrange the workbench extended to vertical structure in the bottom of hanger, support is quadra, the top of quadra is hung on workbench, in workbench, a drag-line is set on one end that vertical structure extends, by drag-line oblique pull on hanger, between the top and bottom and lifting rail of quadra, install tripod respectively.
Preferably, the insulation construction that climbs described in arranging is further comprising the steps of: arrange motor on support, wherein, with gear on motor, the back side of lifting rail is provided with sawtooth, gear engagement is connected on the sawtooth of lifting rail, and then is controlled the rising of lifting rail by motor.
Preferably, the insulation construction that climbs described in arranging is further comprising the steps of: be respectively provided with two lifting rails in the both sides, the back side of every piece of warming plate, and wherein, each lifting rail is equipped with a motor and a gear.
Accompanying drawing explanation
Fig. 1 is that core tube of high-rise building lifting platform of the present invention climbs the overall side structural representation of attemperator;
Fig. 2 is the structure for amplifying schematic diagram of a-quadrant in Fig. 1;
Fig. 3 is the structure for amplifying schematic diagram in B region in Fig. 2;
Fig. 4 is the cross sectional representation of lifting rail and warming plate in Fig. 3;
Fig. 5 is the facade structures schematic diagram corresponding to Fig. 4.
Detailed description of the invention
Below by way of specific instantiation, embodiments of the present invention being described, those skilled in the art the content disclosed by this specification can understand other advantages and effect of the present invention easily.The present invention can also be carried out by additionally different detailed description of the invention or apply, and the every details in this specification based on different viewpoints and application, can also carry out various modification or change under the spirit without departing from the present invention.
In conjunction with shown in Fig. 1 and Fig. 2, present invention firstly provides a kind of core tube of high-rise building lifting platform to climb attemperator, such as Fig. 1, platform truss 5 it is provided with on construction position, multiple hangers 1 hang on platform truss 5 times, build formation vertical structure 2 by hanger 1 in both sides, the insulation construction that climbs is set in the bottom of hanger and forms insulation for the vertical structure 2 built.This insulation construction that climbs includes: support 3, is fixedly arranged on the bottom of hanger 1 and extends to the two sides of vertical structure 2;Lifting rail 9, vertically the two sides of structure 2 drive and are connected on support 3;Warming plate 4, is fixedly arranged on lifting rail 9 and is close to the two sides of vertical structure 2.
Specifically, such as Fig. 2, support 3 is provided with motor 6 and switch-box 7, switch-box 7 is electrically connected to motor 6 to control the keying of motor 6, with gear 60 on motor 6, the back side of lifting rail 9 is provided with sawtooth 90, and gear 60 engagement is connected on the sawtooth 90 of lifting rail 9, and then is controlled the rising of lifting rail 9 by motor 6.
Comparatively preferably, in conjunction with shown in Fig. 2 and Fig. 3, the each more than bottom of hanger 1 and bottom height is respectively provided with the workbench 10 extended to vertical structure 2, support 3 is quadra, the top of quadra hang on workbench 10, workbench 10 is provided with drag-line 12 to one end that vertical structure 2 extends, and drag-line 12 oblique pull, on hanger 1, has installed tripod 30 respectively between the top of quadra 3 and bottom and lifting rail 9.In conjunction with shown in Fig. 4 and Fig. 5, the back side of every piece of warming plate 4 is respectively provided on two sides with two lifting rails 9, and wherein, each lifting rail 9 is equipped with a motor 6 and a gear 60.
Present invention also offers a kind of core tube of high-rise building lifting platform to climb heat insulating construction method, above-mentioned constructing structure also can be carried out by this construction method, and this construction method includes following construction procedure:
Originally just it was arranged at the platform truss 5 above construction as it is shown in figure 1, utilize, and multiple hangers 1 was hung on platform truss and forms vertical structure 2 for building 5 times.
Certainly, template 8 has been installed in the both sides of vertical structure 2 to be built for casting concrete, to form concrete lift n-quadrant;
Shown in Fig. 2, the fixed support 3 extended to vertical structure 2 two sides in the bottom of hanger 1, wherein, specifically, arranging the workbench 10 extended to vertical structure 2 in the bottom of hanger 1, support 3 is quadra, the top of quadra is hung on workbench 10, in workbench 10, a drag-line 12 is set on one end that vertical structure 2 extends, by drag-line 12 oblique pull on hanger 1, between the top of quadra and bottom and lifting rail 9, has installed tripod 30 respectively;
Shown in Fig. 3, the vertically two sides of structure 2, being driven by lifting rail 9 is connected on support 3, wherein, specifically, motor 6 is set on support 3, wherein, with gear 60 on motor 6, the back side of lifting rail 9 is provided with sawtooth 90, gear 60 engagement is connected on the sawtooth 90 of lifting rail 9, and then is controlled the rising of lifting rail 9 by motor 6;
Look back Fig. 2, fixed warming plate 4 be close to the vertical structure after building 2 on lifting rail 9, wherein, specifically, it is respectively provided with two lifting rails 9 in the both sides, the back side of every piece of warming plate 4, and each lifting rail 9 is equipped with 6, gear 60 of a motor and a switch-box 7;
With this, form, by the both sides of support 3, lifting rail 9 and the warming plate 4 vertical structure 2 after building, the insulation construction that climbs;
Look back Fig. 1, pouring construction is proceeded to form new vertical structure 2 ' in above position, the middle part of hanger 1, lifting rail 9 is built the lifting of height with vertical structure 2 and rises, and then the surface of the vertical structure 2 built has warming plate 4 to be close to insulation always.
After completing above-mentioned implementation process, the following characteristics of the present invention should be able to be embodied:
The present invention, by utilizing the drive of motor gear to realize band guide rail warming plate from climbing, increases the concrete curing time of Core Walls Structure vertical structure, it is ensured that concrete construction quality.
It should be noted that, the structure of this specification institute accompanying drawings depicted, ratio, size etc., all only in order to coordinate the disclosed content of description, understand for those skilled in the art and read, it is not limited to the enforceable qualifications of the present invention, therefore do not have technical essential meaning, the adjustment of the modification of any structure, the change of proportionate relationship or size, under not affecting effect that the present invention can be generated by and the purpose that can reach, all should still drop on disclosed technology contents and obtain in the scope that can contain.Simultaneously, in this specification cited as " on ", D score, "left", "right", " centre " and " one " etc. term, it is merely convenient to understanding of narration, and it is not used to limit the enforceable scope of the present invention, the change of its relativeness or adjustment, changing under technology contents without essence, when being also considered as the enforceable category of the present invention.
Above in association with accompanying drawing embodiment, the present invention being described in detail, the present invention can be made many variations example by those skilled in the art according to the above description.Thus, some details in embodiment should not constitute limitation of the invention, the present invention by the scope that defines using appended claims as protection domain.
Claims (10)
1. core tube of high-rise building lifting platform climbs an attemperator, including lifting platform and the hanger under hanging on lifting platform, it is characterised in that the bottom of described hanger is provided with the insulation construction that climbs and forms insulation for the vertical structure built.
2. core tube of high-rise building lifting platform according to claim 1 climbs attemperator, it is characterised in that described in the insulation construction that climbs include:
Support, is fixedly arranged on the bottom of described hanger and extends to the two sides of described vertical structure;
Lifting rail, the two sides along described vertical structure drive and are connected on described support;
Warming plate, is fixedly arranged on described lifting rail and is close to the two sides of described vertical structure.
3. core tube of high-rise building lifting platform according to claim 2 climbs attemperator, it is characterised in that
The bottom of described hanger has the workbench extended to described vertical structure, described support is quadra, the top of described quadra hang on described workbench, one end that described workbench extends to described vertical structure is provided with drag-line, described drag-line oblique pull, on described hanger, has installed tripod respectively between the top of described quadra and bottom and described lifting rail.
4. climb attemperator according to the arbitrary described core tube of high-rise building lifting platform of claim 2 to 3, it is characterised in that
Described support is provided with motor, and with gear on described motor, the back side of described lifting rail is provided with sawtooth, and the engagement of described gear is connected on the sawtooth of described lifting rail, and then is controlled the rising of described lifting rail by described motor.
5. core tube of high-rise building lifting platform according to claim 4 climbs attemperator, it is characterised in that
The back side of every piece of described warming plate is respectively provided on two sides with two described lifting rails, and each described lifting rail is equipped with a described motor and a described gear.
6. a core tube of high-rise building lifting platform climbs heat insulating construction method, it is characterised in that include following construction procedure:
Utilize the lifting platform being arranged at above construction, first under described lifting platform, hang multiple hanger for building vertical structure, the insulation construction that climbs is set then at the bottom of described hanger and forms insulation for the described vertical structure built.
7. core tube of high-rise building lifting platform according to claim 6 climbs heat insulating construction method, it is characterised in that the insulation construction that climbs described in arranging includes following construction procedure:
The fixed support extended to described vertical structure two sides in the bottom of described hanger;
Along the two sides of the described vertical structure built, lifting rail is driven and is connected on described support;
On described lifting rail, fixed warming plate is to be close to the described vertical structure built.
8. core tube of high-rise building lifting platform according to claim 7 climbs heat insulating construction method, it is characterised in that the insulation construction that climbs described in arranging includes following construction procedure:
The workbench extended to described vertical structure is set in the bottom of described hanger, described support is quadra, the top of described quadra is hung on described workbench, in described workbench, a drag-line is set on one end that described vertical structure extends, by described drag-line oblique pull on described hanger, between the top of described quadra and bottom and described lifting rail, install tripod respectively.
9. climb heat insulating construction method according to the arbitrary described core tube of high-rise building lifting platform of claim 7 to 8, it is characterised in that the insulation construction that climbs described in arranging includes following construction procedure:
Arranging motor on described support, wherein, with gear on described motor, the back side of described lifting rail is provided with sawtooth, the engagement of described gear is connected on the sawtooth of described lifting rail, and then is controlled the rising of described lifting rail by described motor.
10. core tube of high-rise building lifting platform according to claim 9 climbs heat insulating construction method, it is characterised in that the insulation construction that climbs described in arranging includes following construction procedure:
Being respectively provided with two described lifting rails in the both sides, the back side of warming plate every piece described, wherein, each described lifting rail is equipped with a described motor and a described gear.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610113675.6A CN105735481B (en) | 2016-03-01 | 2016-03-01 | Core tube of high-rise building lifting platform climbs attemperator and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610113675.6A CN105735481B (en) | 2016-03-01 | 2016-03-01 | Core tube of high-rise building lifting platform climbs attemperator and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105735481A true CN105735481A (en) | 2016-07-06 |
CN105735481B CN105735481B (en) | 2017-10-13 |
Family
ID=56248784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610113675.6A Active CN105735481B (en) | 2016-03-01 | 2016-03-01 | Core tube of high-rise building lifting platform climbs attemperator and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105735481B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400951A (en) * | 2016-10-10 | 2017-02-15 | 中国建筑第八工程局有限公司 | Synchronous construction method for horizontal and vertical structures of super high-rise building |
CN107190860A (en) * | 2017-06-05 | 2017-09-22 | 中国建筑第八工程局有限公司 | The automatic lifting system of Steel Structure Installation |
CN107761961A (en) * | 2017-09-11 | 2018-03-06 | 贵州建工集团第建筑工程有限责任公司 | A kind of electronic climbing frame monolithic construction method of high-rise building |
CN108331175A (en) * | 2018-04-29 | 2018-07-27 | 王林 | Telescopiform integrally promotes architectural construction |
CN108560992A (en) * | 2018-03-14 | 2018-09-21 | 扬州中创模板有限公司 | The construction equipment and concrete placings construction method of towering structure |
CN109750841A (en) * | 2019-01-15 | 2019-05-14 | 上海建工一建集团有限公司 | A kind of distributing platform system of tube structure construction |
CN111058618A (en) * | 2019-12-27 | 2020-04-24 | 上海建工集团股份有限公司 | Combined type telescopic sleeve jacking device and method thereof |
CN114541728A (en) * | 2022-02-28 | 2022-05-27 | 中建三局集团有限公司 | Lightweight and modular self-climbing external frame system for assembled structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01322049A (en) * | 1988-06-23 | 1989-12-27 | Nippon Kaiser Kk | Heat insulating concrete wall and its construction method |
JP2001049756A (en) * | 1999-08-05 | 2001-02-20 | Ohbayashi Corp | Non-combustible core material and heat insulating wall using the same and construction method therefor |
CN102345388A (en) * | 2011-07-12 | 2012-02-08 | 中国十七冶集团有限公司 | Construction method for heat-preservation maintenance of shell sliding-formwork concrete under low-temperature condition |
CN202969968U (en) * | 2012-12-21 | 2013-06-05 | 天津矿山工程有限公司 | Synovium heat preservation structure under the condition of high cold |
CN103643740A (en) * | 2013-11-12 | 2014-03-19 | 浙江江南春建设集团有限公司 | Steel pipe column concrete jacking construction method |
-
2016
- 2016-03-01 CN CN201610113675.6A patent/CN105735481B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01322049A (en) * | 1988-06-23 | 1989-12-27 | Nippon Kaiser Kk | Heat insulating concrete wall and its construction method |
JP2001049756A (en) * | 1999-08-05 | 2001-02-20 | Ohbayashi Corp | Non-combustible core material and heat insulating wall using the same and construction method therefor |
CN102345388A (en) * | 2011-07-12 | 2012-02-08 | 中国十七冶集团有限公司 | Construction method for heat-preservation maintenance of shell sliding-formwork concrete under low-temperature condition |
CN202969968U (en) * | 2012-12-21 | 2013-06-05 | 天津矿山工程有限公司 | Synovium heat preservation structure under the condition of high cold |
CN103643740A (en) * | 2013-11-12 | 2014-03-19 | 浙江江南春建设集团有限公司 | Steel pipe column concrete jacking construction method |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400951A (en) * | 2016-10-10 | 2017-02-15 | 中国建筑第八工程局有限公司 | Synchronous construction method for horizontal and vertical structures of super high-rise building |
CN106400951B (en) * | 2016-10-10 | 2019-04-30 | 中国建筑第八工程局有限公司 | A kind of level and vertical structure method for synchronously constructing of super high-rise building |
CN107190860A (en) * | 2017-06-05 | 2017-09-22 | 中国建筑第八工程局有限公司 | The automatic lifting system of Steel Structure Installation |
CN107190860B (en) * | 2017-06-05 | 2023-05-02 | 中国建筑第八工程局有限公司 | Automatic jacking system for steel structure installation |
CN107761961A (en) * | 2017-09-11 | 2018-03-06 | 贵州建工集团第建筑工程有限责任公司 | A kind of electronic climbing frame monolithic construction method of high-rise building |
CN108560992A (en) * | 2018-03-14 | 2018-09-21 | 扬州中创模板有限公司 | The construction equipment and concrete placings construction method of towering structure |
CN108560992B (en) * | 2018-03-14 | 2023-10-31 | 扬州市中润模板有限公司 | Construction equipment for high-rise structure and concrete pouring construction method |
CN108331175A (en) * | 2018-04-29 | 2018-07-27 | 王林 | Telescopiform integrally promotes architectural construction |
CN109750841A (en) * | 2019-01-15 | 2019-05-14 | 上海建工一建集团有限公司 | A kind of distributing platform system of tube structure construction |
CN109750841B (en) * | 2019-01-15 | 2024-02-13 | 上海建工一建集团有限公司 | Material distribution platform system for barrel structure construction |
CN111058618A (en) * | 2019-12-27 | 2020-04-24 | 上海建工集团股份有限公司 | Combined type telescopic sleeve jacking device and method thereof |
CN114541728A (en) * | 2022-02-28 | 2022-05-27 | 中建三局集团有限公司 | Lightweight and modular self-climbing external frame system for assembled structure |
Also Published As
Publication number | Publication date |
---|---|
CN105735481B (en) | 2017-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735481A (en) | High-rise building core tube jacking platform climbing and thermal insulating device and construction method thereof | |
RU2012115679A (en) | METHOD FOR PRODUCING AN ELEVATOR | |
JP2010534780A (en) | Method for forming multiple horizontal structural members | |
CN103993745B (en) | A kind of conversion beam integral hoisting device for rapid and hanging method thereof | |
US2705359A (en) | Monolithic building construction | |
CN201538462U (en) | Brick-feeding bracket for cock oven masonry | |
CN105672694A (en) | Lifting platform box girder support structure for super high-rise buildings and construction method thereof | |
CN103434933B (en) | Large member hoisting in-position device and in-position method | |
CN214167097U (en) | Lifting appliance for integral steel reinforcement framework of railway box girder | |
CN202248859U (en) | Sliding shifted formwork construction device | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN108792924B (en) | Reinforcing steel bar positioning frame | |
CN204199688U (en) | Floor slab preformed hole hangs mould mounting structure | |
CN202687773U (en) | Hoisting hook, and hoisting device of vehicle frame | |
CN203144909U (en) | Bridge high pier roller die construction device | |
CN205975995U (en) | Cast -in -place concrete floor indent steel tube frame | |
CN204848154U (en) | Curtain formula membrane teeming stage | |
CN204455737U (en) | High-speed railway subgrade lateral sulcus integral construction assembly | |
CN207484991U (en) | A kind of glass curtain wall monorail hoisting structure | |
CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
CN107974946A (en) | A kind of long hoist cable installation auxiliary device of suspension bridge and preparation method thereof and application method | |
CN208534063U (en) | A kind of hanger device | |
CN203229334U (en) | Lifting framework for lifting and translating single steel member | |
CN202831629U (en) | Split mounting type steel-wood stair template | |
CN203755682U (en) | Secondary pouring form board constructing structure for small opening of concrete structure floor slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |