CN104088229B - A kind of collision-prevention wall integrated construction device - Google Patents

A kind of collision-prevention wall integrated construction device Download PDF

Info

Publication number
CN104088229B
CN104088229B CN201410362794.6A CN201410362794A CN104088229B CN 104088229 B CN104088229 B CN 104088229B CN 201410362794 A CN201410362794 A CN 201410362794A CN 104088229 B CN104088229 B CN 104088229B
Authority
CN
China
Prior art keywords
collision
operating platform
hook
construction device
fall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410362794.6A
Other languages
Chinese (zh)
Other versions
CN104088229A (en
Inventor
余敦旻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Road and Bridge Group Co Ltd
Original Assignee
Shanghai Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Road and Bridge Group Co Ltd filed Critical Shanghai Road and Bridge Group Co Ltd
Priority to CN201410362794.6A priority Critical patent/CN104088229B/en
Publication of CN104088229A publication Critical patent/CN104088229A/en
Application granted granted Critical
Publication of CN104088229B publication Critical patent/CN104088229B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of collision-prevention wall integrated construction device, comprise operating platform and Hook member is primary clustering, the anti-fall component in bottom and Multifunctional protective guard shield are auxiliary part.Wherein, one end of Hook member is fixed on anti-collision wall body of wall and railing, and operating platform is fixedly connected with Hook member by protection buckle, and the anti-fall component in bottom is positioned at below operating platform; be connected by support rail with operating platform, Multifunctional protective guard shield is connected with operating platform upper end.Apparatus main body is made up of alloy in lightweight; sound absorption material is covered with in Multifunctional protective guard shield; this construction equipment overcomes that existing anti-collision wall construction device installing space is large, construction noise affects large problem, have anti-splashing, dust-proof, every additional functions such as making an uproar, throw light on, Simple cargo handling unloads.

Description

A kind of collision-prevention wall integrated construction device
Technical field
The present invention relates to a kind of construction of road and bridge device, particularly relate to the construction equipment of a kind of road and bridge anti-collision wall.
Background technology
In recent years, along with urban development, elevated road or construction of road and bridge get more and more, and structure also becomes increasingly complex, road and bridge both sides often need to arrange anti-collision wall in case vehicle derailing road, have an accident.But, road and bridge anti-collision wall construction and maintenance, be often subject to the restriction of traffic and orographic condition and operationally inconvenience to some extent.
Two kinds of modes of operation below existing urban elevated road or the many employings of the anti-collision wall construction of bridge:
The first, in anti-collision wall outside with cantilevered lift truck as its operation platform, shortcoming is that job platform is little, is limited to the obstacles such as traffic above-ground requirement and greenbelt, can construction area and time all by considered critical, cause construction speed to be dragged slowly;
The second, in anti-collision wall inside, overhanging type platform is constructed, and shortcoming to take a track, inner side, during construction, the environment pollution such as noise, airborne dust is larger, comparatively large by traffic impact, produce a large amount of problems that disturbs residents especially when urban district carries on construction work at night, thus produce poor social negative effect.
Therefore, those skilled in the art is devoted to develop a kind of novel device, when little as far as possible to traffic impact, carries out anti-collision wall construction, this device have simultaneously anti-splashing, dust-proof, every additional functions such as making an uproar, throw light on, Simple cargo handling unloads.
Summary of the invention
Because the above-mentioned defect of prior art, technical problem to be solved by this invention overcomes that existing anti-collision wall construction device installing space is large, construction noise affects large problem, there is provided one to remove and unload easy anti-collision wall construction device, and there is the environment amenable functions such as sound-absorbing noise abatement.
For achieving the above object, the invention provides a kind of collision-prevention wall integrated construction device, comprise operating platform and Hook member; Operating platform is installed on the one-sided of anti-collision wall, and there is hook one end of Hook member, and the one end without hook is connected with operating platform by protection buckle, has one end of hook to be affiliated on anti-collision wall body of wall by hook.
Further, operating platform comprises the framework of cross bar and vertical pole formation, and the vertical pole being provided with bottom bracket and cross bar and surrounding is connected and fixed.
In better embodiment of the present invention; operating platform is provided with cross link perpendicular to the both sides in anti-collision wall direction; it is the main body protective device with retractility; its beneficial effect is; the large I of operating platform adjusts flexibly according to practice of construction region; mobility is high, very little to the traffic impact in overall section.
Further; Hook member comprises anti-collision wall hook and connecting rod, and Hook member has two pieces and lays respectively at collision-prevention wall integrated construction device both sides, and anti-collision wall hook is fixed on one end of connecting rod; anti-collision wall is affiliated on anti-collision wall body of wall, and operating platform and connecting rod are linked by protection card and connect.
In another better embodiment of the present invention, be also provided with Anti-collision railing protection hook, Anti-collision railing protection hook is arranged on connecting rod, and anti-collision wall hook is positioned at same one end, is affiliated to and becomes second protection component on Anti-collision railing.
In another better embodiment of the present invention, also comprise an anti-fall component in bottom, the anti-fall component in bottom comprises the anti-fall pocket of anti-fall pull bar and bottom.Be provided with support rail in operating platform both sides, anti-fall pull bar to be connected with support rail by bolt and to swing by tie point; The anti-fall pocket in bottom is arranged at the bottom of the anti-fall component in bottom, and the pocket mouth of this anti-fall pocket is connected with anti-fall pull bar.
Preferably, the anti-fall pocket in bottom adopts canvas to make, and have pliability, its beneficial effect is, when dangerous situation of falling occurs, by buffering, this anti-fall pocket can shield effectively.
Further, be provided with Multifunctional protective guard shield above operating platform, the vertical pole of Multifunctional protective guard shield lower end and operating platform is connected and fixed.
Preferably, Multifunctional protective guard shield adopts arcuate structure to make, and is covered with sound absorption material inside protective cover.
In better embodiment of the present invention; Multifunctional protective guard shield top is provided with the lighting device of explosion-proof lamp composition; also be provided with spray equipment in addition; its beneficial effect is; make construction equipment reach daylighting demand, can realize carrying on construction work at night by the Noise Reduction of illumination with sound absorption material, before and after construction, use spray equipment; depositing dust can be carried out to operating platform space, reach clean effect.
As can be seen here, the present invention has following technique effect:
1, the present invention uses two pieces hook to be connected and fixed with anti-collision wall and railing respectively, has the technique effect of second protection, is also convenient to dismounting simultaneously.
2, the present invention is very little to the traffic impact in overall section, and two people make a concerted effort to operate this device, installs and only needs about 15 minutes, so does not just need to take track.
3, because do not need to take traffic, thus this device can require traffic higher city expressway or bridge use, and the manpower, material resources and financial resources spent are little.
4, this device is considered for environmental protection, can be down to less than 70 decibels, bring breakthrough technical solution to the problem of disturbing residents that carries on construction work at night after installing Multifunctional protective guard shield at this device behind noise.
Be described further below with reference to the technique effect of accompanying drawing to design of the present invention, concrete structure and generation, to understand object of the present invention, characteristic sum effect fully.
Accompanying drawing explanation
Fig. 1 is the collision-prevention wall integrated construction device frame texture edge figure of a preferred embodiment of the present invention, there is shown each parts connection;
Fig. 2 is the collision-prevention wall integrated construction device frame structure front view of a preferred embodiment of the present invention, makes signal in figure to spray equipment;
Fig. 3 is the collision-prevention wall integrated construction device frame structural facades figure of a preferred embodiment of the present invention.
In figure, 1 anti-collision wall hook, 2 Anti-collision railing protection hooks, 3 connecting rods, 4 vertical poles, 5 cross bars, 6 cross link, 7 bottom bracket, 8 protection buckles, 9 support rails, 10 anti-fall pull bars, anti-fall pocket bottom 11,12 Multifunctional protective guard shields, 13 lighting devices, 14 spray equipments.
Detailed description of the invention
Be illustrated in figure 1 the agent structure of the present embodiment, anti-collision wall hook 1, Anti-collision railing protection hook 2 and connecting rod 3 form Hook member; Vertical pole 4, cross bar 5, cross link 6 and bottom bracket 7 form operating platform; The anti-fall component of anti-fall pull bar 10 and bottom anti-fall pocket 11 composition bottom; Be provided with lighting device 13 in Multifunctional protective guard shield 12, as Fig. 2, the side of Multifunctional protective guard shield 12 is provided with spray equipment 14.
Anti-collision wall hook 1 and Anti-collision railing protection hook 2 make the pattern of coupling according to on-the-spot anti-collision wall geomery, be then connected and fixed with connecting rod 3.First anti-collision wall hook 1 is hung on anti-collision wall during erecting device, become main hook, then protected by Anti-collision railing hook 2 to hang on Anti-collision railing, become the second protection component of overall Hanging Basket.This Hook member has 2 groups, and its distance is suitable with the width of operating platform.
As anti-collision wall shape is not suitable for hook scheme, former Hook member can be designed to the shape of back-off framework, encase anti-collision wall from outside and fix with bolt, back link 3 be connected with it and be used for fitting operation platform and other parts.
Operating platform is made up of vertical pole 4, cross bar 5, cross link 6 and bottom bracket 7; 4 vertical poles 4 are vertical in platform surrounding altogether; each 2 parallel directions being positioned at anti-collision wall of cross bar about 5; be connected and fixed by cross bar 5 between vertical pole 4; form stable frame construction; the connecting rod 3 of vertical pole 4 and Hook member is fixed by protection buckle 8; bottom bracket 7 is connected with the cross bar 5 of bottom; and it is auxiliary fixing by the vertical pole 4 of surrounding; this operating platform uses alloy in lightweight such as aluminium, magnesium, titanium alloy to make, and is main body supporting member during construction.This construction operation device has lightweight, and intensity is high, is convenient to the advantage of moving, and two people can install.
In a preferred detailed description of the invention, cross link 6 is arranged on the two sides of operating platform perpendicular to anti-collision wall, is fixedly linked with vertical pole 4.Because cross link 6 has retractility; during construction area change, remove any a pair protection buckle 8 and operating platform can be made to carry out the adjustment of space size in vertical anti-collision wall direction, during adjustment operating platform; because bottom area changes, bottom bracket 7 needs to reinstall fixing.This device mobility is high, has the advantage little to the traffic impact in overall section.
In another preferred detailed description of the invention, cross link also can be replaced with folding connecting rod or shrinking connecting-rod, realizes the function that operating platform adjusts flexibly; If do not used this parts, fence or baffle plate can be used to surround in operating platform surrounding, reach the effect of operating personnel's protection.
Being provided with support rail 9 at operating platform perpendicular to the both sides in anti-collision wall direction is fixed on vertical pole 4, anti-fall pull bar 10 is arranged on platform both sides, be connected by bolt with support rail 9, anti-fall pull bar 10 utilizes lever principle, can accomplish dust and refuse collecting by closely connected bridge substructure during construction.The anti-fall pocket 11 in bottom is connected with anti-fall pull bar 10 and jointly forms the anti-fall component in bottom, and this anti-fall pocket adopts canvas to make, and has pliability, and during dangerous situation of falling generation, by cushioning, this anti-fall pocket can shield effectively.
Multifunctional protective guard shield 12 is arranged on the upside of operating platform, and its lower end is connected with the vertical pole 4 of operating platform, and this Multifunctional protective guard shield as shown in Figure 1, adopts arc to make, noise source can be reflected back protective cover inside, be covered with sound absorption material inside protective cover.In a preferred detailed description of the invention; Multi-function protective cover is connected with operating platform; outside adopts thinner metal sheet as the coated protection of noise enclosure; interior paving sound absorption material such as glass wool, mineral wool; after using which; device behind noise can be down to less than 70 decibels, effectively can solve the problem that disturbs residents night of constructing, and this entirely surrounds structure and can realize dust-proof, anti-splash function simultaneously.
As Fig. 2, Multifunctional protective guard shield 12 top is provided with the lighting device 13 of explosion-proof lamp composition, makes construction equipment reach daylighting demand, conveniently carries on construction work at night; Side is provided with spray equipment 14, uses spray equipment, can carry out depositing dust, reach clean effect to operating platform space before and after construction.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art just design according to the present invention can make many modifications and variations without the need to creative work.Therefore, all technician in the art, all should by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (9)

1. a collision-prevention wall integrated construction device, is characterized in that, comprises operating platform and Hook member; Described operating platform is installed on the one-sided of anti-collision wall, and there is hook one end of described Hook member, and the one end without hook is connected with described operating platform by protection buckle, has one end of hook to be affiliated on anti-collision wall body of wall by hook; Described Hook member comprises anti-collision wall hook and connecting rod; described Hook member has two pieces and lays respectively at described collision-prevention wall integrated construction device both sides; described anti-collision wall hook is fixed on one end of described connecting rod; described anti-collision wall is affiliated on anti-collision wall body of wall, and described operating platform and described connecting rod are linked by described protection card and connect.
2. collision-prevention wall integrated construction device according to claim 1, is characterized in that, described operating platform comprises the framework of cross bar and vertical pole formation, and the described vertical pole being provided with bottom bracket and described cross bar and surrounding is connected and fixed.
3. collision-prevention wall integrated construction device according to claim 2, is characterized in that, the both sides of described operating platform are provided with cross link group, is the main body protective device with retractility.
4. collision-prevention wall integrated construction device according to claim 1; it is characterized in that; described Hook member also comprises Anti-collision railing protection hook; described Anti-collision railing protection hook is arranged on described connecting rod; be arranged at one end with described anti-collision wall hook, be affiliated to and become second protection component on Anti-collision railing.
5. collision-prevention wall integrated construction device according to claim 1, it is characterized in that, also comprise an anti-fall component in bottom, the anti-fall component in described bottom comprises the anti-fall pocket of anti-fall pull bar and bottom, described anti-fall pull bar is arranged on the support rail of described operating platform both sides by bolt, the anti-fall pocket in described bottom is arranged at the bottom of the anti-fall component in described bottom, and the pocket mouth of the anti-fall pocket in described bottom is connected with described anti-fall pull bar.
6. collision-prevention wall integrated construction device according to claim 5, is characterized in that, the anti-fall pocket in described bottom adopts canvas to make.
7. collision-prevention wall integrated construction device according to claim 1, is characterized in that, is provided with Multifunctional protective guard shield above described operating platform.
8. collision-prevention wall integrated construction device according to claim 7, is characterized in that, described Multifunctional protective guard shield adopts arcuate structure to make, and is covered with sound absorption material inside protective cover.
9. collision-prevention wall integrated construction device according to claim 7, is characterized in that, described Multifunctional protective guard shield top is provided with lighting device and the spray equipment of explosion-proof lamp composition.
CN201410362794.6A 2014-07-28 2014-07-28 A kind of collision-prevention wall integrated construction device Active CN104088229B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410362794.6A CN104088229B (en) 2014-07-28 2014-07-28 A kind of collision-prevention wall integrated construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410362794.6A CN104088229B (en) 2014-07-28 2014-07-28 A kind of collision-prevention wall integrated construction device

Publications (2)

Publication Number Publication Date
CN104088229A CN104088229A (en) 2014-10-08
CN104088229B true CN104088229B (en) 2015-11-25

Family

ID=51635979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410362794.6A Active CN104088229B (en) 2014-07-28 2014-07-28 A kind of collision-prevention wall integrated construction device

Country Status (1)

Country Link
CN (1) CN104088229B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252514B (en) * 2018-03-23 2023-05-26 中冶建工集团有限公司 Construction platform for steel form column

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2260101Y (en) * 1996-11-20 1997-08-20 江官贤 Stretching out and drawing back type active safety guard fence
KR20060072721A (en) * 2004-12-23 2006-06-28 재단법인 포항산업과학연구원 Shock absorber for steel railings
CN201753438U (en) * 2010-06-07 2011-03-02 中铁二局股份有限公司 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails
CN202559725U (en) * 2012-05-25 2012-11-28 中煤矿山建设集团有限责任公司 Hydraulic climbing mold
CN202610718U (en) * 2012-05-16 2012-12-19 上海市第一市政工程有限公司 Mobile lifting basket
CN202688871U (en) * 2012-07-09 2013-01-23 江苏省交通工程集团有限公司 Attached walking hanging basket
CN203452012U (en) * 2013-09-09 2014-02-26 中建八局第三建设有限公司 Mobile hanging basket for guard bar outer side construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2260101Y (en) * 1996-11-20 1997-08-20 江官贤 Stretching out and drawing back type active safety guard fence
KR20060072721A (en) * 2004-12-23 2006-06-28 재단법인 포항산업과학연구원 Shock absorber for steel railings
CN201753438U (en) * 2010-06-07 2011-03-02 中铁二局股份有限公司 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails
CN202610718U (en) * 2012-05-16 2012-12-19 上海市第一市政工程有限公司 Mobile lifting basket
CN202559725U (en) * 2012-05-25 2012-11-28 中煤矿山建设集团有限责任公司 Hydraulic climbing mold
CN202688871U (en) * 2012-07-09 2013-01-23 江苏省交通工程集团有限公司 Attached walking hanging basket
CN203452012U (en) * 2013-09-09 2014-02-26 中建八局第三建设有限公司 Mobile hanging basket for guard bar outer side construction

Also Published As

Publication number Publication date
CN104088229A (en) 2014-10-08

Similar Documents

Publication Publication Date Title
CN204000627U (en) A kind of collision-prevention wall integrated construction device
CN104088229B (en) A kind of collision-prevention wall integrated construction device
CN204401486U (en) Prevent railway sand window windbreak
CN101514543B (en) Mobile trolley used for erecting and removing surface of construction catwalk of suspension bridge
CN205531652U (en) Municipal works rail
CN206173825U (en) Acoustic celotex board for road
CN108179704A (en) A kind of traffic safety facilities are built with security warning equipment
CN201401000Y (en) Special hanging basket for installing noise barrier roof boards
CN208844454U (en) A kind of road construction warning sign with cleaning function
CN202989790U (en) Foldable anti-glare facility
KR102106241B1 (en) Smart guard rail with fine dust absorption
CN204780661U (en) Composite module formula sound insulating screen
KR101480257B1 (en) Construction for aerial work flatform
CN204695564U (en) From lifting center of gravity adjustable type traffic lights
CN110345432A (en) A kind of street lamp easy to clean
CN210685458U (en) A reversible elevator shaft protective fence device
CN205264249U (en) Novel model support is used in civil construction teaching
CN105883516A (en) Mesh type elevator shaft opening protection door
CN212005437U (en) Street lamp with lampshade protection structure
CN202249581U (en) Subway shield door structure at platform deformation joint
CN216986893U (en) A protector for building engineering safety construction
CN205805604U (en) A kind of tunnel automatic dust removing apparatus
CN205502736U (en) Electric power warning protector
CN211313519U (en) UHPC station ceiling easy to install
CN220868048U (en) Roadblock device for road maintenance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant