CN106246094A - A kind of novel mounting attachment and using method thereof - Google Patents

A kind of novel mounting attachment and using method thereof Download PDF

Info

Publication number
CN106246094A
CN106246094A CN201610883567.7A CN201610883567A CN106246094A CN 106246094 A CN106246094 A CN 106246094A CN 201610883567 A CN201610883567 A CN 201610883567A CN 106246094 A CN106246094 A CN 106246094A
Authority
CN
China
Prior art keywords
hanger
ladder
fixedly connected
splint
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610883567.7A
Other languages
Chinese (zh)
Inventor
曹叶章
万军
张凯
黄启明
孔祥涛
徐荟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Yangzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Yangzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority to CN201610883567.7A priority Critical patent/CN106246094A/en
Publication of CN106246094A publication Critical patent/CN106246094A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06C—LADDERS
    • E06C1/00—Ladders in general
    • E06C1/02—Ladders in general with rigid longitudinal member or members
    • E06C1/34—Ladders attached to structures, such as windows, cornices, poles, or the like
    • E—FIXED CONSTRUCTIONS
    • E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06C—LADDERS
    • E06C1/00—Ladders in general
    • E06C1/02—Ladders in general with rigid longitudinal member or members
    • E06C1/38—Special constructions of ladders, e.g. ladders with more or less than two longitudinal members, ladders with movable rungs or other treads, longitudinally-foldable ladders
    • E—FIXED CONSTRUCTIONS
    • E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06C—LADDERS
    • E06C7/00—Component parts, supporting parts, or accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

一种新型辅助梯及其使用方法。涉及梯子领域,尤其涉及钢管塔的辅助梯及其使用方法的改进。提供了一种结构精巧、使用简便且使用安全系数高、稳定性好,在不改变法兰盘原有结构的前提下,既能给人体提供有效的支撑,又能方便、安全的转换人体在高空的位置,同时使得螺栓安装时处在操作人员胸口以下的钢管塔的辅助梯及其使用方法。所述活动挂架包括一对挂架和至少一滑轨组件;所述挂架顶部设有夹持组件,所述夹持组件转动连接在所述挂架顶部;所述连接段与所述挂架一固定连接,所述承托段从上到下包括连为一体的垂直段和水平段;本发明具有结构精巧、稳定性好、强度高及使用方便等特点。

A novel auxiliary ladder and its use method. The invention relates to the field of ladders, in particular to the improvement of an auxiliary ladder of a steel pipe tower and a use method thereof. Provides a compact structure, easy to use, high safety factor, and good stability. Without changing the original structure of the flange, it can not only provide effective support for the human body, but also conveniently and safely convert the human body into a flange. The high-altitude position makes the auxiliary ladder of the steel pipe tower below the operator's chest when the bolt is installed and its use method. The movable hanger includes a pair of hangers and at least one slide rail assembly; the top of the hanger is provided with a clamping assembly, and the clamping assembly is rotatably connected to the top of the hanger; the connecting section and the hanger The frame is fixedly connected, and the supporting section includes a vertical section and a horizontal section connected as one from top to bottom; the present invention has the characteristics of compact structure, good stability, high strength and convenient use.

Description

一种新型辅助梯及其使用方法A Novel Auxiliary Ladder and Its Using Method

技术领域technical field

本发明涉及梯子领域,尤其涉及钢管塔的辅助梯及其使用方法的改进。The invention relates to the field of ladders, in particular to the improvement of an auxiliary ladder for a steel pipe tower and a use method thereof.

背景技术Background technique

为了有利于城市规划的摆布,在电力设施中架空线路所用的杆塔,通常采用钢管塔进行搭建。而在施工时,考虑到钢管塔重量大、受地形限制、离旁路带电距离较近等因素,常采用独扒杆或吊车分节组立的钢管塔。在相邻的两节钢管塔之间采用法兰盘结构连接,并通过法兰盘上的一圈均布的螺栓和螺母进行相互固定。然而,工作人员在爬上钢管塔对螺栓和螺母进行安装时,由于钢管塔直径较大而人手长度有限,导致工作人员站在高空安装螺栓时人手无法同时够到所有的螺栓安装位置,同时,工作人员在高空中又无法方便的改变位置。因此,在对钢管塔进行安装或检修时,如何既能给人体提供有效的支撑,又能方便、安全的转换人体在高空的位置成为了本领域技术人员亟待解决的技术问题。In order to facilitate the control of urban planning, the towers used for overhead lines in power facilities are usually built with steel pipe towers. During construction, considering factors such as the heavy weight of the steel pipe tower, the limitation of the terrain, and the short distance from the electrified side of the bypass, steel pipe towers assembled in sections by single poles or cranes are often used. The two adjacent steel pipe towers are connected by a flange structure, and are fixed to each other by a circle of evenly distributed bolts and nuts on the flange. However, when the staff climbed up the steel pipe tower to install the bolts and nuts, due to the large diameter of the steel pipe tower and the limited length of hands, the staff could not reach all the bolt installation positions at the same time when the staff stood at a high altitude to install the bolts. At the same time, The staff cannot easily change their positions at high altitude. Therefore, when installing or overhauling the steel pipe tower, how to provide effective support for the human body and conveniently and safely switch the position of the human body at high altitude has become a technical problem to be solved urgently by those skilled in the art.

针对上述问题,传统的施工方法通常可为以下几种:In response to the above problems, the traditional construction methods can usually be the following:

一、在钢管塔外除了常规的垂直爬梯外增设一对对称设置的辅助爬梯,并将辅助爬梯固定连接在钢管塔的外壁上;此类辅助爬梯使用方法简单,安全性和可靠性高;然而,也存在着施工成本高、在对旧钢管塔进行检修时无法使用、若钢管塔直径过大(超过10米)时还是无法够到所有的螺栓安装位置等缺陷;1. In addition to the conventional vertical ladders, a pair of symmetrical auxiliary ladders are added outside the steel pipe tower, and the auxiliary ladders are fixedly connected to the outer wall of the steel pipe tower; such auxiliary ladders are easy to use and have high safety and reliability; however , there are also defects such as high construction cost, inability to use when overhauling the old steel pipe tower, and inability to reach all bolt installation positions if the diameter of the steel pipe tower is too large (more than 10 meters);

二、由操作人员携带一环形保险绳爬上垂直爬梯,并将保险绳的顶部连接在法兰盘上,使得操作人员在操作时可一脚踩着保险绳,一脚踩着垂直爬梯对螺栓进行安装;然而,此类保险绳仅适用于小直径的钢管塔的安装,同时稳定性差、操作时安全风险大;2. The operator carries a ring-shaped safety rope to climb up the vertical ladder, and connects the top of the safety rope to the flange, so that the operator can step on the safety rope with one foot and the vertical ladder with the other to align the bolts during operation. However, this type of safety rope is only suitable for the installation of small-diameter steel pipe towers, and has poor stability and high safety risks during operation;

三、由于法兰盘上相邻的螺栓孔之间通常设有加强筋,而加强筋上通常设有眼孔,因此操作人员可携带一辅助梯爬上钢管塔,并通过铁丝等将辅助梯连接在眼孔下方,从而使得操作人员站在辅助梯上即可对螺栓进行安装;然而,操作人员在实践中发现,此类辅助梯在高空作业时晃动较大且移动极为不便,使用起来工作效率极低且施工效果差。3. Since reinforcing ribs are usually provided between the adjacent bolt holes on the flange, and eyelets are usually provided on the reinforcing ribs, the operator can carry an auxiliary ladder to climb up the steel pipe tower, and use iron wires to connect the auxiliary ladder to the steel pipe tower. It is connected under the eyelet, so that the operator can install the bolts by standing on the auxiliary ladder; however, the operator found in practice that this type of auxiliary ladder shakes a lot and is extremely inconvenient to move when working at heights, and it is difficult to use it to work. The efficiency is extremely low and the construction effect is poor.

因此,上述三种施工方法均无法有效的解决既能给人体提供有效的支撑,又能方便、安全的转换人体在高空的位置的问题。此外,上述几种施工方法中,操作人员均站在下方对头顶以上的螺栓进行安装,费时费力,且安装后螺栓极易产生松动,带来了极大的安全隐患。Therefore, the above three construction methods cannot effectively solve the problem of providing effective support to the human body and conveniently and safely changing the position of the human body at high altitude. In addition, in the above-mentioned several construction methods, the operator stands below to install the bolts above the head, which is time-consuming and laborious, and the bolts are easy to loosen after installation, which brings great potential safety hazards.

对此,国家局于2015年3月25日公告了一份名为“一种钢管塔的辅助梯使用方法”、申请号为“201310260307.0”的中国发明专利,然而,人们在实际使用后发现,此类技术方案必须先于法兰盘的下方的加强筋上开设眼孔,因此在法兰盘的制造成本上带来了一定的额外增加,并使得此类钢管塔的辅助梯在通用性上具有极大的缺陷。In this regard, the National Bureau announced on March 25, 2015 a Chinese invention patent entitled "A method for using an auxiliary ladder for a steel pipe tower" with the application number "201310260307.0". However, people found after actual use that This type of technical solution must be preceded by opening eyelets on the ribs below the flange, which brings a certain additional increase in the manufacturing cost of the flange and makes the auxiliary ladder of this type of steel pipe tower more versatile. has great flaws.

发明内容Contents of the invention

本发明针对以上问题,提供了一种结构精巧、使用简便且使用安全系数高、稳定性好,在不改变法兰盘原有结构的前提下,既能给人体提供有效的支撑,又能方便、安全的转换人体在高空的位置,同时使得螺栓安装时处在操作人员胸口以下的钢管塔的辅助梯及其使用方法。Aiming at the above problems, the present invention provides a compact structure, easy to use, high safety factor, and good stability. Without changing the original structure of the flange, it can not only provide effective support for the human body, but also facilitate , Safely change the position of the human body at high altitude, and at the same time make the auxiliary ladder of the steel pipe tower below the chest of the operator when the bolt is installed and its use method.

本发明的技术方案是:用于钢管塔上法兰盘的对接安装,所述法兰盘设在钢管塔的端面上、且法兰盘上设有若干均匀分布的螺栓的安装孔,所述法兰盘的下方固定连接且均布有若干加强筋;所述辅助梯包括活动挂架和支撑梯;The technical solution of the present invention is: it is used for the butt joint installation of the flange on the steel pipe tower, the flange is arranged on the end face of the steel pipe tower, and the flange is provided with a number of evenly distributed bolt installation holes, the The bottom of the flange is fixedly connected and evenly distributed with a number of reinforcing ribs; the auxiliary ladder includes a movable hanger and a supporting ladder;

所述活动挂架包括一对挂架和至少一滑轨组件;所述挂架顶部设有夹持组件,所述夹持组件转动连接在所述挂架顶部;所述滑轨组件设在一对所述挂架之间,使得一对所述挂架通过滑轨组件滑动连接;The movable hanger includes a pair of hangers and at least one slide rail assembly; the top of the hanger is provided with a clamping assembly, and the clamping assembly is rotatably connected to the top of the hanger; the slide rail assembly is arranged on a Between the hangers, a pair of hangers are slidably connected through a slide rail assembly;

所述夹持组件包括基座、固定夹板、活动夹板、螺杆和手轮,所述基座转动连接在所述挂架顶部,所述固定夹板固定连接在基座的顶面上,所述活动夹板活动连接在基座的顶面上、且与固定夹板相对设置,所述螺杆的一端与固定夹板相铰接,所述螺杆的中部穿设于活动夹板中、且与活动夹板螺纹连接,所述手轮固定连接在螺杆远离固定夹板的一端;The clamping assembly includes a base, a fixed splint, a movable splint, a screw and a hand wheel, the base is rotatably connected to the top of the hanger, the fixed splint is fixedly connected to the top surface of the base, and the movable The splint is movably connected to the top surface of the base and is arranged opposite to the fixed splint. One end of the screw is hinged to the fixed splint. The hand wheel is fixedly connected to the end of the screw rod away from the fixed splint;

一对所述挂架分为挂架一和挂架二,所述支撑梯固定连接在所述挂架一远离所述挂架二的一侧端面上;The pair of hangers are divided into hanger one and hanger two, and the support ladder is fixedly connected to the end face of the hanger one away from the hanger two;

所述支撑梯从上到下包括连为一体的承托段和连接段,所述连接段与所述挂架一固定连接,所述承托段从上到下包括连为一体的垂直段和水平段;The support ladder includes a connected supporting section and a connecting section from top to bottom, the connecting section is fixedly connected with the hanger, and the supporting section includes a connected vertical section and a connecting section from top to bottom. horizontal section;

所述支撑梯的连接段底端设有至少一撑杆,所述撑杆为伸缩杆,所述撑杆远离所述支撑梯的一端连接有水平设置的滑轮一;The bottom end of the connecting section of the support ladder is provided with at least one strut, the strut is a telescopic rod, and the end of the strut away from the support ladder is connected with a horizontally arranged pulley one;

所述支撑梯的承托段的顶端设有至少一辅助撑杆,所述辅助撑杆远离支撑梯的一端通过螺纹连接有连接杆,所述连接杆的底端连接有竖直设置的滑轮二。The top of the supporting section of the supporting ladder is provided with at least one auxiliary strut, the end of the auxiliary strut away from the supporting ladder is threadedly connected with a connecting rod, and the bottom end of the connecting rod is connected with a vertical pulley two .

所述滑轨组件包括相互适配的弧形滑块和弧形滑槽;所述弧形滑块的截面呈T字形、且固定连接在所述挂架二的端面上,所述弧形滑槽为T型槽、且固定连接在所述挂架一的端面上。The slide rail assembly includes an arc-shaped slider and an arc-shaped chute adapted to each other; the cross-section of the arc-shaped slider is T-shaped, and is fixedly connected to the end surface of the hanger two, and the arc-shaped slider The slot is a T-shaped slot and is fixedly connected to the end face of the hanger one.

所述滑轨组件包括相互适配的弧形凸棱和弧形燕尾槽;所述弧形凸棱的截面呈梯形、且固定连接在所述挂架一的端面上,所述弧形燕尾槽固定连接在所述挂架二的端面上。The slide rail assembly includes arc-shaped ribs and arc-shaped dovetail grooves that are compatible with each other; the cross-section of the arc-shaped ribs is trapezoidal, and is fixedly connected to the end surface of the hanger one, and the arc-shaped dovetail grooves It is fixedly connected to the end surface of the second hanger.

所述固定夹板朝向活动夹板的端面和活动夹板朝向固定夹板的端面上均固定连接有防滑垫,所述防滑垫呈锯齿状或波浪状。Both the end surface of the fixed splint facing the movable splint and the end surface of the movable splint facing the fixed splint are fixedly connected with anti-slip pads, and the anti-slip pads are in a sawtooth or wave shape.

按以下步骤使用:Use as follows:

1)、挂接:人工将辅助梯挂设在法兰盘上,并对撑杆的长度和滑轮二的高度进行调节,使得辅助梯稳定的挂接在法兰盘上;1) Mounting: Manually hang the auxiliary ladder on the flange, and adjust the length of the strut and the height of the pulley 2, so that the auxiliary ladder can be stably mounted on the flange;

2)、定位:人工旋动挂架一中的手轮,使得挂架一中的固定夹板和活动夹板相对运动并夹住某一加强筋;2) Positioning: Manually rotate the hand wheel in hanger one, so that the fixed splint and movable splint in hanger one move relatively and clamp a certain reinforcing rib;

3)、装钉:将螺栓和螺母装入辅助体邻近的至少一个安装孔中并锁紧,完成至少一个安装位置的安装;3) Fixing: Install bolts and nuts into at least one installation hole adjacent to the auxiliary body and lock them to complete the installation of at least one installation position;

4)、判断是否所有安装位置的安装均安装完毕:是,则进入步骤8);否,则进入步骤5);4), judge whether all installation locations are installed: yes, then go to step 8); no, go to step 5);

5)、进位:人工先推动挂架二,使其滑动至下一个加强筋的下方;再翻转并旋动挂架二中的手轮,使得挂架二中的固定夹板和活动夹板相对运动并夹住下一个加强筋;5) Carry: Manually push the hanger 2 to make it slide to the bottom of the next reinforcing rib; then turn over and rotate the hand wheel in the hanger 2, so that the fixed splint and the movable splint in the hanger 2 move relatively and Clamp the next rib;

6)、换位:人工先通过旋动挂架一中的手轮,使得挂架一中的固定夹板和活动夹板相分离,再对挂架一中的夹持组件进行翻转,使之与加强筋相交错,最后,拉住法兰盘滑动支撑梯;6) Transposition: Manually rotate the hand wheel in hanger 1 to separate the fixed splint and movable splint in hanger 1, and then turn over the clamping assembly in hanger 1 to make it compatible with the reinforced The ribs are interlaced, and finally, pull the flange to slide the support ladder;

7)、返回步骤2);7), return to step 2);

8)、收工:人工旋动挂架一以及挂架二中的手轮,使得挂架一和挂架二同时放开对加强筋的夹持,最后取下辅助体;完毕。8) Finish work: Manually rotate the handwheels in hanger 1 and hanger 2, so that hanger 1 and hanger 2 release the clamping of the reinforcing rib at the same time, and finally remove the auxiliary body; complete.

本发明具有结构精巧、稳定性好、强度高及使用方便等特点,在使用时可按照定位、进位、换位的循环操作使得操作人员可简单、有效的对钢管塔上任意安装孔中的螺栓和螺母进行安装调节,达到了既能给人体提供有效的支撑,又能方便、安全的转换人体在高空的位置的效果,大幅降低了操作人员的劳动强度及安全风险。此外,本案有效避免了因开设眼孔而对加强筋结构做出破坏的问题,并有效避免了法兰盘加工成本的额外增加。本发明从整体上实现了在不改变法兰盘原有结构的前提下,既能给人体提供有效的支撑,又能方便、安全的转换人体在高空的位置,同时使得螺栓安装时处在操作人员胸口以下的目的。The invention has the characteristics of exquisite structure, good stability, high strength and convenient use. When in use, it can be operated according to the cycle of positioning, carrying and transposition, so that the operator can simply and effectively install the bolts in any installation holes on the steel pipe tower. It is installed and adjusted with nuts to achieve the effect of not only providing effective support for the human body, but also conveniently and safely changing the position of the human body at high altitude, which greatly reduces the labor intensity and safety risks of operators. In addition, this case effectively avoids the problem of damage to the rib structure due to the opening of eye holes, and effectively avoids the additional increase in the processing cost of the flange. The present invention realizes that on the premise of not changing the original structure of the flange, it can not only provide effective support for the human body, but also conveniently and safely change the position of the human body at high altitude, and at the same time make the bolts in the operating state when they are installed. The purpose below the chest of the personnel.

附图说明Description of drawings

图1是本发明的结构示意图,Fig. 1 is a structural representation of the present invention,

图2是图1的A-A向剖视图,Fig. 2 is a sectional view along the line A-A of Fig. 1,

图3是本发明中挂架的结构示意图;Fig. 3 is the structural representation of hanger among the present invention;

图4是图3的右视图;Fig. 4 is the right view of Fig. 3;

图5是本发明的实施方式示意图,Figure 5 is a schematic diagram of an embodiment of the present invention,

图6是本发明中钢管塔的结构示意图,Fig. 6 is the structural representation of steel pipe tower among the present invention,

图7是本发明中支撑梯的结构示意图;Fig. 7 is the structural representation of support ladder among the present invention;

图8是图7的左视图;Fig. 8 is the left view of Fig. 7;

图9是本发明的使用状态示意图一,Fig. 9 is a schematic diagram of the first use state of the present invention,

图10是本发明的使用状态示意图二,Fig. 10 is a second schematic diagram of the use state of the present invention,

图11是本发明的使用状态示意图三,Fig. 11 is a schematic diagram of the third use state of the present invention,

图12是本发明的使用状态示意图四,Fig. 12 is a schematic view four of the use state of the present invention,

图13是本发明的使用状态示意图五,Fig. 13 is a schematic diagram of the fifth use state of the present invention,

图14是本发明的使用状态示意图六;Fig. 14 is a schematic diagram of the sixth usage state of the present invention;

图中1是钢管塔,11是法兰盘,110是安装孔,111是加强筋;In the figure, 1 is a steel pipe tower, 11 is a flange, 110 is a mounting hole, and 111 is a reinforcing rib;

2是辅助梯,21是活动挂架,211是挂架一,212是挂架二,213是滑轨组件,2131是弧形滑块,2132是弧形滑槽,214是基座,215是固定夹板,216是活动夹板,217是螺杆,218是手轮;2 is auxiliary ladder, 21 is movable hanger, 211 is hanger one, 212 is hanger two, 213 is slide rail assembly, 2131 is arc slider, 2132 is arc chute, 214 is base, 215 is Fixed splint, 216 is a movable splint, 217 is a screw rod, and 218 is a hand wheel;

22是支撑梯,221是承托段,2211是垂直段,2212是水平段,222是连接端,223是撑杆,2230是滑轮一,224是辅助撑杆,2240是滑轮二。22 is a support ladder, 221 is a supporting section, 2211 is a vertical section, 2212 is a horizontal section, 222 is a connection end, 223 is a strut, 2230 is a pulley one, 224 is an auxiliary strut, and 2240 is a pulley two.

具体实施方式detailed description

本发明如图1-14所示,用于钢管塔1上法兰盘11的对接安装,所述法兰盘11设在钢管塔1的端面上、且法兰盘11上设有若干均匀分布的安装孔110,所述法兰盘11的下方固定连接且均布有若干加强筋111;所述辅助梯2包括活动挂架21和支撑梯22;As shown in Figures 1-14, the present invention is used for the butt joint installation of the flange 11 on the steel pipe tower 1. The flange 11 is arranged on the end face of the steel pipe tower 1, and the flange 11 is provided with several The mounting hole 110 of the flange plate 11 is fixedly connected and evenly distributed with a number of reinforcing ribs 111; the auxiliary ladder 2 includes a movable hanger 21 and a support ladder 22;

所述活动挂架21包括一对挂架和至少一滑轨组件213;所述挂架211顶部设有夹持组件214,所述夹持组件转动连接(可铰接或通过转销连接)在所述挂架顶部;所述滑轨组件213设在一对所述挂架之间,使得一对所述挂架通过滑轨组件213滑动连接;The movable hanger 21 includes a pair of hangers and at least one slide rail assembly 213; the top of the hanger 211 is provided with a clamping assembly 214, and the clamping assembly is rotatably connected (hinged or connected by a revolving pin) at the The top of the hanger; the slide rail assembly 213 is arranged between a pair of hangers, so that a pair of hangers are slidably connected by the slide rail assembly 213;

所述夹持组件包括基座214、固定夹板215、活动夹板216、螺杆217和手轮218,所述基座214转动连接在所述挂架顶部,所述固定夹板215固定连接在基座214的顶面上,所述活动夹板216活动连接在基座214的顶面上、且与固定夹板215相对设置,所述螺杆217的一端与固定夹板215相铰接,所述螺杆217的中部穿设于活动夹板216中、且与活动夹板216螺纹连接,所述手轮218固定连接在螺杆217远离固定夹板215的一端;这样,通过人工驱动手轮做旋转运动时,即可在螺杆的作用下驱动活动夹板朝向固定夹板滑移,从而最终夹住加强筋;进而有效避免了因开设眼孔而对加强筋结构做出破坏的问题,并有效避免了法兰盘加工成本的额外增加。The clamping assembly includes a base 214, a fixed splint 215, a movable splint 216, a screw rod 217 and a hand wheel 218, the base 214 is rotatably connected to the top of the hanger, and the fixed splint 215 is fixedly connected to the base 214 On the top surface of the base, the movable splint 216 is movably connected to the top surface of the base 214 and is arranged opposite to the fixed splint 215. One end of the screw rod 217 is hinged to the fixed splint 215, and the middle part of the screw rod 217 is pierced In the movable splint 216 and threaded with the movable splint 216, the handwheel 218 is fixedly connected to the end of the screw rod 217 away from the fixed splint 215; Drive the movable splint to slide towards the fixed splint, so as to finally clamp the reinforcing rib; thereby effectively avoiding the problem of damage to the structure of the reinforcing rib due to the opening of holes, and effectively avoiding the additional increase in the processing cost of the flange.

一对所述挂架分为挂架一211和挂架二212,所述支撑梯22固定连接在所述挂架一211远离所述挂架二212的一侧端面上;这样,挂架一和挂架二可通过滑轨组件进行相互滑动,同时使得支撑梯可随挂架一同步滑移,进而可在高空中作出位置改变,使得操作人员可简单、有效的对钢管塔上任意安装孔中的螺栓和螺母进行安装调节。A pair of hangers is divided into hanger one 211 and hanger two 212, and the support ladder 22 is fixedly connected to the side end face of the hanger one 211 away from the hanger two 212; like this, the hanger one The second hanger and the hanger can slide each other through the slide rail assembly, and at the same time, the support ladder can slide synchronously with the first hanger, and then the position can be changed at high altitude, so that the operator can simply and effectively install any installation hole on the steel pipe tower The bolts and nuts in the installation adjustment.

如图7-8所示,所述支撑梯22从上到下包括连为一体的承托段221和连接段222,所述连接段222与所述挂架一211固定连接,所述承托段221从上到下包括连为一体的垂直段2211和水平段2212;在现场使用时可站立在支撑梯的连接段上或坐在支撑梯的水平段上,同时支撑梯的垂直段可给操作人员的背部提供有效的支撑和防护。使得螺栓安装时可始终处在操作人员胸口以下,便于操作人员发力。As shown in Figures 7-8, the support ladder 22 includes a supporting section 221 and a connecting section 222 connected together from top to bottom, the connecting section 222 is fixedly connected to the hanger one 211, and the supporting Section 221 comprises vertical section 2211 and horizontal section 2212 connected as a whole from top to bottom; Can stand on the connecting section of support ladder or sit on the horizontal section of support ladder when using on-the-spot, the vertical section of support ladder can give simultaneously The operator's back provides effective support and protection. The bolts can always be below the operator's chest during installation, which is convenient for the operator to exert force.

所述支撑梯22的连接段222底端设有至少一撑杆223,所述撑杆223为伸缩杆,所述撑杆223远离所述支撑梯22的一端连接有水平设置的滑轮一2230;这样,可对撑杆的长度做出适应性调节,使得本案在用于不同规格的钢管塔时,滑轮一均可有效的抵住钢管塔的外壁。一方面,给支撑梯的底部提供了有效的支撑,提高了整体的稳定性及强度;另一方面,避免了支撑梯直接贴合在钢管塔的外壁上,留出了足够大的人员操作空间,提升了整体的可操作性及使用性。The bottom end of the connecting section 222 of the support ladder 22 is provided with at least one strut 223, the strut 223 is a telescopic rod, and the end of the strut 223 away from the support ladder 22 is connected with a horizontally arranged pulley 2230; In this way, the length of the strut can be adjusted adaptively, so that when the case is used for steel pipe towers of different specifications, the pulley one can effectively bear against the outer wall of the steel pipe tower. On the one hand, it provides effective support for the bottom of the support ladder, which improves the overall stability and strength; on the other hand, it avoids the support ladder from being directly attached to the outer wall of the steel pipe tower, leaving enough room for personnel to operate , improving the overall operability and usability.

所述支撑梯22的承托段的顶端设有至少一辅助撑杆224,所述辅助撑杆224远离支撑梯22的一端通过螺纹连接有连接杆,所述连接杆的底端连接有竖直设置的滑轮二2240。这样,可对滑轮二所在的高度进行方便的调节,使其在使用时可贴合于上侧的法兰盘的顶面上,从而使得滑轮一、滑轮二对支撑梯整体起导向作用的同时,具有一定程度的支撑作用。The top of the supporting section of the support ladder 22 is provided with at least one auxiliary strut 224, and the end of the auxiliary strut 224 away from the support ladder 22 is threadedly connected with a connecting rod, and the bottom end of the connecting rod is connected with a vertical Set the pulley two 2240. In this way, the height of the second pulley can be adjusted conveniently so that it can fit on the top surface of the upper flange when in use, so that the first pulley and the second pulley play a guiding role on the support ladder as a whole. , has a certain degree of support.

本发明中滑轨组件的第一种实施方式,所述滑轨组件213包括相互适配的弧形滑块2131和弧形滑槽2132;所述弧形滑块2131的截面呈T字形、且固定连接在所述挂架二212的端面上,所述弧形滑槽2132为T型槽、且固定连接在所述挂架一211的端面上。In the first embodiment of the slide rail assembly in the present invention, the slide rail assembly 213 includes an arc-shaped slider 2131 and an arc-shaped slide groove 2132 that are adapted to each other; the section of the arc-shaped slider 2131 is T-shaped, and It is fixedly connected to the end surface of the second hanger 212 , and the arc-shaped sliding groove 2132 is a T-shaped slot and fixedly connected to the end surface of the first hanger 211 .

本发明中滑轨组件的第二种实施方式,所述滑轨组件213包括相互适配的弧形凸棱和弧形燕尾槽;In the second embodiment of the slide rail assembly in the present invention, the slide rail assembly 213 includes arc-shaped ribs and arc-shaped dovetail grooves that are adapted to each other;

所述弧形凸棱的截面呈梯形、且固定连接在所述挂架一的端面上,所述弧形燕尾槽固定连接在所述挂架二的端面上。The cross-section of the arc-shaped rib is trapezoidal, and is fixedly connected to the end surface of the first hanger, and the arc-shaped dovetail groove is fixedly connected to the end surface of the second hanger.

所述固定夹板215朝向活动夹板216的端面和活动夹板216朝向固定夹板215的端面上均固定连接有防滑垫,所述防滑垫呈锯齿状或波浪状。Both the end surface of the fixed splint 215 facing the movable splint 216 and the end surface of the movable splint 216 facing the fixed splint 215 are fixedly connected with anti-slip pads, and the anti-slip pads are in a sawtooth or wave shape.

按以下步骤使用,如图9-14所示:Use the following steps, as shown in Figure 9-14:

1)、挂接:人工将辅助梯挂设在法兰盘上,并对撑杆的长度和滑轮二的高度进行调节,使得辅助梯稳定的挂接在法兰盘上;1) Mounting: Manually hang the auxiliary ladder on the flange, and adjust the length of the strut and the height of the pulley 2, so that the auxiliary ladder can be stably mounted on the flange;

2)、定位:人工旋动挂架一中的手轮,使得挂架一中的固定夹板和活动夹板相对运动并夹住某一加强筋;2) Positioning: Manually rotate the hand wheel in hanger one, so that the fixed splint and movable splint in hanger one move relatively and clamp a certain reinforcing rib;

3)、装钉:将螺栓和螺母装入辅助体邻近的至少一个安装孔中并锁紧,完成至少一个安装位置的安装;装钉时为保持状态的稳定,可将挂架一、挂架二同时夹住俩个或一个加强筋;3), nailing: put the bolts and nuts into at least one installation hole adjacent to the auxiliary body and lock them to complete the installation of at least one installation position; in order to keep the state stable during nailing, you can put the hanger 1, the hanger 2. Clamp two or one reinforcing rib at the same time;

4)、判断是否所有安装位置的安装均安装完毕:是,则进入步骤8);否,则进入步骤5);4), judge whether all installation locations are installed: yes, then go to step 8); no, go to step 5);

5)、进位:人工先推动挂架二,使其滑动至下一个加强筋的下方;再翻转并旋动挂架二中的手轮,使得挂架二中的固定夹板和活动夹板相对运动并夹住下一个加强筋;5) Carry: Manually push the hanger 2 to make it slide to the bottom of the next reinforcing rib; then turn over and rotate the hand wheel in the hanger 2, so that the fixed splint and the movable splint in the hanger 2 move relatively and Clamp the next rib;

6)、换位:人工先通过旋动挂架一中的手轮,使得挂架一中的固定夹板和活动夹板相分离,再对挂架一中的夹持组件进行翻转,使之与加强筋相交错,最后,拉住法兰盘通过摩擦力(人手与钢管塔的摩擦力、人身与支撑梯的摩擦力)及反作用力滑动支撑梯;6) Transposition: Manually rotate the hand wheel in hanger 1 to separate the fixed splint and movable splint in hanger 1, and then turn over the clamping assembly in hanger 1 to make it compatible with the reinforced The ribs are interlaced, and finally, pull the flange to slide the support ladder through friction (the friction between the human hand and the steel pipe tower, the friction between the person and the support ladder) and the reaction force;

7)、返回步骤2);7), return to step 2);

8)、收工:人工旋动挂架一以及挂架二中的手轮,使得挂架一和挂架二同时放开对加强筋的夹持,最后取下辅助体;完毕。8) Finish work: Manually rotate the handwheels in hanger 1 and hanger 2, so that hanger 1 and hanger 2 release the clamping of the reinforcing rib at the same time, and finally remove the auxiliary body; complete.

Claims (5)

1.一种新型辅助梯,用于钢管塔上法兰盘的对接安装,所述法兰盘设在钢管塔的端面上、且法兰盘上设有若干均匀分布的螺栓的安装孔,所述法兰盘的下方固定连接且均布有若干加强筋;其特征在于,所述辅助梯包括活动挂架和支撑梯;1. A new type of auxiliary ladder is used for the butt joint installation of the flange on the steel pipe tower. The flange is located on the end face of the steel pipe tower, and the flange is provided with some evenly distributed mounting holes for bolts. The bottom of the flange plate is fixedly connected and evenly distributed with some reinforcing ribs; it is characterized in that the auxiliary ladder includes a movable hanger and a support ladder; 所述活动挂架包括一对挂架和至少一滑轨组件;所述挂架顶部设有夹持组件,所述夹持组件转动连接在所述挂架顶部;所述滑轨组件设在一对所述挂架之间,使得一对所述挂架通过滑轨组件滑动连接;The movable hanger includes a pair of hangers and at least one slide rail assembly; the top of the hanger is provided with a clamping assembly, and the clamping assembly is rotatably connected to the top of the hanger; the slide rail assembly is arranged on a Between the hangers, a pair of hangers are slidably connected through a slide rail assembly; 所述夹持组件包括基座、固定夹板、活动夹板、螺杆和手轮,所述基座转动连接在所述挂架顶部,所述固定夹板固定连接在基座的顶面上,所述活动夹板活动连接在基座的顶面上、且与固定夹板相对设置,所述螺杆的一端与固定夹板相铰接,所述螺杆的中部穿设于活动夹板中、且与活动夹板螺纹连接,所述手轮固定连接在螺杆远离固定夹板的一端;The clamping assembly includes a base, a fixed splint, a movable splint, a screw and a hand wheel, the base is rotatably connected to the top of the hanger, the fixed splint is fixedly connected to the top surface of the base, and the movable The splint is movably connected to the top surface of the base and is arranged opposite to the fixed splint. One end of the screw is hinged to the fixed splint. The hand wheel is fixedly connected to the end of the screw rod away from the fixed splint; 一对所述挂架分为挂架一和挂架二,所述支撑梯固定连接在所述挂架一远离所述挂架二的一侧端面上;The pair of hangers are divided into hanger one and hanger two, and the support ladder is fixedly connected to the end face of the hanger one away from the hanger two; 所述支撑梯从上到下包括连为一体的承托段和连接段,所述连接段与所述挂架一固定连接,所述承托段从上到下包括连为一体的垂直段和水平段;The support ladder includes a connected supporting section and a connecting section from top to bottom, the connecting section is fixedly connected with the hanger, and the supporting section includes a connected vertical section and a connecting section from top to bottom. horizontal section; 所述支撑梯的连接段底端设有至少一撑杆,所述撑杆为伸缩杆,所述撑杆远离所述支撑梯的一端连接有水平设置的滑轮一;The bottom end of the connecting section of the support ladder is provided with at least one strut, the strut is a telescopic rod, and the end of the strut away from the support ladder is connected with a horizontally arranged pulley one; 所述支撑梯的承托段的顶端设有至少一辅助撑杆,所述辅助撑杆远离支撑梯的一端通过螺纹连接有连接杆,所述连接杆的底端连接有竖直设置的滑轮二。The top of the supporting section of the supporting ladder is provided with at least one auxiliary strut, the end of the auxiliary strut away from the supporting ladder is threadedly connected with a connecting rod, and the bottom end of the connecting rod is connected with a vertical pulley two . 2.根据权利要求1所述的一种新型辅助梯,其特征在于,所述滑轨组件包括相互适配的弧形滑块和弧形滑槽;所述弧形滑块的截面呈T字形、且固定连接在所述挂架二的端面上,所述弧形滑槽为T型槽、且固定连接在所述挂架一的端面上。2. A new type of auxiliary ladder according to claim 1, characterized in that, said slide rail assembly comprises an arc-shaped slide block and an arc-shaped chute adapted to each other; the section of said arc-shaped slide block is T-shaped , and is fixedly connected to the end surface of the second hanger, and the arc-shaped chute is a T-shaped slot, and is fixedly connected to the end surface of the first hanger. 3.根据权利要求1所述的一种新型辅助梯,其特征在于,所述滑轨组件包括相互适配的弧形凸棱和弧形燕尾槽;所述弧形凸棱的截面呈梯形、且固定连接在所述挂架一的端面上,所述弧形燕尾槽固定连接在所述挂架二的端面上。3. A new type of auxiliary ladder according to claim 1, characterized in that, said slide rail assembly includes arc-shaped ribs and arc-shaped dovetail grooves that are mutually adapted; the section of said arc-shaped ribs is trapezoidal, And it is fixedly connected to the end surface of the first hanger, and the arc-shaped dovetail groove is fixedly connected to the end surface of the second hanger. 4.根据权利要求1所述的一种新型辅助梯,其特征在于,所述固定夹板朝向活动夹板的端面和活动夹板朝向固定夹板的端面上均固定连接有防滑垫,所述防滑垫呈锯齿状或波浪状。4. A new type of auxiliary ladder according to claim 1, characterized in that, the end face of the fixed splint facing the movable splint and the end face of the movable splint facing the fixed splint are fixedly connected with anti-slip pads, and the anti-slip pads are sawtooth shaped or wavy. 5.一种根据权利要求1所述的新型辅助梯的使用方法,其特征在于,按以下步骤使用:5. A method for using the novel auxiliary ladder according to claim 1, characterized in that, it is used according to the following steps: 1)、挂接:人工将辅助梯挂设在法兰盘上,并对撑杆的长度和滑轮二的高度进行调节,使得辅助梯稳定的挂接在法兰盘上;1) Mounting: Manually hang the auxiliary ladder on the flange, and adjust the length of the strut and the height of the pulley 2, so that the auxiliary ladder can be stably mounted on the flange; 2)、定位:人工旋动挂架一中的手轮,使得挂架一中的固定夹板和活动夹板相对运动并夹住某一加强筋;2) Positioning: Manually rotate the hand wheel in hanger one, so that the fixed splint and movable splint in hanger one move relatively and clamp a certain reinforcing rib; 3)、装钉:将螺栓和螺母装入辅助体邻近的至少一个安装孔中并锁紧,完成至少一个安装位置的安装;3) Fixing: Install bolts and nuts into at least one installation hole adjacent to the auxiliary body and lock them to complete the installation of at least one installation position; 4)、判断是否所有安装位置的安装均安装完毕:是,则进入步骤8);否,则进入步骤5);4), judge whether all installation locations are installed: yes, then go to step 8); no, go to step 5); 5)、进位:人工先推动挂架二,使其滑动至下一个加强筋的下方;再翻转并旋动挂架二中的手轮,使得挂架二中的固定夹板和活动夹板相对运动并夹住下一个加强筋;5) Carry: Manually push the hanger 2 to make it slide to the bottom of the next reinforcing rib; then turn over and rotate the hand wheel in the hanger 2, so that the fixed splint and the movable splint in the hanger 2 move relatively and Clamp the next rib; 6)、换位:人工先通过旋动挂架一中的手轮,使得挂架一中的固定夹板和活动夹板相分离,再对挂架一中的夹持组件进行翻转,使之与加强筋相交错,最后,拉住法兰盘滑动支撑梯;6) Transposition: Manually rotate the hand wheel in hanger 1 to separate the fixed splint and movable splint in hanger 1, and then turn over the clamping assembly in hanger 1 to make it compatible with the reinforced The ribs are interlaced, and finally, pull the flange to slide the support ladder; 7)、返回步骤2);7), return to step 2); 8)、收工:人工旋动挂架一以及挂架二中的手轮,使得挂架一和挂架二同时放开对加强筋的夹持,最后取下辅助体;完毕。8) Finish work: Manually rotate the handwheels in hanger 1 and hanger 2, so that hanger 1 and hanger 2 release the clamping of the reinforcing rib at the same time, and finally remove the auxiliary body; complete.
CN201610883567.7A 2016-10-10 2016-10-10 A kind of novel mounting attachment and using method thereof Pending CN106246094A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610883567.7A CN106246094A (en) 2016-10-10 2016-10-10 A kind of novel mounting attachment and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610883567.7A CN106246094A (en) 2016-10-10 2016-10-10 A kind of novel mounting attachment and using method thereof

Publications (1)

Publication Number Publication Date
CN106246094A true CN106246094A (en) 2016-12-21

Family

ID=57611481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610883567.7A Pending CN106246094A (en) 2016-10-10 2016-10-10 A kind of novel mounting attachment and using method thereof

Country Status (1)

Country Link
CN (1) CN106246094A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108539663A (en) * 2018-06-11 2018-09-14 国网山东省电力公司烟台供电公司 A kind of Bird's Nest dismounting device
CN108847609A (en) * 2018-06-11 2018-11-20 国网山东省电力公司烟台供电公司 Bird's Nest removes device and its clamping head
CN110924850A (en) * 2019-12-09 2020-03-27 王小玲 Working method of climbing equipment for high-altitude construction of bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008253091A (en) * 2007-03-30 2008-10-16 Tokyo Electric Power Co Inc:The Step bolt mounting device for steel tower components, etc.
CN103291208A (en) * 2013-06-27 2013-09-11 国家电网公司 Auxiliary ladder of steel tube tower and using method thereof
CN105781408A (en) * 2014-12-24 2016-07-20 覃道锋 Simple energy-saving high-altitude manned cleaning system
CN206144452U (en) * 2016-10-10 2017-05-03 国网江苏省电力公司扬州市江都区供电公司 Novel supplementary ladder

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008253091A (en) * 2007-03-30 2008-10-16 Tokyo Electric Power Co Inc:The Step bolt mounting device for steel tower components, etc.
CN103291208A (en) * 2013-06-27 2013-09-11 国家电网公司 Auxiliary ladder of steel tube tower and using method thereof
CN105781408A (en) * 2014-12-24 2016-07-20 覃道锋 Simple energy-saving high-altitude manned cleaning system
CN206144452U (en) * 2016-10-10 2017-05-03 国网江苏省电力公司扬州市江都区供电公司 Novel supplementary ladder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108539663A (en) * 2018-06-11 2018-09-14 国网山东省电力公司烟台供电公司 A kind of Bird's Nest dismounting device
CN108847609A (en) * 2018-06-11 2018-11-20 国网山东省电力公司烟台供电公司 Bird's Nest removes device and its clamping head
CN108847609B (en) * 2018-06-11 2020-12-22 国网山东省电力公司烟台供电公司 Bird's nest removal device and its holding head
CN110924850A (en) * 2019-12-09 2020-03-27 王小玲 Working method of climbing equipment for high-altitude construction of bridge

Similar Documents

Publication Publication Date Title
CN210013134U (en) Attached lightweight bridge anti-collision guardrail formwork installation and dismantling device
CN210855067U (en) Portable cable well lid plays gallows
CN203669328U (en) Quick-disassembly high-altitude working hanging basket
CN206144452U (en) Novel supplementary ladder
CN203321304U (en) Auxiliary ladder of steel tube tower
CN207098462U (en) Box support frame is connect during a kind of power cable laying construction
CN212374717U (en) Power cable lifting device
CN109850823A (en) A solidly installed carrying tool for emergency repair of mains power
CN210337912U (en) Electrified construction ladder car of adjustable level railway
CN103291208B (en) Using method of auxiliary ladder of steel tube tower
CN211473327U (en) Building external climbing type building construction operation platform
CN204092878U (en) A safety belt suspension device that is convenient for quick erection
CN207048285U (en) A kind of portable hanging operating platform
CN206680097U (en) A kind of upper purlin pulley yoke
CN107069508B (en) Auxiliary tool for replacing post insulator of isolating switch under 110kV
CN112062021B (en) Combined distribution transformer hoisting device
CN205282997U (en) A overhaul device for supplying power transmission line
CN204782042U (en) Anti -falling device ascends a height in open air
CN210451082U (en) Hanging rod installation device in building
CN203607723U (en) Overhead operation platform of isolation switch in electrical network
CN210013553U (en) Holding pole suitable for assembling transmission line iron tower
CN115095733A (en) Gantry type anti-seismic clamping support hanger
CN108678650B (en) Modular protection frame is used in thermal power station construction
CN107855697B (en) Longitudinal seam welding and weld seam flaw detection operation device for pressure steel pipe and use method thereof
CN211368426U (en) Stay cable beam end anchor pressing traction operation platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221