CN104088229A - Anti-collision wall integrated construction device - Google Patents

Anti-collision wall integrated construction device Download PDF

Info

Publication number
CN104088229A
CN104088229A CN201410362794.6A CN201410362794A CN104088229A CN 104088229 A CN104088229 A CN 104088229A CN 201410362794 A CN201410362794 A CN 201410362794A CN 104088229 A CN104088229 A CN 104088229A
Authority
CN
China
Prior art keywords
collision
construction device
hook
integrated construction
fall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410362794.6A
Other languages
Chinese (zh)
Other versions
CN104088229B (en
Inventor
余敦旻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Road and Bridge Group Co Ltd
Original Assignee
Shanghai Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Road and Bridge Group Co Ltd filed Critical Shanghai Road and Bridge Group Co Ltd
Priority to CN201410362794.6A priority Critical patent/CN104088229B/en
Publication of CN104088229A publication Critical patent/CN104088229A/en
Application granted granted Critical
Publication of CN104088229B publication Critical patent/CN104088229B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses an anti-collision wall integrated construction device. The anti-collision wall integrated construction device is characterized in that an operation table and a hook component serve as main components, and a bottom anti-falling component and a multi-functional protecting cover serve as auxiliary components. One end of the hook component is fixed on an anti-collision wall body and a handrail, the operation platform is fixedly connected with the hook component through a protecting buckle, the bottom anti-falling component is located below the operation platform and connected with the operation platform through a supporting transverse rod, and the multi-functional protecting cover is connected with the upper end of the operation platform. A body of the anti-collision wall integrated construction device is made of light alloy, sound absorption materials are paved in the multi-functional protecting cover, and the construction device solves the problems that an existing anti-collision wall construction device is large in installation space, and the construction noise is large in influence, and has the additional functions of splashing preventing, dust proofing, noise separation, lighting, easily-moving and the like.

Description

A kind of collision-prevention wall integrated construction device
Technical field
The present invention relates to a kind of construction of road and bridge device, relate in particular to the construction equipment of a kind of road and bridge anti-collision wall.
Background technology
In recent years, along with urban development, elevated road or construction of road and bridge are more and more, and structure also becomes increasingly complex, road and bridge both sides often need anti-collision wall is set in case vehicle derailing road has an accident.Yet, road and bridge anti-collision wall construction and maintenance, be often subject to the restriction of traffic and orographic condition and inconvenience to some extent in operation.
The following two kinds of modes of operation of the many employings of existing urban elevated road or the anti-collision wall construction of bridge:
The first, anti-collision wall outside with cantilevered lifting car as its operation platform, shortcoming is that job platform is little, is limited to the obstacles such as traffic above-ground requirement and greenbelt, can construction area and the time all strictly limited, cause construction speed to be dragged slowly;
The second, constructs with overhanging type platform in anti-collision wall inside, and shortcoming is to take a track, inner side, during construction, the environment pollution such as noise, airborne dust is larger, be subject to traffic impact larger, while carrying on construction work at night in urban district especially, produce a large amount of problems that disturbs residents, thereby produce poor social negative effect.
Therefore, those skilled in the art is devoted to develop a kind of novel device, as far as possible little to traffic impact in the situation that, carries out anti-collision wall construction, this device have simultaneously anti-splash, prevent dust, every making an uproar, illumination, Simple cargo handling the additional function such as unload.
Summary of the invention
Because the above-mentioned defect of prior art, technical problem to be solved by this invention is to overcome that existing anti-collision wall construction device installing space is large, construction noise affects large problem, provide a kind of removing to unload easy anti-collision wall construction device, and there is the environment amenable functions such as sound-absorbing noise abatement.
For achieving the above object, the invention provides a kind of collision-prevention wall integrated construction device, comprise operating platform and Hook member; Operating platform is installed on the one-sided of anti-collision wall, and there is hook one end of Hook member, without one end of linking up with, by protection buckle, is connected with operating platform, has one end of hook to be affiliated on anti-collision wall body of wall by hook.
Further, operating platform comprises the framework that cross bar and vertical pole form, and the vertical pole that is provided with bottom bracket and cross bar and surrounding is connected and fixed.
In better embodiment of the present invention; operating platform is provided with cross link perpendicular to the both sides of anti-collision wall direction; it is the main body protective device with retractility; its beneficial effect is; the large I of operating platform is adjusted flexibly according to practice of construction region; mobility is high, very little to the traffic impact in whole section.
Further; Hook member comprises anti-collision wall hook and connecting rod, and Hook member has two and lay respectively at collision-prevention wall integrated construction device both sides, and anti-collision wall hook is fixed on one end of connecting rod; anti-collision wall is affiliated on anti-collision wall body of wall, and operating platform and connecting rod are linked and connect by protection card.
In another better embodiment of the present invention, be also provided with Anti-collision railing protection hook, Anti-collision railing protection hook is arranged on connecting rod, and anti-collision wall hook is positioned at same one end, is affiliated to and on Anti-collision railing, becomes second protection member.
In another better embodiment of the present invention, also comprise an anti-fall member in bottom, the anti-fall member in bottom comprises the anti-fall pocket of anti-fall pull bar and bottom.In operating platform both sides, be provided with support rail, anti-fall pull bar is connected with support rail by bolt and can swings by tie point; The anti-fall pocket in bottom is arranged at the bottom of the anti-fall member in bottom, and the pocket mouth of this anti-fall pocket is connected with anti-fall pull bar.
Preferably, the anti-fall pocket in bottom adopts canvas to make, and has pliability, and its beneficial effect is that, when the dangerous situation of falling occurs, by buffering, this anti-fall pocket can shield effectively.
Further, operating platform top is provided with Multifunctional protective guard shield, and the vertical pole of Multifunctional protective guard shield lower end and operating platform is connected and fixed.
Preferably, Multifunctional protective guard shield adopts arcuate structure to make, and protective cover inner side is covered with sound absorption material.
In better embodiment of the present invention; Multifunctional protective guard shield top is provided with the lighting device that explosion-proof lamp forms; also be provided with in addition spray equipment; its beneficial effect is; make construction equipment reach daylighting demand, by illumination, can realize and carrying on construction work at night with the Noise Reduction of sound absorption material, before and after construction, use spray equipment; can carry out depositing dust to operating platform space, reach clean effect.
As can be seen here, the present invention has following technique effect:
1, the present invention uses two hooks to be connected and fixed with anti-collision wall and railing respectively, has the technique effect of second protection, is also convenient to dismounting simultaneously.
2, the present invention is very little to the traffic impact in whole section, and two people make a concerted effort to operate this device, installs and only needs about 15 minutes, does not so just need to take track.
3, because do not need to take traffic, thereby this device can require use on higher city expressway or bridge to traffic, and the manpower, material resources and financial resources that spend are little.
4, this device is considered for environmental protection, Multifunctional protective guard shield is installed and at this device behind noise, can be down to below 70 decibels afterwards, and the problem of disturbing residents that carries on construction work at night has been brought to breakthrough technical solution.
Below with reference to accompanying drawing, the technique effect of design of the present invention, concrete structure and generation is described further, to understand fully object of the present invention, feature and effect.
Accompanying drawing explanation
Fig. 1 is the collision-prevention wall integrated construction device frame texture edge figure of a preferred embodiment of the present invention, there is shown each parts connection;
Fig. 2 is the collision-prevention wall integrated construction device frame structure front view of a preferred embodiment of the present invention, in figure, spray equipment is made to signal;
Fig. 3 is the collision-prevention wall integrated construction device frame structure elevation of a preferred embodiment of the present invention.
In figure, 1 anti-collision wall hook, 2 Anti-collision railing protection hooks, 3 connecting rods, 4 vertical poles; 5 cross bars, 6 cross link, 7 bottom bracket, 8 protection buckles, 9 support rails; 10 anti-fall pull bars, the 11 anti-fall pockets in bottom, 12 Multifunctional protective guard shields, 13 lighting devices, 14 Multifunctional protective guard shields.
The specific embodiment
Be illustrated in figure 1 the agent structure of the present embodiment, anti-collision wall hook 1, Anti-collision railing protection hook 2 and connecting rod 3 form Hook member; Vertical pole 4, cross bar 5, cross link 6 and bottom bracket 7 form operating platform; The anti-fall pocket 11 in anti-fall pull bar 10 and bottom forms the anti-fall member in bottom; In Multifunctional protective guard shield 12, be provided with lighting device 13, as Fig. 2, the side of Multifunctional protective guard shield 12 is provided with spray equipment 14.
Anti-collision wall hook 1 and Anti-collision railing protection hook 2 are made the pattern of coupling according to on-the-spot anti-collision wall geomery, be then connected and fixed with connecting rod 3.During erecting device, first anti-collision wall hook 1 is hung on anti-collision wall, become main hook, then Anti-collision railing protection hook 2 is hung on Anti-collision railing, become the second protection member of whole Hanging Basket.This Hook member has 2 groups, and its distance is suitable with the width of operating platform.
As anti-collision wall shape is not suitable for hook scheme, former Hook member can be designed to the shape of back-off framework, from outside, encase anti-collision wall and fix with bolt, connecting rod 3 is connected with it for fitting operation platform and other parts afterwards.
Operating platform consists of vertical pole 4, cross bar 5, cross link 6 and bottom bracket 7; 4 vertical poles 4 are vertically in platform surrounding altogether; cross bar 5 is each 2 parallel directions that are positioned at anti-collision wall up and down; between vertical pole 4, by cross bar 5, be connected and fixed; form stable frame construction; the connecting rod 3 of vertical pole 4 and Hook member is fixing by protection buckle 8; bottom tray 7 is connected with the cross bar 5 of bottom; and auxiliary fixing by vertical pole around 4; this operating platform is used alloy in lightweight to make as aluminium, magnesium, titanium alloy, the main body supporting member while being construction.This construction operation device has lightweight, and intensity is high, the advantage of being convenient to move, and two people can install.
In a preferred specific embodiment, cross link 6 is arranged on operating platform perpendicular to the two sides of anti-collision wall, is fixedly linked with vertical pole 4.Because cross link 6 has retractility; when construction area changes, remove any a pair of protection buckle 8 and can make operating platform carry out the adjustment of space size in vertical anti-collision wall direction, during adjusting operation platform; because bottom area changes, bottom bracket 7 need to be reinstalled fixing.This device mobility is high, has the advantage little to the traffic impact in whole section.
In another preferred specific embodiment, cross link is available folding connecting rod or shrinking connecting-rod replacement also, realizes the function that operating platform is adjusted flexibly; If do not used this parts, can use fence or baffle plate to surround in operating platform surrounding, reach the effect of operating personnel's protection.
At operating platform, perpendicular to the both sides of anti-collision wall direction, being provided with support rail 9 is fixed on vertical pole 4, anti-fall pull bar 10 is arranged on platform both sides, be connected by bolt with support rail 9, anti-fall pull bar 10 utilizes lever principle, during construction, can accomplish dust and refuse collecting by closely connected bridge substructure.The anti-fall pocket 11 in bottom is connected the common anti-fall member in bottom that forms with anti-fall pull bar 10, this anti-fall pocket adopts canvas to make, and has pliability, and when the dangerous situation of falling occurs, by buffering, this anti-fall pocket can shield effectively.
Multifunctional protective guard shield 12 is arranged on operating platform upside, and its lower end is connected with the vertical pole 4 of operating platform, and this Multifunctional protective guard shield as shown in Figure 1, adopts arc to make, and noise source can be reflected back to protective cover inside, and protective cover inner side is covered with sound absorption material.In a preferred specific embodiment; Multi-function protective cover is connected with operating platform; outside adopts thinner metal sheet as the coated protection of noise enclosure; interior paving sound absorption material is glass wool, mineral wool for example; use after which; device behind noise can be down to below 70 decibels, can effectively solve the problem that disturbs residents night of constructing, and this full structure of surrounding can realize dustproof, anti-splash function simultaneously.
As Fig. 2, Multifunctional protective guard shield 12 tops are provided with the lighting device 13 that explosion-proof lamp forms, and make construction equipment reach daylighting demand, conveniently carry on construction work at night; Side is provided with spray equipment 14, uses spray equipment before and after construction, can carry out depositing dust to operating platform space, reaches clean effect.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art just can design according to the present invention make many modifications and variations without creative work.Therefore, all technician in the art, all should be in the determined protection domain by claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (10)

1. a collision-prevention wall integrated construction device, is characterized in that, comprises operating platform and Hook member; Described operating platform is installed on the one-sided of anti-collision wall, and there is hook one end of described Hook member, without one end of linking up with, by protection buckle, is connected with described operating platform, has one end of hook to be affiliated on anti-collision wall body of wall by hook.
2. collision-prevention wall integrated construction device according to claim 1, is characterized in that, described operating platform comprises the framework that cross bar and vertical pole form, and the described vertical pole that is provided with bottom bracket and described cross bar and surrounding is connected and fixed.
3. collision-prevention wall integrated construction device according to claim 2, is characterized in that, the both sides of described operating platform are provided with cross link group, is the main body protective device with retractility.
4. collision-prevention wall integrated construction device according to claim 1; it is characterized in that; described Hook member comprises anti-collision wall hook and connecting rod; described Hook member has two and lay respectively at described collision-prevention wall integrated construction device both sides; described anti-collision wall hook is fixed on one end of described connecting rod; described anti-collision wall is affiliated on anti-collision wall body of wall, and described operating platform and described connecting rod are linked and connect by described protection card.
5. collision-prevention wall integrated construction device according to claim 4; it is characterized in that; described Hook member also comprises Anti-collision railing protection hook; described Anti-collision railing protection hook is arranged on described connecting rod; be arranged at one end with described anti-collision wall hook, be affiliated to and on Anti-collision railing, become second protection member.
6. collision-prevention wall integrated construction device according to claim 1, it is characterized in that, also comprise an anti-fall member in bottom, the anti-fall member in described bottom comprises the anti-fall pocket of anti-fall pull bar and bottom, described anti-fall pull bar is arranged on the support rail of described operating platform both sides by bolt, the anti-fall pocket in described bottom is arranged at the bottom of the anti-fall member in described bottom, and the pocket mouth of the anti-fall pocket in described bottom is connected with described anti-fall pull bar.
7. collision-prevention wall integrated construction device according to claim 6, is characterized in that, the anti-fall pocket in described bottom adopts canvas to make.
8. collision-prevention wall integrated construction device according to claim 1, is characterized in that, described operating platform top is provided with Multifunctional protective guard shield.
9. collision-prevention wall integrated construction device according to claim 8, is characterized in that, described Multifunctional protective guard shield adopts arcuate structure to make, and protective cover inner side is covered with sound absorption material.
10. collision-prevention wall integrated construction device according to claim 8, is characterized in that, described Multifunctional protective guard shield top is provided with lighting device and the spray equipment that explosion-proof lamp forms.
CN201410362794.6A 2014-07-28 2014-07-28 A kind of collision-prevention wall integrated construction device Active CN104088229B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410362794.6A CN104088229B (en) 2014-07-28 2014-07-28 A kind of collision-prevention wall integrated construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410362794.6A CN104088229B (en) 2014-07-28 2014-07-28 A kind of collision-prevention wall integrated construction device

Publications (2)

Publication Number Publication Date
CN104088229A true CN104088229A (en) 2014-10-08
CN104088229B CN104088229B (en) 2015-11-25

Family

ID=51635979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410362794.6A Active CN104088229B (en) 2014-07-28 2014-07-28 A kind of collision-prevention wall integrated construction device

Country Status (1)

Country Link
CN (1) CN104088229B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252514A (en) * 2018-03-23 2018-07-06 中冶建工集团有限公司 A kind of punching block column construction platform

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2260101Y (en) * 1996-11-20 1997-08-20 江官贤 Stretching out and drawing back type active safety guard fence
KR20060072721A (en) * 2004-12-23 2006-06-28 재단법인 포항산업과학연구원 Impact relaxation device of a steel railing
CN201753438U (en) * 2010-06-07 2011-03-02 中铁二局股份有限公司 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails
CN202559725U (en) * 2012-05-25 2012-11-28 中煤矿山建设集团有限责任公司 Hydraulic climbing mold
CN202610718U (en) * 2012-05-16 2012-12-19 上海市第一市政工程有限公司 Mobile lifting basket
CN202688871U (en) * 2012-07-09 2013-01-23 江苏省交通工程集团有限公司 Attached walking hanging basket
CN203452012U (en) * 2013-09-09 2014-02-26 中建八局第三建设有限公司 Mobile hanging basket for guard bar outer side construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2260101Y (en) * 1996-11-20 1997-08-20 江官贤 Stretching out and drawing back type active safety guard fence
KR20060072721A (en) * 2004-12-23 2006-06-28 재단법인 포항산업과학연구원 Impact relaxation device of a steel railing
CN201753438U (en) * 2010-06-07 2011-03-02 中铁二局股份有限公司 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails
CN202610718U (en) * 2012-05-16 2012-12-19 上海市第一市政工程有限公司 Mobile lifting basket
CN202559725U (en) * 2012-05-25 2012-11-28 中煤矿山建设集团有限责任公司 Hydraulic climbing mold
CN202688871U (en) * 2012-07-09 2013-01-23 江苏省交通工程集团有限公司 Attached walking hanging basket
CN203452012U (en) * 2013-09-09 2014-02-26 中建八局第三建设有限公司 Mobile hanging basket for guard bar outer side construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252514A (en) * 2018-03-23 2018-07-06 中冶建工集团有限公司 A kind of punching block column construction platform
CN108252514B (en) * 2018-03-23 2023-05-26 中冶建工集团有限公司 Construction platform for steel form column

Also Published As

Publication number Publication date
CN104088229B (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN204833730U (en) Interim LED traffic light
CN104088229B (en) A kind of collision-prevention wall integrated construction device
CN204000627U (en) A kind of collision-prevention wall integrated construction device
CN202055618U (en) Noise-reduction dust-reduction separating wall system for construction site
CN104481087A (en) Light firm canopy easy for discharging water
CN210178086U (en) Construction site is with portable dust removal protector
CN205531652U (en) Municipal works rail
CN206173825U (en) Acoustic celotex board for road
CN208844454U (en) A kind of road construction warning sign with cleaning function
CN201401000Y (en) Special hanging basket for installing noise barrier roof boards
CN202989790U (en) Foldable anti-glare facility
KR102106241B1 (en) Smart guard rail with fine dust absorption
CN204282241U (en) A kind of noise barrier
CN208777217U (en) A kind of combined road traffic guard rail
KR101480257B1 (en) Construction for aerial work flatform
CN210712605U (en) Protective sound barrier combined with transition section of rail transit tunnel portal
CN209725941U (en) A kind of moistureproof and waterproof railway signal
CN207553385U (en) Type unitized curtain wall weights-hoist component
CN208781500U (en) A kind of warning sign of the road construction with cleaning function
CN105042456A (en) Street lamp provided with chair and spraying device
CN205776272U (en) A kind of anti-slope of highway landslide device
CN204299066U (en) A kind of awning of light firm easily draining
CN105883516A (en) Mesh type elevator shaft opening protection door
CN216194176U (en) Warning sign is used at job site
CN215259304U (en) Lighting device for municipal construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant