CN201753438U - Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails - Google Patents

Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails Download PDF

Info

Publication number
CN201753438U
CN201753438U CN2010202175417U CN201020217541U CN201753438U CN 201753438 U CN201753438 U CN 201753438U CN 2010202175417 U CN2010202175417 U CN 2010202175417U CN 201020217541 U CN201020217541 U CN 201020217541U CN 201753438 U CN201753438 U CN 201753438U
Authority
CN
China
Prior art keywords
hanging basket
self
trimming
forming
bridge anti
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202175417U
Other languages
Chinese (zh)
Inventor
胡光全
李万波
李德俊
何复生
杨琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 1st Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
China Railway Erju 1st Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, China Railway Erju 1st Engineering Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN2010202175417U priority Critical patent/CN201753438U/en
Application granted granted Critical
Publication of CN201753438U publication Critical patent/CN201753438U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails. The hanging basket comprises a 'U'-shaped hanger (1) made of channel steel by welding; rollers (2) are arranged on the insides of the upper edge, the left edge and the right edge of the hanger (1); a work platform (3) is welded at the outer end of the hanger (1); and guardrails (4) are arranged on the work platform (3). The self-traveling hanging basket has the advantages of simple structure, convenience in construction, low manufacturing cost and capabilities of ensuring safety and simultaneously greatly accelerating constructional speed.

Description

Be used for Collison fence for bridge moulding finishing self-propelled Hanging Basket
Technical field
The utility model belongs to the bridge construction equipment technical field, concretely, relates to a kind of Collison fence for bridge moulding finishing self-propelled Hanging Basket that is used for.
Background technology
Domestic present concrete anticollision barrier design is broadly divided into 3 kinds by profile mode difference, and be respectively: common sitting posture anticollision barrier, band are hung cast-in-place anticollision barrier of eaves and prefabricated installation link plate anticollision barrier.
Figure DEST_PATH_GSB00000353619000011
Along with the day by day raising of people to esthetic requirement, the common sitting posture anticollision barrier of former routine can not satisfy the aesthetic needs of people day by day.The concrete anticollision barrier that welded and installed band link plate or direct cast-in-place band are hung eaves arises at the historic moment.
The construction of band extension eaves Cast-in-place concrete anticollision barrier is the ripe construction outfitting tool of none cover still, and most units in charge of construction all adopt small crane organizing construction, have the shortcoming that the plant equipment expense has high input, the safety nothing ensures.
The utility model content
The purpose of this utility model be to provide a kind of simple in structure, portably use conveniently, be used for concrete anticollision barrier construction molding after, the flaw on concrete surface, and the processing of form removable back stay hole sealing etc.
The technical solution of the utility model is as follows:
Be used for Collison fence for bridge moulding finishing self-propelled Hanging Basket, this Hanging Basket comprises " door " shape hook that is welded by channel-section steel, the inboards last, left and right three limits of this hook are provided with roller, and the outer end of described hook is welded with working platform, and this working platform is provided with guardrail.。
Said structure is simple, light weight, easy to carry, " door " shape hook is complementary with bridge-collision-avoidance marge edge, especially can go up the roller that is provided with by hook, the constructor can stand in the position of mobile Hanging Basket on the working platform, thereby realizes behind the concrete anticollision barrier construction molding, the flaw on concrete surface, and anticollision barrier finishing moulding works of treatment such as processing, tapping pipe installation are sealed in form removable back stay hole.This self-propelled is hung indigo plant and is utilized concrete anticollision barrier design outline dexterously, by 6 rollers being installed hanging on the basket, can reaching voluntarily purpose and can effectively avoid the concrete surface by scratch again.
Beneficial effect: the utility model is simple in structure, easy construction, low cost of manufacture, accelerates speed of application when can guarantee safety greatly.
Description of drawings
The utility model will illustrate by example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Embodiment: as shown in Figure 1: be used for Collison fence for bridge moulding finishing self-propelled Hanging Basket, this Hanging Basket comprises " door " shape hook 1 that is welded by channel-section steel, the inboards last, left and right three limits of this hook 1 are provided with roller 2, the outer end of described hook 1 is welded with working platform 3, and this working platform 3 is provided with guardrail 4.

Claims (1)

1. be used for Collison fence for bridge moulding finishing self-propelled Hanging Basket, it is characterized in that: this Hanging Basket comprises " door " shape hook (1) that is welded by channel-section steel, the inboards last, left and right three limits of this hook (1) are provided with roller (2), the outer end of described hook (1) is welded with working platform (3), and this working platform (3) is provided with guardrail (4).
CN2010202175417U 2010-06-07 2010-06-07 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails Expired - Lifetime CN201753438U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202175417U CN201753438U (en) 2010-06-07 2010-06-07 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202175417U CN201753438U (en) 2010-06-07 2010-06-07 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails

Publications (1)

Publication Number Publication Date
CN201753438U true CN201753438U (en) 2011-03-02

Family

ID=43621170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202175417U Expired - Lifetime CN201753438U (en) 2010-06-07 2010-06-07 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails

Country Status (1)

Country Link
CN (1) CN201753438U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433835A (en) * 2011-10-10 2012-05-02 镇江蓝舶工程科技有限公司 Surface operation trolley for variable cross-section box beam of bridge
CN102561211A (en) * 2012-01-11 2012-07-11 中建七局第二建筑有限公司 Hanging basket for protecting collision-prevention wall
CN102747682A (en) * 2012-07-09 2012-10-24 江苏省交通工程集团有限公司 Attached-type walking hanging basket
CN103979468A (en) * 2013-02-08 2014-08-13 何少敦 Building wall table suspending and hanging support frame
CN104060541A (en) * 2014-06-25 2014-09-24 利越集团有限公司 Sliding small hanging basket and construction technology for mounting interception pipe
CN104088229A (en) * 2014-07-28 2014-10-08 上海公路桥梁(集团)有限公司 Anti-collision wall integrated construction device
CN104929039A (en) * 2015-06-29 2015-09-23 河南易博联城规划建筑设计有限公司洛阳分公司 Hoisting frame for overhaul of pier
CN107601031A (en) * 2017-10-11 2018-01-19 青海黄河上游水电开发有限责任公司光伏产业技术分公司 A kind of loading and unloading equipment of photovoltaic module
CN107700352A (en) * 2017-11-18 2018-02-16 河北建设集团卓诚路桥工程有限公司 A kind of equipment for the installation of bridge concrete guardrail tapping pipe
CN111719838A (en) * 2020-06-30 2020-09-29 中国建筑第八工程局有限公司 Adjustable hanging basket for steel beam and construction method thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433835A (en) * 2011-10-10 2012-05-02 镇江蓝舶工程科技有限公司 Surface operation trolley for variable cross-section box beam of bridge
CN102561211A (en) * 2012-01-11 2012-07-11 中建七局第二建筑有限公司 Hanging basket for protecting collision-prevention wall
CN102747682A (en) * 2012-07-09 2012-10-24 江苏省交通工程集团有限公司 Attached-type walking hanging basket
CN103979468A (en) * 2013-02-08 2014-08-13 何少敦 Building wall table suspending and hanging support frame
CN104060541A (en) * 2014-06-25 2014-09-24 利越集团有限公司 Sliding small hanging basket and construction technology for mounting interception pipe
CN104088229A (en) * 2014-07-28 2014-10-08 上海公路桥梁(集团)有限公司 Anti-collision wall integrated construction device
CN104088229B (en) * 2014-07-28 2015-11-25 上海公路桥梁(集团)有限公司 A kind of collision-prevention wall integrated construction device
CN104929039A (en) * 2015-06-29 2015-09-23 河南易博联城规划建筑设计有限公司洛阳分公司 Hoisting frame for overhaul of pier
CN107601031A (en) * 2017-10-11 2018-01-19 青海黄河上游水电开发有限责任公司光伏产业技术分公司 A kind of loading and unloading equipment of photovoltaic module
CN107601031B (en) * 2017-10-11 2023-10-03 青海黄河上游水电开发有限责任公司光伏产业技术分公司 Charging and discharging equipment of photovoltaic module
CN107700352A (en) * 2017-11-18 2018-02-16 河北建设集团卓诚路桥工程有限公司 A kind of equipment for the installation of bridge concrete guardrail tapping pipe
CN111719838A (en) * 2020-06-30 2020-09-29 中国建筑第八工程局有限公司 Adjustable hanging basket for steel beam and construction method thereof

Similar Documents

Publication Publication Date Title
CN201753438U (en) Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails
CN201722618U (en) Movable rotary hoist for eaves-hung cast-in-place concrete crash barrier of bridge
CN202925916U (en) Elevator shaft slope separation system
CN204024139U (en) A kind of " can be stealthy " garage
CN203222995U (en) Construction hoist feeding and discharging operation platform
CN202689496U (en) Moving platform for steel pipe concrete post concrete casing
CN201722619U (en) Mobile operating platform for eaves-hung cast-in-place concrete crash barrier of bridge
CN206494646U (en) Concrete preset piece is from folding entrucking hanger structure
CN202321896U (en) Safety linkage device of construction lift for people and goods
CN204265190U (en) The elevator structure of right-angled door-opened
CN201777839U (en) Forklift attachment pipeline system
CN202625765U (en) Basket head structure of lifting hanging basket
CN203475860U (en) Combined hole covering piece
CN202643261U (en) Lifting hook for pipes
CN202850471U (en) Lifting type operation platform for elevator well
CN205777752U (en) A kind of roomless traction system of three-dimensionally Underground Garage
CN203001827U (en) Spiral telescopic pole climber
CN203076386U (en) Automatic steel tube bending machine
CN201865267U (en) Novel guardrail staircase
CN204419010U (en) Telescopic ladder
CN204353389U (en) Adjustable steel wire straightening device
CN204529092U (en) A kind of small-sized suspender and second spreader unit thereof
CN103867007A (en) Tower-type intelligent stereo garage
CN202346649U (en) Portable tower crane
CN204590721U (en) Tower intelligent garage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160104

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: 610031 Ma Jia 10, Huayuan Road, Sichuan, Chengdu

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU 1ST ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190123

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU 1ST ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110302