CN105735481B - Core tube of high-rise building lifting platform climbs attemperator and its construction method - Google Patents

Core tube of high-rise building lifting platform climbs attemperator and its construction method Download PDF

Info

Publication number
CN105735481B
CN105735481B CN201610113675.6A CN201610113675A CN105735481B CN 105735481 B CN105735481 B CN 105735481B CN 201610113675 A CN201610113675 A CN 201610113675A CN 105735481 B CN105735481 B CN 105735481B
Authority
CN
China
Prior art keywords
vertical structure
lifting
lifting platform
hanger
climbs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610113675.6A
Other languages
Chinese (zh)
Other versions
CN105735481A (en
Inventor
邓明胜
苏亚武
周洪涛
裴鸿斌
刘鹏
杨俊鹏
杨红岩
柯子平
亓立刚
崔爱珍
戚明浩
姚闯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610113675.6A priority Critical patent/CN105735481B/en
Publication of CN105735481A publication Critical patent/CN105735481A/en
Application granted granted Critical
Publication of CN105735481B publication Critical patent/CN105735481B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3511Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B2001/3572Extraordinary methods of construction, e.g. lift-slab, jack-block using templates or jigs to set out buildings or parts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electromagnetism (AREA)
  • Acoustics & Sound (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Climbed attemperator and its construction method the invention provides a kind of core tube of high-rise building lifting platform, wherein, the attemperator that climbs includes lifting platform and the hanger hung under lifting platform, and the bottom of hanger, which is provided with, climbs insulation construction to be incubated the vertical structure formation for pouring completion.The present invention is solved how the problem of after Core Walls Structure vertical structure is constructed to its timely formation curing in the mold so that vertical concrete curing keeps up with itself construction speed, so as to further improve the concrete quality of vertical structure.

Description

Core tube of high-rise building lifting platform climbs attemperator and its construction method
Technical field
Climbed attemperator the present invention relates to one kind, and in particular to a kind of suitable for climbing that core tube of high-rise building is constructed Attemperator and its construction method.
Background technology
With scientific and technological progress and the raising of construction technology, Super High heavy construction is more and more, Super High Core Walls Structure knot Structure horizontal structure is often separately constructed with vertical structure, and Core Walls Structure vertical structure is using the formwork system-entirety that can be climbed certainly Lifting platform.
It can coordinate as shown in fig.1, integral jacking platform realizes construction to vertical structure by lower hanger body, and lower hang Support body is from vertically functionally subregion is that Construction of Steel Structure layer N+2, reinforcement construction layer N+1, concrete lift N and wall are supported again Sheath N-1 (is from top to bottom distinguished) successively.
However, the prestissimo that integral jacking platform carries out vertical structure construction can reach every layer 3.5 days, this is allowed for pair Construct vertical structure wall the curing in the mold time (especially in the winter time) far from construction speed is kept up with, therefore, in jacking The curing time of the multiple rear lower vertical structure wall that climbs is carried out in the platform lower short time far from construction requirement is enough met, is entered And the concrete quality of vertical structure is difficult to be guaranteed.
The content of the invention
To overcome the defect present in prior art, now provide a kind of core tube of high-rise building lifting platform climb insulation dress Put and its construction method, with how the problem of after Core Walls Structure vertical structure is constructed to its timely formation curing in the mold so that perpendicular Itself construction speed is kept up with to the maintenance of concrete, so as to further improve the concrete quality of vertical structure.
To achieve the above object, climbed attemperator present invention firstly provides a kind of core tube of high-rise building lifting platform, Including lifting platform and the hanger hung under lifting platform, the bottom of hanger, which is provided with, climbs insulation construction for having poured Into vertical structure formation insulation.
Preferably, the insulation construction that climbs includes:
Support, is fixedly arranged on the bottom of hanger and extends to the two sides of vertical structure;
Lifting rail, vertically the two sides drive connection of structure is on support;
Warming plate, is fixedly arranged on lifting rail and is close to the two sides of vertical structure.
The climb beneficial effect of attemperator of core tube of high-rise building lifting platform of the present invention is,
The insulation construction that climbs is installed using the lifting platform and hanger for being originally used for pouring vertical structure, wherein, climb The support of insulation construction is fixedly arranged on the bottom of hanger, by the lifting rail on support with vertical structure pour height lifting and Rise so that warming plate on lifting rail can in time to pouring after vertical structure formation insulation to better ensure that Pouring quality.
Preferably, the bottom of hanger has the workbench extended to vertical structure, and support is quadra, quadra Top is hung on workbench, and workbench is provided with drag-line to one end that vertical structure extends, and drag-line oblique pull is square on hanger Tripod has been installed respectively between the top of framework and bottom and lifting rail.
Preferably, support, which is provided with motor, motor, carries gear, and the back side of lifting rail is provided with sawtooth, gear engagement It is connected on the sawtooth of lifting rail, and then passes through the rising of motor control lifting rail.
Preferably, the back side both sides of every piece of warming plate are respectively equipped with two lifting rails, and each lifting rail is equipped with one Individual motor and a gear.
To be better achieved above-mentioned purpose, the present invention also provides a kind of insulation of climbing of core tube of high-rise building lifting platform and applied Work method, including following construction procedure:
Using the lifting platform being arranged above construction, first hang multiple hangers under the lifting platform to pour Vertical structure is built, is set then at the bottom of hanger and climbs insulation construction to be incubated the vertical structure formation for pouring completion.
Preferably, the insulation construction that climbed described in setting includes following construction procedure:It is fixed to vertical knot in the bottom of hanger The support of structure two sides extension;
Vertically two sides of structure, by lifting rail drive connection on support;
In fixed warming plate on lifting rail to be close to the vertical structure after pouring.
The climb beneficial effect of heat insulating construction method of core tube of high-rise building lifting platform of the present invention is,
The insulation construction that climbs is installed using the lifting platform and hanger for being originally used for pouring vertical structure, wherein, climb The support of insulation construction is fixedly arranged on the bottom of hanger, by the lifting rail on support with vertical structure pour height lifting and Rise so that warming plate on lifting rail can in time to pouring after new vertical structure formation insulation with preferably Ensure pouring quality.
Preferably, the insulation construction that climbed described in setting is further comprising the steps of:Set in the bottom of hanger to vertical structure The workbench of extension, support is quadra, and the top of quadra is hung on workbench, in workbench to vertical structure One drag-line is set on one end of extension, by drag-line oblique pull on hanger, in the top and bottom of quadra and lifting rail it Between installed tripod respectively.
Preferably, the insulation construction that climbed described in setting is further comprising the steps of:In setting motor on support, wherein, motor Upper to carry gear, the back side of lifting rail is provided with sawtooth, gear engagement is connected on the sawtooth of lifting rail, and then pass through electricity Machine controls the rising of lifting rail.
Preferably, the insulation construction that climbed described in setting is further comprising the steps of:In the back side both sides difference of every piece of warming plate Two lifting rails are set, wherein, each lifting rail is equipped with a motor and a gear.
Brief description of the drawings
Fig. 1 is that core tube of high-rise building lifting platform of the present invention climbs the overall side structure schematic diagram of attemperator;
Fig. 2 is the mplifying structure schematic diagram of a-quadrant in Fig. 1;
Fig. 3 is the mplifying structure schematic diagram in B regions in Fig. 2;
Fig. 4 is the cross-sectional view of lifting rail and warming plate in Fig. 3;
Fig. 5 is the facade structures schematic diagram corresponding to Fig. 4.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from Various modifications or alterations are carried out under the spirit of the present invention.
With reference to shown in Fig. 1 and Fig. 2, climbed present invention firstly provides a kind of core tube of high-rise building lifting platform and be incubated dress Put, such as Fig. 1, platform truss 5 is provided with construction position, multiple hangers 1 are hung under platform truss 5, pass through hanger 1 Pour to form vertical structure 2 in both sides, set in the bottom of hanger and climb insulation construction for the vertical structure 2 to pouring completion Form insulation.The insulation construction that climbs includes:Support 3, is fixedly arranged on the bottom of hanger 1 and extends to the two sides of vertical structure 2; Lifting rail 9, vertically the two sides drive connection of structure 2 is on support 3;Warming plate 4, is fixedly arranged on lifting rail 9 and tight It is affixed on the two sides of vertical structure 2.
Specifically, such as Fig. 2, support 3 is provided with motor 6 and switch-box 7, and switch-box 7 is electrically connected to motor 6 to control electricity Gear 60 is carried on the keying of machine 6, motor 6, the back side of lifting rail 9 is provided with sawtooth 90, and the engagement of gear 60, which is connected to climb, to be led On the sawtooth 90 of rail 9, and then pass through the rising of the control lifting rail 9 of motor 6.
More preferably, with reference to shown in Fig. 2 and Fig. 3, have respectively in each more than bottom and bottom of hanger 1 height The workbench 10 that oriented vertical structure 2 extends, support 3 is quadra, and the top of quadra is hung on workbench 10, work Make one end that platform 10 extends to vertical structure 2 and be provided with drag-line 12, the oblique pull of drag-line 12 on hanger 1, the top of quadra 3 and Tripod 30 has been installed between bottom and lifting rail 9 respectively.With reference to shown in Fig. 4 and Fig. 5, the back side both sides of every piece of warming plate 4 Two lifting rails 9 are respectively equipped with, wherein, each lifting rail 9 is equipped with a motor 6 and a gear 60.
Climbed heat insulating construction method, above-mentioned constructing structure present invention also offers a kind of core tube of high-rise building lifting platform Also it can be implemented by the construction method, the construction method includes following construction procedure:
As shown in figure 1, using original platform truss 5 being just arranged above construction, multiple hangers 1 are hung on flat Under platform truss 5 vertical structure 2 is formed for pouring.
Certainly, template 8 has been installed in the both sides of vertical structure 2 to be poured for casting concrete, to form concrete LIFT n-quadrant;
With reference to shown in Fig. 2, in the fixed support 3 extended to the two sides of vertical structure 2 in the bottom of hanger 1, wherein, specifically Ground, the workbench 10 extended to vertical structure 2 is set in the bottom of hanger 1, support 3 is quadra, by the top of quadra End is hung on workbench 10, in setting a drag-line 12 on one end that workbench 10 extends to vertical structure 2, by the oblique pull of drag-line 12 In on hanger 1, tripod 30 has been installed respectively between the top and bottom of quadra and lifting rail 9;
With reference to shown in Fig. 3, vertically two sides of structure 2, by the drive connection of lifting rail 9 on support 3, wherein, tool Body, in setting motor 6 on support 3, wherein, gear 60 is carried on motor 6, the back side of lifting rail 9 is provided with sawtooth 90, by tooth The engagement of wheel 60 is connected on the sawtooth 90 of lifting rail 9, and then passes through the rising of the control lifting rail 9 of motor 6;
Fig. 2 is looked back, in fixed warming plate 4 on lifting rail 9 and is close to the vertical structure after pouring 2, wherein, specifically Ground, two lifting rails 9 are set in the back side both sides of every piece of warming plate 4 respectively, and each lifting rail 9 is equipped with a motor 6th, a gear 60 and a switch-box 7;
With this, formed and climbed by the both sides of the vertical structure 2 of support 3, lifting rail 9 and warming plate 4 after pouring Insulation construction;
Fig. 1 is looked back, proceeds pouring construction to form new vertical structure 2 ' in the middle part above position of hanger 1, will Lifting rail 9 pours the lifting of height with vertical structure 2 and risen, and then pours the surface of the vertical structure 2 of completion and have always Warming plate 4 is close to insulation.
Complete after above-mentioned implementation process, the following characteristics of the present invention should be able to be embodied:
The present invention realizes that band guide rail warming plate, from climbing, increases Core Walls Structure vertical structure by using the drive of motor gear The concrete curing time, it is ensured that concrete construction quality.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to the enforceable limit of the present invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Under influence effect of the invention that can be generated and the purpose that can reach, it all should still fall and be obtained in disclosed technology contents In the range of covering.Meanwhile, it is cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State it is bright the present invention is made many variations example.Thus, some of embodiment details should not constitute limitation of the invention, this Invention regard the scope defined using appended claims as protection domain.

Claims (8)

  1. The attemperator 1. a kind of core tube of high-rise building lifting platform climbs, including lifting platform and hang under lifting platform Hanger, it is characterised in that the bottom of the hanger is provided with climbing insulation construction to form the vertical structure for pouring completion Insulation, the insulation construction that climbs includes:
    Support, is fixedly arranged on the bottom of the hanger and extends to the two sides of the vertical structure;
    Lifting rail, along the two sides drive connection of the vertical structure on the support;
    Warming plate, is fixedly arranged on the lifting rail and is close to the two sides of the vertical structure.
  2. The attemperator 2. core tube of high-rise building lifting platform according to claim 1 climbs, it is characterised in that
    The bottom of the hanger has the workbench extended to the vertical structure, and the support is quadra, described square The top of framework is hung on the workbench, and the workbench is provided with drag-line, institute to one end that the vertical structure extends Drag-line oblique pull is stated on the hanger, three have been installed respectively between the top and bottom of the quadra and the lifting rail Corner bracket.
  3. 3. climb attemperator according to any described core tube of high-rise building lifting platform of claim 1 to 2, its feature exists In,
    The support, which is provided with motor, the motor, carries gear, and the back side of the lifting rail is provided with sawtooth, the gear Engagement is connected on the sawtooth of the lifting rail, and then passes through the rising of lifting rail described in the motor control.
  4. The attemperator 4. core tube of high-rise building lifting platform according to claim 3 climbs, it is characterised in that
    The back side both sides of every piece of warming plate are respectively equipped with two lifting rails, and each lifting rail is equipped with one The individual motor and a gear.
  5. The heat insulating construction method 5. a kind of core tube of high-rise building lifting platform climbs, it is characterised in that including following construction procedure:
    Using the lifting platform being arranged above construction, multiple hangers are first hung under the lifting platform perpendicular for pouring To structure, set then at the bottom of the hanger and climb insulation construction to protect the vertical structure formation for pouring completion Temperature;
    Being provided with the insulation construction that climbs includes following construction procedure:
    In the fixed support extended to the vertical structure two sides in the bottom of the hanger;
    Along the two sides of the vertical structure poured, by lifting rail drive connection on the support;
    In fixed warming plate on the lifting rail vertical structure of completion is poured to be close to.
  6. The heat insulating construction method 6. core tube of high-rise building lifting platform according to claim 5 climbs, it is characterised in that set Putting the insulation construction that climbs includes following construction procedure:
    The workbench extended to the vertical structure is set in the bottom of the hanger, and the support is quadra, will be described The top of quadra is hung on the workbench, in setting one on one end that the workbench extends to the vertical structure Drag-line, by the drag-line oblique pull on the hanger, between the top and bottom of the quadra and the lifting rail Tripod has been installed respectively.
  7. 7. climb heat insulating construction method, its feature according to any described core tube of high-rise building lifting platform of claim 5 to 6 It is, the insulation construction that climbed described in setting includes following construction procedure:
    In setting motor on the support, wherein, gear is carried on the motor, the back side of the lifting rail is provided with sawtooth, Gear engagement is connected on the sawtooth of the lifting rail, and then passes through the upper of lifting rail described in the motor control Rise.
  8. The heat insulating construction method 8. core tube of high-rise building lifting platform according to claim 7 climbs, it is characterised in that set Putting the insulation construction that climbs includes following construction procedure:
    In the back side both sides of every piece of warming plate, two lifting rails are set respectively, wherein, each lifting rail It is equipped with a motor and a gear.
CN201610113675.6A 2016-03-01 2016-03-01 Core tube of high-rise building lifting platform climbs attemperator and its construction method Active CN105735481B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610113675.6A CN105735481B (en) 2016-03-01 2016-03-01 Core tube of high-rise building lifting platform climbs attemperator and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610113675.6A CN105735481B (en) 2016-03-01 2016-03-01 Core tube of high-rise building lifting platform climbs attemperator and its construction method

Publications (2)

Publication Number Publication Date
CN105735481A CN105735481A (en) 2016-07-06
CN105735481B true CN105735481B (en) 2017-10-13

Family

ID=56248784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610113675.6A Active CN105735481B (en) 2016-03-01 2016-03-01 Core tube of high-rise building lifting platform climbs attemperator and its construction method

Country Status (1)

Country Link
CN (1) CN105735481B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400951B (en) * 2016-10-10 2019-04-30 中国建筑第八工程局有限公司 A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN107190860B (en) * 2017-06-05 2023-05-02 中国建筑第八工程局有限公司 Automatic jacking system for steel structure installation
CN107761961A (en) * 2017-09-11 2018-03-06 贵州建工集团第建筑工程有限责任公司 A kind of electronic climbing frame monolithic construction method of high-rise building
CN108560992B (en) * 2018-03-14 2023-10-31 扬州市中润模板有限公司 Construction equipment for high-rise structure and concrete pouring construction method
CN108331175A (en) * 2018-04-29 2018-07-27 王林 Telescopiform integrally promotes architectural construction
CN109750841B (en) * 2019-01-15 2024-02-13 上海建工一建集团有限公司 Material distribution platform system for barrel structure construction
CN111058618B (en) * 2019-12-27 2021-06-11 上海建工集团股份有限公司 Combined type telescopic sleeve jacking device and method thereof
CN114541728A (en) * 2022-02-28 2022-05-27 中建三局集团有限公司 Lightweight and modular self-climbing external frame system for assembled structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01322049A (en) * 1988-06-23 1989-12-27 Nippon Kaiser Kk Heat insulating concrete wall and its construction method
JP2001049756A (en) * 1999-08-05 2001-02-20 Ohbayashi Corp Non-combustible core material and heat insulating wall using the same and construction method therefor
CN102345388A (en) * 2011-07-12 2012-02-08 中国十七冶集团有限公司 Construction method for heat-preservation maintenance of shell sliding-formwork concrete under low-temperature condition
CN202969968U (en) * 2012-12-21 2013-06-05 天津矿山工程有限公司 Synovium heat preservation structure under the condition of high cold
CN103643740A (en) * 2013-11-12 2014-03-19 浙江江南春建设集团有限公司 Steel pipe column concrete jacking construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01322049A (en) * 1988-06-23 1989-12-27 Nippon Kaiser Kk Heat insulating concrete wall and its construction method
JP2001049756A (en) * 1999-08-05 2001-02-20 Ohbayashi Corp Non-combustible core material and heat insulating wall using the same and construction method therefor
CN102345388A (en) * 2011-07-12 2012-02-08 中国十七冶集团有限公司 Construction method for heat-preservation maintenance of shell sliding-formwork concrete under low-temperature condition
CN202969968U (en) * 2012-12-21 2013-06-05 天津矿山工程有限公司 Synovium heat preservation structure under the condition of high cold
CN103643740A (en) * 2013-11-12 2014-03-19 浙江江南春建设集团有限公司 Steel pipe column concrete jacking construction method

Also Published As

Publication number Publication date
CN105735481A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN105735481B (en) Core tube of high-rise building lifting platform climbs attemperator and its construction method
CN106065681B (en) It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method
CN106930484A (en) For the full precast stairway system and construction method of prefabricated concrete structure
CN106958186A (en) The construction method of bridge floor body, bridge and bridge
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN107237270A (en) A kind of construction method of girder construction
CN105672694B (en) For the lifting platform box beam support construction and its construction method of high-rise building
CN105438965B (en) The hanging method of glomeration pattern masonry wall 2 centering hanging apparatus of piece
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN102383591B (en) Construction device and construction technology for slip formworks and reverse formworks
CN105839914B (en) Adjustable steel beam support meanss and system
CN112127541A (en) Assembled floor veneer integrated board convenient to handling
CN202248859U (en) Sliding shifted formwork construction device
CN204199688U (en) Floor slab preformed hole hangs mould mounting structure
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN207376661U (en) A kind of plugging structure of poured band of outer wall of basement
CN207513002U (en) A kind of concrete prefabricated wallboard
CN207469433U (en) A kind of assembled arthitecutral structure system
CN103628684B (en) A kind of construction method of simultaneously watering build floor and shear wall
CN203144909U (en) Bridge high pier roller die construction device
CN207144477U (en) The clear-water concrete exposed joint strip template of Measurement of Elevator tower
CN205975995U (en) Cast -in -place concrete floor indent steel tube frame
CN106121067B (en) Wall climbs heat-insulation system and its construction method under skyscraper lifting platform
CN108625590A (en) A kind of prefabricated lining being used in combination with aluminum dipping form
CN208152551U (en) There is the dedicated rack device that climbs of skin concrete structure outer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant