CN104060541B CN201410288373.3A CN201410288373A CN104060541B CN 104060541 B CN104060541 B CN 104060541B CN 201410288373 A CN201410288373 A CN 201410288373A CN 104060541 B CN104060541 B CN 104060541B
Authority
CN
China
Prior art keywords
hanging basket
operating desk
little
mobile jib
slides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410288373.3A
Other languages
Chinese (zh)
Other versions
CN104060541A (en
Inventor
陆军强
俞想锋
徐含锋
姜辉
沈梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIYUE GROUP CO Ltd
Original Assignee
LIYUE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIYUE GROUP CO Ltd filed Critical LIYUE GROUP CO Ltd
Priority to CN201410288373.3A priority Critical patent/CN104060541B/en
Publication of CN104060541A publication Critical patent/CN104060541A/en
Application granted granted Critical
Publication of CN104060541B publication Critical patent/CN104060541B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

To slide little Hanging Basket and the construction technology for installing intercepting drain thereof, belonging to technical field of bridge construction.The operating desk holder that it comprises operating desk and is connected with operating desk, operating desk holder is barb type structure, operating desk holder is arranged Hanging Basket walking part, operating desk holder comprises two skeletons connected by main contact bar, each skeleton comprises horizontally disposed cross bar, and cross bar one end is connected with extenal fixation mobile jib, and the other end is connected with internal fixtion mobile jib, extenal fixation mobile jib other end connection operation platform, the safety guide rail that operating desk holder arranged outside 1 people is upper and lower.The little Hanging Basket of slip of the present invention makes simply, cost compare is light, the little Hanging Basket volume that slides is little, lightweight, transport is installed more convenient, 3 groups of pulleys are set between Hanging Basket and Bridge guardrail, during constructing operation, Hanging Basket conveniently moving, the intercepting drain constructed is more straight, line style is relatively good, adopts the little cradle construction that slides to reduce a lot than employing ladder truck or loop wheel machine construction cost.

Description

A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding
Technical field
The invention belongs to technical field of bridge construction, being specifically related to that a kind of structure is simple, easy for installation, handling safety coefficient is high and the little Hanging Basket of efficiency of construction is high slip and the construction technology for installing intercepting drain thereof.
Background technology
In present highway construction, viaduct bridge design gets more and more, especially city and surrounding city, in order to transport solution pressure to greatest extent, all adopts double-deck stereo traffic design bridge.And the bridge deck drainage of viaduct to pass through function owing to will take into account ground level road, draining does not adopt freely overboard, but enters surface drainage system by leader along bridge pier to bridge pier place by longitudinal direction intercepting drain at the bottom of bridge floor tapping pipe to beam.
More and more extensive along with viaduct and the construction of city cloverleaf Junction, the method for its bridge deck drainage construction also gets more and more, especially on longitudinal intercepting drain hanging operation at the bottom of tapping pipe and beam.Generally all adopt the installation such as hoist, ladder truck at present, in construction, especially intercepting drain is banded structure, longitudinally arrange along bridge, adopt the said equipment to install often to need to move, often move the time manpower once expended all larger, if at cross a river, across road and bridge section, and under bridge, ground level road is not also implemented to cause the unapproachable bridge of ground large machinery cannot construct at all.
Summary of the invention
For the above-mentioned problems in the prior art, the object of the present invention is to provide that a kind of structure is simple, easy for installation, handling safety coefficient is high and the little Hanging Basket of efficiency of construction is high slip and the construction technology for installing intercepting drain thereof.
Described one is slided little Hanging Basket, for being attached to the anticollision barrier of bridge, the operating desk holder that the little Hanging Basket of described slip comprises operating desk and is connected with operating desk, it is characterized in that described operating desk holder is barb type structure, operating desk holder is arranged Hanging Basket walking part, described operating desk holder comprises two skeletons connected by main contact bar, each skeleton comprises horizontally disposed cross bar, described cross bar one end is connected with extenal fixation mobile jib, the other end is connected with internal fixtion mobile jib, extenal fixation mobile jib other end connection operation platform, described operating desk holder arranged outside protective guard.
Described one is slided little Hanging Basket, it is characterized in that the little Hanging Basket of described slip is connected with guardrail by Hanging Basket walking part, described Hanging Basket part of walking comprises the second auxiliary pulley being arranged on head pulley bottom cross bar, being arranged on the first auxiliary pulley inside extenal fixation mobile jib and being arranged on outside internal fixtion mobile jib.
Described one is slided little Hanging Basket, it is characterized in that described operating desk holder is for operating cat ladder, and on described extenal fixation mobile jib, interval arranges one group of level and to creep bar, and described internal fixtion mobile jib bottom arranges horizontal pedal.
Described one is slided little Hanging Basket, it is characterized in that described protective guard comprises the support bar being fixed on the perpendicular connection of cross bar left end, support bar top vertically arranges horizontal auxiliary rod, the auxiliary rod other end arranges the protection mobile jib parallel with extenal fixation mobile jib, protection mobile jib arranges protection cross bar, protection mobile jib bottom arranges the rebound with horizontal auxiliary rod, and rebound other end connection operation platform, arranges arc protector between described cross bar and the termination of support bar.
Described one is slided little Hanging Basket, and it is characterized in that described protection cross bar is arcuate structure, adjacent protection cross bar spacing is 0.5m.
Described one is slided little Hanging Basket, and it is characterized in that described operating desk is of a size of 1m × 1m, on operating desk, rational height is the fence of 1.2m.
Described one is slided little Hanging Basket, it is characterized in that described operating desk holder width is 1m.
Described a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain, is characterized in that comprising the steps:
1) the little Hanging Basket that slides makes and installs:
The cross bar of Hanging Basket skeleton, extenal fixation mobile jib, internal fixtion mobile jib all adopt 8# channel-section steel to be welded, main contact bar between skeleton is the 8# channel-section steel of 1m length, the material of operating desk, protective guard adopts φ 16 indented bars, suspended basket component is pulley, 8 pulleys are set altogether, wherein head pulley is 4, and the first auxiliary pulley and each 2 of the second auxiliary pulley, be directional type pulley; Corresponding component be transported to Assembling good after, above the outside concrete anticollision barrier adopting human assistance vapour to hang to be arranged on and to have constructed, note the angle in place of Hanging Basket during installation, anti-limited slip wheel distortion, after installation in position, check that whether the walking system of Hanging Basket is normal;
2) Hanging Basket pressure testing
Carry out passing walking test by the load of two constructors after Hanging Basket installation, see whether it stablizes, pressure testing is observed its Hanging Basket and is stablized and without exceptionly just can descend cradle construction afterwards;
3) installation of tapping pipe, intercepting drain
A a people can only enter construction due to the little Hanging Basket that slides, and before installation, be first arranged side by side by two Hanging Baskets simultaneously, advance simultaneously, two people share out the work and help one another;
When b tapping pipe is installed, on bridge floor, every Hanging Basket must have people to be responsible for, and takes self-locking measure, prevents from producing the danger of automatically sliding because bridge longitudinal gradient is large;
Open the self-lock switch of associated pulleys when c Hanging Basket moves, after constructor below Hanging Basket leaves, Hanging Basket moves to bridge floor again;
D bridge deck drainage all adopts across interior even draining, tapping pipe spacing is arranged by 2 ~ 6m, intercepting drain is along the longitudinal setting that becomes band of bridge, and by 8 pulley support, Hanging Basket can slide gently, site operation personnel can promote the little Hanging Basket that slides, 4 meters, a joint of having constructed obtains water pipe, and working face moves forward 4 meters, and Hanging Basket just moves forward 4 meters, repeat, to having constructed.
Described a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain, it is characterized in that head pulley is divided into 2 groups, often group is made up of a self-locking pulley 301 and a directional type pulley 302, and self-locking pulley 301 is in outside.
By adopting above-mentioned technology, compared with prior art, beneficial effect of the present invention is as follows:
1) the little Hanging Basket that slides makes simply, cost compare is low, the little Hanging Basket volume that slides is little, lightweight, transport is installed more convenient, 3 groups of pulleys are set between Hanging Basket and Bridge guardrail, during constructing operation, Hanging Basket conveniently moving, side install as anticollision barrier complete after without the need to any mechanical assistant, only need an artificial promotion to walk;
2) little cradle construction bridge platoon waterpipe speed of sliding is fast, because Hanging Basket cost of manufacture is lower, can increase when trying to meet the deadline for the project Hanging Basket quantity and also due to slide little Hanging Basket slide on the same line, the intercepting drain constructed is more straight, line style is relatively good, adopts the little cradle construction that slides to reduce a lot than employing ladder truck or loop wheel machine construction cost;
3) discharge opening is flowed to because deck drainage system is generally rainwater by deck transverse slope, longitudinal gradient, by tapping pipe under intercepting drain, leader flow to bridge, access bottom surface drainage system.Because general viaduct depth of beam is all more than 10 meters, tapping pipe is installed, the equipment of ascending a height must be used during intercepting drain etc., it is more convenient than using equipment of ascending a height under bridge that the present invention arranges slip cradle construction, especially the bridge section of the equipment of ascending a height cannot be stopped under bridge, the Hanging Basket made is arranged on above the outside concrete anticollision barrier of having constructed by the present invention, the outside concrete anticollision barrier of present Design of Highway Bridge is generally highly 1.2 meters, thick is 0.3 meter, by 8 pulley support between Hanging Basket and anticollision barrier, Hanging Basket can slide gently, site operation personnel self can promote slip Hanging Basket, because intercepting drain is banded structure, all longitudinally arrange along bridge with tapping pipe, 4 meters, a joint of having constructed obtains water pipe, working face moves forward 4 meters, Hanging Basket just moves forward 4 meters, speed of application is obviously accelerated, benefit improves, and the security performance of operating personnel is ensured, the installation of this engineering method particularly suitable bridge floor drainage pipe, especially at cross a river, across road and bridge section, and ground level road is not also implemented to cause the unapproachable bridge section of ground large machinery under bridge.
Accompanying drawing explanation
Fig. 1 is slip of the present invention little Hanging Basket side-looking structural representation;
Fig. 2 is A place structure for amplifying schematic diagram in Fig. 1;
Fig. 3 is slip of the present invention little Hanging Basket plan structure schematic diagram;
Fig. 4 is head pulley structural representation of the present invention;
Fig. 5 is slip of the present invention little Hanging Basket using state structural representation.
In figure: 1-protective guard, 101-arc protector, the horizontal auxiliary rod of 102-, 103-protects mobile jib, 104-protects cross bar, 105-support bar, 2-cross bar, 3-head pulley, 301-self-locking pulley, 302-directional type pulley, 4-second auxiliary pulley, 5-internal fixtion mobile jib, 6-horizontal pedal, 7-first auxiliary pulley, 8-extenal fixation mobile jib, 9-operating desk, 10-rebound, 11-level is creeped bar, the main contact bar of 12-, 13-intercepting drain.
Detailed description of the invention
Below in conjunction with Figure of description, the invention will be further described, but protection scope of the present invention is not limited in this:
As Figure 1-5, a kind of little Hanging Basket that slides, for being attached to the anticollision barrier of bridge, the operating desk holder that the little Hanging Basket of described slip comprises operating desk 9 and is connected with operating desk 9, operating desk holder is barb type structure, operating desk holder is arranged Hanging Basket walking part, the little Hanging Basket that slides is arranged on the guardrail of bridge by this operating desk holder, and slided by the guardrail of the relative bridge of Hanging Basket walking part, described operating desk holder comprises two skeletons connected by main contact bar 12, each skeleton comprises horizontally disposed cross bar 2, described cross bar 2 one end is connected with extenal fixation mobile jib 8, the other end is connected with internal fixtion mobile jib 5, extenal fixation mobile jib 8 other end connection operation platform 9, described operating desk holder arranged outside protective guard 1.
As shown in Figure 1, described Hanging Basket walking part comprises the second auxiliary pulley 4 being arranged on head pulley 3 bottom cross bar 2, being arranged on the first auxiliary pulley 7 inside extenal fixation mobile jib 8 and being arranged on outside internal fixtion mobile jib 5, head pulley 3, first auxiliary pulley 7 and each two of the second auxiliary pulley 4, described head pulley 3 is positioning pulley, with guardrail top contact, head pulley 3 is for the little Hanging Basket displacement of anti-sliding stop; First auxiliary pulley 7 and the second auxiliary pulley 4 are separately positioned on outside and the inner side of guardrail, in construction, for auxiliary positioning.
As shown in Figure 1, Figure 3, described operating desk holder operates cat ladder for working as simultaneously, use from during the down operation platform 9 of bridge face operating personnel, on described extenal fixation mobile jib 8, interval arranges one group of level and to creep bar 11, the distance that adjacent level is creeped between bar 11 is 0.5m, level creep bar 11 cat ladder upper and lower for operating personnel time hand steered or pin step on use, described internal fixtion mobile jib 5 height is lower than the height of Bridge guardrail, internal fixtion mobile jib 5 bottom arranges horizontal pedal 6, operates and sets foot on operation cat ladder from member from this horizontal pedal 6.
Because on bridge, operation is work high above the ground, in order to improve the personal safety of operating personnel, the present invention is at operating desk holder arranged outside protective guard 1, protective guard 1 comprises the support bar 105 being fixed on the perpendicular connection of cross bar 2 left end, support bar 105 plan vertical arranges horizontal auxiliary rod 102, auxiliary rod 102 other end arranges the protection mobile jib 103 parallel with extenal fixation mobile jib 8, protection mobile jib 103 is arranged protection cross bar 104, between described cross bar 2 and the termination of support bar 105, arc protector 101 is set, described protection cross bar 104 is arcuate structure, adjacent protection cross bar 104 spacing is 0.5m, protection mobile jib 103 bottom arranges the rebound 10 with horizontal auxiliary rod 102, rebound 10 other end connection operation platform 9, operating personnel set foot on operation cat ladder from horizontal pedal 6, come into operating desk 9 from rebound 10 again and carry out operation.
Construction technology process of the present invention: the little Hanging Basket that slides makes, be transported to in-site installation, Hanging Basket pressure testing tapping pipe, intercepting drain are installed, install first paragraph after forward construction, bridge one rear flank of having constructed again be lifted into opposite side construction, same operation to having constructed, concrete technology is:
1) to slide the making of little Hanging Basket
The little Hanging Basket width of slip of the present invention is 1m, operating desk 9 is of a size of 1m × 1m, on operating desk 9, rational height is the fence of 1.2m, distance between described fence top and bridge bottom flange plate is 0.5m, the cross bar 2 of Hanging Basket skeleton, extenal fixation mobile jib 8, internal fixtion mobile jib 5 all adopts 8# channel-section steel to be welded, main contact bar 12 between skeleton is the 8# channel-section steel of 1m length, operating desk 9, the material of protective guard 1 adopts φ 16 indented bars, suspended basket component is pulley, 6 pulleys are set altogether, wherein head pulley is 4, divide 2 groups, often group is made up of a self-locking pulley 301 and a directional type pulley 302, self-locking pulley 301 is in outside, as shown in Figure 4, first auxiliary pulley 7 and each 2 of the second auxiliary pulley 4, be directional type pulley, pulley bearing leg needs to reinforce with steel plate, execute man-hour requirement when moving, by manually carrying out advancing,
The present invention's little Hanging Basket that slides makes and will make in strict accordance with design drawing, and welding must professional welder's operation, and the welded seam at each position is full, and prevents from biting, and has welded rear timely cleaning welding slag; Antirust treatment will be carried out, timely brush rustproof paint and paint after removing iron rust after the little Hanging Basket that slides completes;
2)hanging Basket is installed
Hanging Basket is installed and is adopted human assistance vapour to lift up into row installation, notes the angle in place of Hanging Basket, anti-limited slip wheel distortion during installation.To check after installation in position that whether the walking system of Hanging Basket is normal, have will repairing in time of distortion;
3) Hanging Basket pressure testing
Carry out passing walking test by the load of two constructors after Hanging Basket installation, see whether it stablizes, pressure testing is observed its Hanging Basket and is stablized and without exceptionly just can descend cradle construction afterwards;
4) installation of tapping pipe, intercepting drain 13
The a little Hanging Basket that slides is generally a people can only enter construction, and two Hanging Baskets are arranged side by side simultaneously, advance simultaneously, and two people share out the work and help one another and can increase work efficiency.
When b tapping pipe is installed, on bridge floor, every Hanging Basket must have people to be responsible for, and takes self-locking measure, prevents from producing the danger of automatically sliding because bridge longitudinal gradient is large.
The c Hanging Basket surface construction personnel at present that move first must leave on Hanging Basket and move to bridge floor again.
D bridge deck drainage all adopts across interior even draining, tapping pipe spacing is arranged by 2 ~ 6m. intercepting drain is along the longitudinal setting that becomes band of bridge, the little Hanging Basket that slides is mounted in above the outside concrete anticollision barrier of having constructed, and by 8 pulley support between Hanging Basket and anticollision barrier, Hanging Basket can slide gently, site operation personnel self can promote the little Hanging Basket that slides, 4 meters, a joint of having constructed obtains water pipe, and working face moves forward 4 meters, and Hanging Basket just moves forward 4 meters, speed of application is obviously accelerated, and benefit improves.

Claims (8)

1. the construction technology utilizing the little Hanging Basket that slides to install intercepting drain, the little Hanging Basket of described slip, for being attached to the anticollision barrier of bridge, the operating desk holder that the little Hanging Basket that slides comprises operating desk (9) and is connected with operating desk (9), described operating desk holder is barb type structure, operating desk holder is arranged Hanging Basket walking part, described operating desk holder comprises two skeletons connected by main contact bar (12), each skeleton comprises horizontally disposed cross bar (2), described cross bar (2) one end is connected with extenal fixation mobile jib (8), the other end is connected with internal fixtion mobile jib (5), extenal fixation mobile jib (8) other end connection operation platform (9), described operating desk holder arranged outside protective guard (1), it is characterized in that comprising the steps:
1) the little Hanging Basket that slides makes and installs:
The cross bar (2) of Hanging Basket skeleton, extenal fixation mobile jib (8), internal fixtion mobile jib (5) all adopt 8# channel-section steel to be welded, main contact bar (12) between skeleton is the 8# channel-section steel of 1m length, the material of operating desk (9), protective guard (1) adopts φ 16 indented bars, suspended basket component is pulley, 8 pulleys are set altogether, wherein head pulley (3) is 4, and the first auxiliary pulley (7) and each 2 of the second auxiliary pulley (4), be directional type pulley; Corresponding component be transported to Assembling good after, above the outside concrete anticollision barrier adopting human assistance vapour to hang to be arranged on and to have constructed, note the angle in place of Hanging Basket during installation, anti-limited slip wheel distortion, after installation in position, check that whether the walking system of Hanging Basket is normal;
2) Hanging Basket pressure testing
Carry out passing walking test by the load of two constructors after Hanging Basket installation, see whether it stablizes, pressure testing is observed its Hanging Basket and is stablized and without exceptionly just can descend cradle construction afterwards;
3) installation of tapping pipe, intercepting drain
A a people can only enter construction due to the little Hanging Basket that slides, and before installation, be first arranged side by side by two Hanging Baskets simultaneously, advance simultaneously, two people share out the work and help one another;
When b tapping pipe is installed, on bridge floor, every Hanging Basket must have people to be responsible for, and takes self-locking measure, prevents from producing the danger of automatically sliding because bridge longitudinal gradient is large;
Open the self-lock switch of associated pulleys when c Hanging Basket moves, after constructor below Hanging Basket leaves, Hanging Basket moves to bridge floor again;
D bridge deck drainage all adopts across interior even draining, tapping pipe spacing is arranged by 2 ~ 6m, intercepting drain is along the longitudinal setting that becomes band of bridge, and by 8 pulley support, Hanging Basket can slide gently, site operation personnel can promote the little Hanging Basket that slides, constructed the joint water pipe of 4 meters, working face moves forward 4 meters, and Hanging Basket just moves forward 4 meters, repeat, to having constructed.
2. a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain according to claim 1, it is characterized in that head pulley (3) is divided into 2 groups, often group is made up of a self-locking pulley (301) and a directional type pulley (302), and self-locking pulley (301) is in outside.
3. a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain according to claim 1, it is characterized in that the little Hanging Basket of described slip is connected with guardrail by Hanging Basket walking part, the second auxiliary pulley (4) that described Hanging Basket walking part comprises the head pulley (3) being arranged on cross bar (2) bottom, the first auxiliary pulley (7) being arranged on extenal fixation mobile jib (8) inner side and is arranged on outside internal fixtion mobile jib (5).
4. a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain according to claim 1, it is characterized in that described operating desk holder is for operating cat ladder, the upper interval of described extenal fixation mobile jib (8) arranges one group of level and to creep bar (11), and described internal fixtion mobile jib (5) bottom arranges horizontal pedal (6).
5. a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain according to claim 1, it is characterized in that described protective guard (1) comprises the support bar (105) being fixed on the perpendicular connection of cross bar (2) left end, support bar (105) plan vertical arranges horizontal auxiliary rod (102), auxiliary rod (102) other end arranges the protection mobile jib (103) parallel with extenal fixation mobile jib (8), protection mobile jib (103) arranges protection cross bar (104), protection mobile jib (103) bottom arranges the rebound (10) with horizontal auxiliary rod (102), rebound (10) other end connection operation platform (9), between described cross bar (2) and the termination of support bar (105), arc protector (101) is set.
6. a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain according to claim 5, it is characterized in that described protection cross bar (104) is arcuate structure, adjacent protection cross bar (104) spacing is 0.5m.
7. a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain according to claim 1, it is characterized in that described operating desk (9) is of a size of 1m × 1m, the upper rational height of operating desk (9) is the fence of 1.2m.
8. a kind of construction technology utilizing the little Hanging Basket that slides to install intercepting drain according to claim 1, is characterized in that described operating desk holder width is 1m.
CN201410288373.3A 2014-06-25 2014-06-25 A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding Expired - Fee Related CN104060541B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410288373.3A CN104060541B (en) 2014-06-25 2014-06-25 A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410288373.3A CN104060541B (en) 2014-06-25 2014-06-25 A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding

Publications (2)

Publication Number Publication Date
CN104060541A CN104060541A (en) 2014-09-24
CN104060541B true CN104060541B (en) 2016-03-23

Family

ID=51548456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410288373.3A Expired - Fee Related CN104060541B (en) 2014-06-25 2014-06-25 A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding

Country Status (1)

Country Link
CN (1) CN104060541B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155410A (en) * 2015-08-21 2015-12-16 中交第一公路工程局有限公司 Mounting device of bridge draining pipe
CN105133499A (en) * 2015-08-26 2015-12-09 中国十七冶集团有限公司 Movable hanging basket trolley for bridge concrete anti-collision guardrail construction
CN108978457B (en) * 2017-06-23 2020-07-03 绍兴市慧融臻合新能源科技有限公司 Drainage system for bridge construction
CN107700352A (en) * 2017-11-18 2018-02-16 河北建设集团卓诚路桥工程有限公司 A kind of equipment for the installation of bridge concrete guardrail tapping pipe
CN110512534A (en) * 2019-08-27 2019-11-29 中铁大桥局武汉桥梁特种技术有限公司 The incisory sewage collection equipment of bridge flange plate
CN112359731B (en) * 2020-11-05 2022-09-23 江苏省交通工程集团有限公司 Movable hanging basket device for concrete tie rod of tied arch bridge
CN113818351A (en) * 2021-09-23 2021-12-21 中铁十二局集团有限公司 Construction method of highway bridge drainage steel pipe

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001049623A (en) * 1999-08-09 2001-02-20 Takeda Goshin Shoten:Kk H-steel arm scaffolding and method for constructing the same
CN201753438U (en) * 2010-06-07 2011-03-02 中铁二局股份有限公司 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails
CN202519591U (en) * 2012-04-19 2012-11-07 北京鑫畅路桥建设有限公司 Movable operation platform
CN203452012U (en) * 2013-09-09 2014-02-26 中建八局第三建设有限公司 Mobile hanging basket for guard bar outer side construction
CN203639825U (en) * 2013-12-26 2014-06-11 浙江金筑交通建设有限公司 Reserved concrete platform operating frame capable of pushing auxiliary-arm type SS stage guardrail
CN203938970U (en) * 2014-06-25 2014-11-12 利越集团有限公司 A kind of little Hanging Basket that slides

Also Published As

Publication number Publication date
CN104060541A (en) 2014-09-24

Similar Documents

Publication Publication Date Title
CN104060541B (en) A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding
CN107489098B (en) Concrete prefabricated welding type guardrail and installation construction method
CN203487803U (en) Safety protection structure for elevator shaft construction
CN109162741B (en) Method for synchronous construction of shield penetrating piston air duct and upper structure of piston air duct
CN208009277U (en) A kind of short sliding installation system of land-based area large-tonnage steel box beam
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN202359510U (en) Multi-functional working vehicle for concrete anti-collision guardrail of bridge
CN202064281U (en) Slip form frame
CN109537912A (en) A kind of safe and stable type Provincial Rink and its construction technology
CN211141313U (en) Portal crane suitable for hoisting low-height underground continuous wall reinforcement cage
CN210439081U (en) Magnetic suspension type platform
CN203938970U (en) A kind of little Hanging Basket that slides
CN103866985A (en) Butt joint method and device for construction elevator and creeping formwork frame body
CN108868192B (en) Construction method for dismantling close-distance over-railway existing line gate-type pier beam support
CN102587601A (en) Multistage connection cage-type staircase
RU180628U1 (en) CONSOLE CRANE FOR INSTALLATION OF A FLAT SUPPORT OF A METAL TACKET
CN106592438B (en) Twin shaft pier and middle binder truss move integrally construction method
CN207553565U (en) A kind of crosshead of truss
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN205976573U (en) Large -span stand cable protection canopy
CN212837823U (en) Open cut tunnel side wall construction trolley
CN104195954B (en) Overhead column erection without scaffolding platform and erection method thereof
CN210134343U (en) Trolley for mounting drain pipe on outer side edge of bridge
CN217419533U (en) Maintenance structure for trash rack at water inlet and water outlet of pumping power station
CN217627255U (en) Rail type gantry crane equipment for liquid bulk cargo wharf

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

Termination date: 20200625

CF01 Termination of patent right due to non-payment of annual fee