CN105350763A - Guide rail-type construction hanging basket for chimney beacon paint and construction method - Google Patents

Guide rail-type construction hanging basket for chimney beacon paint and construction method Download PDF

Info

Publication number
CN105350763A
CN105350763A CN201510772320.3A CN201510772320A CN105350763A CN 105350763 A CN105350763 A CN 105350763A CN 201510772320 A CN201510772320 A CN 201510772320A CN 105350763 A CN105350763 A CN 105350763A
Authority
CN
China
Prior art keywords
hanging basket
platform
chimney
guide rail
basket platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510772320.3A
Other languages
Chinese (zh)
Other versions
CN105350763B (en
Inventor
祝泽龙
夏春
田红云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201510772320.3A priority Critical patent/CN105350763B/en
Publication of CN105350763A publication Critical patent/CN105350763A/en
Application granted granted Critical
Publication of CN105350763B publication Critical patent/CN105350763B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a guide rail-type construction hanging basket for chimney beacon paint and a construction method. The guide rail-type construction hanging basket for chimney beacon paint comprises a rotary platform, hanging brackets, a guide rail and a hanging basket platform. The rotary platform is arranged at the top of a chimney. The hanging brackets are arranged on the rotary platform. The guide rail is arranged on the outer wall of the chimney. Multiple elevators are fixed on the hanging basket platform and in the equal number with the hanging brackets. The elevators are connected with the hanging brackets via a steel wire rope. The hanging basket platform is divided into multiple sections which are hinged with each other for achieving relative rotation. A sliding sleeve is arranged on the hanging basket platform which slide along the guide rail through the sliding sleeve. The guide rail-type construction hanging basket for chimney beacon paint and the construction method have following beneficial effects: angles can be adjusted at will via each section and adjacent subsection; angles of the hanging basket platform are adjusted according to external diameter of the chimney such that the hanging basket platform can be closely attached to the chimney; and due to the fact that the chimney is connected with the hanging basket platform via the sliding sleeve and the guide rail, the hanging basket platform is prevented from swinging during high-altitude operation so that safety of the hanging basket is improved.

Description

A kind of chimney guide tracked construction hanging basket of navigation mark paint and construction method
Technical field
The present invention relates to technical field of high-altitude operation equipment, be specifically related to the guide tracked construction hanging basket of a kind of chimney navigation mark paint and construction method.
Background technology
Chimney outer wall navigation mark paint constructor will have good Equilibrium ability, and they lean on a safety rope and an operation rope aerial for the height being suspended on more than 100 meter themselves, down construct from chimney top.As can be seen from construction in the past, catch suspension strop on the other hand, another hand operation works, and one-stop operation mopping area is little, constructor's crank, can rotate, rock and take both legs to open maintenance balance along with reaction force during operation, when construction point distance suspension centre is far away, because rope lengths is long, run into upper air current, rock serious, difficulty of construction is large, and there is very large potential safety hazard.For the problems referred to above, the object of the present invention is to provide a kind of construction hanging basket, make chimney navigation mark paint quick construction convenient, safe and reliable.
Summary of the invention
The technical problem to be solved in the present invention is, in view of the foregoing defects the prior art has, provide the guide tracked construction hanging basket of a kind of chimney navigation mark paint and construction method, arbitrarily angle can be adjusted with adjacent segmentation by every section, the angle regulating hanging basket platform is carried out according to chimney external diameter, enable hanging basket platform be close to chimney, prevent hanging basket platform in work high above the ground from occurring the phenomenons such as swing, improve the safety of hanging basket.
The present invention for solving the problems of the technologies described above adopted technical scheme is:
The guide tracked construction hanging basket of a kind of chimney navigation mark paint, comprise rotation platform, multiple suspension bracket, guide rail and hanging basket platform, described rotation platform is arranged at chimney top, suspension bracket is arranged on rotation platform, described guide rail is arranged on chimney outer wall, described hanging basket platform is fixed with multiple elevator, elevator quantity and suspension bracket quantity match, elevator is connected with suspension bracket by wire rope, hanging basket platform is divided into multistage, be hinged between each section and can realize relatively rotating, hanging basket platform is also provided with sliding sleeve, hanging basket platform by sliding sleeve along slide.
By such scheme, two junctions are provided with between adjacent each section of described hanging basket platform, one place is hinged, another place is connected with latch by locating hole, the adjacent two sections of link positions of hanging basket platform are equipped with multiple locating hole, inserted the locating hole locking on adjacent two sections of hanging basket platform by latch, select different locating holes by adjustment and then adjust adjacent two intersegmental angles.
By such scheme, hanging basket platform is divided into three sections.
By such scheme, described hanging basket platform is also provided with lockset, is connected with sliding sleeve by lockset.
By such scheme, described suspension bracket the inner is provided with balancing weight, and suspension bracket outer end is provided with pulley, and wire rope is connected with support by pulley.
By such scheme, described suspension bracket quantity is three.
By such scheme, described elevator is provided with safety lock.
The construction method of the guide tracked construction hanging basket of chimney navigation mark paint described in employing, comprises the following steps:
1), in the temporary platform this device handling to chimney top set up, first rotation platform and chimney top are connected and fixed;
2) determine the position of fixing multiple suspension bracket according to on-the-spot real size, suspension bracket is fixed on rotation platform;
3) suspension bracket one end is connected with the elevator on hanging basket platform by wire rope;
4) sling after temporary platform certain altitude by hanging basket platform by elevator, constructor enters in hanging basket platform together with construction tool and guide rail again;
5) suspension bracket stretches out hanging basket platform is moved towards chimney outer wall direction, moves to apart from chimney outer wall a distance;
6) operating personnel operates the elevator in hanging basket platform, is slowly declined by hanging basket platform, then is fixed on by guide rail on the pre-buried connector of chimney outer wall;
7) along with the change of hanging basket podium level, the external diameter of chimney outer wall also finds change, now in order to keep hanging basket platform can attach chimney outer wall, and the angle of operating personnel by regulating the handle at two ends, hanging basket platform stage casing to adjust platform;
8) again latch is installed after having adjusted, reach the fixing effect of hanging basket platform segmentation;
9) hanging basket platform stage casing is connected with the sliding sleeve on guide rail by the lockset of chimney outer wall side by operating personnel;
10), after completing the paint application in this region, guide rail is removed by operating personnel more from the bottom to top;
11) rotated by rotation platform, make hanging basket platform move to next working region along chimney outer wall horizontal direction and construct, repeat step 6)-10) until complete whole mopping work.
The present invention has following beneficial effect:
Arbitrarily angle can be adjusted with adjacent segmentation by every section, the angle regulating hanging basket platform is carried out according to chimney external diameter, angle between the segmentation of timely adjustment hanging basket platform, hanging basket platform is enable to be close to chimney, by sliding sleeve and guide rail, chimney and hanging basket platform are linked together, prevent hanging basket platform in work high above the ground from occurring the phenomenons such as swing, improve the safety of hanging basket; This device dismounting and fast easy to assembly, convenient construction human users, improves efficiency of construction, and each assembly can repeatedly reuse, and saves material, and hanging basket platform is close to chimney and is avoided rocking, and has increased substantially the safety of operating personnel.
Accompanying drawing explanation
Fig. 1 is the stereogram of the guide tracked construction hanging basket of chimney navigation mark paint of the present invention;
Fig. 2 is the stereogram of hanging basket platform in the guide tracked construction hanging basket of chimney navigation mark paint of the present invention;
Fig. 3 is the blast assembling schematic diagram of hanging basket platform in the guide tracked construction hanging basket of chimney navigation mark paint of the present invention;
Fig. 4 is chimney built-in connection and guide-rail coupling member schematic diagram in the guide tracked construction hanging basket of chimney navigation mark paint of the present invention;
In figure, 1-rotation platform, 2-suspension bracket, 3-wire rope, 4-hanging basket platform, 5-connector, 6-guide rail, 7-sliding sleeve, 8-lockset, 9-latch, 10-locating hole, 11-handle, 12-axis of rotation, 13-axle sleeve.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in detail.
With reference to shown in Fig. 1 ~ Fig. 4, the guide tracked construction hanging basket of chimney navigation mark paint of the present invention, comprise rotation platform 1, multiple suspension bracket 2, guide rail 6 and hanging basket platform 4, described rotation platform 1 is arranged at chimney top, suspension bracket 2 is connected with rotation platform 1 by bolt, described guide rail is arranged on chimney outer wall, install fixing by the built-in connection 5 on chimney outer wall or preformed hole, described hanging basket platform 4 is fixed with multiple elevator, elevator quantity and suspension bracket 2 quantity match, elevator is connected with suspension bracket 2 by wire rope 3, hanging basket platform 4 is divided into multistage, be hinged between each section and can realize relatively rotating, hanging basket platform 4 is also provided with sliding sleeve 7, hanging basket platform 4 is slided along guide rail 6 by sliding sleeve 7, along with the change of hanging basket platform 4 height, chimney external diameter size also finds change, arbitrarily angle can be adjusted with adjacent segmentation by every section, the angle regulating hanging basket platform 4 is carried out according to chimney external diameter, angle between the segmentation of timely adjustment hanging basket platform 4, makes hanging basket platform 4 be close to chimney, chimney and hanging basket platform 4 is linked together by sliding sleeve 7 and guide rail 6, prevent hanging basket platform 4 in work high above the ground from occurring the phenomenons such as swing, improve the safety of hanging basket.
Two junctions are provided with between adjacent each section of described hanging basket platform 4, one place is hinged, be sleeved on by the axle sleeve 13 on 4 one sections, hanging basket platform on the axis of rotation 12 on another section of hanging basket platform 4 and form articulated structure, handle 11 is connected with axis of rotation 12 by screw thread, another place is connected with latch 9 by locating hole 10, the adjacent two sections of link positions of hanging basket platform 4 are equipped with multiple locating hole 10, the locating hole 10 inserted on adjacent two sections of hanging basket platform 4 by latch 9 is locked, and selects different locating holes 10 and then adjust adjacent two intersegmental angles by adjustment; Along with the change of hanging basket platform 4 height, chimney external diameter size also finds change, the angle between hanging basket platform 4 segmentation will be adjusted in time, insert different locating holes by latch 9 to lock, hanging basket platform 4 height and angle adjustment well rear operating personnel can carry out mopping work, complete the construction of chimney navigation mark paint.
Described hanging basket platform is also provided with lockset 8, is connected with sliding sleeve 7 by lockset 8.
Described suspension bracket 2 the inner is provided with balancing weight, and suspension bracket 2 outer end is provided with pulley, and wire rope 3 is connected with support by pulley, and the effect of balancing weight is adjustment.
Described suspension bracket 2 quantity is three.
Described elevator is provided with safety lock.
In one embodiment of the present of invention, hanging basket platform 4 is divided into three sections, and every section arbitrarily can adjust angle with adjacent segmentation, carries out according to chimney external diameter the angle regulating platform, axis of rotation 12 is respectively arranged with at hanging basket platform 4 interlude two ends, handle 11, latch 9 is used for locating rear insertion locating hole 10, to ensure that 4 three segmentations of hanging basket platform are fixed, lockset 8 is provided with sliding sleeve 7 to be used for hanging basket platform 4 to be connected with guide rail 6 by chimney survey at hanging basket platform 4 interlude, prevent hanging basket platform 4 in work high above the ground from occurring the phenomenons such as swing, hanging basket platform 4 segmentation both sides are all provided with elevator and safety lock, wire rope 3 one end is connected with elevator, other one section is connected with suspension bracket 2 end, other one section of suspension bracket 2 is provided with balancing weight to facilitate adjustment.Chimney outer wall has preformed hole or punches according to hanging basket position, successively installation connecting element 5, guide rail 6, can be connected with hanging basket platform 4.
In one embodiment of the present of invention, adopt the implementation method of the guide tracked construction hanging basket of chimney navigation mark paint, comprise the following steps:
1), in the temporary platform this device handling to chimney top set up, first rotation platform 1 and chimney top are connected and fixed;
2) determine the position of fixing multiple suspension bracket 2 according to on-the-spot real size, suspension bracket 2 is fixed on rotation platform 1;
3) suspension bracket 2 one end is connected with the elevator on hanging basket platform 4 by wire rope 3;
4) sling after temporary platform 50mm height by hanging basket platform 4 by elevator, constructor enters in hanging basket platform 4 together with construction tool and guide rail again;
5) suspension bracket 2 stretches out hanging basket platform 4 is moved towards chimney outer wall direction, moves to apart from chimney outer wall 100mm place;
6) operating personnel operates the elevator in hanging basket platform 4, is slowly declined by hanging basket platform 4, then is fixed on by guide rail on the pre-buried connector of chimney outer wall 5;
7) along with the change of hanging basket platform 4 height, the external diameter of chimney outer wall also finds change, now in order to keep hanging basket platform 4 can attach chimney outer wall, and the angle of operating personnel by regulating the handle 11 at two ends, hanging basket platform 4 stage casing to adjust hanging basket platform 4;
8) again latch 9 is installed after having adjusted, reach the fixing effect of hanging basket platform 4 segmentation;
9) hanging basket platform 4 stage casing is connected with the sliding sleeve 7 on guide rail 6 by the lockset 8 of chimney outer wall side by operating personnel, avoids occurring in construction operation that hanging basket platform 4 swings the generation of accidents such as causing casualties;
10), after completing the paint application in this region, guide rail 6 is removed by operating personnel more from the bottom to top;
11) rotated by rotation platform 1, make hanging basket platform 4 move to next working region along chimney outer wall horizontal direction and construct, repeat step 6)-10) until complete whole mopping work.
The present invention dismounting and fast easy to assembly, convenient construction human users.Improve efficiency of construction, and each part can repeatedly Reusability, save waste of material, applicability is wide, and has increased substantially the security reliability of operating personnel.
Above is only preferred embodiment of the present invention, certainly can not limit the interest field of the present invention with this, therefore according to the equivalence change that the present patent application the scope of the claims is done, still belongs to protection scope of the present invention.

Claims (9)

1. the guide tracked construction hanging basket of chimney navigation mark paint, it is characterized in that, comprise rotation platform, multiple suspension bracket, guide rail and hanging basket platform, described rotation platform is arranged at chimney top, suspension bracket is arranged on rotation platform, described guide rail is arranged on chimney outer wall, described hanging basket platform is fixed with multiple elevator, elevator quantity and suspension bracket quantity match, elevator is connected with suspension bracket by wire rope, and hanging basket platform is divided into multistage, is hinged and can realizes relatively rotating between each section, hanging basket platform is also provided with sliding sleeve, hanging basket platform by sliding sleeve along slide.
2. the guide tracked construction hanging basket of chimney navigation mark paint according to claim 1, it is characterized in that, two junctions are provided with between adjacent each section of described hanging basket platform, one place is hinged, another place is connected with latch by locating hole, the adjacent two sections of link positions of hanging basket platform are equipped with multiple locating hole, are inserted the locating hole locking on adjacent two sections of hanging basket platform by latch, select different locating holes by adjustment and then adjust adjacent two intersegmental angles.
3. the guide tracked construction hanging basket of chimney navigation mark paint according to claim 2, it is characterized in that, hanging basket platform is divided into three sections.
4. the guide tracked construction hanging basket of chimney navigation mark paint according to claim 1, is characterized in that, described hanging basket platform is also provided with lockset, is connected by lockset with sliding sleeve.
5. the guide tracked construction hanging basket of chimney navigation mark paint according to claim 1, is characterized in that, described suspension bracket the inner is provided with balancing weight, and suspension bracket outer end is provided with pulley, and wire rope is connected with support by pulley.
6. the guide tracked construction hanging basket of chimney navigation mark paint according to claim 1, is characterized in that, described suspension bracket quantity is three.
7. the guide tracked construction hanging basket of chimney navigation mark paint according to claim 1, it is characterized in that, described elevator is provided with safety lock.
8. adopt the construction method of the guide tracked construction hanging basket of chimney navigation mark paint according to claim 1, comprise the following steps:
1), in the temporary platform this device handling to chimney top set up, first rotation platform and chimney top are connected and fixed;
2) determine the position of fixing multiple suspension bracket according to on-the-spot real size, suspension bracket is fixed on rotation platform;
3) suspension bracket one end is connected with the elevator on hanging basket platform by wire rope;
4) sling after temporary platform certain altitude by hanging basket platform by elevator, constructor enters in hanging basket platform together with construction tool and guide rail again;
5) suspension bracket stretches out hanging basket platform is moved towards chimney outer wall direction, moves to apart from chimney outer wall a distance;
6) operating personnel operates the elevator in hanging basket platform, is slowly declined by hanging basket platform, then is fixed on by guide rail on the pre-buried connector of chimney outer wall;
7) along with the change of hanging basket podium level, the external diameter of chimney outer wall also finds change, now in order to keep hanging basket platform can attach chimney outer wall, and the angle of operating personnel by regulating the handle at two ends, hanging basket platform stage casing to adjust platform;
8) again latch is installed after having adjusted, reach the fixing effect of hanging basket platform segmentation;
9) hanging basket platform stage casing is connected with the sliding sleeve on guide rail by the lockset of chimney outer wall side by operating personnel;
10), after completing the paint application in this region, guide rail is removed by operating personnel more from the bottom to top;
11) rotated by rotation platform, make hanging basket platform move to next working region along chimney outer wall horizontal direction and construct, repeat step 6)-10) until complete whole mopping work.
9. construction method according to claim 9, is characterized in that, described step 4) in certain altitude for being no more than 0.5m, described step 6) in certain distance for being no more than 0.3m.
CN201510772320.3A 2015-11-13 2015-11-13 A kind of guide tracked construction hanging basket of chimney navigation mark paint and construction method Active CN105350763B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510772320.3A CN105350763B (en) 2015-11-13 2015-11-13 A kind of guide tracked construction hanging basket of chimney navigation mark paint and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510772320.3A CN105350763B (en) 2015-11-13 2015-11-13 A kind of guide tracked construction hanging basket of chimney navigation mark paint and construction method

Publications (2)

Publication Number Publication Date
CN105350763A true CN105350763A (en) 2016-02-24
CN105350763B CN105350763B (en) 2018-10-23

Family

ID=55326812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510772320.3A Active CN105350763B (en) 2015-11-13 2015-11-13 A kind of guide tracked construction hanging basket of chimney navigation mark paint and construction method

Country Status (1)

Country Link
CN (1) CN105350763B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429730A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Chimney hanging basket
CN109339429A (en) * 2018-10-15 2019-02-15 合肥鸿坤通信工程有限公司 A kind of communication iron tower anti-dropping safety device
CN109706852A (en) * 2019-02-26 2019-05-03 中铁二十二局集团第五工程有限公司 A kind of hanging basket semiautomatic working platform for Bridge Pier
CN109736625A (en) * 2019-03-01 2019-05-10 中国二十二冶集团有限公司 The bracing means and reinforcement means of tall and big concrete chimney outer tube wall
CN110552496A (en) * 2019-09-09 2019-12-10 中国一冶集团有限公司 movable auxiliary corridor operating platform
CN111119464A (en) * 2020-01-18 2020-05-08 陆健 Retractable safe construction hanging basket for house construction
CN111255218A (en) * 2020-01-19 2020-06-09 广东博智林机器人有限公司 Split type hanging basket device
CN113235902A (en) * 2021-04-30 2021-08-10 四川庞源机械设备有限公司 Double-layer operation platform for high-altitude lifting device and cooperative operation method
CN115075539A (en) * 2022-07-07 2022-09-20 中建二局第三建筑工程有限公司 Hanging basket system suitable for building local convex structure
CN115288408A (en) * 2022-07-29 2022-11-04 江汉大学 Construction platform for blasting demolition of high-rise cylindrical structure and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030159884A1 (en) * 2002-02-22 2003-08-28 Cole Michael J. Movable scaffold and method for painting cylindrical tank
NL2000223C2 (en) * 2006-09-08 2008-03-11 Doornbos Equipment B V Stabilization system for hanging baskets used for e.g. cleaning or painting walls, includes gripper device for securing to basket and engaging with wall
CN102086694A (en) * 2009-12-08 2011-06-08 无锡华科机械设备有限公司 Hanging basket for constructional engineering
CN202299367U (en) * 2011-10-15 2012-07-04 于学恭 Hanging bracket for quick construction of outer wall of large-scale storage tank
CN202755635U (en) * 2012-08-08 2013-02-27 中国核工业华兴建设有限公司 Movable-type basket support
CN202787930U (en) * 2012-07-30 2013-03-13 江阴市路达机械制造有限公司 Hanging basket for high-place operations
CN104295080A (en) * 2014-08-21 2015-01-21 重庆广建装饰股份有限公司 External wall hanging basket installing structure
CN204645574U (en) * 2015-05-22 2015-09-16 中国葛洲坝集团三峡建设工程有限公司 Rotary lifting basket device
CN104929355A (en) * 2015-06-16 2015-09-23 博宇(无锡)科技有限公司 Curve basket

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030159884A1 (en) * 2002-02-22 2003-08-28 Cole Michael J. Movable scaffold and method for painting cylindrical tank
NL2000223C2 (en) * 2006-09-08 2008-03-11 Doornbos Equipment B V Stabilization system for hanging baskets used for e.g. cleaning or painting walls, includes gripper device for securing to basket and engaging with wall
CN102086694A (en) * 2009-12-08 2011-06-08 无锡华科机械设备有限公司 Hanging basket for constructional engineering
CN202299367U (en) * 2011-10-15 2012-07-04 于学恭 Hanging bracket for quick construction of outer wall of large-scale storage tank
CN202787930U (en) * 2012-07-30 2013-03-13 江阴市路达机械制造有限公司 Hanging basket for high-place operations
CN202755635U (en) * 2012-08-08 2013-02-27 中国核工业华兴建设有限公司 Movable-type basket support
CN104295080A (en) * 2014-08-21 2015-01-21 重庆广建装饰股份有限公司 External wall hanging basket installing structure
CN204645574U (en) * 2015-05-22 2015-09-16 中国葛洲坝集团三峡建设工程有限公司 Rotary lifting basket device
CN104929355A (en) * 2015-06-16 2015-09-23 博宇(无锡)科技有限公司 Curve basket

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429730A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Chimney hanging basket
CN109339429A (en) * 2018-10-15 2019-02-15 合肥鸿坤通信工程有限公司 A kind of communication iron tower anti-dropping safety device
CN109706852A (en) * 2019-02-26 2019-05-03 中铁二十二局集团第五工程有限公司 A kind of hanging basket semiautomatic working platform for Bridge Pier
CN109736625A (en) * 2019-03-01 2019-05-10 中国二十二冶集团有限公司 The bracing means and reinforcement means of tall and big concrete chimney outer tube wall
CN110552496A (en) * 2019-09-09 2019-12-10 中国一冶集团有限公司 movable auxiliary corridor operating platform
CN111119464A (en) * 2020-01-18 2020-05-08 陆健 Retractable safe construction hanging basket for house construction
CN111119464B (en) * 2020-01-18 2021-09-14 陆健 Retractable safe construction hanging basket for house construction
CN111255218A (en) * 2020-01-19 2020-06-09 广东博智林机器人有限公司 Split type hanging basket device
CN113235902A (en) * 2021-04-30 2021-08-10 四川庞源机械设备有限公司 Double-layer operation platform for high-altitude lifting device and cooperative operation method
CN115075539A (en) * 2022-07-07 2022-09-20 中建二局第三建筑工程有限公司 Hanging basket system suitable for building local convex structure
CN115288408A (en) * 2022-07-29 2022-11-04 江汉大学 Construction platform for blasting demolition of high-rise cylindrical structure and construction method thereof

Also Published As

Publication number Publication date
CN105350763B (en) 2018-10-23

Similar Documents

Publication Publication Date Title
CN105350763A (en) Guide rail-type construction hanging basket for chimney beacon paint and construction method
JP5977265B2 (en) Suspended scaffolding system
CN105442827A (en) Chimney beacon paint surrounding rope type construction basket and method
CN102628421A (en) Wind turbine rotor and wind turbine rotor maintenance method
CN103342318A (en) Lifting device for steel truss inspection trolley working platform and installation method thereof
CN106088637A (en) Construction assembled high-altitude protection canopy and assembly method thereof
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN103759706A (en) Three-dimensional measurement method and measurement device for mine draw shaft
CN205304086U (en) Insulating electric power overhaul ladder
CN108996421B (en) Finished furniture hoisting machine and finished furniture hoisting method
CN104018659A (en) Auxiliary man-riding appliance for regular checkups in spherical tank
CN105113415B (en) Hydraulic pressure sliding sash climbing frame
CN208747581U (en) A kind of transmission line high-altitude operation self-powered platform
CN102061889A (en) Driller tower hoisting device and using method thereof
CN106337652B (en) A kind of power equipment maintaining ladder
CN113027140B (en) Reverse ceiling aluminum plate installation method and system
CN103982881B (en) A kind of omnipotent lamp bracket, the illuminator of curtain wall and construction method thereof
CN205877657U (en) Adjustable installing support
CN106390327A (en) Safety belt suspending device for high-place operation of transformer substation
CN104695848A (en) Novel vertical shaft safety ladder
CN211287478U (en) Ladder is hung to collapsible level outside window
RU2307064C2 (en) Device for mounting of load by means of flying vehicle
CN205421884U (en) Safety device that pole aerial work used
TWM559392U (en) Aerial lever-typed fixing bracket
CN105442828B (en) One kind is conveniently detached security protection screen

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant