CN208009277U - A kind of short sliding installation system of land-based area large-tonnage steel box beam - Google Patents
A kind of short sliding installation system of land-based area large-tonnage steel box beam Download PDFInfo
- Publication number
- CN208009277U CN208009277U CN201820375352.9U CN201820375352U CN208009277U CN 208009277 U CN208009277 U CN 208009277U CN 201820375352 U CN201820375352 U CN 201820375352U CN 208009277 U CN208009277 U CN 208009277U
- Authority
- CN
- China
- Prior art keywords
- pier
- girder
- steel box
- short sliding
- land
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of short sliding installation system of land-based area large-tonnage steel box beam, including short sliding system and lifting system, the short sliding system includes steel-pipe pile, the track girder setting up main beam thereon and be laid on main beam;The lifting system includes auxiliary pier, the pier outer support steel pipe framed bent being arranged on the outside of pier, pier top supporting steel pipe framed bent on auxiliary pier and pier outer support steel pipe framed bent, ride upon the hoisting frame system girder on pier top supporting steel pipe framed bent, and the hoisting mechanism on girder, hoisting mechanism are equipped with suspender.The short sliding system sets up to land-based area the position for installing steel box-girder from waters, completes the transport of large-tonnage steel box beam in low level, then by lift mechanism lifts to mounting height.Simple in structure compared with conventional mounting mode, stability is good, and low level safe transportation.
Description
Technical field
The utility model belongs to building field, and in particular to a kind of short sliding installation system of land-based area large-tonnage steel box beam.
Background technology
Steel box-girder is called ntitorque steel plate box-girder, is the common structure type of Large Span Bridges.It is commonly used in the larger bridge of span
Liang Shang, external form is as a chest therefore is called steel box-girder.
Previous land-based area large-tonnage (if list Pin steel box-girders are more than 400 tons) steel box-girder Duo Youta area's pushing tows slide onto installation position
It sets, or large-tonnage steel box beam is divided into several fritters, lifted using large lifting equipment, then carry out site welding.Top
It pushes away or traditional sliding construction is both needed to set up high trestle since the position of waters and extends to land-based area position, utilize barging steel case
Beam is aided with to waters of constructing on large-tonnage crane barge bale handle to tower area high trestle, using the track girder and sliding block that are arranged on holder with
The traction steel box-girder such as haulage gear slides onto land-based area construction location.Strutting system is complicated needed for steel box-girder sliding construction, branch
It is big that frame peace tears risk open, costly, and sliding installation security risk is high, long construction period, while holder need to cross over river surface and protect embankment,
Long to the embankment traffic impact time, sliding piling bar is also possible to that embankment can be destroyed;Piecemeal lifts large-tonnage steel box beam, steel box girder segment
Between welding job amount it is big, and welding deformation is more apparent, and the splicing accuracy of steel box-girder is difficult to be protected.
Utility model content
In view of the above technical problems, the purpose of this utility model is for a kind of safety, high-precision land-based area large-tonnage steel case
The short sliding installation system of beam.
The above-mentioned purpose of the utility model is achieved through the following technical solutions:
A kind of short sliding installation system of land-based area large-tonnage steel box beam, including short sliding system and lifting system, the short cunning
The track girder that shifting system includes steel-pipe pile, sets up main beam thereon and is laid on main beam;The lifting system includes auxiliary
Pier is helped, the pier outer support steel pipe framed bent being arranged on the outside of pier, the pier top branch being mounted on auxiliary pier and pier outer support steel pipe framed bent
Steel pipe framed bent is supportted, the hoisting frame system girder on pier top supporting steel pipe framed bent, and the promotion on girder are ridden upon
Mechanism, hoisting mechanism are equipped with suspender.
The short sliding installation system of land-based area large-tonnage steel box beam of the utility model, the short sliding system from waters set up to
Land-based area installs the position of steel box-girder, completes the transport of large-tonnage steel box beam in low level, then by lift mechanism lifts to mounting height.
Compared with tradition sets up the sliding system of high trestle, simple in structure, stability is good, and low level safe transportation.
Further, the short sliding installation system of land-based area large-tonnage steel box beam of the utility model, sets in waters embankments both sides
There is armored concrete Extended chemotherapy to support the short sliding system.Since steel box-girder mounting height is big, traditional sliding system is wanted
Reach such highly desirable very high stability, you must use steel-pipe pile.But for the construction environment across embankment, steel
Pile pile can destroy bank structure, and therefore, building in constructing across embankment for sliding system is a great problem.The utility model uses
The short sliding overcomes described problem well.
Further, the short sliding installation system of land-based area large-tonnage steel box beam of the utility model, the auxiliary pier are bridge
Bridge pier.Lifting system is constructed using the structure of itself of building bridge, it is more effortless, efficient.
Further, the short sliding installation system of land-based area large-tonnage steel box beam of the utility model, the lifting system it is auxiliary
It helps on Dun Hedun outer support steel pipe framed bents and is additionally provided with steel box-girder load transfer platform.
Further, the short sliding installation system of land-based area large-tonnage steel box beam of the utility model is with steel box-girder center line
Laterally, the sliding route of the short sliding system be vertical shift-it is traversing-vertical shift again.
Include using the method that the installation system of the utility model is constructed:
Step 1:Set up the short sliding system of steel box-girder and mounting slip the device and operating system, debugging;
Step 2:Steel box-girder is transported to bridge location, on large-tonnage crane barge lifting steel box-girder to short sliding system, traction is
System is connect with steel box-girder, adjusts steel box-girder posture, prepares sliding;
Step 3:Start trailer system, steel box-girder is according to first vertical shift, traversing, vertical shift again route slides onto installation position again
Set lower section;
Step 4:Set up steel box-girder lifting system, equipment etc. is installed in place, debug hoisting frame lifting system, prepare into
Row steel box-girder lifts;
Step 5:Mounting hanger and suspender connection, steel box-girder are promoted to setting height;And it is adjusted to design position, it installs
Bracket is shelved temporarily, cushion block is supported on steel box-girder bottom;
Step 6:Conversion load holder is set up, hoisting frame system is removed, carries out subsequent construction.
The short sliding installation system of land-based area large-tonnage steel box beam of the utility model is located at land-based area position for crossing over Jiang Di
Steel box-girder installation, have that security risk is small, effect is high, installation accuracy is high, and elevation location is accurate, graceful excellent of appearance line style
Point.
Description of the drawings
Fig. 1 is the short sliding installation system general illustration of the utility model land-based area large-tonnage steel box beam;
Fig. 2 is the lifting system schematic diagram of the short sliding installation system of the utility model land-based area large-tonnage steel box beam;
Fig. 3 is the side view of Fig. 2;
One schematic diagram of the step of Fig. 4 is embodiment 2;
Two schematic diagram of the step of Fig. 5 is embodiment 2;
Three schematic diagram of the step of Fig. 6 is embodiment 2;
Five schematic diagram of the step of Fig. 7 is embodiment 2;
Wherein, 1 is track girder, and 2 be main beam, and 3 be steel-pipe pile, and 4 be armored concrete Extended chemotherapy, and 5 be hoisting mechanism,
6 be suspender, and 7 be auxiliary pier, and 8 be steel box-girder load transfer platform, and 9 be pier outer support steel pipe framed bent, and 10 be pier top supporting steel pipe
Framed bent, 11 be hoisting frame system girder.
Specific implementation mode
It is the non-limiting embodiment of the utility model below.
Embodiment 1
Referring to Fig. 1~3, the short sliding installation system of land-based area large-tonnage steel box beam, including short sliding system and lifting system, institute
State short sliding system include steel-pipe pile 3, the track girder 1 setting up main beam 2 thereon and be laid on main beam;The promotion
System includes auxiliary pier 7, the pier outer support steel pipe framed bent 9 being arranged on the outside of pier, is mounted on auxiliary pier 7 and pier outer support steel pipe is arranged
Pier top supporting steel pipe framed bent 10 on frame 9 rides upon the hoisting frame system girder 11 on pier top supporting steel pipe framed bent 10, and
Hoisting mechanism 5 on girder, hoisting mechanism 5 are equipped with suspender 6.The auxiliary pier 7 and pier outer support steel pipe of lifting system
Steel box-girder load transfer platform 8 is additionally provided on framed bent 9.Auxiliary pier 7 is bridge pier.
Steel-pipe pile armored concrete Extended chemotherapy 4 in the both sides Jiang Di is replaced, and causes to leak in order to avoid destroying big embankment structure.
Short sliding system is laterally to see with steel box-girder center line, the route of short sliding be vertical shift-it is traversing-vertical shift again.
Embodiment 2
The step of being constructed using the installation system of embodiment 1, installed land-based area large-tonnage steel box beam is as follows:
Step 1:The short sliding system of steel box-girder and mounting slip the device and operating system are set up according to embodiment 1, is debugged,
Such as Fig. 4;
Step 2:Steel box-girder is transported to bridge location, on large-tonnage crane barge lifting steel box-girder to short sliding system, traction is
System is connect with steel box-girder, adjusts steel box-girder posture, prepares sliding, such as Fig. 5;
Step 3:Start trailer system, steel box-girder is according to first vertical shift, traversing, vertical shift again route slides onto installation position again
Set lower section, such as Fig. 6;
Step 4:Set up steel box-girder lifting system, equipment etc. is installed in place, debug hoisting frame lifting system, prepare into
Row steel box-girder lifts;
Step 5:Mounting hanger and suspender connection, steel box-girder are promoted to setting height;And it is adjusted to design position, it installs
Bracket is shelved temporarily, cushion block is supported on steel box-girder bottom, such as Fig. 7;
Step 6:Conversion load holder is set up, hoisting frame system is removed, carries out subsequent construction.
Claims (5)
1. a kind of short sliding installation system of land-based area large-tonnage steel box beam, which is characterized in that including short sliding system and lifting system,
The track girder that the short sliding system includes steel-pipe pile, sets up main beam thereon and is laid on main beam;The promotion system
System includes auxiliary pier, the pier outer support steel pipe framed bent being arranged on the outside of pier, is mounted on auxiliary pier and pier outer support steel pipe framed bent
Pier top supporting steel pipe framed bent, ride upon the hoisting frame system girder on pier top supporting steel pipe framed bent, and be mounted on girder
On hoisting mechanism, hoisting mechanism be equipped with suspender.
2. the short sliding installation system of land-based area large-tonnage steel box beam according to claim 1, which is characterized in that waters embankments two
The steel-pipe pile of side is replaced with armored concrete Extended chemotherapy.
3. the short sliding installation system of land-based area large-tonnage steel box beam according to claim 1, which is characterized in that the auxiliary pier
For bridge pier.
4. the short sliding installation system of land-based area large-tonnage steel box beam according to claim 1, which is characterized in that the promotion system
It is additionally provided with steel box-girder load transfer platform on the auxiliary pier and pier outer support steel pipe framed bent of system.
5. the short sliding installation system of land-based area large-tonnage steel box beam according to claim 1, which is characterized in that in steel box-girder
Heart line be laterally, the sliding route of the short sliding system be vertical shift-it is traversing-vertical shift again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820375352.9U CN208009277U (en) | 2018-03-20 | 2018-03-20 | A kind of short sliding installation system of land-based area large-tonnage steel box beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820375352.9U CN208009277U (en) | 2018-03-20 | 2018-03-20 | A kind of short sliding installation system of land-based area large-tonnage steel box beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208009277U true CN208009277U (en) | 2018-10-26 |
Family
ID=63889766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820375352.9U Expired - Fee Related CN208009277U (en) | 2018-03-20 | 2018-03-20 | A kind of short sliding installation system of land-based area large-tonnage steel box beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208009277U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110242055A (en) * | 2019-05-08 | 2019-09-17 | 江苏江都建设集团有限公司 | A kind of steel truss installation method |
CN114703757A (en) * | 2022-04-13 | 2022-07-05 | 中交路桥建设有限公司 | Multifunctional support for steel cross beam of cable-stayed bridge and assembling method of steel cross beam |
CN114775431A (en) * | 2022-04-13 | 2022-07-22 | 中交路桥建设有限公司 | Assembling and sliding support for large-tonnage steel cross beam of cable-stayed bridge cable tower |
-
2018
- 2018-03-20 CN CN201820375352.9U patent/CN208009277U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110242055A (en) * | 2019-05-08 | 2019-09-17 | 江苏江都建设集团有限公司 | A kind of steel truss installation method |
CN114703757A (en) * | 2022-04-13 | 2022-07-05 | 中交路桥建设有限公司 | Multifunctional support for steel cross beam of cable-stayed bridge and assembling method of steel cross beam |
CN114775431A (en) * | 2022-04-13 | 2022-07-22 | 中交路桥建设有限公司 | Assembling and sliding support for large-tonnage steel cross beam of cable-stayed bridge cable tower |
CN114703757B (en) * | 2022-04-13 | 2024-04-19 | 中交路桥建设有限公司 | Multifunctional bracket for steel cross beam of cable-stayed bridge and assembly method of steel cross beam |
CN114775431B (en) * | 2022-04-13 | 2024-05-14 | 中交路桥建设有限公司 | Splicing sliding support for large-tonnage steel cross beam of cable-stayed bridge cable tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104562936B (en) | A kind of tie-rod steel pipe arch bridge construction method continuously | |
CN101265690B (en) | Method for protectively dismantling arch bridge | |
CN208009277U (en) | A kind of short sliding installation system of land-based area large-tonnage steel box beam | |
CN104746437B (en) | A kind of self-anchored suspension bridge installation method | |
CN103669216A (en) | Steel box girder scattered-splicing sliding device and installation method | |
CN204940312U (en) | A kind of integral lifting lowering system of steel cofferdam | |
CN104060541B (en) | A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding | |
CN106192776A (en) | A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology | |
CN103184722B (en) | Large-span double-layer Bailey truss structure and construction method thereof | |
CN109629576B (en) | Suspension protection system for water supply pipe crossing foundation pit and construction method | |
CN102367650A (en) | Construction method of steel pipe arch bridge | |
CN208995937U (en) | Mounting bracket is slid suitable for the S type steel box girder of cable stayed bridge above subway station | |
CN109972623A (en) | A kind of construction method and device carrying out pipeline suspension using Bailey beam | |
CN101122115B (en) | Construction method for tower crane shift | |
CN202658590U (en) | Integral assembled drilling platform | |
CN101177933B (en) | Bridge rib hoisting and supporting rack integral construction method and device | |
CN205917601U (en) | Integrally lift up device of bridge arch rib | |
CN208965416U (en) | A kind of safeguard structure of large span frame bridge jack-in process existing railway | |
CN105421239B (en) | Hoisting method for large-span highway-railway dual-purpose steel truss girder bridge deck slab | |
CN102535344A (en) | Concrete transportation method for bridge body of high-pier bridge in gully region | |
CN202989781U (en) | Width widened cast-in-place box beam moving support | |
CN209906222U (en) | A loop wheel machine that descends river for large-span steel pipe encircles segment lift shipment | |
CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
CN110331672A (en) | Across the pier bale handle holder device in bridge side position and its simple and fast construction method | |
CN204919348U (en) | Supplementary head tower of using of self anchored suspension bridge installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181026 |
|
CF01 | Termination of patent right due to non-payment of annual fee |