CN105735481B - Core tube of high-rise building lifting platform climbs attemperator and its construction method - Google Patents
Core tube of high-rise building lifting platform climbs attemperator and its construction method Download PDFInfo
- Publication number
- CN105735481B CN105735481B CN201610113675.6A CN201610113675A CN105735481B CN 105735481 B CN105735481 B CN 105735481B CN 201610113675 A CN201610113675 A CN 201610113675A CN 105735481 B CN105735481 B CN 105735481B
- Authority
- CN
- China
- Prior art keywords
- vertical structure
- lifting
- lifting platform
- hanger
- climbs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 59
- 238000009413 insulation Methods 0.000 claims abstract description 30
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 8
- 238000010792 warming Methods 0.000 claims description 18
- 238000000034 method Methods 0.000 claims description 10
- 230000000630 rising effect Effects 0.000 claims description 5
- 230000009194 climbing Effects 0.000 claims description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3511—Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B2001/3572—Extraordinary methods of construction, e.g. lift-slab, jack-block using templates or jigs to set out buildings or parts thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electromagnetism (AREA)
- Acoustics & Sound (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Climbed attemperator and its construction method the invention provides a kind of core tube of high-rise building lifting platform, wherein, the attemperator that climbs includes lifting platform and the hanger hung under lifting platform, and the bottom of hanger, which is provided with, climbs insulation construction to be incubated the vertical structure formation for pouring completion.The present invention is solved how the problem of after Core Walls Structure vertical structure is constructed to its timely formation curing in the mold so that vertical concrete curing keeps up with itself construction speed, so as to further improve the concrete quality of vertical structure.
Description
Technical field
Climbed attemperator the present invention relates to one kind, and in particular to a kind of suitable for climbing that core tube of high-rise building is constructed
Attemperator and its construction method.
Background technology
With scientific and technological progress and the raising of construction technology, Super High heavy construction is more and more, Super High Core Walls Structure knot
Structure horizontal structure is often separately constructed with vertical structure, and Core Walls Structure vertical structure is using the formwork system-entirety that can be climbed certainly
Lifting platform.
It can coordinate as shown in fig.1, integral jacking platform realizes construction to vertical structure by lower hanger body, and lower hang
Support body is from vertically functionally subregion is that Construction of Steel Structure layer N+2, reinforcement construction layer N+1, concrete lift N and wall are supported again
Sheath N-1 (is from top to bottom distinguished) successively.
However, the prestissimo that integral jacking platform carries out vertical structure construction can reach every layer 3.5 days, this is allowed for pair
Construct vertical structure wall the curing in the mold time (especially in the winter time) far from construction speed is kept up with, therefore, in jacking
The curing time of the multiple rear lower vertical structure wall that climbs is carried out in the platform lower short time far from construction requirement is enough met, is entered
And the concrete quality of vertical structure is difficult to be guaranteed.
The content of the invention
To overcome the defect present in prior art, now provide a kind of core tube of high-rise building lifting platform climb insulation dress
Put and its construction method, with how the problem of after Core Walls Structure vertical structure is constructed to its timely formation curing in the mold so that perpendicular
Itself construction speed is kept up with to the maintenance of concrete, so as to further improve the concrete quality of vertical structure.
To achieve the above object, climbed attemperator present invention firstly provides a kind of core tube of high-rise building lifting platform,
Including lifting platform and the hanger hung under lifting platform, the bottom of hanger, which is provided with, climbs insulation construction for having poured
Into vertical structure formation insulation.
Preferably, the insulation construction that climbs includes:
Support, is fixedly arranged on the bottom of hanger and extends to the two sides of vertical structure;
Lifting rail, vertically the two sides drive connection of structure is on support;
Warming plate, is fixedly arranged on lifting rail and is close to the two sides of vertical structure.
The climb beneficial effect of attemperator of core tube of high-rise building lifting platform of the present invention is,
The insulation construction that climbs is installed using the lifting platform and hanger for being originally used for pouring vertical structure, wherein, climb
The support of insulation construction is fixedly arranged on the bottom of hanger, by the lifting rail on support with vertical structure pour height lifting and
Rise so that warming plate on lifting rail can in time to pouring after vertical structure formation insulation to better ensure that
Pouring quality.
Preferably, the bottom of hanger has the workbench extended to vertical structure, and support is quadra, quadra
Top is hung on workbench, and workbench is provided with drag-line to one end that vertical structure extends, and drag-line oblique pull is square on hanger
Tripod has been installed respectively between the top of framework and bottom and lifting rail.
Preferably, support, which is provided with motor, motor, carries gear, and the back side of lifting rail is provided with sawtooth, gear engagement
It is connected on the sawtooth of lifting rail, and then passes through the rising of motor control lifting rail.
Preferably, the back side both sides of every piece of warming plate are respectively equipped with two lifting rails, and each lifting rail is equipped with one
Individual motor and a gear.
To be better achieved above-mentioned purpose, the present invention also provides a kind of insulation of climbing of core tube of high-rise building lifting platform and applied
Work method, including following construction procedure:
Using the lifting platform being arranged above construction, first hang multiple hangers under the lifting platform to pour
Vertical structure is built, is set then at the bottom of hanger and climbs insulation construction to be incubated the vertical structure formation for pouring completion.
Preferably, the insulation construction that climbed described in setting includes following construction procedure:It is fixed to vertical knot in the bottom of hanger
The support of structure two sides extension;
Vertically two sides of structure, by lifting rail drive connection on support;
In fixed warming plate on lifting rail to be close to the vertical structure after pouring.
The climb beneficial effect of heat insulating construction method of core tube of high-rise building lifting platform of the present invention is,
The insulation construction that climbs is installed using the lifting platform and hanger for being originally used for pouring vertical structure, wherein, climb
The support of insulation construction is fixedly arranged on the bottom of hanger, by the lifting rail on support with vertical structure pour height lifting and
Rise so that warming plate on lifting rail can in time to pouring after new vertical structure formation insulation with preferably
Ensure pouring quality.
Preferably, the insulation construction that climbed described in setting is further comprising the steps of:Set in the bottom of hanger to vertical structure
The workbench of extension, support is quadra, and the top of quadra is hung on workbench, in workbench to vertical structure
One drag-line is set on one end of extension, by drag-line oblique pull on hanger, in the top and bottom of quadra and lifting rail it
Between installed tripod respectively.
Preferably, the insulation construction that climbed described in setting is further comprising the steps of:In setting motor on support, wherein, motor
Upper to carry gear, the back side of lifting rail is provided with sawtooth, gear engagement is connected on the sawtooth of lifting rail, and then pass through electricity
Machine controls the rising of lifting rail.
Preferably, the insulation construction that climbed described in setting is further comprising the steps of:In the back side both sides difference of every piece of warming plate
Two lifting rails are set, wherein, each lifting rail is equipped with a motor and a gear.
Brief description of the drawings
Fig. 1 is that core tube of high-rise building lifting platform of the present invention climbs the overall side structure schematic diagram of attemperator;
Fig. 2 is the mplifying structure schematic diagram of a-quadrant in Fig. 1;
Fig. 3 is the mplifying structure schematic diagram in B regions in Fig. 2;
Fig. 4 is the cross-sectional view of lifting rail and warming plate in Fig. 3;
Fig. 5 is the facade structures schematic diagram corresponding to Fig. 4.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification
Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition
The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from
Various modifications or alterations are carried out under the spirit of the present invention.
With reference to shown in Fig. 1 and Fig. 2, climbed present invention firstly provides a kind of core tube of high-rise building lifting platform and be incubated dress
Put, such as Fig. 1, platform truss 5 is provided with construction position, multiple hangers 1 are hung under platform truss 5, pass through hanger 1
Pour to form vertical structure 2 in both sides, set in the bottom of hanger and climb insulation construction for the vertical structure 2 to pouring completion
Form insulation.The insulation construction that climbs includes:Support 3, is fixedly arranged on the bottom of hanger 1 and extends to the two sides of vertical structure 2;
Lifting rail 9, vertically the two sides drive connection of structure 2 is on support 3;Warming plate 4, is fixedly arranged on lifting rail 9 and tight
It is affixed on the two sides of vertical structure 2.
Specifically, such as Fig. 2, support 3 is provided with motor 6 and switch-box 7, and switch-box 7 is electrically connected to motor 6 to control electricity
Gear 60 is carried on the keying of machine 6, motor 6, the back side of lifting rail 9 is provided with sawtooth 90, and the engagement of gear 60, which is connected to climb, to be led
On the sawtooth 90 of rail 9, and then pass through the rising of the control lifting rail 9 of motor 6.
More preferably, with reference to shown in Fig. 2 and Fig. 3, have respectively in each more than bottom and bottom of hanger 1 height
The workbench 10 that oriented vertical structure 2 extends, support 3 is quadra, and the top of quadra is hung on workbench 10, work
Make one end that platform 10 extends to vertical structure 2 and be provided with drag-line 12, the oblique pull of drag-line 12 on hanger 1, the top of quadra 3 and
Tripod 30 has been installed between bottom and lifting rail 9 respectively.With reference to shown in Fig. 4 and Fig. 5, the back side both sides of every piece of warming plate 4
Two lifting rails 9 are respectively equipped with, wherein, each lifting rail 9 is equipped with a motor 6 and a gear 60.
Climbed heat insulating construction method, above-mentioned constructing structure present invention also offers a kind of core tube of high-rise building lifting platform
Also it can be implemented by the construction method, the construction method includes following construction procedure:
As shown in figure 1, using original platform truss 5 being just arranged above construction, multiple hangers 1 are hung on flat
Under platform truss 5 vertical structure 2 is formed for pouring.
Certainly, template 8 has been installed in the both sides of vertical structure 2 to be poured for casting concrete, to form concrete
LIFT n-quadrant;
With reference to shown in Fig. 2, in the fixed support 3 extended to the two sides of vertical structure 2 in the bottom of hanger 1, wherein, specifically
Ground, the workbench 10 extended to vertical structure 2 is set in the bottom of hanger 1, support 3 is quadra, by the top of quadra
End is hung on workbench 10, in setting a drag-line 12 on one end that workbench 10 extends to vertical structure 2, by the oblique pull of drag-line 12
In on hanger 1, tripod 30 has been installed respectively between the top and bottom of quadra and lifting rail 9;
With reference to shown in Fig. 3, vertically two sides of structure 2, by the drive connection of lifting rail 9 on support 3, wherein, tool
Body, in setting motor 6 on support 3, wherein, gear 60 is carried on motor 6, the back side of lifting rail 9 is provided with sawtooth 90, by tooth
The engagement of wheel 60 is connected on the sawtooth 90 of lifting rail 9, and then passes through the rising of the control lifting rail 9 of motor 6;
Fig. 2 is looked back, in fixed warming plate 4 on lifting rail 9 and is close to the vertical structure after pouring 2, wherein, specifically
Ground, two lifting rails 9 are set in the back side both sides of every piece of warming plate 4 respectively, and each lifting rail 9 is equipped with a motor
6th, a gear 60 and a switch-box 7;
With this, formed and climbed by the both sides of the vertical structure 2 of support 3, lifting rail 9 and warming plate 4 after pouring
Insulation construction;
Fig. 1 is looked back, proceeds pouring construction to form new vertical structure 2 ' in the middle part above position of hanger 1, will
Lifting rail 9 pours the lifting of height with vertical structure 2 and risen, and then pours the surface of the vertical structure 2 of completion and have always
Warming plate 4 is close to insulation.
Complete after above-mentioned implementation process, the following characteristics of the present invention should be able to be embodied:
The present invention realizes that band guide rail warming plate, from climbing, increases Core Walls Structure vertical structure by using the drive of motor gear
The concrete curing time, it is ensured that concrete construction quality.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate
Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to the enforceable limit of the present invention
Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not
Under influence effect of the invention that can be generated and the purpose that can reach, it all should still fall and be obtained in disclosed technology contents
In the range of covering.Meanwhile, it is cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification
Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune
It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper
State it is bright the present invention is made many variations example.Thus, some of embodiment details should not constitute limitation of the invention, this
Invention regard the scope defined using appended claims as protection domain.
Claims (8)
- The attemperator 1. a kind of core tube of high-rise building lifting platform climbs, including lifting platform and hang under lifting platform Hanger, it is characterised in that the bottom of the hanger is provided with climbing insulation construction to form the vertical structure for pouring completion Insulation, the insulation construction that climbs includes:Support, is fixedly arranged on the bottom of the hanger and extends to the two sides of the vertical structure;Lifting rail, along the two sides drive connection of the vertical structure on the support;Warming plate, is fixedly arranged on the lifting rail and is close to the two sides of the vertical structure.
- The attemperator 2. core tube of high-rise building lifting platform according to claim 1 climbs, it is characterised in thatThe bottom of the hanger has the workbench extended to the vertical structure, and the support is quadra, described square The top of framework is hung on the workbench, and the workbench is provided with drag-line, institute to one end that the vertical structure extends Drag-line oblique pull is stated on the hanger, three have been installed respectively between the top and bottom of the quadra and the lifting rail Corner bracket.
- 3. climb attemperator according to any described core tube of high-rise building lifting platform of claim 1 to 2, its feature exists In,The support, which is provided with motor, the motor, carries gear, and the back side of the lifting rail is provided with sawtooth, the gear Engagement is connected on the sawtooth of the lifting rail, and then passes through the rising of lifting rail described in the motor control.
- The attemperator 4. core tube of high-rise building lifting platform according to claim 3 climbs, it is characterised in thatThe back side both sides of every piece of warming plate are respectively equipped with two lifting rails, and each lifting rail is equipped with one The individual motor and a gear.
- The heat insulating construction method 5. a kind of core tube of high-rise building lifting platform climbs, it is characterised in that including following construction procedure:Using the lifting platform being arranged above construction, multiple hangers are first hung under the lifting platform perpendicular for pouring To structure, set then at the bottom of the hanger and climb insulation construction to protect the vertical structure formation for pouring completion Temperature;Being provided with the insulation construction that climbs includes following construction procedure:In the fixed support extended to the vertical structure two sides in the bottom of the hanger;Along the two sides of the vertical structure poured, by lifting rail drive connection on the support;In fixed warming plate on the lifting rail vertical structure of completion is poured to be close to.
- The heat insulating construction method 6. core tube of high-rise building lifting platform according to claim 5 climbs, it is characterised in that set Putting the insulation construction that climbs includes following construction procedure:The workbench extended to the vertical structure is set in the bottom of the hanger, and the support is quadra, will be described The top of quadra is hung on the workbench, in setting one on one end that the workbench extends to the vertical structure Drag-line, by the drag-line oblique pull on the hanger, between the top and bottom of the quadra and the lifting rail Tripod has been installed respectively.
- 7. climb heat insulating construction method, its feature according to any described core tube of high-rise building lifting platform of claim 5 to 6 It is, the insulation construction that climbed described in setting includes following construction procedure:In setting motor on the support, wherein, gear is carried on the motor, the back side of the lifting rail is provided with sawtooth, Gear engagement is connected on the sawtooth of the lifting rail, and then passes through the upper of lifting rail described in the motor control Rise.
- The heat insulating construction method 8. core tube of high-rise building lifting platform according to claim 7 climbs, it is characterised in that set Putting the insulation construction that climbs includes following construction procedure:In the back side both sides of every piece of warming plate, two lifting rails are set respectively, wherein, each lifting rail It is equipped with a motor and a gear.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610113675.6A CN105735481B (en) | 2016-03-01 | 2016-03-01 | Core tube of high-rise building lifting platform climbs attemperator and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610113675.6A CN105735481B (en) | 2016-03-01 | 2016-03-01 | Core tube of high-rise building lifting platform climbs attemperator and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105735481A CN105735481A (en) | 2016-07-06 |
CN105735481B true CN105735481B (en) | 2017-10-13 |
Family
ID=56248784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610113675.6A Active CN105735481B (en) | 2016-03-01 | 2016-03-01 | Core tube of high-rise building lifting platform climbs attemperator and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105735481B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400951B (en) * | 2016-10-10 | 2019-04-30 | 中国建筑第八工程局有限公司 | A kind of level and vertical structure method for synchronously constructing of super high-rise building |
CN107190860B (en) * | 2017-06-05 | 2023-05-02 | 中国建筑第八工程局有限公司 | Automatic jacking system for steel structure installation |
CN107761961A (en) * | 2017-09-11 | 2018-03-06 | 贵州建工集团第建筑工程有限责任公司 | A kind of electronic climbing frame monolithic construction method of high-rise building |
CN108560992B (en) * | 2018-03-14 | 2023-10-31 | 扬州市中润模板有限公司 | Construction equipment for high-rise structure and concrete pouring construction method |
CN108331175A (en) * | 2018-04-29 | 2018-07-27 | 王林 | Telescopiform integrally promotes architectural construction |
CN109750841B (en) * | 2019-01-15 | 2024-02-13 | 上海建工一建集团有限公司 | Material distribution platform system for barrel structure construction |
CN111058618B (en) * | 2019-12-27 | 2021-06-11 | 上海建工集团股份有限公司 | Combined type telescopic sleeve jacking device and method thereof |
CN114541728A (en) * | 2022-02-28 | 2022-05-27 | 中建三局集团有限公司 | Lightweight and modular self-climbing external frame system for assembled structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01322049A (en) * | 1988-06-23 | 1989-12-27 | Nippon Kaiser Kk | Heat insulating concrete wall and its construction method |
JP2001049756A (en) * | 1999-08-05 | 2001-02-20 | Ohbayashi Corp | Non-combustible core material and heat insulating wall using the same and construction method therefor |
CN102345388A (en) * | 2011-07-12 | 2012-02-08 | 中国十七冶集团有限公司 | Construction method for heat-preservation maintenance of shell sliding-formwork concrete under low-temperature condition |
CN202969968U (en) * | 2012-12-21 | 2013-06-05 | 天津矿山工程有限公司 | Synovium heat preservation structure under the condition of high cold |
CN103643740A (en) * | 2013-11-12 | 2014-03-19 | 浙江江南春建设集团有限公司 | Steel pipe column concrete jacking construction method |
-
2016
- 2016-03-01 CN CN201610113675.6A patent/CN105735481B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01322049A (en) * | 1988-06-23 | 1989-12-27 | Nippon Kaiser Kk | Heat insulating concrete wall and its construction method |
JP2001049756A (en) * | 1999-08-05 | 2001-02-20 | Ohbayashi Corp | Non-combustible core material and heat insulating wall using the same and construction method therefor |
CN102345388A (en) * | 2011-07-12 | 2012-02-08 | 中国十七冶集团有限公司 | Construction method for heat-preservation maintenance of shell sliding-formwork concrete under low-temperature condition |
CN202969968U (en) * | 2012-12-21 | 2013-06-05 | 天津矿山工程有限公司 | Synovium heat preservation structure under the condition of high cold |
CN103643740A (en) * | 2013-11-12 | 2014-03-19 | 浙江江南春建设集团有限公司 | Steel pipe column concrete jacking construction method |
Also Published As
Publication number | Publication date |
---|---|
CN105735481A (en) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735481B (en) | Core tube of high-rise building lifting platform climbs attemperator and its construction method | |
CN106065681B (en) | It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method | |
CN106930484A (en) | For the full precast stairway system and construction method of prefabricated concrete structure | |
CN106958186A (en) | The construction method of bridge floor body, bridge and bridge | |
CN107605177A (en) | The construction method of efficient precast floor slab and its independent support frame | |
CN107237270A (en) | A kind of construction method of girder construction | |
CN105672694B (en) | For the lifting platform box beam support construction and its construction method of high-rise building | |
CN105438965B (en) | The hanging method of glomeration pattern masonry wall 2 centering hanging apparatus of piece | |
CN207436503U (en) | Efficient construction of precast floorslab hangs membrane module | |
CN102383591B (en) | Construction device and construction technology for slip formworks and reverse formworks | |
CN105839914B (en) | Adjustable steel beam support meanss and system | |
CN112127541A (en) | Assembled floor veneer integrated board convenient to handling | |
CN202248859U (en) | Sliding shifted formwork construction device | |
CN204199688U (en) | Floor slab preformed hole hangs mould mounting structure | |
CN105370027B (en) | The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure | |
CN207376661U (en) | A kind of plugging structure of poured band of outer wall of basement | |
CN207513002U (en) | A kind of concrete prefabricated wallboard | |
CN207469433U (en) | A kind of assembled arthitecutral structure system | |
CN103628684B (en) | A kind of construction method of simultaneously watering build floor and shear wall | |
CN203144909U (en) | Bridge high pier roller die construction device | |
CN207144477U (en) | The clear-water concrete exposed joint strip template of Measurement of Elevator tower | |
CN205975995U (en) | Cast -in -place concrete floor indent steel tube frame | |
CN106121067B (en) | Wall climbs heat-insulation system and its construction method under skyscraper lifting platform | |
CN108625590A (en) | A kind of prefabricated lining being used in combination with aluminum dipping form | |
CN208152551U (en) | There is the dedicated rack device that climbs of skin concrete structure outer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||