CN109736625A - The bracing means and reinforcement means of tall and big concrete chimney outer tube wall - Google Patents
The bracing means and reinforcement means of tall and big concrete chimney outer tube wall Download PDFInfo
- Publication number
- CN109736625A CN109736625A CN201910156707.4A CN201910156707A CN109736625A CN 109736625 A CN109736625 A CN 109736625A CN 201910156707 A CN201910156707 A CN 201910156707A CN 109736625 A CN109736625 A CN 109736625A
- Authority
- CN
- China
- Prior art keywords
- anchor ear
- chimney
- hanging scaffold
- sunpender
- annular hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The present invention relates to construction techniques, the especially a kind of bracing means and reinforcement means of tall and big concrete chimney outer tube wall, including hanging scaffold, anchor ear and climbing device, the bottom of hanging scaffold is provided with supporting beam, and bottom plate is provided in supporting beam, is provided with guardrail on hanging scaffold;Anchor ear is fixed on the top of chimney, and sunpender is provided on anchor ear, is connected between sunpender and hanging scaffold by wirerope.The present invention replaces traditional reinforcement means, reduces the construction risk of construction personnel, shortens construction period, reduces construction cost.
Description
Technical field
The present invention relates to construction techniques, the bracing means of especially a kind of tall and big concrete chimney outer tube wall and
Reinforcement means.
Background technique
Iron and steel enterprise and Thermal Power Enterprises on-site, since the demand of technique has tall and big concrete chimney, these cigarettes
Chimney is subjected to the damage of high temperature, etchant gas throughout the year, reaches after certain time limit or removes and rebuilds or existing chimney is reinforced.Previous is mixed
Solidifying soil chimney reinforcement means is to set up overall height annular scaffold to top in chimney bottom, and springboard is set up on scaffold and carries out cigarette
Chimney strengthening construction;Or chimney strengthening construction is carried out using climbing frame.Set up the method investment scaffold tubes enormous amount of scaffold, cost
Height, while scaffolding height more high safety risk is bigger;It is constructed using climbing frame, needs to wait the cast-in-place concrete barrel of reinforcing to reach
It could continue to climb after to intensity, especially construction period, long construction period, security risk increase in winter.
Summary of the invention
In order to solve the above technical problems, the present invention proposes that a kind of structure is simple, short construction period uses hanging scaffold to tall and big
The construction method that concrete chimney outer tube wall is reinforced.
The present invention adopts the following technical scheme:
A kind of bracing means of tall and big concrete chimney outer tube wall, including annular hanging scaffold and anchor ear, the bottom setting of annular hanging scaffold
There is supporting beam, bottom plate is provided in supporting beam, is provided with guardrail on annular hanging scaffold;Anchor ear is fixed on the top of chimney, on anchor ear
It is provided with sunpender, is connected between sunpender and annular hanging scaffold by wirerope.
A kind of reinforcement means of tall and big concrete chimney outer tube wall carries out as follows:
A, the first anchor ear and the second anchor ear are fixedly mounted respectively in chimney top, sunpender are installed, and sunpender is connected as on anchor ear
It is integrally formed knockdown sunpender;
B, on the outer tube wall that chimney bottom assembles annular hanging scaffold and annular hanging scaffold is made to be sleeved on chimney, the one ends wound of wirerope
On climbing device, the other end of wirerope is fixed on knockdown sunpender, and annular hanging scaffold is by climbing device along wirerope
It is lifted up;
C, to concreting is carried out between template and chimney outer wall, annular hanging scaffold is gradually above mentioned and is carried out to chimney outer wall piecewise
It pours, until annular hanging scaffold is above mentioned to chimney top and completes pouring for chimney top;
D, after pouring, annular hanging scaffold is fallen into ground and is removed, then remove the anchor ear and sunpender of chimney top again.
Compared with prior art, the beneficial effects of the present invention are:
The present invention is reinforced instead of the mode that traditional scaffold climbs, short construction period, and reduces construction personnel's
Security risk reduces the cost of Strengthening Chimney outer wall.
Further, the preferred embodiment that the present invention uses is:
Climbing device is provided in supporting beam, one end of wirerope is fixed on climbing device, and the other end is fixed on sunpender.
Anchor ear is provided with the first anchor ear and the second anchor ear, and the first anchor ear is placed in the top of the second anchor ear, and the first anchor ear is circumferential
Setting is there are six upper hanger, and the second anchor ear corresponds to upper hanger position, and circumferentially there are six lower sunpender, upper hanger and lower sunpenders pair for setting
It should connect to form knockdown sunpender.
Supporting beam is ring structure, and supporting beam is provided with 3 by the Inside To Outside of annular hanging scaffold.
There is guardrail in the inner side and outer side of annular hanging scaffold respectively.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the structural schematic diagram of the first anchor ear;
Fig. 4 is the structural schematic diagram of the second anchor ear;
In figure: chimney 1;First anchor ear 2;Upper hanger 3;Lower sunpender 4;Second anchor ear 5;Wirerope 6;Steel platform 7;Annular hanging scaffold 8;
Supporting beam 801;Bottom plate 802;Guardrail 9.
Specific embodiment:
Below in conjunction with the drawings and specific embodiments, the present invention is further described.
Referring to attached drawing: a kind of bracing means of tall and big concrete chimney outer tube wall is made of, ring annular hanging scaffold 8 and anchor ear
The bottom of shape hanging scaffold 8 is provided with 3 annular supporting beams 801, and the diameter of supporting beam 801 is by annular 8 Inside To Outside of hanging scaffold
It is sequentially increased, bottom plate 802 is provided in supporting beam 801, the inner side and outer side of annular hanging scaffold 8 is respectively arranged with guardrail 9, and climb dress
It sets and is mounted in supporting beam 801.
The top of chimney 1 is separately installed with the first anchor ear 2 and the second anchor ear 5, and the first anchor ear 2 is placed in the upper of the second anchor ear 5
Side, the first anchor ear 2 is circumferential to be evenly arranged with six roots of sensation upper hanger 3, and corresponding 3 position of upper hanger of the second anchor ear 5 is circumferentially there are six settings
Lower sunpender 4, each upper hanger 3 connect to form knockdown sunpender with corresponding lower sunpender 4.
Annular hanging scaffold 8 is connect with sunpender by wirerope 6, and for the one ends wound of wirerope 6 on climbing device, the other end is solid
It is scheduled on knockdown sunpender.
Template of the inside assembling reinforcement and installation of annular hanging scaffold 8 for pouring.
A kind of reinforcement means of up to concrete chimney outer tube wall, carries out as follows:
A, the first anchor ear 2 and the second anchor ear 5 are fixedly mounted respectively above the steel platform 7 at 1 top of chimney, pacify on the first anchor ear 2
Sunpender 3, the second anchor ear 5 are loaded onto, lower sunpender 4 is installed in the position of corresponding upper hanger 3, and upper hanger 3 is correspondingly connected with to be formed with lower sunpender 4
Knockdown sunpender;
B, assemble annular hanging scaffold 8 in 1 bottom of chimney and be sleeved on annular hanging scaffold 8 on the outer tube wall of chimney 1, annular hanging scaffold 8 with
There are gap between the outer tube wall of chimney 1, on climbing device, the other end of wirerope 6 is fixed on the one ends wound of wirerope 6
On knockdown sunpender, annular hanging scaffold 8 is lifted up by climbing device along wirerope 6;Construction personnel is to annular 8 inside of hanging scaffold
Assembling reinforcement, and the template for pouring is installed;
C, to concreting is carried out between 1 outer wall of template and chimney, annular hanging scaffold 8 is gradually above mentioned and is carried out to 1 outer wall of chimney
Paragraph by paragraph pouring, until annular hanging scaffold 8 is above mentioned to 1 top of chimney and completes pouring for 1 top of chimney;
D, after pouring, annular hanging scaffold 8 is fallen into bottom surface and is removed, then remove the anchor ear at 1 top of chimney again and hung
Bar.
The present embodiment 1 outer tube wall of Strengthening Chimney, annular hanging scaffold 8 by the way of installation template in the annular hanging scaffold 8 of annular
Reinforced concrete structure is stepped up from bottom to up, apparatus structure is simple, the construction cost of 1 outer tube wall of chimney reinforcing is reduced,
Construction period is shortened, the construction risk of construction personnel is reduced.
The above is only a specific embodiment of the invention, but are not limited to this to protection of the invention, relate to this skill
Art field technical staff it is thinkable to the technical program technical characteristic propose equivalent change or replacement, all cover this
Within the protection scope of invention.
Claims (6)
1. a kind of bracing means of tall and big concrete chimney outer tube wall, it is characterised in that: including annular hanging scaffold and anchor ear, annular is hung
The bottom of disk is provided with supporting beam, and bottom plate is provided in supporting beam, is provided with guardrail on annular hanging scaffold;Anchor ear is fixed on chimney
Top is provided with sunpender on anchor ear, passes through wirerope connection between sunpender and annular hanging scaffold.
2. the bracing means of tall and big concrete chimney outer tube wall according to claim 1, it is characterised in that: set in supporting beam
It is equipped with climbing device, one end of wirerope is fixed on climbing device, and the other end is fixed on sunpender.
3. the bracing means of tall and big concrete chimney outer tube wall according to claim 1, it is characterised in that: anchor ear is provided with
First anchor ear and the second anchor ear, the first anchor ear are placed in the top of the second anchor ear, and the first anchor ear is circumferentially arranged there are six upper hanger, the
Two anchor ears correspond to upper hanger position, and circumferentially there are six lower sunpenders, upper hanger to be correspondingly connected with to form knockdown hang with lower sunpender for setting
Bar.
4. the bracing means of tall and big concrete chimney outer tube wall according to claim 1, it is characterised in that: supporting beam is ring
Shape structure, supporting beam are provided with 3 by the Inside To Outside of annular hanging scaffold.
5. the bracing means of tall and big concrete chimney outer tube wall according to claim 1, it is characterised in that: annular hanging scaffold
There is guardrail in inner side and outer side respectively.
6. a kind of reinforcement means of tall and big concrete chimney outer tube wall, which is characterized in that carry out as follows:
A, the first anchor ear and the second anchor ear are fixedly mounted respectively in chimney top, sunpender are installed, and sunpender is connected as on anchor ear
It is integrally formed knockdown sunpender;
B, on the outer tube wall that chimney bottom assembles annular hanging scaffold and annular hanging scaffold is made to be sleeved on chimney, the one ends wound of wirerope
On climbing device, the other end of wirerope is fixed on knockdown sunpender, and annular hanging scaffold is by climbing device along wirerope
It is lifted up;
C, to concreting is carried out between template and chimney outer wall, annular hanging scaffold is gradually above mentioned and is carried out to chimney outer wall piecewise
It pours, until annular hanging scaffold is above mentioned to chimney top and completes pouring for chimney top;
D, after pouring, annular hanging scaffold is fallen into ground and is removed, then remove the anchor ear and sunpender of chimney top again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910156707.4A CN109736625A (en) | 2019-03-01 | 2019-03-01 | The bracing means and reinforcement means of tall and big concrete chimney outer tube wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910156707.4A CN109736625A (en) | 2019-03-01 | 2019-03-01 | The bracing means and reinforcement means of tall and big concrete chimney outer tube wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109736625A true CN109736625A (en) | 2019-05-10 |
Family
ID=66369074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910156707.4A Pending CN109736625A (en) | 2019-03-01 | 2019-03-01 | The bracing means and reinforcement means of tall and big concrete chimney outer tube wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109736625A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110778206A (en) * | 2019-10-21 | 2020-02-11 | 中国建筑第八工程局有限公司 | Method for reinforcing ultrahigh-brick chimney |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH668800A5 (en) * | 1985-12-17 | 1989-01-31 | Diaber Ag | Tall chimney demolition mechanism - has annular working platform, travelling on vertical rails on chimney outer wall and fitted with support columns |
CN203271102U (en) * | 2013-01-24 | 2013-11-06 | 中国十七冶集团有限公司 | Fixed hoisting point part for maintenance of outer walls of chimneys |
CN103669900A (en) * | 2013-12-03 | 2014-03-26 | 东北电业管理局烟塔工程公司 | Integral reinforcement construction method for outer barrel wall of chimney |
CN105350763A (en) * | 2015-11-13 | 2016-02-24 | 中国一冶集团有限公司 | Guide rail-type construction hanging basket for chimney beacon paint and construction method |
CN205382699U (en) * | 2016-03-14 | 2016-07-13 | 广西建工集团第一建筑工程有限责任公司 | A hanging flower basket for skin shotcrete construction |
CN106284997A (en) * | 2015-05-28 | 2017-01-04 | 中国二十冶集团有限公司 | The big punching block construction method for lifting whole of reinforced concrete chimney |
CN107859315A (en) * | 2017-11-03 | 2018-03-30 | 北京中易房建筑工程有限公司 | Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket |
-
2019
- 2019-03-01 CN CN201910156707.4A patent/CN109736625A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH668800A5 (en) * | 1985-12-17 | 1989-01-31 | Diaber Ag | Tall chimney demolition mechanism - has annular working platform, travelling on vertical rails on chimney outer wall and fitted with support columns |
CN203271102U (en) * | 2013-01-24 | 2013-11-06 | 中国十七冶集团有限公司 | Fixed hoisting point part for maintenance of outer walls of chimneys |
CN103669900A (en) * | 2013-12-03 | 2014-03-26 | 东北电业管理局烟塔工程公司 | Integral reinforcement construction method for outer barrel wall of chimney |
CN106284997A (en) * | 2015-05-28 | 2017-01-04 | 中国二十冶集团有限公司 | The big punching block construction method for lifting whole of reinforced concrete chimney |
CN105350763A (en) * | 2015-11-13 | 2016-02-24 | 中国一冶集团有限公司 | Guide rail-type construction hanging basket for chimney beacon paint and construction method |
CN205382699U (en) * | 2016-03-14 | 2016-07-13 | 广西建工集团第一建筑工程有限责任公司 | A hanging flower basket for skin shotcrete construction |
CN107859315A (en) * | 2017-11-03 | 2018-03-30 | 北京中易房建筑工程有限公司 | Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket |
Non-Patent Citations (1)
Title |
---|
建筑工人杂志编辑部编: "《砖石砌筑工程技术》", 31 October 1998, 中国计划出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110778206A (en) * | 2019-10-21 | 2020-02-11 | 中国建筑第八工程局有限公司 | Method for reinforcing ultrahigh-brick chimney |
CN110778206B (en) * | 2019-10-21 | 2023-02-28 | 中国建筑第八工程局有限公司 | Method for reinforcing ultrahigh-brick chimney |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587645B (en) | Climbing supporting mechanism having expansion and automatic meshing functions, and construction method thereof | |
CN209482679U (en) | Tub brace type integral steel platform suitable for sloping core construction | |
CN210316779U (en) | Template supporting structure of water tower inverted cone shell | |
CN108979131A (en) | A kind of high-building construction steel form and operation frame integral hoisting stage apparatus | |
CN102912996A (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN109736625A (en) | The bracing means and reinforcement means of tall and big concrete chimney outer tube wall | |
CN202954552U (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN215887959U (en) | Hanging flower basket of encorbelmenting is used in aqueduct construction | |
CN103291116B (en) | For the netted shuttering supporting operating platform of construction of water tank on top of inverted-cone water tower | |
CN204530493U (en) | A kind of high pier over-form construction platform | |
CN105239804B (en) | Assembly and lift-erecting method of indirect air-cooling system stretching platforms | |
CN108824204A (en) | Pier stud construction method and the construction assembled operating platform of pier stud | |
CN201714056U (en) | Truss-type operating platform | |
CN206625585U (en) | A kind of carrying pole device of purlin installation | |
CN202023149U (en) | Hanging basket used in construction | |
CN204530492U (en) | A kind of hydraulic climbing mould construction platform | |
CN112211384B (en) | Scaffold for building site | |
CN210798251U (en) | But scaffold of automatically regulated height | |
CN107461029B (en) | Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting | |
CN208328946U (en) | Moveable suspended formula construction operation platform device | |
CN106760464B (en) | Elevator shaft operating platform and its construction method | |
CN205976695U (en) | Integrated configuration of chimney and water tower | |
CN217298630U (en) | Integral type safety platform for construction of pad stone | |
CN107859066A (en) | Pipe gallery Quick Release formwork erecting structure and its construction method | |
CN212836618U (en) | A integral operation platform in capital for prefabricated stand concrete placement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190510 |