CN108331175A - Telescopiform integrally promotes architectural construction - Google Patents
Telescopiform integrally promotes architectural construction Download PDFInfo
- Publication number
- CN108331175A CN108331175A CN201810405581.5A CN201810405581A CN108331175A CN 108331175 A CN108331175 A CN 108331175A CN 201810405581 A CN201810405581 A CN 201810405581A CN 108331175 A CN108331175 A CN 108331175A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- architectural construction
- jack
- promotion
- construction according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3511—Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of architectural construction, especially a kind of telescopiform interaction rises, and does not have to the whole of outdoor overhead operation and promotes architectural construction and construction method, does not have any impact to urban environment, while shortening the duration, reduce labor intensity, most importantly:This programme operation is all controlled with computer, more meets modern management requirement.The power drive that scheme uses is Double acting through type jack, as shown in the figure:Jack one end is fixed on reinforced concrete Core Walls Structure 1,10 sets of companies of the other end and steel pipe column, steel pipe column is fixed between two layers of Vierendeel girder 8, when jack climbs upwards, Core Walls Structure 1 is driven to be lifted up a story height, it is on the contrary, when jack climbs downwards, Vierendeel girder 8 is up promoted a story height, is so moved in circles, and building is promoted to design height by interaction.
Description
Technical field
The present invention relates to a kind of architecture structure form and corresponding engineering construction scheme, in especially a kind of telescopiform interaction
It rises, and does not have to the whole of outdoor overhead operation substantially and promote architectural construction scheme and construction method.
Background technology
Conventional architecture structure form is reinforced concrete frame structure, reinforced concrete frame shear wall structure, reinforced concrete core at present
The structure types such as heart barrel structure, steel construction, brick mix structure, their sequence of construction are all main body knots of first having constructed from top to bottom
Structure, building enclosure of then constructing from top to bottom again and exterior wall finishing engineering, construction personnel must follow agent structure from top to bottom,
Followed by exterior wall finishing engineering from top to bottom so again and again, until Practical Completion a set of conventional operational procedure, but it
There are the drawbacks of be also it will be apparent that such as:Worker's working at height has larger personal safety hidden danger;Falling object from high altitude applies ground
Worker person or pedestrian are likely to cause injury;Tower crane load lifts by crane the harassing and wrecking to facing side resident and pedestrian;Besides to city shape
Adverse effect etc. as caused by with environment.
Invention content
To solve the above-mentioned problems, present invention employs a kind of reverse arrangement and method for construction different from routine:Carry out basis
Afterwards, first by the building of top layer include exterior wall finishing all ground construction complete, it is using whole hoisting way that entire building is upward
After promoting a story height, then the layer second from the bottom in ground construction building, then by the top layer in building and layer second from the bottom
After promoting a story height together, then the layer third from the bottom in ground construction building, it moves in circles in this way, building seems just
Until design height as growing tall naturally.The structure type that the present invention is taken is reinforced concrete frame core wall structure, here
Core Walls Structure refer to the Core Walls Structure group being made of multiple cores cylinder, as in Fig. 1 main Core Walls Structure 1 and 4 auxiliary 2 groups of Core Walls Structures
At the function of Core Walls Structure 1 is mainly elevator and staircase;Core Walls Structure 2 is usually piping shaft or ventilation shaft etc..Core Walls Structure group with
Frame is respectively mutually independent stress system, their mutual intussusceptions in the construction stage(See Fig. 2-Fig. 6), pass through jack and steel
Tubing string is temporarily attached to together(Such as Fig. 7 and Fig. 8), using the effect up and down of jack, drive reinforced concrete frame and reinforced concrete
Core Walls Structure group alternates rising, and Core Walls Structure group can be promoted and can also be promoted respectively simultaneously, depends on Mechanics Calculation, until big
Building is thus lifted to design height.
The beneficial effects of the invention are as follows:The buildings Zheng Dong construction operation is essentially all to be carried out on ground or underground, is not present
Outdoor overhead operation, vertical transport do not have to setting tower crane, and alien invasion finishing is molded in ground synchronous, not any to urban environment
It influences, while shortening the construction period, reduce labor intensity, most importantly:This programme lifting system uses hydraulic-driven,
Operation is all controlled with computer, is fully achieved building engineering construction mechanization, is more met modern management requirement, but also very
Solve the various inconvenient and drawbacks that conventional construction is brought well.
Description of the drawings:Fig. 1 is structural plan figure, and vertical structure is made of reinforced concrete Core Walls Structure group, and planar structure is reinforcing bar
Concrete frame;Fig. 2 is the building top layer elevation completed in ground construction;After the buildings Tu3Shi Jiang top layer promotes a story height
Elevation;Fig. 4 is that building layer elevation second from the bottom is completed in construction;The buildings Tu5Shi Jiang top layer and layer second from the bottom carry together
Rise the elevation after a story height;Fig. 6 is that building layer elevation third from the bottom is completed in construction;Fig. 7 is that jack is climb
The drawing for rising and Core Walls Structure being driven to be lifted up;Fig. 8 is the full-page proof that jack climbs downwards and is lifted up main body frame
Figure;Fig. 9 is Double acting through type jack top plan view.Wherein:Label 1 refers to the main Core Walls Structure of building top layer;Label 2 refers to
Building top layer assists Core Walls Structure;Label 3 refers to building top floor body;Label 4 refers to building floor body second from the bottom;Label 5 refers to building
The main Core Walls Structure of layer second from the bottom;Label 6 refers to building layer second from the bottom and assists Core Walls Structure;Label 7 refers to building floor body third from the bottom;
Label 8 refers to Reinforced Concrete Beamsin Frame Construction;Label 9 refers to Double acting through type jack;Label 10 refers to jack and climbs steel pipe column.
Specific implementation mode:The power drive that this programme uses is Double acting through type jack, as shown in Figure 7, Figure 8:
9 one end of jack is fixed on reinforced concrete Core Walls Structure 1 or 2, and 10 sets of companies of the other end and steel pipe column, steel pipe column 10 is fixed on two layers of frame
It sets a roof beam in place between 8, when jack 9 climbs upwards(As shown in Figure 7), drive Core Walls Structure 1 or 2 to be lifted up, practical figure 4 above and Fig. 6
Indicate Construction State of the Core Walls Structure after inside buildings improve a story height;Conversely, when jack 9 climbs downwards(Such as
Shown in Fig. 8), Vierendeel girder 8 is up promoted, as Fig. 3, Fig. 5 building body indicated are moving upward a story height.Lifting force
Depending on the quantity of jack setting, jack is arranged more, and lifting force is also bigger, before the load and dead weight with building are
It carries.After the body construction completion of entire building reaches design height, reinforced concrete frame and Core Walls Structure are rigidly connected between the two
For an entirety.
Claims (9)
1. a kind of whole promotion architectural construction, structural system are made of reinforced concrete frame and reinforced concrete Core Walls Structure group, feature exists
In:The Core Walls Structure group is respectively independent stress system with frame in the construction stage, their mutual intussusceptions, by jack and climbs
Rising stem is temporarily attached to together, and using jack as power, by climbing, bar drives reinforced concrete frame and reinforced concrete Core Walls Structure
Flock-mate is for rising until reaching design height.
2. a kind of whole promotion architectural construction according to claim 1, it is characterised in that:The structural system can be by
Reinforced concrete frame, reinforced concrete shear wall and reinforced concrete core wall structure system composition.
3. a kind of whole promotion architectural construction according to claim 1, it is characterised in that:The structural system can be by
Steel construction and reinforced concrete structural system composition.
4. a kind of whole promotion architectural construction according to claim 1, it is characterised in that:The structural system can be by
Two or more steel structure system forms.
5. a kind of whole promotion architectural construction according to claim 1-4, it is characterised in that:The promotion power is liquid
Press Double acting through type jack.
6. a kind of whole promotion architectural construction according to claim 1-4, it is characterised in that:The promotion power can be with
It is electric gear driving.
7. a kind of whole promotion architectural construction according to claim 1-4, it is characterised in that:The promotion power can be with
It is electronic pulley drive.
8. a kind of whole promotion architectural construction according to claim 1-4, it is characterised in that:The bar that climbs is metal
Tubing string.
9. a kind of whole promotion architectural construction according to claim 1-4, it is characterised in that:The bar that climbs can be
Solid metal column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810405581.5A CN108331175A (en) | 2018-04-29 | 2018-04-29 | Telescopiform integrally promotes architectural construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810405581.5A CN108331175A (en) | 2018-04-29 | 2018-04-29 | Telescopiform integrally promotes architectural construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108331175A true CN108331175A (en) | 2018-07-27 |
Family
ID=62934528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810405581.5A Pending CN108331175A (en) | 2018-04-29 | 2018-04-29 | Telescopiform integrally promotes architectural construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108331175A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1585870A4 (en) * | 2002-12-23 | 2008-09-24 | Jacking Systems Ltd | Concrete slab lifting system |
CN102108786A (en) * | 2010-12-09 | 2011-06-29 | 浙江省天和建材集团有限公司 | Overall lifting construction method of ultra-large type building member and device thereof |
CN103243930A (en) * | 2013-04-23 | 2013-08-14 | 重庆大学 | System and method for modularized construction of super high-rise steel structures |
CN105735481A (en) * | 2016-03-01 | 2016-07-06 | 中国建筑第八工程局有限公司 | High-rise building core tube jacking platform climbing and thermal insulating device and construction method thereof |
CN105839784A (en) * | 2016-03-17 | 2016-08-10 | 杨春 | Assemble-jacking type building construction method |
CN107542267A (en) * | 2016-06-28 | 2018-01-05 | 中国二十冶集团有限公司 | The jacking contrary sequence method of skyscraper |
-
2018
- 2018-04-29 CN CN201810405581.5A patent/CN108331175A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1585870A4 (en) * | 2002-12-23 | 2008-09-24 | Jacking Systems Ltd | Concrete slab lifting system |
CN102108786A (en) * | 2010-12-09 | 2011-06-29 | 浙江省天和建材集团有限公司 | Overall lifting construction method of ultra-large type building member and device thereof |
CN103243930A (en) * | 2013-04-23 | 2013-08-14 | 重庆大学 | System and method for modularized construction of super high-rise steel structures |
CN105735481A (en) * | 2016-03-01 | 2016-07-06 | 中国建筑第八工程局有限公司 | High-rise building core tube jacking platform climbing and thermal insulating device and construction method thereof |
CN105839784A (en) * | 2016-03-17 | 2016-08-10 | 杨春 | Assemble-jacking type building construction method |
CN107542267A (en) * | 2016-06-28 | 2018-01-05 | 中国二十冶集团有限公司 | The jacking contrary sequence method of skyscraper |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN106400951B (en) | A kind of level and vertical structure method for synchronously constructing of super high-rise building | |
AU2013265054B2 (en) | High rise building elevation concept | |
US10392794B2 (en) | Structure and method of making the same | |
CN107060275A (en) | A kind of modularization elevator hoistways construction technology | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN101191382A (en) | Steel pillar supporting type integral self-lifting steel platform scaffold template system and constructing method thereof | |
CN107399656B (en) | Outdoor elevator and construction method thereof | |
CN202850498U (en) | Hydraulic support system used for elevator shaft mold | |
CN103741842A (en) | Lightweight fabricated shear wall structure | |
CN105839784B (en) | Assembled jacking type construction techniques | |
CN108868161A (en) | Adhere to console mode tower crane outside a kind of super-high building structure to interlock construction method | |
CN108286332A (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method | |
CN106013818A (en) | Semiautomatic self-climbing hoisting mechanism of light steel structure under closed structure | |
CN203684457U (en) | Light assembled shear wall structure | |
CN111648555A (en) | Laminated precast concrete elevator shaft way | |
CN108331175A (en) | Telescopiform integrally promotes architectural construction | |
CN110589690A (en) | Climbing method of internal climbing tower crane in narrow space | |
CN205894715U (en) | Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs | |
CN212507305U (en) | High-altitude operation platform applied to large-span factory building | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN112627543A (en) | Shaft inner lifting frame for mounting steel beams of core tube elevator shaft and steel beam construction method | |
CN204876576U (en) | Building construction system | |
CN212388905U (en) | Laminated precast concrete elevator shaft way | |
CN110817690B (en) | Transmission and hoisting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180727 |