CN202359510U - Multi-functional working vehicle for concrete anti-collision guardrail of bridge - Google Patents
Multi-functional working vehicle for concrete anti-collision guardrail of bridge Download PDFInfo
- Publication number
- CN202359510U CN202359510U CN2012200712197U CN201220071219U CN202359510U CN 202359510 U CN202359510 U CN 202359510U CN 2012200712197 U CN2012200712197 U CN 2012200712197U CN 201220071219 U CN201220071219 U CN 201220071219U CN 202359510 U CN202359510 U CN 202359510U
- Authority
- CN
- China
- Prior art keywords
- working platform
- bridge
- working
- function operation
- vehicle frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 230000009194 climbing Effects 0.000 claims abstract description 12
- 230000004888 barrier function Effects 0.000 claims description 19
- 239000000725 suspension Substances 0.000 claims description 9
- 241000282326 Felis catus Species 0.000 claims description 6
- 230000010165 autogamy Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 16
- 238000000034 method Methods 0.000 abstract description 14
- 238000009434 installation Methods 0.000 abstract description 6
- 238000012423 maintenance Methods 0.000 abstract description 5
- 238000005034 decoration Methods 0.000 abstract description 4
- 238000007689 inspection Methods 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000012216 screening Methods 0.000 description 2
- 238000005282 brightening Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model provides a multi-functional working vehicle for and anti-collision guardrail of a bridge, which comprises a walking base, a vehicle frame arranged on the walking base, a first working platform, a second working platform, a third working platform and a fourth working platform arranged on the vehicle frame, a working guardrail arranged on the first working platform, and a climbing part. The second working platform and the fourth working platform are respectively arranged on two sides of the anti-collision guardrail. The third working platform is arranged above the guardrail. The first working platform is arranged below the second working platform. The climbing part is used in sequentially connection with the fourth working platform, the third working platform, the second working platform, and the first working platform. The complete process relates to concrete anti-collision guardrail construction, decoration, inspection and maintenance can be finished through the working vehicle, the construction efficiency is increased, the safety potential danger of dropping from high position is eliminated, the working equipment cost is lowered, the installation and the disassembly are convenient, and is not limited by the form, profile and dimension of the anti-collision guiderail, or the height of the bridge.
Description
Technical field
The utility model relates to field of bridge construction, relates in particular to a kind of multi-function operation car that is used for the bridge concrete anticollision barrier.
Background technology
In the construction of bridge concrete anticollision barrier, mainly contain the guardrail reinforcement installation, inside and outside template is installed, concreting, form removable, processes such as skin patching, brightening.After coming into operation, also need safeguard, overhaul; Above process all relates to eminence and faces the limit operation; Adopt an effective measure and guarantee that personnel's material equipment safety is the problem that must solve on the bridge, under the bridge; When particularly bridge is crossed over railway, highway, navigable river and personnel's close quarters, must guarantee that construction overall process does not have any object and falls.Present settling mode has: 1, under bridge, set up integral support; 2, monolithic protection frame is installed under bridge; 3, carry out the manual work protection under the simple and easy operation suspender construction of making, the bridge, relieve traffic congestion etc.But above measure all has deficiency, method 1 can the blocking-up bridge under traffic, and limited by landform, as be not suitable for and stride water, stride the territory, mountain area, stride traffic lines and productive life zone etc.Method 2 takies the below usage space, and frame can't use by the double as working platform when under-clearance is higher.Method 3 protection effects are poor, efficiency of construction is low, and the construction organization difficulty is big.
The utility model content
The technical problem that the utility model will solve is: provide a kind of and can accomplish the multi-function operation car that relates to the construction of concrete anticollision barrier, decorations, repair and maintenance overall process; Improve efficiency of construction; Eliminate the falling object from high altitude potential safety hazard; Reduce the equipment of operating cost, easy installation and removal, and not limited by Collison fence for bridge form, appearance and size, bridge height.
The utility model is to solve the problems of the technologies described above the technical scheme of being taked to be:
Collison fence for bridge multi-function operation car; It is characterized in that: but it comprises the traveling base; But be arranged on the vehicle frame on the said traveling base; Be arranged on first working platform on the said vehicle frame, second working platform, the 3rd working platform, and the 4th working platform, be arranged at the operation guardrail on said first working platform, and the climbing parts; Said second working platform and the 4th working platform are separately positioned on the both sides of anticollision barrier; Said the 3rd working platform is arranged on the anticollision barrier top; Said first working platform is arranged on the below of said second working platform, and said climbing parts are used for connecting successively said the 4th working platform, the 3rd working platform, second working platform, reach first working platform.
Press such scheme, said Collison fence for bridge multi-function operation car also comprises concrete hopper that is arranged on the vehicle frame and the chute that is connected with said concrete hopper.
Press such scheme, said climbing parts comprise cat ladder and staircase, and said staircase connects the 4th working platform and the 3rd working platform, and said cat ladder connects the 3rd working platform, second working platform, reaches first working platform.
Press such scheme, said vehicle frame is the heavy overhanging type vehicle frame of autogamy.
Press such scheme, said Collison fence for bridge multi-function operation car also comprises the protecting component that is arranged at the part periphery of encorbelmenting.
Press such scheme, said Collison fence for bridge multi-function operation car also comprises a plurality of suspension hooks that are arranged on the vehicle frame top.
Compared with prior art, the technique effect obtained of the utility model is:
1, this working vehicle can accomplish the operation of bridge concrete anticollision barrier construction overall process, comprises construction, fitment process and later maintenance process;
2, concrete hopper, chute are detachable, are connected with working vehicle through bearing pin;
3, working vehicle installs, dismantles fast, adopts the self-balancing counterweight, also can set up counterweight, and car load walks in bridge floor, not restricted by ground condition, and efficiency of construction is high, applicable to the anticollision barrier of various cross sections;
4, personnel walk between variant function job platform through staircase, cat ladder, have platform to support during operation, and guardrail and protective screening (or protected apron) protection has suspension hook suspension safety rope, and personnel's job safety is guaranteed.
Description of drawings
Fig. 1 is a bridge concrete anticollision barrier multi-function operation car elevation.
Fig. 2 is a bridge concrete anticollision barrier multi-function operation car vertical view.
Fig. 3 is a bridge concrete anticollision barrier multi-function operation car lateral view.
Among the figure: 1-vehicle frame, but 2-traveling base, 3-first working platform, 4-second working platform, 5-the 3rd working platform; 6-the 4th working platform, 7-concrete hopper, 8-chute, 9-counterweight, 10-staircase; The 11-suspension hook, 12-cat ladder, 13-protecting component, 14-pin-connected panel node, 15-anticollision barrier; The 16-leader, the plug-in lamp decoration of 17-, 18-bridge floor, 19-guardrail outside finish, 20-operation guardrail.
The specific embodiment
Below in conjunction with accompanying drawing and case study on implementation the utility model is done further to describe, certain following embodiment should not be construed as the restriction to the utility model.
Bridge concrete anticollision barrier multi-function operation car shown in Figure 1, but it comprises traveling base 2, but be arranged on the vehicle frame 1 on the traveling base 2; Be arranged on first working platform 3 on the vehicle frame 1, second working platform 4, the 3rd working platform 5, and the 4th working platform 6, dismountable concrete hopper 7, conduit or chute 8; Be arranged on a plurality of suspension hooks 11 at vehicle frame 1 top; Protecting component 13, guardrail 20, and climbing parts.
In the present embodiment, vehicle frame 1 is the overhanging type vehicle frame from counterweight 9, and bearing pin is all adopted in 1 connection of vehicle frame.Protecting component 13 is arranged at the part periphery of encorbelmenting, and can be protective screening or protected apron.In the present embodiment, the climbing parts comprise staircase 10 and cat ladder 12.Staircase 10 connects the 4th working platform 6 and the 3rd working platform 5.Cat ladder 12 connects the 3rd working platform 5, second working platform 4, and first working platform 3.
Second working platform 4 and the 4th working platform 6 are separately positioned on the both sides of anticollision barrier 15.The 4th working platform 6 is positioned at the top of bridge floor 18, is used for the construction of crashproof 15 inboards of guardrail.Second working platform 4 is positioned at the outside of anticollision barrier 15.The 3rd working platform 5 is arranged on crashproof 15 tops of guardrail.First working platform 3 is arranged on the below of second working platform 4.Operation guardrail 20 is arranged on first working platform 3, can guarantee personnel's safety work.
This multi-function operation car can be worked continuously in the bridge floor walking, can accomplish bridge concrete anticollision barrier construction overall process.This multi-function operation car adopts the assemble type structure, is convenient to dismounting, Fast Installation.
Use the method for this Collison fence for bridge multi-function operation car construction, it may further comprise the steps:
Prefabricated reinforcing bar is placed on the 4th working platform 6, personnel utilize second working platform 4 and the 4th working platform 6 carry out in the installation of outside reinforcing bar, like colligation, location, and welding etc.;
Utilize suspension hook 11 to do suspension centre template is sling, be installed in design attitude, personnel utilize second working platform 4 and the 4th working platform 6 to carry out the installation of inner and outer template;
Utilize the bridge floor loader to concrete hopper 7 charging, concrete directly is fed in the above-mentioned template through chute 8, and personnel climb up the operation of vibrating of the 3rd working platform 5 through the climbing parts, can buckle of safety belt be hung on the suspension hook during personnel's operation;
Personnel utilize second working platform 4 and the 4th working platform 6 to carry out form removable;
Personnel get into first working platform 3 and second working platform 4 through the climbing parts and carry out concrete anticollision barrier outer surface and modify, install drainage system (like leader 16 etc.), plug-in lamp decoration 17 and later maintenance maintenance are installed.Under the protection of protecting component 13, operation guardrail 20, but personnel's safety work.
Claims (6)
1. Collison fence for bridge multi-function operation car; It is characterized in that: but it comprises the traveling base; But be arranged on the vehicle frame on the said traveling base; Be arranged on first working platform on the said vehicle frame, second working platform, the 3rd working platform, and the 4th working platform, be arranged at the operation guardrail on said first working platform, and the climbing parts; Said second working platform and the 4th working platform are separately positioned on the both sides of anticollision barrier; Said the 3rd working platform is arranged on the anticollision barrier top; Said first working platform is arranged on the below of said second working platform, and said climbing parts are used for connecting successively said the 4th working platform, the 3rd working platform, second working platform, reach first working platform.
2. Collison fence for bridge multi-function operation car as claimed in claim 1 is characterized in that, said Collison fence for bridge multi-function operation car also comprises concrete hopper that is arranged on the vehicle frame and the chute that is connected with said concrete hopper.
3. Collison fence for bridge multi-function operation car as claimed in claim 1; It is characterized in that; Said climbing parts comprise cat ladder and staircase, and said staircase connects the 4th working platform and the 3rd working platform, and said cat ladder connects the 3rd working platform, second working platform, reaches first working platform.
4. Collison fence for bridge multi-function operation car as claimed in claim 1 is characterized in that, said vehicle frame is the heavy overhanging type vehicle frame of autogamy.
5. Collison fence for bridge multi-function operation car as claimed in claim 4 is characterized in that, said Collison fence for bridge multi-function operation car also comprises the protecting component that is arranged at the part periphery of encorbelmenting.
6. Collison fence for bridge multi-function operation car as claimed in claim 1 is characterized in that, said Collison fence for bridge multi-function operation car also comprises a plurality of suspension hooks that are arranged on the vehicle frame top.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012200712197U CN202359510U (en) | 2012-02-29 | 2012-02-29 | Multi-functional working vehicle for concrete anti-collision guardrail of bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012200712197U CN202359510U (en) | 2012-02-29 | 2012-02-29 | Multi-functional working vehicle for concrete anti-collision guardrail of bridge |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202359510U true CN202359510U (en) | 2012-08-01 |
Family
ID=46570705
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012200712197U Withdrawn - After Issue CN202359510U (en) | 2012-02-29 | 2012-02-29 | Multi-functional working vehicle for concrete anti-collision guardrail of bridge |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202359510U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102587276A (en) * | 2012-02-29 | 2012-07-18 | 中铁七局集团有限公司 | Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle |
| CN105133499A (en) * | 2015-08-26 | 2015-12-09 | 中国十七冶集团有限公司 | Movable hanging basket trolley for bridge concrete anti-collision guardrail construction |
| CN106012824A (en) * | 2016-07-26 | 2016-10-12 | 交通运输部科学研究院 | Movable bridge anti-collision guardrail construction operation trolley |
| CN109537445A (en) * | 2017-09-22 | 2019-03-29 | 上海宝冶集团有限公司 | Mobile overhanging lifting platform for crash barrier template construction |
| CN113152866A (en) * | 2020-12-16 | 2021-07-23 | 中建四局安装工程有限公司 | Novel removal cage of construction outside highway concrete guardrail |
| CN116289564A (en) * | 2022-12-30 | 2023-06-23 | 保利长大工程有限公司 | Auxiliary construction device for inner and outer guardrail formwork |
-
2012
- 2012-02-29 CN CN2012200712197U patent/CN202359510U/en not_active Withdrawn - After Issue
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102587276A (en) * | 2012-02-29 | 2012-07-18 | 中铁七局集团有限公司 | Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle |
| CN102587276B (en) * | 2012-02-29 | 2014-12-03 | 中铁七局集团有限公司 | Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle |
| CN105133499A (en) * | 2015-08-26 | 2015-12-09 | 中国十七冶集团有限公司 | Movable hanging basket trolley for bridge concrete anti-collision guardrail construction |
| CN106012824A (en) * | 2016-07-26 | 2016-10-12 | 交通运输部科学研究院 | Movable bridge anti-collision guardrail construction operation trolley |
| CN109537445A (en) * | 2017-09-22 | 2019-03-29 | 上海宝冶集团有限公司 | Mobile overhanging lifting platform for crash barrier template construction |
| CN113152866A (en) * | 2020-12-16 | 2021-07-23 | 中建四局安装工程有限公司 | Novel removal cage of construction outside highway concrete guardrail |
| CN116289564A (en) * | 2022-12-30 | 2023-06-23 | 保利长大工程有限公司 | Auxiliary construction device for inner and outer guardrail formwork |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202359510U (en) | Multi-functional working vehicle for concrete anti-collision guardrail of bridge | |
| CN101514586B (en) | Hanger rail type electric hanging boat and construction method thereof | |
| CN102493346A (en) | Upper air anti-collision guardrail module transfer hanging bracket and construction method | |
| CN103015325A (en) | Construction method of cast-in-place concrete crash barrier with eaves | |
| CN109881585A (en) | A kind of assembly flow shop platform for high pier construction | |
| CN106400691B (en) | Anti-collision wall mould bases integrated construction technique | |
| CN206591862U (en) | A kind of subway overhead station construction protecting platform car | |
| CN206157569U (en) | Protective platform is construct to portable bridge | |
| CN111828086B (en) | Mechanical supporting construction equipment for heavy-gradient inclined shaft and construction method thereof | |
| CN106012824A (en) | Movable bridge anti-collision guardrail construction operation trolley | |
| CN105297639B (en) | Multifunctional hydraulic lifting system and construction method thereof | |
| CN102587276B (en) | Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle | |
| CN202064281U (en) | Slip form frame | |
| CN205654127U (en) | Portable operation protective platform of assembly type structure stairwell | |
| CN207176494U (en) | Channel design suitable for the maintenance of box beam internal overhaul | |
| CN203923917U (en) | Job platform at the bottom of a kind of packaged type bridge | |
| CN201649654U (en) | Discharging platform for high-rise building construction | |
| CN219952606U (en) | Safety platform for beam slab prefabricated field | |
| CN206616460U (en) | A kind of adhesion type bridge maintenance nacelle device | |
| CN109537445A (en) | Mobile overhanging lifting platform for crash barrier template construction | |
| CN202559618U (en) | Multi-step connection type cage staircase | |
| CN205955164U (en) | Portable steel truss operation platform | |
| CN217536662U (en) | Guardrail flange plate construction moving trolley in bridge floor | |
| CN117846286A (en) | A construction method and support system for cantilevered eaves of a shallow round silo | |
| CN205223849U (en) | Bridge anticollision barrier template is lifted by crane and concrete defect patching device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20120801 Effective date of abandoning: 20141203 |
|
| RGAV | Abandon patent right to avoid regrant |