CN202359510U - Multi-functional working vehicle for concrete anti-collision guardrail of bridge - Google Patents

Multi-functional working vehicle for concrete anti-collision guardrail of bridge Download PDF

Info

Publication number
CN202359510U
CN202359510U CN2012200712197U CN201220071219U CN202359510U CN 202359510 U CN202359510 U CN 202359510U CN 2012200712197 U CN2012200712197 U CN 2012200712197U CN 201220071219 U CN201220071219 U CN 201220071219U CN 202359510 U CN202359510 U CN 202359510U
Authority
CN
China
Prior art keywords
working platform
bridge
working
function operation
vehicle frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012200712197U
Other languages
Chinese (zh)
Inventor
方竞
文斌
邹赐敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN2012200712197U priority Critical patent/CN202359510U/en
Application granted granted Critical
Publication of CN202359510U publication Critical patent/CN202359510U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a multi-functional working vehicle for and anti-collision guardrail of a bridge, which comprises a walking base, a vehicle frame arranged on the walking base, a first working platform, a second working platform, a third working platform and a fourth working platform arranged on the vehicle frame, a working guardrail arranged on the first working platform, and a climbing part. The second working platform and the fourth working platform are respectively arranged on two sides of the anti-collision guardrail. The third working platform is arranged above the guardrail. The first working platform is arranged below the second working platform. The climbing part is used in sequentially connection with the fourth working platform, the third working platform, the second working platform, and the first working platform. The complete process relates to concrete anti-collision guardrail construction, decoration, inspection and maintenance can be finished through the working vehicle, the construction efficiency is increased, the safety potential danger of dropping from high position is eliminated, the working equipment cost is lowered, the installation and the disassembly are convenient, and is not limited by the form, profile and dimension of the anti-collision guiderail, or the height of the bridge.

Description

Bridge concrete anticollision barrier multi-function operation car
Technical field
The utility model relates to field of bridge construction, relates in particular to a kind of multi-function operation car that is used for the bridge concrete anticollision barrier.
Background technology
In the construction of bridge concrete anticollision barrier, mainly contain the guardrail reinforcement installation, inside and outside template is installed, concreting, form removable, processes such as skin patching, brightening.After coming into operation, also need safeguard, overhaul; Above process all relates to eminence and faces the limit operation; Adopt an effective measure and guarantee that personnel's material equipment safety is the problem that must solve on the bridge, under the bridge; When particularly bridge is crossed over railway, highway, navigable river and personnel's close quarters, must guarantee that construction overall process does not have any object and falls.Present settling mode has: 1, under bridge, set up integral support; 2, monolithic protection frame is installed under bridge; 3, carry out the manual work protection under the simple and easy operation suspender construction of making, the bridge, relieve traffic congestion etc.But above measure all has deficiency, method 1 can the blocking-up bridge under traffic, and limited by landform, as be not suitable for and stride water, stride the territory, mountain area, stride traffic lines and productive life zone etc.Method 2 takies the below usage space, and frame can't use by the double as working platform when under-clearance is higher.Method 3 protection effects are poor, efficiency of construction is low, and the construction organization difficulty is big.
The utility model content
The technical problem that the utility model will solve is: provide a kind of and can accomplish the multi-function operation car that relates to the construction of concrete anticollision barrier, decorations, repair and maintenance overall process; Improve efficiency of construction; Eliminate the falling object from high altitude potential safety hazard; Reduce the equipment of operating cost, easy installation and removal, and not limited by Collison fence for bridge form, appearance and size, bridge height.
The utility model is to solve the problems of the technologies described above the technical scheme of being taked to be:
Collison fence for bridge multi-function operation car; It is characterized in that: but it comprises the traveling base; But be arranged on the vehicle frame on the said traveling base; Be arranged on first working platform on the said vehicle frame, second working platform, the 3rd working platform, and the 4th working platform, be arranged at the operation guardrail on said first working platform, and the climbing parts; Said second working platform and the 4th working platform are separately positioned on the both sides of anticollision barrier; Said the 3rd working platform is arranged on the anticollision barrier top; Said first working platform is arranged on the below of said second working platform, and said climbing parts are used for connecting successively said the 4th working platform, the 3rd working platform, second working platform, reach first working platform.
Press such scheme, said Collison fence for bridge multi-function operation car also comprises concrete hopper that is arranged on the vehicle frame and the chute that is connected with said concrete hopper.
Press such scheme, said climbing parts comprise cat ladder and staircase, and said staircase connects the 4th working platform and the 3rd working platform, and said cat ladder connects the 3rd working platform, second working platform, reaches first working platform.
Press such scheme, said vehicle frame is the heavy overhanging type vehicle frame of autogamy.
Press such scheme, said Collison fence for bridge multi-function operation car also comprises the protecting component that is arranged at the part periphery of encorbelmenting.
Press such scheme, said Collison fence for bridge multi-function operation car also comprises a plurality of suspension hooks that are arranged on the vehicle frame top.
Compared with prior art, the technique effect obtained of the utility model is:
1, this working vehicle can accomplish the operation of bridge concrete anticollision barrier construction overall process, comprises construction, fitment process and later maintenance process;
2, concrete hopper, chute are detachable, are connected with working vehicle through bearing pin;
3, working vehicle installs, dismantles fast, adopts the self-balancing counterweight, also can set up counterweight, and car load walks in bridge floor, not restricted by ground condition, and efficiency of construction is high, applicable to the anticollision barrier of various cross sections;
4, personnel walk between variant function job platform through staircase, cat ladder, have platform to support during operation, and guardrail and protective screening (or protected apron) protection has suspension hook suspension safety rope, and personnel's job safety is guaranteed.
Description of drawings
Fig. 1 is a bridge concrete anticollision barrier multi-function operation car elevation.
Fig. 2 is a bridge concrete anticollision barrier multi-function operation car vertical view.
Fig. 3 is a bridge concrete anticollision barrier multi-function operation car lateral view.
Among the figure: 1-vehicle frame, but 2-traveling base, 3-first working platform, 4-second working platform, 5-the 3rd working platform; 6-the 4th working platform, 7-concrete hopper, 8-chute, 9-counterweight, 10-staircase; The 11-suspension hook, 12-cat ladder, 13-protecting component, 14-pin-connected panel node, 15-anticollision barrier; The 16-leader, the plug-in lamp decoration of 17-, 18-bridge floor, 19-guardrail outside finish, 20-operation guardrail.
The specific embodiment
Below in conjunction with accompanying drawing and case study on implementation the utility model is done further to describe, certain following embodiment should not be construed as the restriction to the utility model.
Bridge concrete anticollision barrier multi-function operation car shown in Figure 1, but it comprises traveling base 2, but be arranged on the vehicle frame 1 on the traveling base 2; Be arranged on first working platform 3 on the vehicle frame 1, second working platform 4, the 3rd working platform 5, and the 4th working platform 6, dismountable concrete hopper 7, conduit or chute 8; Be arranged on a plurality of suspension hooks 11 at vehicle frame 1 top; Protecting component 13, guardrail 20, and climbing parts.
In the present embodiment, vehicle frame 1 is the overhanging type vehicle frame from counterweight 9, and bearing pin is all adopted in 1 connection of vehicle frame.Protecting component 13 is arranged at the part periphery of encorbelmenting, and can be protective screening or protected apron.In the present embodiment, the climbing parts comprise staircase 10 and cat ladder 12.Staircase 10 connects the 4th working platform 6 and the 3rd working platform 5.Cat ladder 12 connects the 3rd working platform 5, second working platform 4, and first working platform 3.
Second working platform 4 and the 4th working platform 6 are separately positioned on the both sides of anticollision barrier 15.The 4th working platform 6 is positioned at the top of bridge floor 18, is used for the construction of crashproof 15 inboards of guardrail.Second working platform 4 is positioned at the outside of anticollision barrier 15.The 3rd working platform 5 is arranged on crashproof 15 tops of guardrail.First working platform 3 is arranged on the below of second working platform 4.Operation guardrail 20 is arranged on first working platform 3, can guarantee personnel's safety work.
This multi-function operation car can be worked continuously in the bridge floor walking, can accomplish bridge concrete anticollision barrier construction overall process.This multi-function operation car adopts the assemble type structure, is convenient to dismounting, Fast Installation.
Use the method for this Collison fence for bridge multi-function operation car construction, it may further comprise the steps:
Prefabricated reinforcing bar is placed on the 4th working platform 6, personnel utilize second working platform 4 and the 4th working platform 6 carry out in the installation of outside reinforcing bar, like colligation, location, and welding etc.;
Utilize suspension hook 11 to do suspension centre template is sling, be installed in design attitude, personnel utilize second working platform 4 and the 4th working platform 6 to carry out the installation of inner and outer template;
Utilize the bridge floor loader to concrete hopper 7 charging, concrete directly is fed in the above-mentioned template through chute 8, and personnel climb up the operation of vibrating of the 3rd working platform 5 through the climbing parts, can buckle of safety belt be hung on the suspension hook during personnel's operation;
Personnel utilize second working platform 4 and the 4th working platform 6 to carry out form removable;
Personnel get into first working platform 3 and second working platform 4 through the climbing parts and carry out concrete anticollision barrier outer surface and modify, install drainage system (like leader 16 etc.), plug-in lamp decoration 17 and later maintenance maintenance are installed.Under the protection of protecting component 13, operation guardrail 20, but personnel's safety work.

Claims (6)

1. Collison fence for bridge multi-function operation car; It is characterized in that: but it comprises the traveling base; But be arranged on the vehicle frame on the said traveling base; Be arranged on first working platform on the said vehicle frame, second working platform, the 3rd working platform, and the 4th working platform, be arranged at the operation guardrail on said first working platform, and the climbing parts; Said second working platform and the 4th working platform are separately positioned on the both sides of anticollision barrier; Said the 3rd working platform is arranged on the anticollision barrier top; Said first working platform is arranged on the below of said second working platform, and said climbing parts are used for connecting successively said the 4th working platform, the 3rd working platform, second working platform, reach first working platform.
2. Collison fence for bridge multi-function operation car as claimed in claim 1 is characterized in that, said Collison fence for bridge multi-function operation car also comprises concrete hopper that is arranged on the vehicle frame and the chute that is connected with said concrete hopper.
3. Collison fence for bridge multi-function operation car as claimed in claim 1; It is characterized in that; Said climbing parts comprise cat ladder and staircase, and said staircase connects the 4th working platform and the 3rd working platform, and said cat ladder connects the 3rd working platform, second working platform, reaches first working platform.
4. Collison fence for bridge multi-function operation car as claimed in claim 1 is characterized in that, said vehicle frame is the heavy overhanging type vehicle frame of autogamy.
5. Collison fence for bridge multi-function operation car as claimed in claim 4 is characterized in that, said Collison fence for bridge multi-function operation car also comprises the protecting component that is arranged at the part periphery of encorbelmenting.
6. Collison fence for bridge multi-function operation car as claimed in claim 1 is characterized in that, said Collison fence for bridge multi-function operation car also comprises a plurality of suspension hooks that are arranged on the vehicle frame top.
CN2012200712197U 2012-02-29 2012-02-29 Multi-functional working vehicle for concrete anti-collision guardrail of bridge Withdrawn - After Issue CN202359510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200712197U CN202359510U (en) 2012-02-29 2012-02-29 Multi-functional working vehicle for concrete anti-collision guardrail of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200712197U CN202359510U (en) 2012-02-29 2012-02-29 Multi-functional working vehicle for concrete anti-collision guardrail of bridge

Publications (1)

Publication Number Publication Date
CN202359510U true CN202359510U (en) 2012-08-01

Family

ID=46570705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200712197U Withdrawn - After Issue CN202359510U (en) 2012-02-29 2012-02-29 Multi-functional working vehicle for concrete anti-collision guardrail of bridge

Country Status (1)

Country Link
CN (1) CN202359510U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587276A (en) * 2012-02-29 2012-07-18 中铁七局集团有限公司 Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle
CN105133499A (en) * 2015-08-26 2015-12-09 中国十七冶集团有限公司 Movable hanging basket trolley for bridge concrete anti-collision guardrail construction
CN106012824A (en) * 2016-07-26 2016-10-12 交通运输部科学研究院 Movable bridge anti-collision guardrail construction operation trolley
CN109537445A (en) * 2017-09-22 2019-03-29 上海宝冶集团有限公司 Mobile overhanging lifting platform for crash barrier template construction
CN113152866A (en) * 2020-12-16 2021-07-23 中建四局安装工程有限公司 Novel removal cage of construction outside highway concrete guardrail

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587276A (en) * 2012-02-29 2012-07-18 中铁七局集团有限公司 Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle
CN102587276B (en) * 2012-02-29 2014-12-03 中铁七局集团有限公司 Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle
CN105133499A (en) * 2015-08-26 2015-12-09 中国十七冶集团有限公司 Movable hanging basket trolley for bridge concrete anti-collision guardrail construction
CN106012824A (en) * 2016-07-26 2016-10-12 交通运输部科学研究院 Movable bridge anti-collision guardrail construction operation trolley
CN109537445A (en) * 2017-09-22 2019-03-29 上海宝冶集团有限公司 Mobile overhanging lifting platform for crash barrier template construction
CN113152866A (en) * 2020-12-16 2021-07-23 中建四局安装工程有限公司 Novel removal cage of construction outside highway concrete guardrail

Similar Documents

Publication Publication Date Title
CN202359510U (en) Multi-functional working vehicle for concrete anti-collision guardrail of bridge
CN103015325B (en) Construction method of cast-in-place concrete crash barrier with eaves
CN101725111B (en) Totally enclosed cradle and construction method for suspending cast of concrete by using same
CN102493346A (en) Upper air anti-collision guardrail module transfer hanging bracket and construction method
CN105781124A (en) Method for installing corridor with ultra-high double-tower steel structure
CN206591862U (en) A kind of subway overhead station construction protecting platform car
CN106400691B (en) Anti-collision wall mould bases integrated construction technique
CN206553923U (en) A kind of mobile platform device for being used to install Collison fence for bridge
CN206157569U (en) Protective platform is construct to portable bridge
CN105297639B (en) Multifunctional hydraulic lifting system and construction method thereof
CN206538685U (en) Twin shaft pier and middle binder truss move integrally system
CN202064281U (en) Slip form frame
CN106012824A (en) Movable bridge anti-collision guardrail construction operation trolley
CN102587276B (en) Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle
CN205857026U (en) A kind of movable type bridge anticollision barrier construction operation chassis
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN201649654U (en) Discharging platform for high-rise building construction
CN205955164U (en) Portable steel truss operation platform
CN202559618U (en) Multi-step connection type cage staircase
CN210049105U (en) Self-propelled bridge formwork operation trolley
CN205223849U (en) Bridge anticollision barrier template is lifted by crane and concrete defect patching device
CN106592438A (en) Two-column pier and middle tie beam construction method employing integral movement of trusses
CN213804900U (en) Pier body construction platform of high pier bridge
CN205188823U (en) Construction of light rail prestressing force bent cap and end -blocking work platform
CN211200116U (en) Protective frame for construction of mid-span closure section steel shell of continuous beam of cross highway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120801

Effective date of abandoning: 20141203

RGAV Abandon patent right to avoid regrant