CN109736625A - The bracing means and reinforcement means of tall and big concrete chimney outer tube wall - Google Patents

The bracing means and reinforcement means of tall and big concrete chimney outer tube wall Download PDF

Info

Publication number
CN109736625A
CN109736625A CN201910156707.4A CN201910156707A CN109736625A CN 109736625 A CN109736625 A CN 109736625A CN 201910156707 A CN201910156707 A CN 201910156707A CN 109736625 A CN109736625 A CN 109736625A
Authority
CN
China
Prior art keywords
anchor ear
chimney
hanging scaffold
sunpender
annular hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910156707.4A
Other languages
Chinese (zh)
Inventor
王军勇
金国帅
王磊
陈光中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910156707.4A priority Critical patent/CN109736625A/en
Publication of CN109736625A publication Critical patent/CN109736625A/en
Pending legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The present invention relates to construction techniques, the especially a kind of bracing means and reinforcement means of tall and big concrete chimney outer tube wall, including hanging scaffold, anchor ear and climbing device, the bottom of hanging scaffold is provided with supporting beam, and bottom plate is provided in supporting beam, is provided with guardrail on hanging scaffold;Anchor ear is fixed on the top of chimney, and sunpender is provided on anchor ear, is connected between sunpender and hanging scaffold by wirerope.The present invention replaces traditional reinforcement means, reduces the construction risk of construction personnel, shortens construction period, reduces construction cost.

Description

The bracing means and reinforcement means of tall and big concrete chimney outer tube wall
Technical field
The present invention relates to construction techniques, the bracing means of especially a kind of tall and big concrete chimney outer tube wall and Reinforcement means.
Background technique
Iron and steel enterprise and Thermal Power Enterprises on-site, since the demand of technique has tall and big concrete chimney, these cigarettes Chimney is subjected to the damage of high temperature, etchant gas throughout the year, reaches after certain time limit or removes and rebuilds or existing chimney is reinforced.Previous is mixed Solidifying soil chimney reinforcement means is to set up overall height annular scaffold to top in chimney bottom, and springboard is set up on scaffold and carries out cigarette Chimney strengthening construction;Or chimney strengthening construction is carried out using climbing frame.Set up the method investment scaffold tubes enormous amount of scaffold, cost Height, while scaffolding height more high safety risk is bigger;It is constructed using climbing frame, needs to wait the cast-in-place concrete barrel of reinforcing to reach It could continue to climb after to intensity, especially construction period, long construction period, security risk increase in winter.
Summary of the invention
In order to solve the above technical problems, the present invention proposes that a kind of structure is simple, short construction period uses hanging scaffold to tall and big The construction method that concrete chimney outer tube wall is reinforced.
The present invention adopts the following technical scheme:
A kind of bracing means of tall and big concrete chimney outer tube wall, including annular hanging scaffold and anchor ear, the bottom setting of annular hanging scaffold There is supporting beam, bottom plate is provided in supporting beam, is provided with guardrail on annular hanging scaffold;Anchor ear is fixed on the top of chimney, on anchor ear It is provided with sunpender, is connected between sunpender and annular hanging scaffold by wirerope.
A kind of reinforcement means of tall and big concrete chimney outer tube wall carries out as follows:
A, the first anchor ear and the second anchor ear are fixedly mounted respectively in chimney top, sunpender are installed, and sunpender is connected as on anchor ear It is integrally formed knockdown sunpender;
B, on the outer tube wall that chimney bottom assembles annular hanging scaffold and annular hanging scaffold is made to be sleeved on chimney, the one ends wound of wirerope On climbing device, the other end of wirerope is fixed on knockdown sunpender, and annular hanging scaffold is by climbing device along wirerope It is lifted up;
C, to concreting is carried out between template and chimney outer wall, annular hanging scaffold is gradually above mentioned and is carried out to chimney outer wall piecewise It pours, until annular hanging scaffold is above mentioned to chimney top and completes pouring for chimney top;
D, after pouring, annular hanging scaffold is fallen into ground and is removed, then remove the anchor ear and sunpender of chimney top again.
Compared with prior art, the beneficial effects of the present invention are:
The present invention is reinforced instead of the mode that traditional scaffold climbs, short construction period, and reduces construction personnel's Security risk reduces the cost of Strengthening Chimney outer wall.
Further, the preferred embodiment that the present invention uses is:
Climbing device is provided in supporting beam, one end of wirerope is fixed on climbing device, and the other end is fixed on sunpender.
Anchor ear is provided with the first anchor ear and the second anchor ear, and the first anchor ear is placed in the top of the second anchor ear, and the first anchor ear is circumferential Setting is there are six upper hanger, and the second anchor ear corresponds to upper hanger position, and circumferentially there are six lower sunpender, upper hanger and lower sunpenders pair for setting It should connect to form knockdown sunpender.
Supporting beam is ring structure, and supporting beam is provided with 3 by the Inside To Outside of annular hanging scaffold.
There is guardrail in the inner side and outer side of annular hanging scaffold respectively.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the structural schematic diagram of the first anchor ear;
Fig. 4 is the structural schematic diagram of the second anchor ear;
In figure: chimney 1;First anchor ear 2;Upper hanger 3;Lower sunpender 4;Second anchor ear 5;Wirerope 6;Steel platform 7;Annular hanging scaffold 8; Supporting beam 801;Bottom plate 802;Guardrail 9.
Specific embodiment:
Below in conjunction with the drawings and specific embodiments, the present invention is further described.
Referring to attached drawing: a kind of bracing means of tall and big concrete chimney outer tube wall is made of, ring annular hanging scaffold 8 and anchor ear The bottom of shape hanging scaffold 8 is provided with 3 annular supporting beams 801, and the diameter of supporting beam 801 is by annular 8 Inside To Outside of hanging scaffold It is sequentially increased, bottom plate 802 is provided in supporting beam 801, the inner side and outer side of annular hanging scaffold 8 is respectively arranged with guardrail 9, and climb dress It sets and is mounted in supporting beam 801.
The top of chimney 1 is separately installed with the first anchor ear 2 and the second anchor ear 5, and the first anchor ear 2 is placed in the upper of the second anchor ear 5 Side, the first anchor ear 2 is circumferential to be evenly arranged with six roots of sensation upper hanger 3, and corresponding 3 position of upper hanger of the second anchor ear 5 is circumferentially there are six settings Lower sunpender 4, each upper hanger 3 connect to form knockdown sunpender with corresponding lower sunpender 4.
Annular hanging scaffold 8 is connect with sunpender by wirerope 6, and for the one ends wound of wirerope 6 on climbing device, the other end is solid It is scheduled on knockdown sunpender.
Template of the inside assembling reinforcement and installation of annular hanging scaffold 8 for pouring.
A kind of reinforcement means of up to concrete chimney outer tube wall, carries out as follows:
A, the first anchor ear 2 and the second anchor ear 5 are fixedly mounted respectively above the steel platform 7 at 1 top of chimney, pacify on the first anchor ear 2 Sunpender 3, the second anchor ear 5 are loaded onto, lower sunpender 4 is installed in the position of corresponding upper hanger 3, and upper hanger 3 is correspondingly connected with to be formed with lower sunpender 4 Knockdown sunpender;
B, assemble annular hanging scaffold 8 in 1 bottom of chimney and be sleeved on annular hanging scaffold 8 on the outer tube wall of chimney 1, annular hanging scaffold 8 with There are gap between the outer tube wall of chimney 1, on climbing device, the other end of wirerope 6 is fixed on the one ends wound of wirerope 6 On knockdown sunpender, annular hanging scaffold 8 is lifted up by climbing device along wirerope 6;Construction personnel is to annular 8 inside of hanging scaffold Assembling reinforcement, and the template for pouring is installed;
C, to concreting is carried out between 1 outer wall of template and chimney, annular hanging scaffold 8 is gradually above mentioned and is carried out to 1 outer wall of chimney Paragraph by paragraph pouring, until annular hanging scaffold 8 is above mentioned to 1 top of chimney and completes pouring for 1 top of chimney;
D, after pouring, annular hanging scaffold 8 is fallen into bottom surface and is removed, then remove the anchor ear at 1 top of chimney again and hung Bar.
The present embodiment 1 outer tube wall of Strengthening Chimney, annular hanging scaffold 8 by the way of installation template in the annular hanging scaffold 8 of annular Reinforced concrete structure is stepped up from bottom to up, apparatus structure is simple, the construction cost of 1 outer tube wall of chimney reinforcing is reduced, Construction period is shortened, the construction risk of construction personnel is reduced.
The above is only a specific embodiment of the invention, but are not limited to this to protection of the invention, relate to this skill Art field technical staff it is thinkable to the technical program technical characteristic propose equivalent change or replacement, all cover this Within the protection scope of invention.

Claims (6)

1. a kind of bracing means of tall and big concrete chimney outer tube wall, it is characterised in that: including annular hanging scaffold and anchor ear, annular is hung The bottom of disk is provided with supporting beam, and bottom plate is provided in supporting beam, is provided with guardrail on annular hanging scaffold;Anchor ear is fixed on chimney Top is provided with sunpender on anchor ear, passes through wirerope connection between sunpender and annular hanging scaffold.
2. the bracing means of tall and big concrete chimney outer tube wall according to claim 1, it is characterised in that: set in supporting beam It is equipped with climbing device, one end of wirerope is fixed on climbing device, and the other end is fixed on sunpender.
3. the bracing means of tall and big concrete chimney outer tube wall according to claim 1, it is characterised in that: anchor ear is provided with First anchor ear and the second anchor ear, the first anchor ear are placed in the top of the second anchor ear, and the first anchor ear is circumferentially arranged there are six upper hanger, the Two anchor ears correspond to upper hanger position, and circumferentially there are six lower sunpenders, upper hanger to be correspondingly connected with to form knockdown hang with lower sunpender for setting Bar.
4. the bracing means of tall and big concrete chimney outer tube wall according to claim 1, it is characterised in that: supporting beam is ring Shape structure, supporting beam are provided with 3 by the Inside To Outside of annular hanging scaffold.
5. the bracing means of tall and big concrete chimney outer tube wall according to claim 1, it is characterised in that: annular hanging scaffold There is guardrail in inner side and outer side respectively.
6. a kind of reinforcement means of tall and big concrete chimney outer tube wall, which is characterized in that carry out as follows:
A, the first anchor ear and the second anchor ear are fixedly mounted respectively in chimney top, sunpender are installed, and sunpender is connected as on anchor ear It is integrally formed knockdown sunpender;
B, on the outer tube wall that chimney bottom assembles annular hanging scaffold and annular hanging scaffold is made to be sleeved on chimney, the one ends wound of wirerope On climbing device, the other end of wirerope is fixed on knockdown sunpender, and annular hanging scaffold is by climbing device along wirerope It is lifted up;
C, to concreting is carried out between template and chimney outer wall, annular hanging scaffold is gradually above mentioned and is carried out to chimney outer wall piecewise It pours, until annular hanging scaffold is above mentioned to chimney top and completes pouring for chimney top;
D, after pouring, annular hanging scaffold is fallen into ground and is removed, then remove the anchor ear and sunpender of chimney top again.
CN201910156707.4A 2019-03-01 2019-03-01 The bracing means and reinforcement means of tall and big concrete chimney outer tube wall Pending CN109736625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910156707.4A CN109736625A (en) 2019-03-01 2019-03-01 The bracing means and reinforcement means of tall and big concrete chimney outer tube wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910156707.4A CN109736625A (en) 2019-03-01 2019-03-01 The bracing means and reinforcement means of tall and big concrete chimney outer tube wall

Publications (1)

Publication Number Publication Date
CN109736625A true CN109736625A (en) 2019-05-10

Family

ID=66369074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910156707.4A Pending CN109736625A (en) 2019-03-01 2019-03-01 The bracing means and reinforcement means of tall and big concrete chimney outer tube wall

Country Status (1)

Country Link
CN (1) CN109736625A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778206A (en) * 2019-10-21 2020-02-11 中国建筑第八工程局有限公司 Method for reinforcing ultrahigh-brick chimney

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH668800A5 (en) * 1985-12-17 1989-01-31 Diaber Ag Tall chimney demolition mechanism - has annular working platform, travelling on vertical rails on chimney outer wall and fitted with support columns
CN203271102U (en) * 2013-01-24 2013-11-06 中国十七冶集团有限公司 Fixed hoisting point part for maintenance of outer walls of chimneys
CN103669900A (en) * 2013-12-03 2014-03-26 东北电业管理局烟塔工程公司 Integral reinforcement construction method for outer barrel wall of chimney
CN105350763A (en) * 2015-11-13 2016-02-24 中国一冶集团有限公司 Guide rail-type construction hanging basket for chimney beacon paint and construction method
CN205382699U (en) * 2016-03-14 2016-07-13 广西建工集团第一建筑工程有限责任公司 A hanging flower basket for skin shotcrete construction
CN106284997A (en) * 2015-05-28 2017-01-04 中国二十冶集团有限公司 The big punching block construction method for lifting whole of reinforced concrete chimney
CN107859315A (en) * 2017-11-03 2018-03-30 北京中易房建筑工程有限公司 Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH668800A5 (en) * 1985-12-17 1989-01-31 Diaber Ag Tall chimney demolition mechanism - has annular working platform, travelling on vertical rails on chimney outer wall and fitted with support columns
CN203271102U (en) * 2013-01-24 2013-11-06 中国十七冶集团有限公司 Fixed hoisting point part for maintenance of outer walls of chimneys
CN103669900A (en) * 2013-12-03 2014-03-26 东北电业管理局烟塔工程公司 Integral reinforcement construction method for outer barrel wall of chimney
CN106284997A (en) * 2015-05-28 2017-01-04 中国二十冶集团有限公司 The big punching block construction method for lifting whole of reinforced concrete chimney
CN105350763A (en) * 2015-11-13 2016-02-24 中国一冶集团有限公司 Guide rail-type construction hanging basket for chimney beacon paint and construction method
CN205382699U (en) * 2016-03-14 2016-07-13 广西建工集团第一建筑工程有限责任公司 A hanging flower basket for skin shotcrete construction
CN107859315A (en) * 2017-11-03 2018-03-30 北京中易房建筑工程有限公司 Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
建筑工人杂志编辑部编: "《砖石砌筑工程技术》", 31 October 1998, 中国计划出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778206A (en) * 2019-10-21 2020-02-11 中国建筑第八工程局有限公司 Method for reinforcing ultrahigh-brick chimney
CN110778206B (en) * 2019-10-21 2023-02-28 中国建筑第八工程局有限公司 Method for reinforcing ultrahigh-brick chimney

Similar Documents

Publication Publication Date Title
CN102587645B (en) Climbing supporting mechanism having expansion and automatic meshing functions, and construction method thereof
CN209482679U (en) Tub brace type integral steel platform suitable for sloping core construction
CN210316779U (en) Template supporting structure of water tower inverted cone shell
CN108979131A (en) A kind of high-building construction steel form and operation frame integral hoisting stage apparatus
CN102912996A (en) Steel tube concrete column high-altitude construction safety protection system
CN109736625A (en) The bracing means and reinforcement means of tall and big concrete chimney outer tube wall
CN202954552U (en) Steel tube concrete column high-altitude construction safety protection system
CN215887959U (en) Hanging flower basket of encorbelmenting is used in aqueduct construction
CN103291116B (en) For the netted shuttering supporting operating platform of construction of water tank on top of inverted-cone water tower
CN204530493U (en) A kind of high pier over-form construction platform
CN105239804B (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN108824204A (en) Pier stud construction method and the construction assembled operating platform of pier stud
CN201714056U (en) Truss-type operating platform
CN206625585U (en) A kind of carrying pole device of purlin installation
CN202023149U (en) Hanging basket used in construction
CN204530492U (en) A kind of hydraulic climbing mould construction platform
CN112211384B (en) Scaffold for building site
CN210798251U (en) But scaffold of automatically regulated height
CN107461029B (en) Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting
CN208328946U (en) Moveable suspended formula construction operation platform device
CN106760464B (en) Elevator shaft operating platform and its construction method
CN205976695U (en) Integrated configuration of chimney and water tower
CN217298630U (en) Integral type safety platform for construction of pad stone
CN107859066A (en) Pipe gallery Quick Release formwork erecting structure and its construction method
CN212836618U (en) A integral operation platform in capital for prefabricated stand concrete placement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510