CN201401000Y - Special hanging basket for installing noise barrier roof boards - Google Patents
Special hanging basket for installing noise barrier roof boards Download PDFInfo
- Publication number
- CN201401000Y CN201401000Y CN2009201024559U CN200920102455U CN201401000Y CN 201401000 Y CN201401000 Y CN 201401000Y CN 2009201024559 U CN2009201024559 U CN 2009201024559U CN 200920102455 U CN200920102455 U CN 200920102455U CN 201401000 Y CN201401000 Y CN 201401000Y
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- hanging
- frame
- hanging rod
- sound barrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a special hanging basket for installing noise barrier roof boards. The special hanging basket comprises a hanging basket framework, a hanging device and a protective device, wherein the hanging basket framework includes ladders fixedly connected into a frame formed by fixedly connecting a transverse beam and a longitudinal beam. One end of the frame is provided with anupper hanging rod perpendicular to the frame, the other end of the frame is provided with a lower hanging rod perpendicular to the frame, the hanging device is formed by connecting hooks with the upper hanging rod and the lower hanging rod, and the protective device is formed by arranging handrails on the upper hanging rod and the lower hanging rod. The hanging basket has the advantages of simplestructure, light weight, easy and flexible operation, convenient process and capability of being widely used in installation of noise barriers on two sides of a railway. Moreover, the hanging basket has not only simple structure but also more convenient operation in that only two or three workers are needed to manage the operation easily, and the hanging basket can be widely popularized into multiple construction areas such as houses and the like.
Description
Technical field
The utility model relates to a kind of sound barrier roof panel special-purpose hanging basket is installed.
Background technology
Along with the development of high speed, heavy haul railway, require to strengthen environmental consciousness, in residential block, railway both sides sound barrier is set.Because the urban district, metropolis mostly is highrise building, for the defening effect that guarantees just must be provided with higher sound barrier.The defening effect of sound barrier and circuit distance are inversely proportional to, and are directly proportional with the sound barrier height, in order not only to save cost but also reach good soundproof effect, so have high-rise resident block should be provided with the sound barrier of certain altitude in the nearer position of distance circuit in the railway both sides.Because of present railway mostly is electric railway greatly, so security protection is extremely important in the construction of sound barrier superstructure.Sound barrier be by column, crossbeam and purlin match be fixed with the bottom vertically, the barrier unit of upper angled, because of sound barrier has certain height and nearer apart from rail track, when laying the barrier unit (roof panel) on sound barrier top, need a kind of not only simple but also practical special-purpose hanging basket instrument.
The utility model content
The technical problems to be solved in the utility model provides a kind of simple in structure, easy to operate sound barrier roof panel special-purpose hanging basket is installed.
For solving the problems of the technologies described above, the utility model comprises hanging basket skeleton, suspension arrangement and protector; Described hanging basket skeleton is to be connected with step ladder in crossbeam and the affixed frame-saw that forms of longeron, is provided with the upper hanging rod of vertical frame-saw at an end of frame-saw, and the other end is provided with the following peg of vertical frame-saw; Described suspension arrangement is to be provided with crotch on upper hanging rod and following peg; Described protector is to be provided with handrail on upper hanging rod and following peg.
The utility model in use, crotch on the upper hanging rod is hooked on the crossbeam at sound barrier top, crotch on the following peg is hooked on the lower beam of sound barrier inclined plane, make the inclined plane on the top of frame-saw and sound barrier be parastate, the sound barrier installation personnel can be laid purlin and barrier unit along the step ladder on the crossbeam of sound barrier.After installing the utility model institute counterpart, promote the utility model and make it to move horizontally along crossbeam, can on the crossbeam of diverse location, lay purlin and barrier unit.
Adopt the beneficial effect that technique scheme produced to be: the utility model is simple in structure, in light weight, convenient and flexible operation, and is easy to process, can be widely used in the installation of railway both sides sound barrier.The utility model is not only simple in structure, and operation is more easy, only needs two or three staff just can easily finish.The utility model also can extensively be generalized to a plurality of construction fields such as house.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is a user mode schematic diagram of the present utility model.
The specific embodiment
This sound barrier roof panel is installed special-purpose hanging basket and is made of hanging basket skeleton, suspension arrangement and protector.As described in Figure 1, the hanging basket skeleton is to be connected with step ladder 7 in crossbeam 6 and the longeron 5 affixed frame-saws that form, on two corners of frame-saw one end, be welded with the upper hanging rod 2 of vertical frame-saw, be welded with the following peg 8 of vertical frame-saw on two corners of the other end, it is affixed with frame-saw all to be welded with diagonal brace 3 on upper hanging rod 2 and following peg 8, in order to upper hanging rod and following peg and frame-saw are reinforced.As described in Figure 1, described suspension arrangement is at upper hanging rod 2 crotch 1 to be arranged; Following peg 8 is connected with crotch 1 by a chain of 9, and the purpose that the chain of rings 9 is set is that crotch and following peg are flexibly connected, and can easily the crotch that is connected with following peg be removed or hang up from the extension thing like this.As shown in Figure 1, with crotch that following peg 8 is connected on be provided with mousing-hook bolt 10, in use break away to prevent crotch, increase its safety in utilization.As shown in Figure 1, described protector is to be provided with handrail 4 on upper hanging rod 2 and following peg 8.
This sound barrier roof panel is installed special-purpose hanging basket in use, as shown in Figure 2, at first utilize on the crossbeam that manually this hanging basket 11 is drawn to sound barrier 12 fixed stablyly, below this hanging basket 11, protective screening is set then, manually can on this hanging basket 11, carry out the roof panel installation exercise.Carry out secondary when moving, at first will confirm does not have movable object on this hanging basket 11, then the crotch of the relative advance side in bottom is removed, along this hanging basket of sound barrier crossbeam horizontal sliding 11, after treating that the advance side crotch strides across middle cant beam, the crotch of bottom advance side is hung surely, the crotch of removing the bottom rear side continues horizontal sliding this hanging basket 11 to best job position, then the crotch of bottom rear side is hung surely, manually can be carried out cycle operation.
Claims (4)
1, a kind of sound barrier roof panel is installed special-purpose hanging basket, it comprises hanging basket skeleton, suspension arrangement and protector, it is characterized in that: described hanging basket skeleton is to be connected with the step ladder in crossbeam and the affixed frame-saw that forms of longeron, be provided with the upper hanging rod of vertical frame-saw at an end of frame-saw, the other end is provided with the following peg of vertical frame-saw; Described suspension arrangement is to be connected with crotch on upper hanging rod and following peg; Described protector is to be provided with handrail on upper hanging rod and following peg.
2, sound barrier roof panel according to claim 1 is installed special-purpose hanging basket, it is characterized in that in the described hanging basket skeleton, is equipped with diagonal brace and frame-saw is affixed on upper hanging rod and following peg.
3, sound barrier roof panel according to claim 1 is installed special-purpose hanging basket, it is characterized in that described suspension arrangement also comprises the chain of rings that is connected down between peg and the crotch.
4, according to claim 1,2 or 3 described sound barrier roof panel special-purpose hanging basket is installed, is it is characterized in that on crotch, being provided with the mousing-hook bolt in the described suspension arrangement.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201024559U CN201401000Y (en) | 2009-04-24 | 2009-04-24 | Special hanging basket for installing noise barrier roof boards |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201024559U CN201401000Y (en) | 2009-04-24 | 2009-04-24 | Special hanging basket for installing noise barrier roof boards |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201401000Y true CN201401000Y (en) | 2010-02-10 |
Family
ID=41660799
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009201024559U Expired - Lifetime CN201401000Y (en) | 2009-04-24 | 2009-04-24 | Special hanging basket for installing noise barrier roof boards |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201401000Y (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102080445A (en) * | 2010-12-15 | 2011-06-01 | 中建三局建设工程股份有限公司 | Simple high-altitude hanging operation scaffold |
| CN103669822A (en) * | 2013-11-27 | 2014-03-26 | 安徽三宝钢结构有限公司 | Permanently suspended structure for structural steel building |
| CN103758040A (en) * | 2013-12-31 | 2014-04-30 | 中铁二十一局集团路桥工程有限公司 | Special hanging frame for construction of post-casting flange plate of sound barrier T beam and using method thereof |
-
2009
- 2009-04-24 CN CN2009201024559U patent/CN201401000Y/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102080445A (en) * | 2010-12-15 | 2011-06-01 | 中建三局建设工程股份有限公司 | Simple high-altitude hanging operation scaffold |
| CN103669822A (en) * | 2013-11-27 | 2014-03-26 | 安徽三宝钢结构有限公司 | Permanently suspended structure for structural steel building |
| CN103758040A (en) * | 2013-12-31 | 2014-04-30 | 中铁二十一局集团路桥工程有限公司 | Special hanging frame for construction of post-casting flange plate of sound barrier T beam and using method thereof |
| CN103758040B (en) * | 2013-12-31 | 2016-03-23 | 中铁二十一局集团路桥工程有限公司 | Frange plate construction special hoisting bar and using method is watered after sound barrier T beam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201649678U (en) | Semi-automatic safety protective shed for high-rise building construction | |
| CN201598820U (en) | Single-point suspension external hanging rack | |
| CN206625528U (en) | A kind of saddle climbing type Work platform system | |
| CN206591862U (en) | A kind of subway overhead station construction protecting platform car | |
| CN202324576U (en) | Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall | |
| CN202202800U (en) | Ropeladder used for lateral tensioning of T-shaped girder | |
| CN202227701U (en) | Assembled horizontal passage device | |
| CN208056596U (en) | A kind of Novel engineering exterior wall scaffold | |
| CN208039787U (en) | High-altitude edge-facing operation assembly operation platform | |
| CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
| CN205874987U (en) | Simply put up bridge crane | |
| CN202850470U (en) | Construction platform for installation of corner connecters of curtain wall | |
| CN106088564A (en) | Track climbing type monolithic architecture construction scaffolding | |
| CN103206077B (en) | Structure for steel structure roof inner slab installation foot hand cradle | |
| CN206722372U (en) | Across a plurality of business circuit elevated station room curtain wall decoration bilateral vertical transport erecting device | |
| CN204826697U (en) | Railway continuous beam construction safety protective guard strides | |
| CN201722937U (en) | Sliding platform for installation of net rack | |
| CN215564748U (en) | Pavement for roof structure of swimming pool | |
| CN203129617U (en) | Quick-disassembling protective fence | |
| CN204038917U (en) | Detachable external hanging type operating platform | |
| CN203160663U (en) | Mounting scaffold of roof inner plate of steel structure | |
| CN104818859A (en) | Method for installing construction platform of rail transit elevated station | |
| CN2871634Y (en) | Bridge maintaining equipment | |
| CN213772931U (en) | Stretching-in type viaduct side construction crawling ladder | |
| CN220336411U (en) | Protection platform lifting point truss for building construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20100210 |