CN108708544A - A kind of intelligentized multi-use architecture construction hanging basket - Google Patents

A kind of intelligentized multi-use architecture construction hanging basket Download PDF

Info

Publication number
CN108708544A
CN108708544A CN201810540234.3A CN201810540234A CN108708544A CN 108708544 A CN108708544 A CN 108708544A CN 201810540234 A CN201810540234 A CN 201810540234A CN 108708544 A CN108708544 A CN 108708544A
Authority
CN
China
Prior art keywords
plate
welded
protective
hanging basket
socket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810540234.3A
Other languages
Chinese (zh)
Other versions
CN108708544B (en
Inventor
田锋刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Xishan Sanjian Industry Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810540234.3A priority Critical patent/CN108708544B/en
Publication of CN108708544A publication Critical patent/CN108708544A/en
Application granted granted Critical
Publication of CN108708544B publication Critical patent/CN108708544B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32—Hoisting devices; Safety devices
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32—Hoisting devices; Safety devices
    • E04G3/325—Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00—Component parts or accessories for scaffolds
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00—Component parts or accessories for scaffolds
    • E04G5/001—Safety or protective measures against falling down relating to scaffoldings
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention provides a kind of intelligentized multi-use architecture construction hanging basket, including pedestal, left fender rod, right fender rod, first crossbar, second crossbar, third cross bar, elevator, safety lock, distribution box, protecting screen structure, protection plate structure, supporting bar structure, barrel structure and holder structure are adjusted, the left fender rod and right fender rod are respectively welded at the upper surface of pedestal, while being welded with third cross bar, second crossbar and first crossbar in the both sides up and down of upper end and front surface.Beneficial effects of the present invention are:Pass through the setting of protecting screen structure, be conducive to when carrying out high-altitude progress operation, the problem of can in the air falling from height to avoid tool and the people of surrounding are damaged, pass through the setting of protection plate structure, be conducive to when carrying out operation, the sundries such as the concrete fallen from building or dyestuff can be easily collected, and then protection can be played the role of.

Description

一种智能化的多功能建筑施工用吊篮An intelligent multifunctional hanging basket for building construction

技术领域technical field

本发明属于建筑施工用具技术领域,尤其涉及一种智能化的多功能建筑施工用吊篮。The invention belongs to the technical field of building construction tools, in particular to an intelligent multifunctional hanging basket for building construction.

背景技术Background technique

吊篮是一种能够替代传统脚手架,可减轻劳动强度,提高工作效率,并能够重复使用的新型高处作业设备,建筑吊篮多用于在高层、多层等高建筑的外墙进行施工、幕墙安装、保温施工和维修清洗外墙等高空作业中,同时可用于大型罐体、桥梁和大坝等工程的作业,使用本产品,可免搭脚手架,使施工成本大大降低,施工费用仅为传统脚手架的28%,而且工作效率大幅提高,吊篮操作灵活、移位容易、方便实用、安全可靠,现有技术为中国专利公开号为201711441461.2的一种建筑施工用吊篮所采用的技术方案是:包括吊篮主体,在所述吊篮主体的四周设有围栏;所述吊篮还包括两条滑槽、滑动块、安全固定带和安全绳,在所述吊篮主体底板上设有两条所述滑槽,在所述滑槽上设有所述滑动块,在所述滑动块的表面设有一挂环,所述安全固定带和安全绳连接,所述安全绳的另一端设有与所述挂环匹配的安全钩,在所述吊篮主体四周的围栏上设有踏板,沿所述围栏设有延伸挡板。The hanging basket is a new type of high-altitude operation equipment that can replace traditional scaffolding, reduce labor intensity, improve work efficiency, and can be reused. Construction hanging baskets are mostly used for construction on the exterior walls of high-rise, multi-storey buildings, and curtain walls. Installation, insulation construction, maintenance and cleaning of exterior walls and other high-altitude operations can also be used for large-scale tanks, bridges and dams. Using this product can avoid scaffolding, greatly reducing construction costs, and the construction cost is only the traditional one. 28% of the scaffolding, and the work efficiency is greatly improved, the hanging basket is flexible in operation, easy to shift, convenient and practical, safe and reliable. : comprise hanging basket main body, be provided with fence around described hanging basket main body; Described hanging basket also comprises two chutes, sliding block, safety fixing belt and safety rope, is provided with two on the described hanging basket main body bottom plate. The chute is provided with the sliding block on the chute, a hanging ring is provided on the surface of the sliding block, the safety fixing belt is connected with the safety rope, and the other end of the safety rope is provided with The safety hook matched with the hanging ring is provided with a pedal on the fence around the main body of the hanging basket, and an extension baffle is arranged along the fence.

但是,现有的建筑施工用吊篮还存在着防护效果差且不方便对下落的工具起到拦截的作用、不方便收集从建筑上下落的混凝土或染料、该吊篮的下端容易与建筑发生碰撞和不方便调节该吊篮的倾斜度的问题。However, the existing hanging baskets for building construction also have poor protection effect and are inconvenient to intercept the falling tools, inconvenient to collect concrete or dyes falling from the building, and the lower end of the hanging basket is easy to contact with the building Problems of collision and inconvenient adjustment of the inclination of the gondola.

因此,发明一种智能化的多功能建筑施工用吊篮显得非常必要。Therefore, it is very necessary to invent a kind of intelligent multifunctional building construction hanging basket.

发明内容Contents of the invention

为了解决上述技术问题,本发明提供一种智能化的多功能建筑施工用吊篮,以解决现有的建筑施工用吊篮防护效果差且不方便对下落的工具起到拦截的作用、不方便收集从建筑上下落的混凝土或染料、该吊篮的下端容易与建筑发生碰撞和不方便调节该吊篮的倾斜度的问题。一种智能化的多功能建筑施工用吊篮,包括底座,左防护杆,右防护杆,第一横杆,第二横杆,第三横杆,提升机,安全锁,配电箱,防护网结构,防护板结构,支撑杆结构,调节筒结构和放置盒结构,所述的左防护杆和右防护杆分别焊接在底座的上表面,同时在上端和正表面的上下两侧焊接有第三横杆、第二横杆和第一横杆;所述的提升机和安全锁分别安装在底座内部左右两侧的中上部和上部;所述的配电箱焊接在第二横杆和第三横杆正表面的纵向中间部位;所述的防护网结构分别安装在底座下表面的左右两侧,同时在内部的左右两侧安装有防护板结构;所述的支撑杆结构分别安装在第一横杆上表面的左右两侧;所述的调节筒结构分别安装在第三横杆上表面的左右两侧;所述的放置盒结构分别安装在第三横杆正表面的左右两侧;所述的防护网结构包括连接头,套接头,插接杆,调节螺栓,支撑绳和保护网,所述的套接头分别通过连接头焊接在底座下表面的左右两侧;所述的插接杆插入在套接头的内部,并通过调节螺栓固定住。In order to solve the above-mentioned technical problems, the present invention provides an intelligent multi-functional hanging basket for building construction to solve the problem that the existing hanging basket for building construction has poor protection effect and is inconvenient to intercept falling tools, which is inconvenient Concrete or dye falling from the building is collected, the lower end of the hanging basket is likely to collide with the building, and it is inconvenient to adjust the inclination of the hanging basket. An intelligent multi-functional hanging basket for building construction, including a base, a left protective bar, a right protective bar, a first crossbar, a second crossbar, a third crossbar, a hoist, a safety lock, a distribution box, a protective Net structure, protective plate structure, support rod structure, adjustment cylinder structure and placement box structure, the left protective rod and the right protective rod are respectively welded on the upper surface of the base, and at the same time, there are third cross bar, second cross bar and first cross bar; the hoist and safety lock are respectively installed in the middle upper part and the upper part of the left and right sides inside the base; the described distribution box is welded on the second cross bar and the third The longitudinal middle part of the front surface of the cross bar; the protective net structure is respectively installed on the left and right sides of the lower surface of the base, and the protective plate structure is installed on the left and right sides of the interior; the support rod structure is respectively installed on the first The left and right sides of the upper surface of the cross bar; the adjustment cylinder structure is respectively installed on the left and right sides of the upper surface of the third cross bar; the described placement box structure is respectively installed on the left and right sides of the front surface of the third cross bar; The protective net structure described above includes a connecting head, a sleeve joint, a plug-in rod, an adjustment bolt, a support rope and a protective net, and the described sleeve joint is respectively welded to the left and right sides of the lower surface of the base through the connecting head; the described plug-in rod Inserted into the inside of the socket and secured by the adjusting screw.

优选的,所述的防护板结构包括紧固板,收集板,连接边,连接垫和紧固螺栓,所述的收集板焊接在紧固板正表面的下部,同时在左右两端焊接有连接边;所述的紧固螺栓分别穿过连接垫与紧固板上表面的左右两侧螺纹连接。Preferably, the protective plate structure includes a fastening plate, a collecting plate, a connecting edge, a connecting pad and fastening bolts, the collecting plate is welded on the lower part of the front surface of the fastening plate, and at the same time, there are joints welded at the left and right ends edge; said fastening bolts pass through the connecting pads respectively and are threaded on the left and right sides of the upper surface of the fastening plate.

优选的,所述的支撑杆结构包括第一调节板,套接板,插接板,连接螺栓,第二调节板和支撑轮,所述的第一调节板分别焊接在第一横杆上表面的左右两侧,同时在内侧轴接有套接板;所述的插接板后端插入在套接板的内部,并通过连接螺栓固定住,同时在正表面的左右两侧焊接有第二调节板;所述的支撑轮轴接在第二调节板与第二调节板之间。Preferably, the support bar structure includes a first adjustment plate, a socket plate, a socket plate, connecting bolts, a second adjustment plate and support wheels, and the first adjustment plate is welded on the upper surface of the first cross bar respectively At the same time, there are socket plates on the inner side; the rear end of the socket plate is inserted into the inside of the socket plate and fixed by connecting bolts. At the same time, a second An adjustment plate; the support wheel shaft is connected between the second adjustment plate and the second adjustment plate.

优选的,所述的调节筒结构包括竖立板,旋转收纳筒,旋转条,插接架,套接管,固定螺栓和顶杆,所述的竖立板分别焊接在第三横杆上表面的左右两侧,同时在内壁的上部轴接有旋转收纳筒;所述的旋转条焊接在旋转收纳筒的外壁上;所述的插接架焊接在竖立板的右端;所述的套接管上端焊接有顶杆,下端套入在插接架的上端,并通过固定螺栓固定住。Preferably, the structure of the adjustment cylinder includes a vertical plate, a rotating storage tube, a rotating bar, a socket frame, a sleeve pipe, a fixing bolt and a push rod, and the vertical plates are respectively welded to the left and right sides of the upper surface of the third cross bar. At the same time, the upper part of the inner wall is axially connected with a rotating storage tube; the rotating bar is welded on the outer wall of the rotating storage tube; the socket frame is welded on the right end of the vertical plate; the upper end of the socket pipe is welded with a top The lower end of the rod is inserted into the upper end of the socket frame and fixed by a fixing bolt.

优选的,所述的放置盒结构包括挡板,左右保护边,下防护边,卡杆和磁石块,所述的挡板分别焊接在第三横杆正表面的左右两侧,同时在正表面的左右两侧和下部焊接有左右保护边和下防护边;所述的卡杆焊接在左右保护边与左右保护边之间。Preferably, the structure of the placement box includes a baffle, left and right protective edges, a lower protective edge, clamping rods and magnet blocks, and the baffles are respectively welded on the left and right sides of the front surface of the third cross bar, and at the same time The left and right sides and the lower part of the body are welded with left and right protective edges and a lower protective edge; the clamping rod is welded between the left and right protective edges and the left and right protective edges.

优选的,所述的保护网具体采用尼龙网,所述的保护网网孔的直径设置为一毫米至三毫米,所述的保护网通过支撑绳与插接杆连接。Preferably, the protection net is specifically made of a nylon net, the diameter of the mesh hole of the protection net is set to 1 mm to 3 mm, and the protection net is connected to the insertion rod through a support rope.

优选的,所述的插接杆插接在套接头的内部,并通过调节螺栓固定住。Preferably, the inserting rod is inserted into the sleeve joint and fixed by adjusting bolts.

优选的,所述的收集板具体采用不锈钢板,并使前端与建筑紧密接触,同时收集板的左右两端焊接有连接边。Preferably, the collecting plate is specifically made of stainless steel, and the front end is in close contact with the building, and the left and right ends of the collecting plate are welded with connecting edges.

优选的,所述的紧固螺栓穿过连接垫和保护网与紧固板的上表面螺纹连接。Preferably, the fastening bolts are screwed to the upper surface of the fastening plate through the connection pad and the protection net.

优选的,所述的套接板和插接板相适配,并通过连接螺栓固定住,所述的插接板正表面第二调节板内壁的支撑轮与建筑接触。Preferably, the socket plate and the socket plate are matched and fixed by connecting bolts, and the support wheels on the inner wall of the second adjustment plate on the front surface of the socket plate are in contact with the building.

优选的,所述的第一调节板设置有两个,所述的第一调节板内壁上轴接有套接板。Preferably, there are two first adjusting plates, and a socket plate is pivotally connected to the inner wall of the first adjusting plate.

优选的,所述的顶杆焊接在套接管内壁的上部,所述的套接管下端与插接架相适配,并通过固定螺栓紧固住,所述的顶杆上端与旋转条的外壁紧密接触。Preferably, the ejector rod is welded on the upper part of the inner wall of the socket pipe, the lower end of the socket pipe is adapted to the socket frame, and is fastened by fixing bolts, and the upper end of the ejector rod is tightly connected to the outer wall of the rotating bar touch.

优选的,所述的旋转收纳筒外壁上缠绕有升降该施建筑施工用吊篮的钢丝绳,所述的旋转收纳筒具体采用不锈钢筒。Preferably, the outer wall of the rotating storage tube is wound with a steel wire rope for lifting and lowering the construction basket, and the rotating storage tube is specifically a stainless steel tube.

优选的,所述的磁石块镶嵌在挡板正表面的纵向中间部位,同时挡板与卡杆对应。Preferably, the magnet block is inlaid in the longitudinal middle of the front surface of the baffle, and the baffle corresponds to the clamping rod.

与现有技术相比,本发明的有益效果为:Compared with prior art, the beneficial effect of the present invention is:

1.本发明中,所述的保护网具体采用尼龙网,所述的保护网网孔的直径设置为一毫米至三毫米,所述的保护网通过支撑绳与插接杆连接,有利于在进行高空进行作业时,可以避免工具从高空中下落并对周围的人们造成伤害的问题。1. In the present invention, the protective net specifically adopts a nylon net, the diameter of the mesh hole of the protective net is set to 1 mm to 3 mm, and the protective net is connected with the insertion rod through a support rope, which is beneficial to When working at heights, the problem of tools falling from heights and causing injuries to surrounding people can be avoided.

2.本发明中,所述的插接杆插接在套接头的内部,并通过调节螺栓固定住,有利于方便的调节套接头和插接杆的长度,进而更加方便的调节保护网的大小,进而增加了防护网结构的防护效果。2. In the present invention, the insertion rod is plugged into the inside of the sleeve joint and fixed by the adjusting bolt, which is beneficial to conveniently adjust the length of the sleeve joint and the insertion rod, and then more conveniently adjust the size of the protective net , thus increasing the protective effect of the protective net structure.

3.本发明中,所述的收集板具体采用不锈钢板,并使前端与建筑紧密接触,同时收集板的左右两端焊接有连接边,有利于在进行作业时,可以方便的收集从建筑上掉落的混凝土或者染料等杂物,进而可以起到防护的作用。3. In the present invention, the collecting plate is specifically made of stainless steel plate, and the front end is in close contact with the building. At the same time, the left and right ends of the collecting plate are welded with connecting edges, which is beneficial to conveniently collect from the building during operation. Falling concrete or dyes and other sundries can play a protective role.

4.本发明中,所述的紧固螺栓穿过连接垫和保护网与紧固板的上表面螺纹连接,有利于方的安装防护板结构,同时也方便的使用防护板结构。4. In the present invention, the fastening bolts pass through the connection pad and the protective net and are threadedly connected to the upper surface of the fastening plate, which facilitates the installation of the protective plate structure and facilitates the use of the protective plate structure.

5.本发明中,所述的套接板和插接板相适配,并通过连接螺栓固定住,所述的插接板正表面第二调节板内壁的支撑轮与建筑接触,有利于增加了该施建筑施工用吊篮的稳定性,进而避免了该施建筑施工用吊篮的下端与建筑发生碰撞,同时也避免了建筑或者施建筑施工用吊篮发生损坏的问题。5. In the present invention, the socket plate and the socket plate are matched and fixed by connecting bolts. The support wheels on the inner wall of the second adjustment plate on the front surface of the socket plate are in contact with the building, which is beneficial to increase the The stability of the hanging basket for building construction is improved, thereby avoiding the collision between the lower end of the hanging basket for building construction and the building, and also avoiding the problem of damage to the building or the hanging basket for building construction.

6.本发明中,所述的第一调节板设置有两个,所述的第一调节板内壁上轴接有套接板,有利于方便的调节支撑杆结构的倾斜度,同时也方便的使用支撑杆结构。6. In the present invention, the first adjusting plate is provided with two, and the inner wall of the first adjusting plate is axially connected with a sleeve plate, which is conducive to convenient adjustment of the inclination of the support rod structure, and is also convenient Use strut structures.

7.本发明中,所述的顶杆焊接在套接管内壁的上部,所述的套接管下端与插接架相适配,并通过固定螺栓紧固住,所述的顶杆上端与旋转条的外壁紧密接触,有利于方便的卡住旋转收纳筒,同时也可以调节该施建筑施工用吊篮上钢丝绳的长度,进而可以更加平稳的使用该施建筑施工用吊篮。7. In the present invention, the ejector rod is welded on the upper part of the inner wall of the socket pipe, the lower end of the socket pipe is adapted to the socket frame, and is fastened by fixing bolts, and the upper end of the ejector rod is connected to the rotating bar The outer wall of the structure is in close contact, which is conducive to conveniently clamping the rotating storage tube, and at the same time can also adjust the length of the steel wire rope on the hanging basket for construction, so that the hanging basket for construction can be used more smoothly.

8.本发明中,所述的旋转收纳筒外壁上缠绕有升降该施建筑施工用吊篮的钢丝绳,所述的旋转收纳筒具体采用不锈钢筒,有利于更加合理的使用调节筒结构,同时也可以起调节筒结构更加合理的使用。8. In the present invention, the outer wall of the rotating storage tube is wound with a wire rope for lifting and lowering the hanging basket for the building construction, and the rotating storage tube is specifically made of stainless steel tube, which is conducive to a more reasonable use of the adjustment tube structure, and at the same time It can be used more rationally by regulating the barrel structure.

9.本发明中,所述的磁石块镶嵌在挡板正表面的纵向中间部位,同时挡板与卡杆对应,有利于方便的放置在高空中需要使用的工具,进而增加了该该施建筑施工用吊篮的功能。9. In the present invention, the magnet block is inlaid in the longitudinal middle part of the front surface of the baffle plate, and the baffle plate corresponds to the clamping rod at the same time, which is conducive to conveniently placing the tools that need to be used in the high altitude, thereby increasing the number of constructions. The function of the hanging basket for construction.

附图说明Description of drawings

图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2是本发明的防护网结构的结构示意图。Fig. 2 is a structural schematic diagram of the protective net structure of the present invention.

图3是本发明的防护板结构的结构示意图。Fig. 3 is a structural schematic diagram of the protective plate structure of the present invention.

图4是本发明的支撑杆结构的结构示意图。Fig. 4 is a structural schematic diagram of the support rod structure of the present invention.

图5是本发明的调节筒结构的结构示意图。Fig. 5 is a structural schematic diagram of the structure of the regulating cylinder of the present invention.

图6是本发明的放置盒结构的结构示意图。Fig. 6 is a structural schematic diagram of the placement box structure of the present invention.

图中:In the picture:

1、底座;2、左防护杆;3、右防护杆;4、第一横杆;5、第二横杆;6、第三横杆;7、提升机;8、安全锁;9、配电箱;10、防护网结构;101、连接头;102、套接头;103、插接杆;104、调节螺栓;105、支撑绳;106、保护网;11、防护板结构;111、紧固板;112、收集板;113、连接边;114、连接垫;115、紧固螺栓;12、支撑杆结构;121、第一调节板;122、套接板;123、插接板;124、连接螺栓;125、第二调节板;126、支撑轮;13、调节筒结构;131、竖立板;132、旋转收纳筒;133、旋转条;134、插接架;135、套接管;136、固定螺栓;137、顶杆;14、放置盒结构;141、挡板;142、左右保护边;143、下防护边;144、卡杆;145、磁石块。1. Base; 2. Left protective bar; 3. Right protective bar; 4. First crossbar; 5. Second crossbar; 6. Third crossbar; 7. Hoist; 8. Safety lock; 9. Accessories Electric box; 10. Protective net structure; 101. Connector; 102. Sleeve joint; 103. Insertion rod; 104. Adjusting bolt; 105. Support rope; 106. Protective net; 11. Protective plate structure; 111. Fastening Plate; 112, collecting plate; 113, connecting edge; 114, connecting pad; 115, fastening bolt; 12, support rod structure; 121, first adjusting plate; 122, socket plate; Connecting bolt; 125, second adjusting plate; 126, supporting wheel; 13, adjusting cylinder structure; 131, erecting plate; 132, rotating storage tube; 133, rotating bar; Fixing bolt; 137, ejector rod; 14, placement box structure; 141, baffle plate; 142, left and right protection edges; 143, lower protection edge; 144, clamping rod; 145, magnet block.

具体实施方式Detailed ways

以下结合附图对本发明做进一步描述:The present invention will be further described below in conjunction with accompanying drawing:

实施例:Example:

如附图1至附图6所示As shown in Figure 1 to Figure 6

本发明提供一种智能化的多功能建筑施工用吊篮,包括底座1,左防护杆2,右防护杆3,第一横杆4,第二横杆5,第三横杆6,提升机7,安全锁8,配电箱9,防护网结构10,防护板结构11,支撑杆结构12,调节筒结构13和放置盒结构14,所述的左防护杆2和右防护杆3分别焊接在底座1的上表面,同时在上端和正表面的上下两侧焊接有第三横杆6、第二横杆5和第一横杆4;所述的提升机7和安全锁8分别安装在底座1内部左右两侧的中上部和上部;所述的配电箱9焊接在第二横杆5和第三横杆6正表面的纵向中间部位;所述的防护网结构10分别安装在底座1下表面的左右两侧,同时在内部的左右两侧安装有防护板结构11;所述的支撑杆结构12分别安装在第一横杆4上表面的左右两侧;所述的调节筒结构13分别安装在第三横杆6上表面的左右两侧;所述的放置盒结构14分别安装在第三横杆6正表面的左右两侧;所述的防护网结构10包括连接头101,套接头102,插接杆103,调节螺栓104,支撑绳105和保护网106,所述的套接头102分别通过连接头101焊接在底座1下表面的左右两侧;所述的插接杆103插入在套接头102的内部,并通过调节螺栓104固定住。The invention provides an intelligent multi-functional hanging basket for building construction, which includes a base 1, a left protective bar 2, a right protective bar 3, a first cross bar 4, a second cross bar 5, a third cross bar 6, and a hoist 7. Safety lock 8, distribution box 9, protective net structure 10, protective plate structure 11, support rod structure 12, adjustment cylinder structure 13 and placement box structure 14, the left protective rod 2 and the right protective rod 3 are welded respectively On the upper surface of the base 1, a third crossbar 6, a second crossbar 5 and a first crossbar 4 are welded on the upper end and the upper and lower sides of the front surface; the hoist 7 and the safety lock 8 are respectively installed on the base 1. The upper middle and upper parts of the left and right sides of the interior; the distribution box 9 is welded to the longitudinal middle of the front surface of the second crossbar 5 and the third crossbar 6; the protective net structure 10 is respectively installed on the base 1 The left and right sides of the lower surface are installed with protective plate structures 11 on the left and right sides of the interior; the support rod structure 12 is respectively installed on the left and right sides of the upper surface of the first cross bar 4; the adjustment cylinder structure 13 respectively installed on the left and right sides of the upper surface of the third crossbar 6; the described placement box structure 14 is respectively installed on the left and right sides of the front surface of the third crossbar 6; Joint 102, insertion rod 103, adjustment bolt 104, support rope 105 and protective net 106, the sleeve joints 102 are respectively welded on the left and right sides of the lower surface of the base 1 through the connection head 101; the insertion rod 103 is inserted into It is inside the sleeve joint 102 and is fixed by adjusting bolts 104 .

上述实施例中,具体的,所述的防护板结构11包括紧固板111,收集板112,连接边113,连接垫114和紧固螺栓115,所述的收集板112焊接在紧固板111正表面的下部,同时在左右两端焊接有连接边113;所述的紧固螺栓115分别穿过连接垫114与紧固板111上表面的左右两侧螺纹连接。In the above-mentioned embodiment, specifically, the described protective plate structure 11 includes a fastening plate 111, a collecting plate 112, a connecting edge 113, a connecting pad 114 and fastening bolts 115, and the collecting plate 112 is welded on the fastening plate 111 The lower part of the front surface is welded with connecting edges 113 at the left and right ends; the fastening bolts 115 are respectively passed through the connecting pads 114 and screwed to the left and right sides of the upper surface of the fastening plate 111 .

上述实施例中,具体的,所述的支撑杆结构12包括第一调节板121,套接板122,插接板123,连接螺栓124,第二调节板125和支撑轮126,所述的第一调节板121分别焊接在第一横杆4上表面的左右两侧,同时在内侧轴接有套接板122;所述的插接板123后端插入在套接板122的内部,并通过连接螺栓124固定住,同时在正表面的左右两侧焊接有第二调节板125;所述的支撑轮126轴接在第二调节板125与第二调节板125之间。In the above embodiment, specifically, the support rod structure 12 includes a first adjustment plate 121, a sleeve plate 122, an insertion plate 123, a connecting bolt 124, a second adjustment plate 125 and a support wheel 126, the first An adjustment plate 121 is respectively welded on the left and right sides of the upper surface of the first crossbar 4, and at the same time, a socket plate 122 is axially connected on the inner side; the rear end of the socket plate 123 is inserted into the inside of the socket plate 122, and passed The connecting bolts 124 are fixed, and the second adjusting plate 125 is welded on the left and right sides of the front surface; the support wheel 126 is pivotally connected between the second adjusting plate 125 and the second adjusting plate 125 .

上述实施例中,具体的,所述的调节筒结构13包括竖立板131,旋转收纳筒132,旋转条133,插接架134,套接管135,固定螺栓136和顶杆137,所述的竖立板131分别焊接在第三横杆6上表面的左右两侧,同时在内壁的上部轴接有旋转收纳筒132;所述的旋转条133焊接在旋转收纳筒132的外壁上;所述的插接架134焊接在竖立板131的右端;所述的套接管135上端焊接有顶杆137,下端套入在插接架134的上端,并通过固定螺栓136固定住。In the above embodiment, specifically, the adjustment cylinder structure 13 includes a vertical plate 131, a rotating storage cylinder 132, a rotating bar 133, a socket frame 134, a socket pipe 135, a fixing bolt 136 and a push rod 137. The plates 131 are respectively welded on the left and right sides of the upper surface of the third cross bar 6, and at the same time, the upper part of the inner wall is pivotally connected with a rotating storage tube 132; the rotating bar 133 is welded on the outer wall of the rotating receiving tube 132; The connecting frame 134 is welded on the right end of the vertical plate 131 ;

上述实施例中,具体的,所述的放置盒结构14包括挡板141,左右保护边142,下防护边143,卡杆144和磁石块145,所述的挡板141分别焊接在第三横杆6正表面的左右两侧,同时在正表面的左右两侧和下部焊接有左右保护边142和下防护边143;所述的卡杆144焊接在左右保护边142与左右保护边142之间。In the above embodiment, specifically, the placement box structure 14 includes a baffle 141, a left and right protection edge 142, a lower protection edge 143, a clamping rod 144 and a magnet block 145, and the baffle 141 is respectively welded on the third transverse The left and right sides of the front surface of the rod 6 are welded with left and right protective edges 142 and lower protective edges 143 on the left and right sides and the lower part of the front surface; .

上述实施例中,具体的,所述的保护网106具体采用尼龙网,所述的保护网106网孔的直径设置为一毫米至三毫米,所述的保护网106通过支撑绳105与插接杆103连接,有利于在进行高空进行作业时,可以避免工具从高空中下落并对周围的人们造成伤害的问题。In the above embodiment, specifically, the protective net 106 is specifically made of a nylon net, and the diameter of the mesh of the protective net 106 is set to one millimeter to three millimeters, and the described protective net 106 is plugged with the support rope 105 The rod 103 is connected, which is beneficial to avoid the problem that the tool falls from a high altitude and causes harm to people around when working at a high altitude.

上述实施例中,具体的,所述的插接杆103插接在套接头102的内部,并通过调节螺栓104固定住,有利于方便的调节套接头102和插接杆103的长度,进而更加方便的调节保护网106的大小,进而增加了防护网结构10的防护效果。In the above embodiment, specifically, the insertion rod 103 is plugged into the inside of the sleeve joint 102 and fixed by the adjusting bolt 104, which is conducive to conveniently adjusting the length of the sleeve joint 102 and the insertion rod 103, and furthermore The size of the protective net 106 can be adjusted conveniently, thereby increasing the protective effect of the protective net structure 10 .

上述实施例中,具体的,所述的收集板112具体采用不锈钢板,并使前端与建筑紧密接触,同时收集板112的左右两端焊接有连接边113,有利于在进行作业时,可以方便的收集从建筑上掉落的混凝土或者染料等杂物,进而可以起到防护的作用。In the above embodiment, specifically, the collecting plate 112 is specifically made of stainless steel, and the front end is in close contact with the building. At the same time, the left and right ends of the collecting plate 112 are welded with connecting edges 113, which is beneficial to facilitate operation. It collects debris such as concrete or dyes falling from the building, which can then play a protective role.

上述实施例中,具体的,所述的紧固螺栓115穿过连接垫114和保护网106与紧固板111的上表面螺纹连接,有利于方的安装防护板结构11,同时也方便的使用防护板结构11。In the above embodiment, specifically, the fastening bolts 115 pass through the connection pad 114 and the protective net 106 and are screwed to the upper surface of the fastening plate 111, which is conducive to the convenient installation of the protective plate structure 11 and is also convenient to use. Shield structure 11.

上述实施例中,具体的,所述的套接板122和插接板123相适配,并通过连接螺栓124固定住,所述的插接板123正表面第二调节板125内壁的支撑轮126与建筑接触,有利于增加了该施建筑施工用吊篮的稳定性,进而避免了该施建筑施工用吊篮的下端与建筑发生碰撞,同时也避免了建筑或者施建筑施工用吊篮发生损坏的问题。In the above embodiment, specifically, the socket plate 122 and the socket plate 123 are adapted and fixed by the connecting bolts 124, and the support wheel on the inner wall of the second adjustment plate 125 on the front surface of the socket plate 123 126 is in contact with the building, which is beneficial to increase the stability of the building construction hanging basket, thereby avoiding the collision between the lower end of the building construction hanging basket and the building, and also avoiding the collision between the building or the building construction hanging basket. Corruption problem.

上述实施例中,具体的,所述的第一调节板121设置有两个,所述的第一调节板121内壁上轴接有套接板122,有利于方便的调节支撑杆结构12的倾斜度,同时也方便的使用支撑杆结构12。In the above embodiment, specifically, there are two first adjustment plates 121, and the inner wall of the first adjustment plate 121 is pivotally connected with a sleeve plate 122, which is beneficial to conveniently adjust the inclination of the support rod structure 12. degree, and it is also convenient to use the support rod structure 12 simultaneously.

上述实施例中,具体的,所述的顶杆137焊接在套接管135内壁的上部,所述的套接管135下端与插接架134相适配,并通过固定螺栓136紧固住,所述的顶杆137上端与旋转条133的外壁紧密接触,有利于方便的卡住旋转收纳筒132,同时也可以调节该施建筑施工用吊篮上钢丝绳的长度,进而可以更加平稳的使用该施建筑施工用吊篮。In the above embodiment, specifically, the ejector rod 137 is welded on the upper part of the inner wall of the socket pipe 135, and the lower end of the socket pipe 135 is adapted to the socket frame 134, and is fastened by the fixing bolt 136. The upper end of the ejector rod 137 is in close contact with the outer wall of the rotating bar 133, which is conducive to conveniently blocking the rotating storage tube 132, and can also adjust the length of the steel wire rope on the hanging basket for the construction of the construction, so that the construction of the construction can be used more smoothly. Baskets for construction.

上述实施例中,具体的,所述的旋转收纳筒132外壁上缠绕有升降该施建筑施工用吊篮的钢丝绳,所述的旋转收纳筒132具体采用不锈钢筒,有利于更加合理的使用调节筒结构13,同时也可以起调节筒结构13更加合理的使用。In the above embodiment, specifically, the outer wall of the rotating storage tube 132 is wound with a steel wire rope for lifting and lowering the construction basket, and the rotating storage tube 132 is specifically made of a stainless steel tube, which is conducive to a more reasonable use of the adjustment tube. Structure 13 can also play the more reasonable use of regulating cylinder structure 13 simultaneously.

上述实施例中,具体的,所述的磁石块145镶嵌在挡板141正表面的纵向中间部位,同时挡板141与卡杆144对应,有利于方便的放置在高空中需要使用的工具,进而增加了该该施建筑施工用吊篮的功能。In the above embodiment, specifically, the magnet block 145 is inlaid in the longitudinal middle of the front surface of the baffle plate 141, and the baffle plate 141 corresponds to the clamping rod 144, which is conducive to conveniently placing tools that need to be used high in the sky, and then The function of the hanging basket for the building construction has been increased.

工作原理working principle

本发明的工作原理:在使用时,先拉伸插接杆103和套接头102,当插接杆103和套接头102处于合适的长度后,拧紧调节螺栓104即可完成固定,完成固定后再使保护网106通过支撑绳105安装在插接杆103的外壁上,这样即可在高空中进行工作时,可以避免工具掉落并对周围环境或者人们造成损坏的问题,当完成初步安装后,再使紧固板111与保护网106的下表面紧密接触,同时拧紧紧固螺栓115即可完成固定,完成固定后收集板112与建筑墙壁紧密接触,这样在工作时,可以方便的收集掉落的混凝土或者染料,在升降前,当需要避免该建筑施工用吊篮与墙壁发生碰撞时,先将套接板122和插接板123拉伸到合适的长度,然后拧紧连接螺栓124,同时支撑轮126与建筑接触,这样在升降时可以避免该建筑施工用吊篮与墙壁发生碰撞的问题,在进行升降后,通过旋转条133带动旋转收纳筒132旋转,同时该建筑施工用吊篮上的钢丝绳缠绕在旋转收纳筒132的外壁上,完成调节后再将插接架134和套接管135拉伸到合适的长度,同时同时顶杆137与旋转条133紧密接触,然后再次拧紧固定螺栓136上的螺栓即可完成固定,在进行使用时,工作人员可以方便的将工具放置到挡板141的内侧即可进行使用。Working principle of the present invention: when in use, first stretch the insertion rod 103 and the sleeve joint 102, when the insertion rod 103 and the sleeve joint 102 are at a suitable length, tighten the adjusting bolt 104 to complete the fixation, and then The protection net 106 is installed on the outer wall of the insertion rod 103 through the support rope 105, so that when working at a high altitude, the problem of the tool falling and causing damage to the surrounding environment or people can be avoided. After the preliminary installation is completed, Then the fastening plate 111 is in close contact with the lower surface of the protective net 106, and the fastening bolt 115 is tightened at the same time to complete the fixation. After the fixation is completed, the collecting plate 112 is in close contact with the building wall, so that it can be conveniently collected during work. Concrete or dye, before lifting, when needing to avoid this building construction with the hanging basket colliding with the wall, first stretch the socket plate 122 and the socket plate 123 to a suitable length, then tighten the connecting bolts 124, and support Wheel 126 is in contact with the building, so that the problem of collision between the hanging basket for building construction and the wall can be avoided when lifting. The steel wire rope is wound on the outer wall of the rotating storage tube 132. After the adjustment is completed, the socket frame 134 and the sleeve pipe 135 are stretched to a suitable length. The bolts can be fixed, and when in use, the staff can conveniently place the tool on the inner side of the baffle plate 141 for use.

利用本发明所述的技术方案,或本领域的技术人员在本发明技术方案的启发下,设计出类似的技术方案,而达到上述技术效果的,均是落入本发明的保护范围。Utilize the technical solution described in the present invention, or those skilled in the art design a similar technical solution under the inspiration of the technical solution of the present invention, and achieve the above-mentioned technical effect, all fall into the protection scope of the present invention.

Claims (10)

1.一种智能化的多功能建筑施工用吊篮,其特征在于,该智能化的多功能建筑施工用吊篮,包括底座(1),左防护杆(2),右防护杆(3),第一横杆(4),第二横杆(5),第三横杆(6),提升机(7),安全锁(8),配电箱(9),防护网结构(10),防护板结构(11),支撑杆结构(12),调节筒结构(13)和放置盒结构(14),所述的左防护杆(2)和右防护杆(3)分别焊接在底座(1)的上表面,同时在上端和正表面的上下两侧焊接有第三横杆(6)、第二横杆(5)和第一横杆(4);所述的提升机(7)和安全锁(8)分别安装在底座(1)内部左右两侧的中上部和上部;所述的配电箱(9)焊接在第二横杆(5)和第三横杆(6)正表面的纵向中间部位;所述的防护网结构(10)分别安装在底座(1)下表面的左右两侧,同时在内部的左右两侧安装有防护板结构(11);所述的支撑杆结构(12)分别安装在第一横杆(4)上表面的左右两侧;所述的调节筒结构(13)分别安装在第三横杆(6)上表面的左右两侧;所述的放置盒结构(14)分别安装在第三横杆(6)正表面的左右两侧;所述的防护网结构(10)包括连接头(101),套接头(102),插接杆(103),调节螺栓(104),支撑绳(105)和保护网(106),所述的套接头(102)分别通过连接头(101)焊接在底座(1)下表面的左右两侧;所述的插接杆(103)插入在套接头(102)的内部,并通过调节螺栓(104)固定住;所述的防护板结构(11)包括紧固板(111),收集板(112),连接边(113),连接垫(114)和紧固螺栓(115),所述的收集板(112)焊接在紧固板(111)正表面的下部,同时在左右两端焊接有连接边(113);所述的紧固螺栓(115)分别穿过连接垫(114)与紧固板(111)上表面的左右两侧螺纹连接;所述的支撑杆结构(12)包括第一调节板(121),套接板(122),插接板(123),连接螺栓(124),第二调节板(125)和支撑轮(126),所述的第一调节板(121)分别焊接在第一横杆(4)上表面的左右两侧,同时在内侧轴接有套接板(122);所述的插接板(123)后端插入在套接板(122)的内部,并通过连接螺栓(124)固定住,同时在正表面的左右两侧焊接有第二调节板(125);所述的支撑轮(126)轴接在第二调节板(125)与第二调节板(125)之间。1. An intelligent multifunctional hanging basket for building construction, characterized in that the intelligent multifunctional hanging basket for building construction includes a base (1), a left protective pole (2), and a right protective pole (3) , the first cross bar (4), the second cross bar (5), the third cross bar (6), hoist (7), safety lock (8), distribution box (9), protective net structure (10) , the protective plate structure (11), the support rod structure (12), the adjustment cylinder structure (13) and the placement box structure (14), the left protective rod (2) and the right protective rod (3) are respectively welded on the base ( 1) on the upper surface, at the same time, the third crossbar (6), the second crossbar (5) and the first crossbar (4) are welded on the upper end and the upper and lower sides of the front surface; the hoist (7) and The safety locks (8) are respectively installed on the middle, upper and upper parts of the left and right sides of the base (1); the distribution box (9) is welded on the front surfaces of the second crossbar (5) and the third crossbar (6) The longitudinal middle part; the protective net structure (10) is respectively installed on the left and right sides of the lower surface of the base (1), and the protective plate structure (11) is installed on the left and right sides of the interior; the support rod structure (12) are respectively installed on the left and right sides of the upper surface of the first crossbar (4); the said adjusting cylinder structure (13) is respectively installed on the left and right sides of the upper surface of the third crossbar (6); The box structure (14) is respectively installed on the left and right sides of the front surface of the third cross bar (6); the protective net structure (10) includes a connector (101), a sleeve joint (102), and a plug rod (103) , adjusting bolts (104), support ropes (105) and protection nets (106), the sleeve joints (102) are respectively welded to the left and right sides of the lower surface of the base (1) through the connectors (101); the The inserting rod (103) is inserted into the sleeve joint (102) and fixed by the adjusting bolt (104); the protective plate structure (11) includes a fastening plate (111), a collecting plate (112), and a connecting edge (113), connecting pad (114) and fastening bolt (115), the collection plate (112) is welded on the lower part of the front surface of the fastening plate (111), and the connecting edge (113) is welded at the left and right ends ); the fastening bolts (115) pass through the connecting pads (114) and are screwed to the left and right sides of the upper surface of the fastening plate (111); the support rod structure (12) includes a first adjustment plate ( 121), socket plate (122), socket plate (123), connecting bolts (124), second adjustment plate (125) and support wheel (126), and the first adjustment plate (121) is welded on The left and right sides of the upper surface of the first cross bar (4) are connected with socket plates (122) on the inner side; the rear end of the socket plate (123) is inserted into the inside of the socket plate (122), and It is fixed by connecting bolts (124), and at the same time, a second adjustment plate (125) is welded on the left and right sides of the front surface; the support wheel (126) is axially connected to the second adjustment plate (125) (125) between . 2.如权利要求1所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的调节筒结构(13)包括竖立板(131),旋转收纳筒(132),旋转条(133),插接架(134),套接管(135),固定螺栓(136)和顶杆(137),所述的竖立板(131)分别焊接在第三横杆(6)上表面的左右两侧,同时在内壁的上部轴接有旋转收纳筒(132);所述的旋转条(133)焊接在旋转收纳筒(132)的外壁上;所述的插接架(134)焊接在竖立板(131)的右端;所述的套接管(135)上端焊接有顶杆(137),下端套入在插接架(134)的上端,并通过固定螺栓(136)固定住。2. The intelligent multifunctional building construction hanging basket according to claim 1, characterized in that, the adjustment cylinder structure (13) includes a vertical plate (131), a rotating storage cylinder (132), a rotating bar ( 133), socket frame (134), socket pipe (135), fixing bolt (136) and ejector rod (137), and the vertical plate (131) is respectively welded on the left and right sides of the upper surface of the third crossbar (6) On both sides, a rotating storage cylinder (132) is connected to the upper part of the inner wall at the same time; the rotating bar (133) is welded on the outer wall of the rotating storage cylinder (132); the insertion frame (134) is welded on the vertical The right end of the plate (131); the upper end of the socket pipe (135) is welded with a push rod (137), and the lower end is inserted into the upper end of the socket frame (134), and fixed by a fixing bolt (136). 3.如权利要求1所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的放置盒结构(14)包括挡板(141),左右保护边(142),下防护边(143),卡杆(144)和磁石块(145),所述的挡板(141)分别焊接在第三横杆(6)正表面的左右两侧,同时在正表面的左右两侧和下部焊接有左右保护边(142)和下防护边(143);所述的卡杆(144)焊接在左右保护边(142)与左右保护边(142)之间。3. The intelligent multifunctional building construction hanging basket according to claim 1, characterized in that, the placement box structure (14) includes a baffle (141), left and right protection sides (142), a bottom protection side (143), clamping bar (144) and magnet block (145), described baffle plate (141) is welded on the left and right sides of the front surface of the third crossbar (6) respectively, simultaneously on the left and right sides of the front surface and The lower part is welded with left and right protective edges (142) and lower protective edges (143); the clamping rod (144) is welded between the left and right protective edges (142) and the left and right protective edges (142). 4.如权利要求1所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的保护网(106)具体采用尼龙网,所述的保护网(106)网孔的直径设置为一毫米至三毫米,所述的保护网(106)通过支撑绳(105)与插接杆(103)连接。4. The intelligent multifunctional building construction hanging basket according to claim 1, characterized in that, the protective net (106) is specifically made of nylon net, and the diameter of the mesh of the protective net (106) is set 1 mm to 3 mm, the protection net (106) is connected with the insertion rod (103) through the support rope (105). 5.如权利要求1所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的插接杆(103)插接在套接头(102)的内部,并通过调节螺栓(104)固定住。5. The intelligent multi-functional building construction hanging basket according to claim 1, characterized in that, the insertion rod (103) is inserted into the inside of the sleeve joint (102), and is adjusted by the adjustment bolt (104) )fix. 6.如权利要求1所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的收集板(112)具体采用不锈钢板,并使前端与建筑紧密接触,同时收集板(112)的左右两端焊接有连接边(113)。6. The intelligent multifunctional building construction hanging basket according to claim 1, characterized in that, the collecting plate (112) is specifically made of stainless steel plate, and the front end is in close contact with the building, while the collecting plate (112) ) are welded with connecting edges (113) at the left and right ends. 7.如权利要求1所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的套接板(122)和插接板(123)相适配,并通过连接螺栓(124)固定住,所述的插接板(123)正表面第二调节板(125)内壁的支撑轮(126)与建筑接触。7. The intelligent multifunctional building construction hanging basket according to claim 1, characterized in that, the socket plate (122) and the socket plate (123) are matched, and are connected by connecting bolts (124) ) is fixed, and the support wheel (126) on the inner wall of the second adjustment plate (125) on the front surface of the plug-in plate (123) is in contact with the building. 8.如权利要求2所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的顶杆(137)焊接在套接管(135)内壁的上部,所述的套接管(135)下端与插接架(134)相适配,并通过固定螺栓(136)紧固住,所述的顶杆(137)上端与旋转条(133)的外壁紧密接触。8. The intelligent multifunctional building construction hanging basket according to claim 2, characterized in that, the push rod (137) is welded on the upper part of the inner wall of the socket pipe (135), and the socket pipe (135) ) lower end is adapted to the socket frame (134) and fastened by fixing bolts (136), and the upper end of the push rod (137) is in close contact with the outer wall of the rotating bar (133). 9.如权利要求2所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的旋转收纳筒(132)外壁上缠绕有升降该施建筑施工用吊篮的钢丝绳,所述的旋转收纳筒(132)具体采用不锈钢筒。9. The intelligent multifunctional building construction hanging basket according to claim 2, characterized in that, the outer wall of the rotating storage tube (132) is wound with a wire rope for lifting and lowering the building construction hanging basket, and the The rotary receiving tube (132) specifically adopts a stainless steel tube. 10.如权利要求3所述的智能化的多功能建筑施工用吊篮,其特征在于,所述的磁石块(145)镶嵌在挡板(141)正表面的纵向中间部位,同时挡板(141)与卡杆(144)对应。10. The intelligent multifunctional building construction hanging basket according to claim 3, characterized in that, the magnet block (145) is inlaid in the longitudinal middle part of the front surface of the baffle (141), and at the same time the baffle (141) 141) corresponds to the clamping rod (144).
CN201810540234.3A 2018-05-30 2018-05-30 Intelligent multi-use architecture hanging flower basket for construction Expired - Fee Related CN108708544B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810540234.3A CN108708544B (en) 2018-05-30 2018-05-30 Intelligent multi-use architecture hanging flower basket for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810540234.3A CN108708544B (en) 2018-05-30 2018-05-30 Intelligent multi-use architecture hanging flower basket for construction

Publications (2)

Publication Number Publication Date
CN108708544A true CN108708544A (en) 2018-10-26
CN108708544B CN108708544B (en) 2020-08-21

Family

ID=63870881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810540234.3A Expired - Fee Related CN108708544B (en) 2018-05-30 2018-05-30 Intelligent multi-use architecture hanging flower basket for construction

Country Status (1)

Country Link
CN (1) CN108708544B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080515A (en) * 2019-04-16 2019-08-02 筑邦建设集团股份有限公司 For construction safety protective device
CN110735400A (en) * 2019-10-22 2020-01-31 中国一冶集团有限公司 Protection mechanism and protection construction method for special-shaped structures

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291629A (en) * 2005-04-13 2006-10-26 Chuden Kogyo Kk Working scaffold device
CN202864617U (en) * 2012-09-24 2013-04-10 天津庆丰顺建筑机械有限公司 Rope-twisting-resistant hanging basket
CN205400014U (en) * 2016-02-26 2016-07-27 杜好伟 Hanging flower basket device for construction
KR20170001001U (en) * 2015-09-08 2017-03-16 현대엔지니어링 주식회사 Built Type Scaffold having Fall and Drop Prevention Net
CN107119898A (en) * 2017-05-09 2017-09-01 广东联高技术推广服务有限公司 A kind of building construction hanging basket
CN107859315A (en) * 2017-11-03 2018-03-30 北京中易房建筑工程有限公司 Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291629A (en) * 2005-04-13 2006-10-26 Chuden Kogyo Kk Working scaffold device
CN202864617U (en) * 2012-09-24 2013-04-10 天津庆丰顺建筑机械有限公司 Rope-twisting-resistant hanging basket
KR20170001001U (en) * 2015-09-08 2017-03-16 현대엔지니어링 주식회사 Built Type Scaffold having Fall and Drop Prevention Net
CN205400014U (en) * 2016-02-26 2016-07-27 杜好伟 Hanging flower basket device for construction
CN107119898A (en) * 2017-05-09 2017-09-01 广东联高技术推广服务有限公司 A kind of building construction hanging basket
CN107859315A (en) * 2017-11-03 2018-03-30 北京中易房建筑工程有限公司 Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080515A (en) * 2019-04-16 2019-08-02 筑邦建设集团股份有限公司 For construction safety protective device
CN110080515B (en) * 2019-04-16 2021-04-16 筑邦建设集团股份有限公司 Safety protection device for building construction
CN110735400A (en) * 2019-10-22 2020-01-31 中国一冶集团有限公司 Protection mechanism and protection construction method for special-shaped structures
CN110735400B (en) * 2019-10-22 2021-10-01 中国一冶集团有限公司 Special-shaped structure protection mechanism and protection construction method

Also Published As

Publication number Publication date
CN108708544B (en) 2020-08-21

Similar Documents

Publication Publication Date Title
CN104993421B (en) A kind of portable pay-off crossing frame
CN108708544B (en) Intelligent multi-use architecture hanging flower basket for construction
CN204767097U (en) High altitude construction safety belt linkage
CN110805249A (en) Indoor scaffold with protection structure
CN109084154A (en) A kind of liquid crystal display
CN206487126U (en) A kind of scaffold for the architectural engineering being easily installed
CN107394669B (en) A kind of multifunction power overhaul of the equipments frame being moved easily
CN212053859U (en) Horizontal overhanging flexible protective net for construction of main structure of building
CN208122242U (en) A kind of shrinkable steel building platform device for high-altitude operation
CN207131172U (en) Windproof fence rack
CN207330285U (en) A kind of removable spider-man's lifting-point device
CN207484933U (en) A kind of hanging basket for building
CN217975496U (en) Construction elevator well protective structure is built to building room
CN201495788U (en) Safety net system
CN206957566U (en) A kind of combined type steps on bar repairing Anti-slipping ladder
CN208950347U (en) A kind of civic building construction safety net
CN221609418U (en) A construction frame for interior decoration with a safety mechanism
CN221856288U (en) A foldable and assembled cantilevered protective shed
CN216476248U (en) A hanging basket for construction engineering with adjustable use area
CN209147117U (en) A kind of dry bottom hopper inspection platform
CN214659903U (en) A cat ladder for safety engineering
CN211421789U (en) Scaffold for housing construction
CN208858175U (en) A kind of wallboard cleaning bracket
CN203008504U (en) Hard rod type protective barrier
CN221191178U (en) Wire rope type safety barrier for emergency repair of mine vertical shaft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Guo Xiao

Inventor after: Zhang Jingyi

Inventor after: Ma Tiejun

Inventor after: Tian Fenggang

Inventor before: Tian Fenggang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20200724

Address after: No.107, Xigang West Road, Zhangjing, Xibei Town, Xishan District, Wuxi City, Jiangsu Province

Applicant after: Wuxi Xishan Sanjian Industry Co.,Ltd.

Address before: 713300 the four groups of Great Wall village, Tai Wall Township, Qianxian County, Xianyang, Shaanxi

Applicant before: Tian Fenggang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200821

CF01 Termination of patent right due to non-payment of annual fee