CN207245138U - Boat scaffold adjustable in pitch - Google Patents
Boat scaffold adjustable in pitch Download PDFInfo
- Publication number
- CN207245138U CN207245138U CN201721100809.7U CN201721100809U CN207245138U CN 207245138 U CN207245138 U CN 207245138U CN 201721100809 U CN201721100809 U CN 201721100809U CN 207245138 U CN207245138 U CN 207245138U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- wall
- channel steel
- standing screw
- adjustable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种间距可调的悬挂式脚手架。The utility model relates to a hanging scaffold with adjustable spacing.
背景技术Background technique
建筑行业,无论是高楼大厦还是平房,在建造过程中都用到了脚手架作为施工平台,方便施工者进行施工,脚手架指施工现场为工人操作并解决垂直和水平运输而搭设的支架。传统脚手架的安装需要从底层开始,一层一层向上叠装,不仅安装麻烦,耗材量大,而且消耗工人劳动量大,生产效率极低;同时整栋楼的脚手架与墙体之间的间距是固定的,无法调节,不利于施工和安装操作。In the construction industry, whether it is a high-rise building or a bungalow, scaffolding is used as a construction platform during the construction process, which is convenient for builders to carry out construction. Scaffolding refers to the support set up on the construction site for workers to operate and solve vertical and horizontal transportation. The installation of traditional scaffolding needs to start from the bottom layer and stack up layer by layer, which is not only troublesome to install, consumes a lot of materials, but also consumes a lot of labor, and the production efficiency is extremely low; at the same time, the distance between the scaffolding and the wall of the entire building It is fixed and cannot be adjusted, which is not conducive to construction and installation operations.
实用新型内容Utility model content
有鉴于此,本实用新型的目的是提供一种拆装快速,便于施工的间距可调的悬挂式脚手架。In view of this, the purpose of this utility model is to provide a kind of suspension scaffolding with adjustable spacing which can be disassembled quickly and convenient for construction.
本实用新型采用以下方案实现:一种间距可调的悬挂式脚手架,包括悬挂于墙体外侧的脚手架,脚手架与墙体之间留有间隔,脚手架上部设置有搭在楼板上侧的槽钢,楼板上穿设有固定螺杆,所述槽钢上开设有供固定螺杆穿过的长孔,固定螺杆上端穿过长孔后由螺母锁紧,所述固定螺杆上端套设有套环,槽钢上设置有位于固定螺杆旁侧的固定板,所述套环侧部固连有穿过固定板的第一调节螺杆,第一调节螺杆上旋接有位于固定板两侧的调节螺母,脚手架下部设置有支撑于墙体外墙面的可伸缩支撑机构。The utility model adopts the following scheme to realize: a suspended scaffold with adjustable spacing, including a scaffold suspended on the outside of the wall, there is a gap between the scaffold and the wall, and the upper part of the scaffold is provided with a channel steel on the upper side of the floor. A fixed screw is pierced on the floor, and the channel steel is provided with a long hole for the fixed screw to pass through. The upper end of the fixed screw is locked by a nut after passing through the long hole. There is a fixed plate on the side of the fixed screw, the side of the collar is fixedly connected with the first adjusting screw passing through the fixed plate, the first adjusting screw is screwed with adjusting nuts located on both sides of the fixed plate, the lower part of the scaffold A telescopic support mechanism supported on the outer wall of the wall is provided.
进一步的,所述支撑机构包括套在一起并可滑动伸缩的套筒和第二调节螺杆,所述第二调节螺杆经定位板固定于墙体的外墙面,所述套筒经抱箍固定于脚手架竖杆上,第二调节螺杆上旋接有顶着套筒端部的螺母座。Further, the support mechanism includes a sliding and telescopic sleeve and a second adjusting screw that are nested together, and the second adjusting screw is fixed on the outer wall of the wall through a positioning plate, and the sleeve is fixed through a hoop On the vertical rod of the scaffolding, a nut seat against the end of the sleeve is screwed on the second adjusting screw rod.
进一步的,所述抱箍由两个对半箍体组成,两个对半箍体其中一端铰接在一起,另一端锁紧在一起;其中一个对半箍体的锁紧端铰接有锁紧螺栓,其中一个对半箍体的锁紧端开设有卡槽,所述锁紧螺栓杆部由卡槽穿过后被一螺母锁紧。Further, the hoop is composed of two hoop halves, one end of the hoop halves is hinged together, and the other end is locked together; one of the hoop halves is hinged with a locking bolt at the locking end , one of the locking ends of the half hoops is provided with a card slot, and the locking bolt shank passes through the card slot and is locked by a nut.
进一步的,固定螺杆下端固连有卡在楼板下侧的挡板,所述楼板内预埋有套于固定螺杆上的套管;脚手架上部朝向墙体一侧与槽钢之间连接有斜置拉杆,斜置拉杆下端焊接于脚手架上,斜置拉杆上端设置有穿过槽钢底部并贴焊在槽钢内槽底面上的弯折部。Further, the lower end of the fixing screw is fixedly connected with a baffle plate stuck on the lower side of the floor, and a sleeve sleeve on the fixing screw is pre-embedded in the floor; the upper part of the scaffold is connected to the side facing the wall and the channel steel. The tie rod, the lower end of the inclined tie rod is welded on the scaffold, and the upper end of the inclined tie rod is provided with a bending part passing through the bottom of the channel steel and pasted and welded on the bottom surface of the inner channel of the channel steel.
与现有技术相比,本实用新型具有以下有益效果:本实用新型间距可调的悬挂式脚手架采用悬挂方式安装,安装简单,便于拆卸,降低工人劳动强度,减少耗材量,提高了安装效率,加快了施工速度;同时脚手架于外墙之间的距离可调节,便于施工和安装。Compared with the prior art, the utility model has the following beneficial effects: the suspended scaffold with adjustable spacing of the utility model is installed in a hanging manner, which is simple to install, easy to disassemble, reduces the labor intensity of workers, reduces the amount of consumable materials, and improves the installation efficiency. The construction speed is accelerated; at the same time, the distance between the scaffold and the outer wall can be adjusted, which is convenient for construction and installation.
为使本实用新型的目的、技术方案及优点更加清楚明白,以下将通过具体实施例和相关附图,对本实用新型作进一步详细说明。In order to make the purpose, technical solutions and advantages of the utility model clearer, the utility model will be further described in detail through specific embodiments and related drawings below.
附图说明Description of drawings
图1是本实用新型实施例构造示意图;Fig. 1 is the structural representation of the utility model embodiment;
图2是本实用新型实施例中支撑机构构造示意图;Fig. 2 is a schematic diagram of the structure of the support mechanism in the embodiment of the utility model;
图3是本实用新型实施例中抱箍构造示意图;Fig. 3 is a schematic diagram of the hoop structure in the embodiment of the utility model;
图中标号说明:1-墙体、2-脚手架、3-楼板、4-槽钢、5-固定螺杆、6-长孔、7-套环、8-固定板、9-第一调节螺杆、10-调节螺母、11-支撑机构、12-套筒、13-第二调节螺杆、14-定位板、15-抱箍、16-螺母座、17-对半箍体、18-锁紧螺栓、19-挡板、20-套管、21-斜置拉杆。Explanation of symbols in the figure: 1-wall, 2-scaffolding, 3-floor, 4-channel steel, 5-fixing screw, 6-long hole, 7-collar, 8-fixing plate, 9-first adjusting screw, 10-adjusting nut, 11-support mechanism, 12-sleeve, 13-second adjusting screw, 14-positioning plate, 15-clamp, 16-nut seat, 17-half hoop, 18-locking bolt, 19-baffle plate, 20-sleeve pipe, 21-slanted pull rod.
具体实施方式Detailed ways
如图1~3所示,一种间距可调的悬挂式脚手架,包括悬挂于墙体1外侧的脚手架2,脚手架2与墙体1之间留有间隔,脚手架2上部设置有搭在楼板3上侧的槽钢4;脚手架上部通过槽钢固定于楼板上,下部有支撑机构支撑于墙体以实现脚手架的安装固定,本实用新型中的脚手架采用悬挂方式安装,只需要将其安装在施工层的下一层即可,不需要底层向上层层叠装,现场安装时可使用塔吊等机械配合操作施工,实现高空安装,降低工人劳动强度,耗材量少,安装简单、便于拆卸、提高了安装效率,加快了施工速度。As shown in Figures 1 to 3, a suspended scaffold with adjustable spacing includes a scaffold 2 suspended on the outside of the wall 1. There is a gap between the scaffold 2 and the wall 1. The upper part of the scaffold 2 is provided with a floor 3 Channel steel 4 on the upper side; the upper part of the scaffold is fixed on the floor through the channel steel, and the lower part is supported by a support mechanism on the wall to realize the installation and fixation of the scaffold. The next layer of the layer is sufficient, and the bottom layer is not required to be stacked on the upper layer. During on-site installation, tower cranes and other machinery can be used to cooperate with the construction to realize high-altitude installation, reduce labor intensity of workers, less consumables, simple installation, easy disassembly, and improved installation. Efficiency, speed up the construction speed.
楼板3上穿设有固定螺杆5,所述槽钢4上开设有供固定螺杆5穿过的长孔6,固定螺杆5上端穿过长孔6后由螺母锁紧,所述固定螺杆5上端套设有套环7,槽钢4上设置有位于固定螺杆5旁侧的固定板8,所述套环7侧部固连有穿过固定板的第一调节螺杆9,第一调节螺杆9上旋接有位于固定板8两侧的调节螺母10,脚手架下部设置有支撑于墙体外墙面的可伸缩支撑机构11,通过调节固定板8两侧的调节螺母10可以实现槽钢位置的调整实现脚手架与墙体之间的间距调节。The floor 3 is pierced with a fixed screw 5, and the channel steel 4 is provided with a long hole 6 for the fixed screw 5 to pass through. The upper end of the fixed screw 5 passes through the long hole 6 and is locked by a nut. The upper end of the fixed screw 5 is A collar 7 is sleeved, and the channel steel 4 is provided with a fixing plate 8 positioned at the side of the fixing screw 5. The side of the collar 7 is fixedly connected with a first adjusting screw 9 passing through the fixing plate. The first adjusting screw 9 Adjusting nuts 10 located on both sides of the fixing plate 8 are screwed on the top, and the lower part of the scaffold is provided with a telescopic support mechanism 11 supported on the outer wall surface of the wall. By adjusting the adjusting nuts 10 on both sides of the fixing plate 8, the position of the channel steel can be adjusted. The adjustment realizes the adjustment of the distance between the scaffold and the wall.
在本实施例中,所述支撑机构11包括套在一起并可滑动伸缩的套筒12和第二调节螺杆13,所述第二调节螺杆13经定位板14固定于墙体1的外墙面,所述套筒12经抱箍15固定于脚手架2竖杆上,第二调节螺杆13上旋接有顶着套筒端部的螺母座16,通过拧动螺母座16,能够向外顶出套筒12,与第一调节螺杆9上的调节螺母配合实现脚手架于墙体之间的间距调节。In this embodiment, the supporting mechanism 11 includes a sliding and telescopic sleeve 12 and a second adjusting screw 13 that are nested together, and the second adjusting screw 13 is fixed to the outer wall surface of the wall body 1 via a positioning plate 14 , the sleeve 12 is fixed on the vertical rod of the scaffold 2 through the hoop 15, and the second adjusting screw 13 is screwed with a nut seat 16 against the end of the sleeve, and can be ejected outward by turning the nut seat 16. The sleeve 12 cooperates with the adjusting nut on the first adjusting screw rod 9 to adjust the distance between the scaffold and the wall.
在本实施例中,所述抱箍15由两个对半箍体17组成,两个对半箍体17其中一端铰接在一起,另一端锁紧在一起;其中一个对半箍体的锁紧端铰接有锁紧螺栓18,其中一个对半箍体17的锁紧端开设有卡槽,所述锁紧螺栓18杆部由卡槽穿过后被一螺母锁紧。In this embodiment, the hoop 15 is composed of two hoop halves 17, one end of the hoop halves 17 is hinged together, and the other end is locked together; The ends are hinged with locking bolts 18, and one of the locking ends of the half hoop bodies 17 is provided with a locking slot, and the rod of the locking bolt 18 is locked by a nut after passing through the locking slots.
在本实施例中,固定螺杆5下端固连有卡在楼板下侧的挡板19,所述楼板内预埋有套于固定螺杆上的套管20;脚手架2上部朝向墙体一侧与槽钢4之间连接有斜置拉杆21,斜置拉杆下端焊接于脚手架上,斜置拉杆上端设置有穿过槽钢底部并贴焊在槽钢内槽底面上的弯折部;斜置拉杆21提高槽钢与脚手架连接部位的稳定性,更加安全可靠。In this embodiment, the lower end of the fixing screw 5 is fixedly connected with a baffle 19 stuck on the lower side of the floor, and a sleeve 20 sleeved on the fixing screw is pre-embedded in the floor; The steel 4 is connected with an inclined tie rod 21, the lower end of the inclined tie rod is welded on the scaffold, and the upper end of the inclined tie rod is provided with a bending part passing through the bottom of the channel steel and pasted and welded on the bottom surface of the inner channel of the channel steel; the inclined tie rod 21 Improve the stability of the connection between the channel steel and the scaffold, making it safer and more reliable.
上列较佳实施例,对本实用新型的目的、技术方案和优点进行了进一步详细说明,所应理解的是,以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above preferred embodiments have further described the purpose, technical solutions and advantages of the utility model in detail. It should be understood that the above descriptions are only preferred embodiments of the utility model and are not intended to limit the utility model. For new models, any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included within the protection scope of the present utility model.
Claims (4)
- A kind of 1. boat scaffold adjustable in pitch, it is characterised in that:Scaffold including hanging on wall outer side, scaffold Spaced between wall, scaffold top is provided with the channel steel ridden on the upside of floor, and standing screw, institute are equipped with floor State the slot hole for offering on channel steel and being passed through for standing screw, standing screw upper end is passed through after slot hole by nut check, the fixation Screw rod upper end is arranged with the lantern ring, and the fixed plate positioned at standing screw side is provided with channel steel, and the lantern ring sidepiece, which is fixed with, to be worn The first adjusting screw rod of fixed plate is crossed, is screwed with the adjusting nut positioned at fixed plate both sides on the first adjusting screw rod, under scaffold Portion is provided with the retractable supports mechanism for being supported in wall body outer wall face.
- 2. boat scaffold adjustable in pitch according to claim 1, it is characterised in that:The supporting mechanism includes set Simultaneously the sleeve and the second adjusting screw rod of Slidable telescopic, the located plate of the second adjusting screw rod are fixed on the outer of wall together Metope, the sleeve are fixed on scaffold montant through anchor ear, and the nut for heading on sleeve ends is screwed with the second adjusting screw rod Seat.
- 3. boat scaffold adjustable in pitch according to claim 2, it is characterised in that:The anchor ear by two double Hoop body forms, and two double of hoop body wherein one end are hinged, and the other end is locked together;The lock of one of them double of hoop body Tight end is hinged with clamping screw, and the locking end of one of them double of hoop body offers card slot, and the clamping screw bar portion is by card slot By a nut check after passing through.
- 4. boat scaffold adjustable in pitch according to claim 1, it is characterised in that:Standing screw lower end is fixed with The baffle being stuck on the downside of floor, is embedded with the casing being placed on standing screw in the floor;Scaffold top is towards wall one Tilting pull rod is connected between side and channel steel, tilting pull rod lower end is welded on scaffold, and tilting pull rod upper end is provided through Simultaneously paste the bending part being welded on channel steel inside groove bottom surface in channel steel bottom.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721100809.7U CN207245138U (en) | 2017-08-30 | 2017-08-30 | Boat scaffold adjustable in pitch |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721100809.7U CN207245138U (en) | 2017-08-30 | 2017-08-30 | Boat scaffold adjustable in pitch |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207245138U true CN207245138U (en) | 2018-04-17 |
Family
ID=61883761
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721100809.7U Expired - Fee Related CN207245138U (en) | 2017-08-30 | 2017-08-30 | Boat scaffold adjustable in pitch |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207245138U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111550030A (en) * | 2020-06-02 | 2020-08-18 | 深圳市宝龙泰建设工程有限公司 | Rear-mounted scaffold wall connecting piece and construction method |
| CN113266137A (en) * | 2021-06-24 | 2021-08-17 | 安徽长青建筑制品有限公司 | High-safety overhanging type scaffold and supporting system thereof |
| CN113605676A (en) * | 2021-08-12 | 2021-11-05 | 中国水利水电第五工程局有限公司 | An attached scaffold for construction |
| CN114991453A (en) * | 2022-06-08 | 2022-09-02 | 湖北中建三局建筑工程技术有限责任公司 | A non-counterweight adjustable two-side suspension construction platform |
-
2017
- 2017-08-30 CN CN201721100809.7U patent/CN207245138U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111550030A (en) * | 2020-06-02 | 2020-08-18 | 深圳市宝龙泰建设工程有限公司 | Rear-mounted scaffold wall connecting piece and construction method |
| CN113266137A (en) * | 2021-06-24 | 2021-08-17 | 安徽长青建筑制品有限公司 | High-safety overhanging type scaffold and supporting system thereof |
| CN113605676A (en) * | 2021-08-12 | 2021-11-05 | 中国水利水电第五工程局有限公司 | An attached scaffold for construction |
| CN114991453A (en) * | 2022-06-08 | 2022-09-02 | 湖北中建三局建筑工程技术有限责任公司 | A non-counterweight adjustable two-side suspension construction platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104453197B (en) | High Large Cantilever concrete structural steel shape supports platform | |
| CN211447708U (en) | Super high-rise building construction elevator feeding platform support system that encorbelments | |
| CN103469735B (en) | The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation | |
| CN208202530U (en) | A kind of new type scaffold wall-connecting piece | |
| CN204001731U (en) | A kind of shuttering supporting vertical rod base fixing device | |
| CN201567787U (en) | Form-traveler steel formwork | |
| CN103615103B (en) | Suspension type assembling movable platform | |
| CN210659228U (en) | A movable single-sided formwork system for subway construction | |
| CN206477497U (en) | A kind of trussing for exempting to support steel form | |
| CN210289075U (en) | Adjustable elevator shaft operating platform system that can have enough to meet need | |
| CN207245139U (en) | Boat scaffold mounting structure | |
| CN104018655B (en) | A kind of assembly type monomer bracing frame | |
| CN205894638U (en) | Balcony scaffolding structure that encorbelments | |
| CN207660236U (en) | The quick connection hanging piece structure of wall | |
| CN202577969U (en) | Cast-in-situ stair board template supporting system | |
| CN206636157U (en) | A steel structure suitable for construction site assembly | |
| CN203285058U (en) | Wall body formwork vertical supporting device | |
| CN205476391U (en) | Builder's jack | |
| CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
| CN203905436U (en) | Steel chimney annular installation platform | |
| CN211736321U (en) | Pre-buried fixed knot of prefabricated outer shear wall scaffold puts up constructs | |
| CN207453448U (en) | A kind of bar type wall-attached frame | |
| CN205242981U (en) | Concrete construction operation platform | |
| CN211664573U (en) | Vertical transportation device for outer wall construction materials | |
| CN216840666U (en) | Pump pipe fixing device for super high-rise tower |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180417 |