CN105442827A - Chimney beacon paint surrounding rope type construction basket and method - Google Patents

Chimney beacon paint surrounding rope type construction basket and method Download PDF

Info

Publication number
CN105442827A
CN105442827A CN201510776146.XA CN201510776146A CN105442827A CN 105442827 A CN105442827 A CN 105442827A CN 201510776146 A CN201510776146 A CN 201510776146A CN 105442827 A CN105442827 A CN 105442827A
Authority
CN
China
Prior art keywords
hanging basket
platform
chimney
rope
suspension bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510776146.XA
Other languages
Chinese (zh)
Other versions
CN105442827B (en
Inventor
祝泽龙
夏春
田红云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201510776146.XA priority Critical patent/CN105442827B/en
Publication of CN105442827A publication Critical patent/CN105442827A/en
Application granted granted Critical
Publication of CN105442827B publication Critical patent/CN105442827B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a chimney beacon paint surrounding rope type construction basket and method. The chimney beacon paint surrounding rope type construction basket comprises a rotary platform, a plurality of hanging brackets and a basket platform. The rotary platform is arranged on the top of a chimney. The hanging brackets are arranged on the rotary platform. A plurality of elevators are fixedly arranged on the basket. The number of the elevators is matched with that of the hanging brackets. The elevators are connected with the hanging brackets through steel wire ropes. The basket platform is divided into multiple sections which are hinged so as to achieve relative rotation. The basket platform is provided with a surrounding rope which surrounds the chimney. The two ends of the surrounding rope are connected with the basket platform. The angle can be freely adjusted through each section and the adjacent section, the angle of the basket platform is adjusted according to the outer diameter of the chimney so that the basket platform can be tightly attached to the chimney, the chimney and the basket platform are connected together through the surrounding rope, the basket platform is prevented from swinging and the like during working at heights, and the safety of the basket is improved.

Description

A kind of chimney navigation mark paint embraces rope type construction hanging basket and construction method
Technical field
The present invention relates to technical field of high-altitude operation equipment, be specifically related to a kind of chimney navigation mark paint and embrace rope type construction hanging basket and construction method.
Background technology
Chimney outer wall navigation mark paint constructor will have good Equilibrium ability, and they lean on a safety rope and an operation rope aerial for the height being suspended on more than 100 meter themselves, down construct from chimney top.As can be seen from construction in the past, catch suspension strop on the other hand, another hand operation works, and one-stop operation mopping area is little, constructor's crank, can rotate, rock and take both legs to open maintenance balance along with reaction force during operation, when construction point distance suspension centre is far away, because rope lengths is long, run into upper air current, rock serious, difficulty of construction is large, and there is very large potential safety hazard.For the problems referred to above, the object of the present invention is to provide a kind of construction hanging basket, make chimney navigation mark paint quick construction convenient, safe and reliable.
Summary of the invention
The technical problem to be solved in the present invention is, in view of the foregoing defects the prior art has, provide a kind of chimney navigation mark paint and embrace rope type construction hanging basket and construction method, arbitrarily angle can be adjusted with adjacent segmentation by every section, carry out according to chimney external diameter the angle regulating hanging basket platform, enable hanging basket platform be close to chimney, encircle rope and chimney and hanging basket platform are linked together, prevent hanging basket platform in work high above the ground from occurring the phenomenons such as swing, improve the safety of hanging basket.
The present invention for solving the problems of the technologies described above adopted technical scheme is:
Rope type construction hanging basket embraced by a kind of chimney navigation mark paint, comprise rotation platform, multiple suspension bracket, hanging basket platform, described rotation platform is arranged at chimney top, suspension bracket is connected with rotation platform by bolt, described hanging basket platform is fixed with multiple elevator, elevator quantity and suspension bracket quantity match, elevator is connected with suspension bracket by wire rope, hanging basket platform is divided into multistage, be hinged between each section and can realize relatively rotating, hanging basket platform is also provided with and encircles rope, encircle rope by chimney around, encircle rope ends and be connected with hanging basket platform.
By such scheme, two junctions are provided with between each section of described hanging basket platform, one place passes through hinge, another place is connected with fastening bolt by chute, convex axle, in adjacent two sections of hanging basket platform, one section is provided with chute, another section being provided with convex axle, by regulating fastening bolt elasticity to adjust the position of convex axle in chute, and then adjusting adjacent two intersegmental angles.
By such scheme, hanging basket platform is divided into three sections.
By such scheme, encircle on rope and be also provided with many pull ropes, pull rope one end with encircle rope and be connected, rotation platform is also provided with hoist engine, and the pull rope other end is connected with hoist engine, hoist engine motor and elevator motor in synchrony folding and unfolding rope.
By such scheme, described suspension bracket the inner is provided with balancing weight, and suspension bracket outer end is provided with pulley, and wire rope is connected with support by pulley.
By such scheme, described suspension bracket quantity is three.
By such scheme, described elevator is provided with safety lock.
The construction method of rope type construction hanging basket embraced by chimney navigation mark paint described in employing, comprises the following steps:
1), in the temporary platform this device handling to chimney top set up, first rotation platform and chimney top are connected and fixed;
2) determine the position of fixing multiple suspension bracket according to on-the-spot real size, suspension bracket is fixed on rotation platform;
3) suspension bracket one end is connected with the elevator on hanging basket platform by wire rope;
4) sling after temporary platform certain altitude by hanging basket platform by elevator, constructor enters in hanging basket platform together with construction tool again;
5) rope will be encircled and enclose lowering along chimney outer wall one;
6) suspension bracket stretches out hanging basket platform is moved towards chimney outer wall direction, moves to apart from chimney outer wall a distance;
7) operating personnel operates the elevator in hanging basket platform, is slowly declined by hanging basket platform, and at this moment pull rope also can carry out adjusting the height encircling rope along with the height of hanging basket platform;
8) along with the change of hanging basket podium level, the external diameter of chimney outer wall also finds change, now in order to keep hanging basket platform can attach chimney outer wall, and the angle of operating personnel by regulating the degree of tightness of encircling rope to adjust platform;
9) again fastening bolt is tightened after having adjusted, reach the fixing effect of hanging basket platform segmentation;
10) when after the good hanging basket podium level of operation personnel adjustment, operating personnel regulates the elasticity of encircling rope again, avoids occurring in construction operation that hanging basket platform swings the generation of accidents such as causing casualties;
11) after completing the paint application in this region, rotated by rotation platform, make hanging basket platform move to next working region along chimney outer wall horizontal direction and construct, repeat step 7)-10) until complete whole mopping work.
The present invention has following beneficial effect:
Arbitrarily angle can be adjusted with adjacent segmentation by every section, the angle regulating hanging basket platform is carried out according to chimney external diameter, angle between the segmentation of timely adjustment hanging basket platform, hanging basket platform is enable to be close to chimney, encircle rope chimney and hanging basket platform are linked together, prevent hanging basket platform in work high above the ground from occurring the phenomenons such as swing, the elasticity simultaneously by encircling rope completes the angle adjustment between the segmentation of hanging basket platform, improves the safety of hanging basket; This device dismounting and fast easy to assembly, convenient construction human users, improves efficiency of construction, and each assembly can repeatedly reuse, and saves material, and hanging basket platform is close to chimney and is avoided rocking, and has increased substantially the safety of operating personnel.
Accompanying drawing explanation
Fig. 1 is the front view that rope type construction hanging basket embraced by chimney navigation mark paint of the present invention;
Fig. 2 is the stereogram that rope type construction hanging basket embraced by chimney navigation mark paint of the present invention;
Fig. 3 is the structural representation that hanging basket platform in rope type construction hanging basket embraced by chimney navigation mark paint of the present invention;
Fig. 4 is the K region partial schematic diagram of Fig. 3;
Fig. 5 is the blast assembling schematic diagram that hanging basket platform in rope type construction hanging basket embraced by chimney navigation mark paint of the present invention;
Fig. 6 is the M region partial schematic diagram of Fig. 5;
Fig. 7 is the n-quadrant partial schematic diagram of Fig. 5;
In figure, 1-rotation platform, 2-suspension bracket, 3-wire rope, 4-hanging basket platform, 5-encircles rope, 6-pull rope, 7-pin sleeve, 8-bearing pin, 9-spacer pin, the convex axle of 10-, 11-chute, 12-pad, 13-fastening bolt.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in detail.
With reference to shown in Fig. 1 ~ Fig. 7, rope type construction hanging basket embraced by chimney navigation mark paint of the present invention, comprise rotation platform 1, multiple suspension bracket 2, hanging basket platform 4, described rotation platform 1 is arranged at chimney top, suspension bracket 2 is connected with rotation platform 1 by bolt, described hanging basket platform 4 is fixed with multiple elevator, elevator quantity and suspension bracket 2 quantity match, elevator is connected with suspension bracket 2 by wire rope 3, hanging basket platform 4 is divided into multistage, be hinged between each section and can realize relatively rotating, hanging basket platform 4 is also provided with and encircles rope 5, encircle rope 5 by chimney around, encircle rope 5 two ends to be connected with hanging basket platform 4, along with the change of hanging basket platform 4 height, chimney external diameter size also finds change, arbitrarily angle can be adjusted with adjacent segmentation by every section, the angle regulating hanging basket platform 4 is carried out according to chimney external diameter, angle between the segmentation of timely adjustment hanging basket platform 4, hanging basket platform 4 is made to be close to chimney, encircle rope 5 chimney and hanging basket platform are linked together, prevent hanging basket platform 4 in work high above the ground from occurring the phenomenons such as swing, elasticity simultaneously by encircling rope 5 completes the angle adjustment between hanging basket platform 4 segmentation, improves the safety of hanging basket.
Two junctions are provided with between each section of described hanging basket platform 4, one place passes through hinge, pierce in pin sleeve 7 by bearing pin 8, be fixed with spacer pin 9 again, another place is connected with fastening bolt 13 by chute 11, convex axle 10, and in adjacent two sections of hanging basket platform 4, one section is provided with chute 11, another section is provided with convex axle 10, by regulating fastening bolt 13 elasticity to adjust the convex position of axle 10 in chute 11, and then adjust adjacent two intersegmental angles; Along with the change of hanging basket platform 4 height, chimney external diameter size also finds change, the angle between hanging basket platform 4 segmentation will be adjusted in time, convex axle 10 is utilized to be fixed with fastening bolt 13 through after chute 11, pad 12, the angle adjustment between hanging basket platform 4 segmentation is completed by the elasticity of adjustment fastening bolt 13, hanging basket platform 4 height and angle adjustment well rear operating personnel can carry out mopping work, complete the construction of chimney navigation mark paint.
Encircle on rope 5 and be also provided with many pull ropes 6, pull rope 6 one end with encircle rope 5 and be connected, rotation platform is also provided with hoist engine, and pull rope 6 other end is connected with hoist engine, hoist engine motor and elevator motor in synchrony folding and unfolding rope; Pull rope 6 adjusts the height encircling rope 5, with hanging basket platform 4 height change.
Further, the corresponding hoist engine of each pull rope 6, hoist engine adopts synchronous motor.
Described suspension bracket 2 the inner is provided with balancing weight, and suspension bracket 2 outer end is provided with pulley, and wire rope 3 is connected with support by pulley, and the effect of balancing weight is adjustment.
Described suspension bracket 2 quantity is three.
Described elevator is provided with safety lock.
In one embodiment of the present of invention, hanging basket platform 4 is divided into three sections, and every section arbitrarily can adjust angle with adjacent segmentation, carries out according to chimney external diameter the angle regulating platform; Spacer pin 9, chute 11, pad 12, fastening bolt 13, pin sleeve 7 is respectively arranged with at hanging basket platform 4 interlude two ends, at hanging basket platform 4 two ends, section is provided with bearing pin 8, convex axle 10 near interlude place, adjustment and the connection of each intersegmental angle of hanging basket platform 4 is completed, to ensure that 4 three segmentations of hanging basket platform are fixed by these.
In one embodiment of the present of invention, adopt chimney navigation mark paint to embrace the implementation method of rope type construction hanging basket, comprise the following steps:
1), in the temporary platform this device handling to chimney top set up, first rotation platform 1 and chimney top are connected and fixed;
2) determine the position of fixing multiple suspension bracket 2 according to on-the-spot real size, suspension bracket 2 is fixed on rotation platform 1;
3) suspension bracket 2 one end is connected with the elevator on hanging basket platform 4 by wire rope 3;
4) sling after temporary platform 50mm height by hanging basket platform 4 by elevator, constructor enters in hanging basket platform 4 together with construction tool again;
5) rope 5 will be encircled and enclose lowering along chimney outer wall one;
6) suspension bracket 2 stretches out hanging basket platform 4 is moved towards chimney outer wall direction, moves to apart from chimney outer wall 100mm place;
7) operating personnel operates the elevator in hanging basket platform 4, is slowly declined by hanging basket platform 4, and at this moment pull rope 6 also can carry out adjusting the height encircling rope 5 along with the height of hanging basket platform 4;
8) along with the change of hanging basket platform 4 height, the external diameter of chimney outer wall also finds change, now in order to keep hanging basket platform 4 can attach chimney outer wall, and the angle of operating personnel by regulating the degree of tightness of encircling rope 5 to adjust platform;
9) again fastening bolt is tightened after having adjusted, reach the fixing effect of hanging basket platform 4 segmentation;
10) when after operation personnel adjustment good hanging basket platform 4 height, operating personnel regulates the elasticity of encircling rope 5 again, avoids occurring in construction operation that hanging basket platform swings the generation of accidents such as causing casualties;
11) after completing the paint application in this region, rotated by rotation platform 1, make hanging basket platform 4 move to next working region along chimney outer wall horizontal direction and construct, repeat step 7)-10) until complete whole mopping work.
The present invention dismounting and fast easy to assembly, convenient construction human users.Improve efficiency of construction, and each part can repeatedly Reusability, save waste of material, applicability is wide, and has increased substantially the security reliability of operating personnel.
Above is only preferred embodiment of the present invention, certainly can not limit the interest field of the present invention with this, therefore according to the equivalence change that the present patent application the scope of the claims is done, still belongs to protection scope of the present invention.

Claims (9)

1. rope type construction hanging basket embraced by a chimney navigation mark paint, it is characterized in that, comprise rotation platform, multiple suspension bracket, hanging basket platform, described rotation platform is arranged at chimney top, suspension bracket is arranged on rotation platform, described hanging basket is fixed with multiple elevator, elevator quantity and suspension bracket quantity match, elevator is connected with suspension bracket by wire rope, hanging basket platform is divided into multistage, is hinged and can realizes relatively rotating between each section, hanging basket platform is also provided with and encircles rope, encircle rope by chimney around, encircle rope ends and be connected with hanging basket platform.
2. rope type construction hanging basket embraced by chimney navigation mark paint according to claim 1, it is characterized in that, two junctions are provided with between each section of described hanging basket platform, one place passes through hinge, another place is connected with fastening bolt by chute, convex axle, and in adjacent two sections of hanging basket platform, one section is provided with chute, and another section is provided with convex axle, by regulating the elasticity of fastening bolt to adjust the position of convex axle in chute, and then adjust adjacent two intersegmental angles.
3. rope type construction hanging basket embraced by chimney navigation mark paint according to claim 2, and it is characterized in that, hanging basket platform is divided into three sections.
4. rope type construction hanging basket embraced by chimney navigation mark paint according to claim 1, it is characterized in that, encircle on rope and be also provided with many pull ropes, pull rope one end with encircle rope and be connected, rotation platform is also provided with hoist engine, the pull rope other end is connected with hoist engine, hoist engine motor and elevator motor in synchrony folding and unfolding rope.
5. rope type construction hanging basket embraced by chimney navigation mark paint according to claim 1, it is characterized in that, described suspension bracket the inner is provided with balancing weight, and suspension bracket outer end is provided with pulley, and wire rope is connected with support by pulley.
6. rope type construction hanging basket embraced by chimney navigation mark paint according to claim 1, it is characterized in that, described suspension bracket quantity is three.
7. rope type construction hanging basket embraced by chimney navigation mark paint according to claim 1, and it is characterized in that, described elevator is provided with safety lock.
8. adopt chimney navigation mark paint according to claim 1 to embrace the construction method of rope type construction hanging basket, comprise the following steps:
1), in the temporary platform this device handling to chimney top set up, first rotation platform and chimney top are connected and fixed;
2) determine the position of fixing multiple suspension bracket according to on-the-spot real size, suspension bracket is fixed on rotation platform;
3) suspension bracket one end is connected with the elevator on hanging basket platform by wire rope;
4) sling after temporary platform certain altitude by hanging basket platform by elevator, constructor enters in hanging basket platform together with construction tool again;
5) rope will be encircled and enclose lowering along chimney outer wall one;
6) suspension bracket stretches out hanging basket platform is moved towards chimney outer wall direction, moves to apart from chimney outer wall a distance;
7) operating personnel operates the elevator in hanging basket platform, is slowly declined by hanging basket platform, and at this moment pull rope also can carry out adjusting the height encircling rope along with the height of hanging basket platform;
8) along with the change of hanging basket podium level, the external diameter of chimney outer wall also finds change, now in order to keep hanging basket platform can attach chimney outer wall, and the angle of operating personnel by regulating the degree of tightness of encircling rope to adjust platform;
9) again fastening bolt is tightened after having adjusted, reach the fixing effect of hanging basket platform segmentation;
10) when after the good hanging basket podium level of operation personnel adjustment, operating personnel regulates the elasticity of encircling rope again, avoids occurring in construction operation that hanging basket platform swings the generation of accidents such as causing casualties;
11) after completing the paint application in this region, rotated by rotation platform, make hanging basket platform move to next working region along chimney outer wall horizontal direction and construct, repeat step 7)-10) until complete whole mopping work.
9. construction method according to claim 9, is characterized in that, described step 4) in certain altitude for being no more than 0.5m, described step 6) in certain distance for being no more than 0.3m.
CN201510776146.XA 2015-11-13 2015-11-13 A kind of chimney navigation mark paint armful rope type construction hanging basket and construction method Active CN105442827B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510776146.XA CN105442827B (en) 2015-11-13 2015-11-13 A kind of chimney navigation mark paint armful rope type construction hanging basket and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510776146.XA CN105442827B (en) 2015-11-13 2015-11-13 A kind of chimney navigation mark paint armful rope type construction hanging basket and construction method

Publications (2)

Publication Number Publication Date
CN105442827A true CN105442827A (en) 2016-03-30
CN105442827B CN105442827B (en) 2018-10-23

Family

ID=55553417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510776146.XA Active CN105442827B (en) 2015-11-13 2015-11-13 A kind of chimney navigation mark paint armful rope type construction hanging basket and construction method

Country Status (1)

Country Link
CN (1) CN105442827B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547438A (en) * 2018-05-07 2018-09-18 天元建设集团有限公司 A kind of lifting type support and its construction method
CN108824213A (en) * 2018-08-02 2018-11-16 中铁十二局集团有限公司 Protection operation hoistable platform for the installation of round end type solid pier hanging basket
CN109706852A (en) * 2019-02-26 2019-05-03 中铁二十二局集团第五工程有限公司 A kind of hanging basket semiautomatic working platform for Bridge Pier
CN110409803A (en) * 2019-08-07 2019-11-05 中国电建集团山东电力建设有限公司 Dismantle the hanging method of hydraulic mould lifting device center drum circle
CN110593546A (en) * 2019-09-02 2019-12-20 中国二十冶集团有限公司 Chimney heat preservation construction auxiliary device
CN115142656A (en) * 2022-07-29 2022-10-04 江汉大学 Suspension structure suitable for annular hanging basket and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6666299B2 (en) * 2002-02-22 2003-12-23 Michael J. Cole Movable scaffold and method for painting cylindrical tank
CN102086694A (en) * 2009-12-08 2011-06-08 无锡华科机械设备有限公司 Hanging basket for constructional engineering
CN202299367U (en) * 2011-10-15 2012-07-04 于学恭 Hanging bracket for quick construction of outer wall of large-scale storage tank
CN202787930U (en) * 2012-07-30 2013-03-13 江阴市路达机械制造有限公司 Hanging basket for high-place operations
CN104295080A (en) * 2014-08-21 2015-01-21 重庆广建装饰股份有限公司 External wall hanging basket installing structure
CN104929355A (en) * 2015-06-16 2015-09-23 博宇(无锡)科技有限公司 Curve basket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6666299B2 (en) * 2002-02-22 2003-12-23 Michael J. Cole Movable scaffold and method for painting cylindrical tank
CN102086694A (en) * 2009-12-08 2011-06-08 无锡华科机械设备有限公司 Hanging basket for constructional engineering
CN202299367U (en) * 2011-10-15 2012-07-04 于学恭 Hanging bracket for quick construction of outer wall of large-scale storage tank
CN202787930U (en) * 2012-07-30 2013-03-13 江阴市路达机械制造有限公司 Hanging basket for high-place operations
CN104295080A (en) * 2014-08-21 2015-01-21 重庆广建装饰股份有限公司 External wall hanging basket installing structure
CN104929355A (en) * 2015-06-16 2015-09-23 博宇(无锡)科技有限公司 Curve basket

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547438A (en) * 2018-05-07 2018-09-18 天元建设集团有限公司 A kind of lifting type support and its construction method
CN108547438B (en) * 2018-05-07 2023-06-02 天元建设集团有限公司 Lifting support and construction method thereof
CN108824213A (en) * 2018-08-02 2018-11-16 中铁十二局集团有限公司 Protection operation hoistable platform for the installation of round end type solid pier hanging basket
CN109706852A (en) * 2019-02-26 2019-05-03 中铁二十二局集团第五工程有限公司 A kind of hanging basket semiautomatic working platform for Bridge Pier
CN110409803A (en) * 2019-08-07 2019-11-05 中国电建集团山东电力建设有限公司 Dismantle the hanging method of hydraulic mould lifting device center drum circle
CN110409803B (en) * 2019-08-07 2022-02-01 中国电建集团山东电力建设有限公司 Hoisting method for disassembling central drum ring of hydraulic mold lifting device
CN110593546A (en) * 2019-09-02 2019-12-20 中国二十冶集团有限公司 Chimney heat preservation construction auxiliary device
CN115142656A (en) * 2022-07-29 2022-10-04 江汉大学 Suspension structure suitable for annular hanging basket and construction method thereof
CN115142656B (en) * 2022-07-29 2024-06-07 江汉大学 Suspension structure suitable for annular hanging basket and construction method thereof

Also Published As

Publication number Publication date
CN105442827B (en) 2018-10-23

Similar Documents

Publication Publication Date Title
CN105442827A (en) Chimney beacon paint surrounding rope type construction basket and method
CN105350763A (en) Guide rail-type construction hanging basket for chimney beacon paint and construction method
CN106320682A (en) Auxiliary device for spherical tank checkout and checkout method
CN106088637A (en) Construction assembled high-altitude protection canopy and assembly method thereof
CN104638553A (en) 180-degree rotary reinforced concrete pole lazy arm
CN105565220A (en) Aerial working platform
CN106586846A (en) Hoisting equipment of wind power generating set and construction method thereof
CN104481194A (en) Reversed assembling method of upright cylindrical equipment
CN104018659B (en) The auxiliary manned utensil of the inner regular inspection of a kind of spherical tank
CN205743235U (en) A kind of self-supporting anemometer tower
CN110485289A (en) A kind of inspection platform in extension type double plane cable stayed bridge king-post drag-line area
CN106246094A (en) A kind of novel mounting attachment and using method thereof
CN106985129A (en) Regular inspection uses hydraulic pressure manned device inside a kind of spherical tank
CN104695848B (en) A kind of novel silo emergency staircase
CN206784303U (en) A kind of hanging building foot guard repairing treatment suspension platform device
CN104587616A (en) Household foldable high-rise building escaping device
CN204277366U (en) For the hydraulic lifting apparatus of vertical type tubular equipment upside-down mounting
CN208617222U (en) A kind of digging machine upright bar special hanger
CN203891440U (en) Freely-rotating in-storage-tank overhauling work platform
CN206220624U (en) The helicopter servicing unit of extra-high voltage wine glass tower tower head
CN106382046B (en) The helicopter auxiliary device and hanging method of extra-high voltage wine glass tower tower head
CN206834607U (en) Monolithic insulator hanging apparatus
CN206529230U (en) A kind of maintenance platform for sphere dome
CN104876165A (en) Mobile mounting and maintenance platform of photovoltaic component
CN207002063U (en) A kind of hoisting fixture for being used to change torch steam loop

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant