JP2008253091A - Ascending/descending step-bolt mounting device for steel-tower constituting member or the like - Google Patents

Ascending/descending step-bolt mounting device for steel-tower constituting member or the like Download PDF

Info

Publication number
JP2008253091A
JP2008253091A JP2007093519A JP2007093519A JP2008253091A JP 2008253091 A JP2008253091 A JP 2008253091A JP 2007093519 A JP2007093519 A JP 2007093519A JP 2007093519 A JP2007093519 A JP 2007093519A JP 2008253091 A JP2008253091 A JP 2008253091A
Authority
JP
Japan
Prior art keywords
mounting
angle
bolt
fixed
step bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007093519A
Other languages
Japanese (ja)
Inventor
Yoshio Ono
良夫 大野
Shokichi Saito
章吉 齋藤
Koji Aida
幸二 合田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Tokyo Electric Power Company Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Denso Corp filed Critical Tokyo Electric Power Co Inc
Priority to JP2007093519A priority Critical patent/JP2008253091A/en
Publication of JP2008253091A publication Critical patent/JP2008253091A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)
  • Electric Cable Installation (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an ascending/descending step-bolt mounting device for steel-tower constituting members or the like that is used for mounting step bolts to main-post materials and web materials, which constitute a steel tower for overhead transmission lines, and rails for an elevator installed in a steel tower. <P>SOLUTION: The ascending/descending step-bolt mounting device for steel-tower constituting members or the like is composed of a plurality of mounting jigs, which are installed onto steel-tower constituting members or the like, and each vertical member to be mounted with step-bolts that is fixed to the steel-tower constituting members or the like by the mounting jigs. Each vertical member to be mounted with step-bolts is formed of a long angle by using an equal-angle steel material. Each hole part for fitting a step bolt thereinto is provided in the angle. Each mounting jig is provided with a support fixture fixed to a main-post material and a bracket that allows an angle to be mounted with step bolts to be fixedly installed at its front end part. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、例えば、架空送電線用の鉄塔を構成する主柱材や腹材、また、鉄塔に設置した昇降機用のレールにステップボルトを取り付けるための、鉄塔構成部材等における昇降用ステップボルトの取付装置に関するものである。   The present invention is, for example, a main pillar material or abdominal material constituting a tower for an overhead power transmission line, or a step bolt for raising and lowering in a tower component for attaching a step bolt to a rail for an elevator installed in the tower. The present invention relates to a mounting device.

架空送電線用の鉄塔に作業員が昇降する場合、鉄塔を構成する主柱材にステップボルトを取り付け、このステップボルトを使用して作業員が昇降するのが一般的である。   When a worker moves up and down on a steel tower for an overhead power transmission line, a step bolt is generally attached to a main pillar material constituting the steel tower, and the worker moves up and down using the step bolt.

そして、従来のステップボルトとしては、例えば、図16に示すように、鉄塔を構成する主柱材Pに台形金具Wを溶接等により取り付け、この台形金具Wの前端に形成したボルト孔にステップボルトSを装着する構成のものがある。   As a conventional step bolt, for example, as shown in FIG. 16, a trapezoidal metal fitting W is attached to a main pillar material P constituting a steel tower by welding or the like, and a step bolt is installed in a bolt hole formed at the front end of the trapezoidal metal fitting W. There is a configuration in which S is mounted.

また、他のステップボルトSとしては、例えば、図17に示すように、鉄塔を構成する主柱材Pを挟持してネジ止め固定される締結部材Lを用いたものがある。このステップボルトSは、締結部材Lを形成する半円弧状の一対のバンドの一方に台形金具Wを溶接等により取り付け、この台形金具Wの前端に形成したボルト孔にステップボルトSを装着するものである。   Further, as another step bolt S, for example, as shown in FIG. 17, there is one using a fastening member L that is fixed with screws by sandwiching a main pillar material P constituting a steel tower. In this step bolt S, a trapezoidal bracket W is attached to one of a pair of semicircular arcs forming a fastening member L by welding or the like, and the step bolt S is mounted in a bolt hole formed at the front end of the trapezoidal bracket W. It is.

この他、例えば、特許文献1に開示されているように、ステップボルトをナット締め等によって塔脚に直接装着するものがある。
特開平10−243536号公報
In addition, as disclosed in Patent Document 1, for example, there is a type in which a step bolt is directly attached to a tower base by tightening a nut or the like.
Japanese Patent Laid-Open No. 10-243536

しかしながら、図16に示すように、鉄塔を構成する主柱材Pに台形金具Wを溶接等により取り付け、この台形金具Wの前端に形成したボルト孔にステップボルトSを装着する場合、鉄塔の製作時において、亜鉛メッキ施工前の状態にある鉄塔の主柱材Pに工場溶接で台形金具Wを個別に取り付けるため、装置全体の制作費が多く掛かっていた。   However, as shown in FIG. 16, when a trapezoidal fitting W is attached to the main pillar member P constituting the tower by welding or the like, and the step bolt S is attached to the bolt hole formed at the front end of the trapezoidal fitting W, the tower is manufactured. At that time, since the trapezoidal metal fittings W were individually attached to the main pillar material P of the steel tower in the state before the galvanization construction by factory welding, the production cost of the entire apparatus was high.

しかも、このような台形金具Wは、常温塑性加工で製造されているため、使用中に荷重が掛かると簡単に折損する等のトラブルも発生していた。   In addition, since such a trapezoidal metal fitting W is manufactured by room temperature plastic working, troubles such as easy breakage occur when a load is applied during use.

例えば、図16に示すように、鉄塔を構成する主柱材Pに溶接等により取り付けた台形金具Wにおいて、この台形金具Wの前端に形成したボルト孔を備えている板状部材が折れてしまったり、台形金具Wの一部が欠けてしまう事態が生じていたのである。   For example, as shown in FIG. 16, in a trapezoidal metal fitting W attached by welding or the like to a main pillar material P constituting a steel tower, a plate-like member provided with a bolt hole formed at the front end of the trapezoidal metal fitting W is broken. There was a situation where a part of the trapezoidal metal fitting W was missing.

また、鉄塔のフランジ継手部の近辺においては、フランジ継手部が邪魔になってステップボルトS同士の間隔が広くなったり、また、狭くなってしまい、作業員が登り易い間隔にステップボルトSを配置できない事態が生じていた。   Further, in the vicinity of the flange joint portion of the steel tower, the stepped bolts S are arranged at intervals where the flange joint portions become obstructive and the distance between the step bolts S is widened or narrowed so that workers can easily climb. An impossible situation occurred.

さらに、亜鉛メッキ施工後に台形金具Wを溶接する場合、亜鉛が溶出し、これが溶接部に混入して品質低下を招く虞れがあり、しかも、これによって台形金具Wの経年劣化や損傷等が発生した場合、現場溶接で台形金具Wを改修することは困難である。   Furthermore, when the trapezoidal metal fitting W is welded after galvanization, zinc may be eluted and mixed into the welded part, leading to deterioration of quality, and this may cause aging deterioration or damage of the trapezoidal metal fitting W. In this case, it is difficult to repair the trapezoidal metal fitting W by field welding.

特に、鋼管鉄塔では、山形材鉄塔と違って、主柱材Pに孔開け加工によるステップの取付改修は不可能である。   In particular, in the steel pipe steel tower, unlike the Yamagata steel tower, it is impossible to refurbish the step by drilling the main pillar material P.

また、図17に示すように、鉄塔を構成する主柱材Pを挟持してネジ止め固定される締結部材Lを用いたステップボルトS(締結部材Lを形成する半円弧状の一対のバンドの一方に台形金具Wを溶接等により取り付け、この台形金具Wの前端に形成したボルト孔にステップボルトSを装着する構成)においては、鉄塔を構成する主柱材Pについて、鉄塔の下部に向かうほど応力が大きく働き、上部に向かうほど応力は低下してゆくため、各応力に見合った鋼管径の材料を使用する必要がある。   In addition, as shown in FIG. 17, a step bolt S (a pair of semicircular arc-shaped bands forming the fastening member L) using a fastening member L that is clamped and fixed by sandwiching the main pillar material P constituting the steel tower. On the other hand, the trapezoidal bracket W is attached by welding or the like, and in the configuration in which the step bolt S is mounted in the bolt hole formed at the front end of the trapezoidal bracket W, the main pillar material P constituting the steel tower is directed toward the lower part of the steel tower. Since the stress works greatly and the stress decreases toward the upper part, it is necessary to use a material having a steel pipe diameter corresponding to each stress.

このため、各種鋼管径に合わせて締結部材Lであるバンドを製作してこれを取り付けなければならず、その製作費と取付費用が多く掛かっていた。   For this reason, the band which is the fastening member L must be manufactured according to various steel pipe diameters, and this must be attached, and the manufacturing cost and the attachment cost were large.

しかも、鋼板バンドを使用した際にも、鋼管鉄塔特有のリブ付きフランジ継手や部材取付用プレート類が邪魔をして、ステップボルトS同士の間隔が広くなったり、また、狭くなってしまい、作業員が登り易い間隔にステップボルトSを配置できない事態が生じていた。   Moreover, even when steel plate bands are used, ribbed flange joints and member mounting plates that are unique to steel pipe towers obstruct the gap between step bolts S, and the distance between them becomes narrower. There was a situation in which the step bolts S could not be arranged at intervals at which it was easy for a member to climb.

このため、作業員が手や足を伸ばした自然の状態で各ステップボルトSを手で掴んだり、また、各ステップボルトSに足を掛けることができないことがあり、作業員の昇降時における安全性を欠くものとなっていた。   For this reason, the operator may not be able to grab each step bolt S with his / her hand or leg in a natural state, and may not be able to step on each step bolt S. It was lacking in sex.

さらに、鋼板バンドを略40cm間隔で多数取り付ける必要があるため、防錆塗装等の鉄塔劣化管理面からあまり好ましいものではなく、しかも、見栄えも悪くなるという諸々の問題点を有していた。   Furthermore, since it is necessary to attach a large number of steel plate bands at intervals of about 40 cm, it is not preferable from the viewpoint of steel tower deterioration management such as rust prevention coating, and it has various problems that it looks bad.

加えて、特許文献1に開示されているように、ステップボルトを塔脚にナット締め等によって直接装着する場合、鋼管鉄塔を構成する主柱材Pへの孔開け加工はナットの締め付けができないため、ステップボルトを取り付けできなかった。   In addition, as disclosed in Patent Document 1, when the step bolt is directly attached to the tower base by tightening the nut or the like, the hole drilling process to the main pillar material P constituting the steel pipe tower cannot be tightened with the nut. The step bolt could not be installed.

また、鉄塔のフランジ継手部においては、ステップボルトS同士の間隔が広くなったり、また、狭くなってしまい、作業員が登り易い間隔にステップボルトSを配置できない事態が生じていた。   Moreover, in the flange joint part of a steel tower, the space | interval of step bolts S became wide, and the situation where the step bolt S could not be arrange | positioned at the space | interval which a worker climbs easily occurred.

この他、鋼管鉄塔に設置する昇降用墜落防止装置は、主柱材に溶接接続された取付プレート、または、主柱材に取付用鋼板バンドを介して取り付けるが、フランジ継手や部材用取付プレート類が邪魔をして、取付プレートや取付用鋼板バンドを等間隔に配置できない事態が生じていた。   In addition, the fall prevention device for raising and lowering installed on the steel pipe tower is attached to the main column member by welding connection or attached to the main column member via a steel plate band for mounting. However, the mounting plate and the mounting steel plate band cannot be arranged at equal intervals.

また、塔高の高い鉄塔については、自動鉄塔昇降機用のレールが設置されているが、鉄塔周辺の住宅化等で、昇降機の搬入困難化、騒音等の要因により、鉄塔昇降機の利用ができない鉄塔が出現し、昇降に制約を受ける鉄塔があった。   In addition, for towers with high tower height, rails for automatic tower elevators are installed, but towers that cannot be used due to factors such as difficulty in carrying elevators and noise due to housing around the towers, etc. Appeared, and there was a steel tower that was restricted in elevation.

さらに、狭線間鉄塔においては、主柱材を利用した昇降では、充電部との安全距離が確保できなかった。このため、腹材等を利用した塔外梯子を設置して昇降するが、塔外梯子幅が40cmあるため、取付位置に制約を受けていた。   Furthermore, in the narrow-line steel tower, the safety distance from the charging unit could not be ensured by lifting using the main pillar material. For this reason, although the tower ladder using abdominal material etc. is installed and it goes up and down, since the tower ladder width is 40 cm, the installation position was restricted.

そこで、本発明は如上のような従来存した諸事情に鑑み創出されたもので、鉄塔を構成する主柱材や腹材、また、鉄塔に設置した昇降機用のレールに取付治具を複数設置し、この取付治具により垂直部材を固定して垂直部材にステップボルトを取り付けることにより、ステップボルト同士を好ましい間隔で配置することができ、作業員の昇降時における安全性を確保し、また、ステップボルトの取付作業時間・取付費用等を大幅に削減した鉄塔構成部材等における昇降用ステップボルトの取付装置を提供することを目的とする。   Therefore, the present invention was created in view of the existing circumstances as described above, and a plurality of mounting jigs are installed on the main pillar material and the abdomen constituting the tower, and the elevator rail installed on the tower. Then, by fixing the vertical member with this mounting jig and attaching the step bolts to the vertical member, the step bolts can be arranged at a preferred interval, ensuring the safety of the worker when ascending and descending, It is an object of the present invention to provide an apparatus for attaching a step bolt for ascending / descending in a steel tower structural member or the like that significantly reduces the time and cost for attaching a step bolt.

本発明に係る鉄塔構成部材等における昇降用ステップボルトの取付装置は、 鉄塔構成部材等に設置される複数の取付治具と、この取付治具により鉄塔構成部材等に固定されるステップボルト取付用の垂直部材から成ることで、上述した課題を解決した。   A step bolt mounting device for a tower component or the like according to the present invention includes a plurality of mounting jigs installed on a tower component or the like, and a step bolt mounting fixed to the tower component or the like by the mounting jig. The above-mentioned problem was solved by comprising the vertical member.

また、ステップボルト取付用の垂直部材は、等辺山形鋼材を用いて長尺状のアングルにより形成され、このアングルに、ステップボルトを取り付けるための孔部を設けていることで、同じく上述した課題を解決した。   Further, the vertical member for attaching the step bolt is formed by a long angle using an equilateral mountain-shaped steel material, and the hole for attaching the step bolt is provided in this angle, so that the above-mentioned problem is also obtained. Settled.

さらに、ステップボルト取付用の垂直部材は、複数のステップボルトを等間隔に、また、複数のステップボルトについて、取付角度を90度ずらしながらアングルに固定可能であることで、同じく上述した課題を解決した。   Furthermore, the vertical members for attaching the step bolts can fix the plurality of step bolts at equal intervals, and the plurality of step bolts can be fixed to the angle while shifting the mounting angle by 90 degrees, thereby solving the above-mentioned problem. did.

また、鉄塔構成部材等としての主柱材に、取付治具が設置されることで、同じく上述した課題を解決した。   Moreover, the problem mentioned above was solved similarly by installing an attachment jig in the main pillar material as a steel tower component.

加えて、取付治具は、主柱材に固定される支持固定具と、前端部にステップボルト取付用のアングルを固設できるブラケット具を備えていることで、同じく上述した課題を解決した。   In addition, the mounting jig is provided with a support fixture that is fixed to the main column member and a bracket that can fix a step bolt mounting angle at the front end, thereby solving the above-described problem.

また、支持固定具は、主柱材に当接して固定される当接固定部と、ブラケット具を取り付ける支持台部により形成されていることで、同じく上述した課題を解決した。   In addition, the support fixture is formed by a contact fixing portion that is fixed in contact with the main column member and a support base portion to which the bracket tool is attached, thereby solving the above-described problem.

この他、ブラケット具は、支持固定具の支持台部に載置して固定される載置固定部と、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成されていることで、同じく上述した課題を解決した。   In addition, the bracket device is formed by a mounting fixing portion that is mounted and fixed on the support base portion of the supporting fixture, and a clamping portion that sandwiches and fixes an angle for attaching the step bolt. Solved the above-mentioned problems.

また、ブラケット具は、前後に移動できるように支持固定具の支持台部に取り付けられていることで、同じく上述した課題を解決した。   Further, the bracket tool is attached to the support base portion of the support fixture so as to be movable back and forth, thereby solving the above-described problem.

さらに、ブラケット具の挟持部は、載置固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成され、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで固定することで、同じく上述した課題を解決した。   Further, the holding part of the bracket tool is formed by a receiving plate part using an equilateral mountain-shaped steel material fixed to the tip part of the mounting fixing part, and a contact plate part using an equilateral mountain-shaped steel material applied to the receiving plate part. In addition, the above-mentioned problem has been solved by sandwiching and fixing the step bolt mounting angle between the receiving plate portion and the contact plate portion.

また、鉄塔構成部材等としての腹材に、取付治具が設置されることで、同じく上述した課題を解決した。   Moreover, the problem mentioned above was solved similarly by installing an attachment jig in the abdomen as a steel tower structural member.

加えて、取付治具は、所定の間隔を開けて腹材に固定される2個の脚部と、前端部にステップボルト取付用のアングルを固設できるブラケット具により構成されていることで、同じく上述した課題を解決した。   In addition, the mounting jig is composed of two legs that are fixed to the abdomen with a predetermined interval, and a bracket that can fix a step bolt mounting angle to the front end. The problem mentioned above was also solved.

また、ブラケット具は、載置固定部と、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成され、載置固定部は、2個の脚部の端部を掛け渡すように配置している支持掛架部に固定されていることで、同じく上述した課題を解決した。   Further, the bracket device is formed by a mounting fixing portion and a clamping portion that clamps and fixes an angle for attaching the step bolt, and the mounting fixing portion is arranged so as to span the end portions of the two leg portions. The problem mentioned above was also solved by being fixed to the support hanging part which is.

この他、2個の脚部は、前後に移動できるように腹材に取り付けられていることで、同じく上述した課題を解決した。   In addition, the two legs are attached to the abdomen so as to be able to move back and forth, thereby solving the above-described problem.

また、2個の脚部の端部を掛け渡すように配置している支持掛架部は、左右に移動できるように脚部に取り付けられていることで、同じく上述した課題を解決した。   Moreover, the support suspension part arrange | positioned so that the edge part of two legs may be spanned is attached to the leg part so that it can move to right and left, and the subject mentioned above was solved similarly.

さらに、ブラケット具の挟持部は、載置固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成され、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで固定することで、同じく上述した課題を解決した。   Further, the holding part of the bracket tool is formed by a receiving plate part using an equilateral mountain-shaped steel material fixed to the tip part of the mounting fixing part, and a contact plate part using an equilateral mountain-shaped steel material applied to the receiving plate part. In addition, the above-mentioned problem has been solved by sandwiching and fixing the step bolt mounting angle between the receiving plate portion and the contact plate portion.

また、鉄塔構成部材等としての昇降機用のレールに、取付治具が設置されることで、同じく上述した課題を解決した。   Moreover, the problem mentioned above was similarly solved by installing an attachment jig in the rail for elevators as a steel tower structural member.

加えて、取付治具は、前端部にステップボルト取付用のアングルを固設できるブラケット具により形成されていることで、同じく上述した課題を解決した。   In addition, the mounting jig is formed of a bracket that can fix an angle for attaching a step bolt to the front end, thereby solving the above-described problem.

また、ブラケット具は、昇降機用のレールに当接して固定される当接固定部と、この当接固定部の先端部に取り付けられた、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成されていることで、同じく上述した課題を解決した。   In addition, the bracket device includes a contact fixing portion that is fixed in contact with the rail for the elevator, and a clamping portion that is attached to the tip end portion of the contact fixing portion and sandwiches and fixes the step bolt mounting angle. By being formed, the same problem as described above was solved.

この他、ブラケット具の挟持部は、当接固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成され、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで固定することで、同じく上述した課題を解決した。   In addition to this, the holding part of the bracket tool includes a receiving plate portion using an equilateral mountain-shaped steel material fixed to the distal end portion of the abutting fixing portion, and a backing plate portion using an equilateral mountain-shaped steel material applied to the receiving plate portion. The above-mentioned problem was solved by forming and fixing the step bolt mounting angle between the receiving plate portion and the contact plate portion.

また、ステップボルト取付用の垂直部材に、昇降用墜落防止装置を取り付けたことで、同じく上述した課題を解決した。   Moreover, the problem mentioned above was similarly solved by attaching the fall prevention apparatus for raising / lowering to the vertical member for step bolt attachment.

本発明によれば、鉄塔を構成する主柱材や腹材、また、鉄塔に設置した昇降機用のレールに取付治具を複数設置し、この取付治具により垂直部材を固定して垂直部材にステップボルトを取り付けることにより、ステップボルト同士を好ましい間隔で配置することができ、作業員の昇降時における安全性を確保し、また、ステップボルトの取付作業時間・取付費用等を大幅に削減することができる。   According to the present invention, a plurality of mounting jigs are installed on the main pillar material and the belly material constituting the steel tower, and the elevator rail installed on the steel tower, and the vertical member is fixed to the vertical member by the mounting jig. By installing the step bolts, the step bolts can be arranged at a preferred interval, ensuring safety when the worker moves up and down, and greatly reducing the time and cost of installing the step bolts. Can do.

即ち、本発明に係る鉄塔構成部材等における昇降用ステップボルトの取付装置は、鉄塔構成部材等に設置される複数の取付治具と、この取付治具により鉄塔構成部材等に固定されるステップボルト取付用の垂直部材から成ることから、鉄塔構成部材等に取付治具を介して垂直部材を簡単に固定することができる。   That is, the step bolt mounting device for tower components according to the present invention includes a plurality of mounting jigs installed on the tower components and the step bolts fixed to the tower components by the mounting jigs. Since it consists of a vertical member for attachment, a vertical member can be easily fixed to a steel tower constituent member etc. via an attachment jig.

そして、この垂直部材にステップボルトを取り付けることから、鉄塔構成部材等へのステップボルトの取付作業を簡単・迅速に行うことができる。   Since the step bolt is attached to the vertical member, the step bolt can be easily and quickly attached to the steel tower component or the like.

また、ステップボルト取付用の垂直部材は、等辺山形鋼材を用いて長尺状のアングルにより形成され、このアングルに、ステップボルトを取り付けるための孔部を設けていることから、複数のステップボルトを等間隔に取り付けることができる。   In addition, the vertical member for attaching the step bolt is formed by a long angle using an equilateral mountain-shaped steel material, and a hole for attaching the step bolt is provided in this angle. Can be installed at regular intervals.

さらに、ステップボルト取付用の垂直部材は、等辺山形鋼材を用いたアングルにより形成されていることから、複数のステップボルトについて、取付角度を90度ずらしながらアングルに固定可能である。   Furthermore, since the vertical member for attaching the step bolt is formed by an angle using an equilateral mountain-shaped steel material, the plurality of step bolts can be fixed to the angle while shifting the attachment angle by 90 degrees.

その結果、作業員が手や足を伸ばした自然の状態で各ステップボルトを手で掴んだり、また、各ステップボルトに足を掛けることができ、作業員の昇降時における安全性を確保することができる。   As a result, the operator can grasp each step bolt with his / her hand and legs in a natural state, and can put his / her feet on each step bolt to ensure the safety of the worker when raising and lowering. Can do.

また、ステップボルトの取り付けに際し、溶接により台形金具を個別に取り付ける必要が無いため、取付装置全体を安価に製作できる。   In addition, when attaching the step bolts, it is not necessary to individually attach the trapezoidal brackets by welding, so that the entire attachment device can be manufactured at low cost.

加えて、各種鋼管径に合わせて締結部材であるバンドを製作する必要が無く、この点においても、取付装置全体を安価に製作できる。   In addition, it is not necessary to manufacture a band as a fastening member in accordance with various steel pipe diameters, and also in this respect, the entire mounting device can be manufactured at low cost.

また、鉄塔構成部材等に取付治具を介してアングルを固定することから、鉄塔から若干離れた位置にアングルを配置して、このアングルにステップボルトを取り付けることができる。   In addition, since the angle is fixed to the steel tower constituent member or the like via an attachment jig, the angle can be arranged at a position slightly away from the steel tower, and the step bolt can be attached to this angle.

そのため、鋼管鉄塔におけるリブ付きフランジ継手や部材取付用プレート類が邪魔になることがなく、常に作業員が登り易い等間隔にステップボルトを取り付けることができる。   Therefore, the flanged joints with ribs and the member mounting plates in the steel pipe tower do not get in the way, and the step bolts can always be attached at equal intervals where the worker can easily climb.

さらに、鉄塔構成部材等に取付治具を介してアングルを固定し、このアングルにステップボルトを取り付けることから、防錆塗装等の鉄塔劣化管理面においても好ましいものとなり、しかも、鉄塔の見栄えも良いものとなる。   Furthermore, since an angle is fixed to a steel tower component via a mounting jig, and a step bolt is attached to this angle, it is preferable in terms of steel tower deterioration management such as rust prevention coating, and the appearance of the steel tower is also good. It will be a thing.

具体的には、取付治具を鉄塔構成部材等としての主柱材に設置し、この取付治具を介してアングルを固定することから、主柱材へのステップボルトの取付作業を簡単・迅速に行うことができる。   Specifically, the mounting jig is installed on the main pillar material such as a steel tower component, and the angle is fixed via this mounting jig, making it easy and quick to attach the step bolt to the main pillar material. Can be done.

また、取付治具は、主柱材に固定される支持固定具と、前端部にステップボルト取付用のアングルを固設できるブラケット具を備えていることから、その構成部品が少なく、取付装置を安価に製作することができる。   In addition, the mounting jig includes a support fixture that is fixed to the main column member and a bracket that can fix the angle for attaching the step bolt to the front end portion. It can be manufactured at low cost.

さらに、支持固定具は、主柱材に当接して固定される当接固定部と、ブラケット具を取り付ける支持台部により形成されていることから、鉄塔を構成する主柱材に当接固定部を確実に固定できると共に、支持台部にブラケット具を確実に取り付けることができる。   Furthermore, since the support fixture is formed by a contact fixing portion that is fixed in contact with the main pillar member and a support base portion to which the bracket tool is attached, the contact fixing portion is attached to the main pillar member constituting the steel tower. Can be securely fixed, and the bracket can be securely attached to the support base.

また、ブラケット具は、支持固定具の支持台部に載置して固定される載置固定部と、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成されていることから、支持固定具の支持台部にブラケット具の載置固定部を密接状態に固定できると共に、挟持部によりステップボルト取付用のアングルを確実に固定することができる。   In addition, the bracket device is formed by a mounting fixing portion that is mounted and fixed on the support base portion of the supporting fixture and a clamping portion that clamps and fixes the angle for attaching the step bolt, thereby supporting and fixing. The mounting fixture of the bracket can be fixed in close contact with the support base of the fixture, and the angle for attaching the step bolt can be reliably fixed by the clamping portion.

加えて、ブラケット具は、前後に移動できるように支持固定具の支持台部に取り付けられていることから、鉄塔から離れた位置にもステップボルト取付用のアングルを固定することができる。   In addition, since the bracket tool is attached to the support base portion of the support fixture so as to be able to move back and forth, the angle for attaching the step bolt can be fixed at a position away from the steel tower.

そのため、鉄塔のフランジ継手部の近辺においても、このフランジ継手部が邪魔にならず、ステップボルト同士の間隔が広くなったり、また、狭くなってしまうことも無いため、作業員が登り易い間隔にステップボルトを配置できる。   Therefore, even in the vicinity of the flange joint portion of the steel tower, the flange joint portion does not get in the way, and the interval between the step bolts does not become wide or narrow, so that the worker can climb easily. Step bolts can be placed.

また、ブラケット具の挟持部は、載置固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成されていることから、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで確実に固定することができる。   Further, the holding part of the bracket tool is formed by a receiving plate part using an equilateral mountain-shaped steel material fixed to the tip part of the mounting fixing part, and a contact plate part using an equilateral mountain-shaped steel material applied to the receiving plate part. Therefore, the angle for attaching the step bolt can be securely fixed by being sandwiched between the receiving plate portion and the contact plate portion.

この他、取付治具を鉄塔構成部材等としての腹材に設置し、この取付治具を介してアングルを固定することから、腹材へのステップボルトの取付作業を簡単・迅速に行うことができる。   In addition, since the mounting jig is installed on the abdominal material as a steel tower component and the angle is fixed via the mounting jig, the step bolt can be easily and quickly attached to the abdominal material. it can.

その結果、充電部との安全距離を充分に確保して、作業員の昇降時における安全性を維持することができる。   As a result, it is possible to secure a sufficient safety distance from the charging unit and maintain safety when the worker moves up and down.

また、従来においては、腹材に塔外梯子を設置して昇降する手法が用いられていたが、この塔外梯子の幅が40cmあり、その取付位置に制約を受けていた。   Further, conventionally, a method has been used in which an outside ladder is installed on the abdomen and the elevator is moved up and down. However, the outside ladder has a width of 40 cm, and its mounting position is restricted.

しかし、本発明によれば、取付治具を腹材に設置し、この取付治具を介してアングルを固定することから、装置全体の幅が塔外梯子に比べて小さくなり、取付位置の選定範囲が広がるため、その取付位置に制約を受けることが無く、より安全な設備形成が可能となった。   However, according to the present invention, since the mounting jig is installed on the abdomen and the angle is fixed via this mounting jig, the width of the entire apparatus becomes smaller than that of the tower ladder, and the selection of the mounting position is performed. Since the range is expanded, there is no restriction on the mounting position, and safer equipment can be formed.

さらに、取付治具は、所定の間隔を開けて腹材に固定される2個の脚部と、前端部にステップボルト取付用のアングルを固設できるブラケット具により構成されていることから、腹材にブラケット具を確実に固定できる。   Further, the mounting jig is composed of two legs that are fixed to the abdomen with a predetermined interval, and a bracket that can fix a step bolt mounting angle at the front end. The bracket can be securely fixed to the material.

また、ブラケット具は、載置固定部と、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成されていることから、ブラケット具によりステップボルト取付用のアングルを確実に固定することができる。   Further, since the bracket tool is formed by the mounting fixing part and the clamping part that sandwiches and fixes the angle for attaching the step bolt, the angle for attaching the step bolt can be reliably fixed by the bracket tool. .

加えて、載置固定部は、2個の脚部の端部を掛け渡すように配置している支持掛架部に固定されていることから、所定の間隔を開けて腹材に固定される2個の脚部に、ブラケット具を確実に固定することができる。   In addition, the mounting fixing part is fixed to the abdomen at a predetermined interval because it is fixed to the support hanging part arranged so as to span the ends of the two leg parts. The bracket device can be securely fixed to the two legs.

また、2個の脚部は、前後に移動できるように腹材に取り付けられていることから、ステップボルト取付用のアングルの取り付け位置を前後方向に微妙に調節できる。   In addition, since the two legs are attached to the abdomen so as to be able to move back and forth, the attachment position of the angle for attaching the step bolt can be finely adjusted in the front-rear direction.

さらに、2個の脚部の端部を掛け渡すように配置している支持掛架部は、左右に移動できるように脚部に取り付けられていることから、ステップボルト取付用のアングルの取り付け位置を左右方向に微妙に調節できる。   Furthermore, the support hanging part, which is arranged so as to span the ends of the two leg parts, is attached to the leg parts so that it can move left and right. Can be finely adjusted in the horizontal direction.

また、ブラケット具の挟持部は、載置固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成されていることから、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで確実に固定することができる。   Further, the holding part of the bracket tool is formed by a receiving plate part using an equilateral mountain-shaped steel material fixed to the tip part of the mounting fixing part, and a contact plate part using an equilateral mountain-shaped steel material applied to the receiving plate part. Therefore, the angle for attaching the step bolt can be securely fixed by being sandwiched between the receiving plate portion and the contact plate portion.

一方、取付治具を鉄塔構成部材等としての昇降機用のレールに設置し、この取付治具を介してアングルを固定することから、昇降機用のレールへのステップボルトの取付作業を簡単・迅速に行うことができる。   On the other hand, the mounting jig is installed on the elevator rail as a steel tower component and the angle is fixed via this mounting jig, so the step bolt can be easily and quickly attached to the elevator rail. It can be carried out.

その結果、鉄塔における昇降機の利用が困難な箇所等においても、作業員が安全に昇降することができる。   As a result, even in places where it is difficult to use the elevator in the steel tower, the worker can ascend and descend safely.

また、取付治具は、前端部にステップボルト取付用のアングルを固設できるブラケット具により形成されていることから、このブラケット具を介して、昇降機用のレールへステップボルト取付用のアングルを確実に固定することができる。   In addition, the mounting jig is formed by a bracket that can fix the angle for attaching the step bolt to the front end, so that the angle for attaching the step bolt to the elevator rail can be reliably secured via this bracket. Can be fixed to.

さらに、ブラケット具は、昇降機用のレールに当接して固定される当接固定部と、この当接固定部の先端部に取り付けられた、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成されていることから、昇降機用のレールに当接固定部を密接状態に固定できると共に、挟持部によりステップボルト取付用のアングルを確実に固定することができる。   In addition, the bracket device includes a contact fixing portion that is fixed in contact with the rail for the elevator, and a clamping portion that is attached to the tip end portion of the contact fixing portion and sandwiches and fixes the step bolt mounting angle. Since it is formed, the contact fixing portion can be fixed in close contact with the elevator rail, and the angle for attaching the step bolt can be reliably fixed by the clamping portion.

また、ブラケット具の挟持部は、当接固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成されていることから、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで確実に固定することができる。   Further, the holding part of the bracket tool is formed by a receiving plate part using an equilateral mountain-shaped steel material fixed to the tip part of the abutting fixing part and an abutting plate part using an equilateral mountain-shaped steel material applied to the receiving plate part. Therefore, the angle for attaching the step bolt can be securely fixed by being sandwiched between the receiving plate portion and the contact plate portion.

この他、ステップボルト取付用の垂直部材に、昇降用墜落防止装置を取り付けたことから、作業員の昇降時における墜落を防止し、その安全を確保している。   In addition, since the fall prevention device for raising and lowering is attached to the vertical member for attaching the step bolt, the worker is prevented from falling during the raising and lowering and the safety is ensured.

また、昇降用墜落防止装置を取り付けるために、鉄塔を構成する主柱材に所定の取付プレートを設けたり、また、主柱材に取付用鋼板バンドを取り付ける必要も無く、昇降用墜落防止装置の取付作業の効率化を図ることができる。   Moreover, in order to install the fall prevention device for raising and lowering, it is not necessary to provide a predetermined mounting plate on the main pillar material constituting the tower, or to attach a steel plate band for attachment to the main pillar material. The mounting work can be made more efficient.

以下に、本発明を実施するための最良の形態を、図面を参照して説明する。   The best mode for carrying out the present invention will be described below with reference to the drawings.

本発明に係る鉄塔構成部材等における昇降用ステップボルトの取付装置は、鉄塔構成部材等に設置される複数の取付治具Aと、この取付治具Aにより鉄塔構成部材等に固定されるステップボルト取付用の垂直部材から構成されている。   The apparatus for attaching the step bolts for ascending / descending in the steel tower constituent members according to the present invention includes a plurality of mounting jigs A installed on the steel tower constituent members and the step bolts fixed to the steel tower constituent members by the mounting jig A. It is comprised from the vertical member for attachment.

このステップボルト取付用の垂直部材は、長尺状のアングルBにより形成されている。   The vertical member for attaching the step bolt is formed by a long angle B.

また、取付治具Aは、鉄塔構成部材としての主柱材Pに設置されるものと、腹材Qに設置されるものがある。また、取付治具Aは、鉄塔に取り付けられている昇降機用のレールRに設置されるものがある。   Moreover, the attachment jig A includes those installed on the main pillar material P as a steel tower constituent member and those installed on the abdomen Q. Moreover, there exists what has been installed in the rail R for elevators and the attachment jig | tool A attached to the steel tower.

以下に、これを順に説明する。   This will be described in turn below.

(鉄塔構成部材としての主柱材Pに設置される取付治具A)
この取付治具Aは、図1に示すように、鉄塔構成部材としての主柱材Pに設置され、主柱材Pにステップボルト取付用のアングルBを固定している。
(Mounting jig A installed on main pillar P as a steel tower component)
As shown in FIG. 1, the mounting jig A is installed on a main pillar member P as a steel tower constituting member, and an angle B for attaching a step bolt is fixed to the main pillar member P.

取付治具Aは、図2(a)・図3に示すように、鋼管鉄塔の主柱材Pに固定される支持固定具1と、前端部にステップボルト取付用のアングルBを固設できるブラケット具2を備えている。   As shown in FIGS. 2 (a) and 3, the mounting jig A can be fixedly provided with a support fixture 1 fixed to the main column P of the steel pipe tower and an angle B for attaching the step bolt to the front end. A bracket tool 2 is provided.

また、取付治具Aは、図2(b)・図3に示すように、鋼管鉄塔の主柱材Pに、例えば、Uボルト状の締結部材Lを介して固定されている。尚、取付治具Aを、バンド状の締結部材Lにより固定しても良い。また、取付治具Aの取付間隔は、2000mm±400mmを標準としている。   Moreover, as shown in FIG.2 (b) and FIG. 3, the attachment jig | tool A is being fixed to the main pillar material P of a steel pipe tower via the fastening member L of a U-bolt shape, for example. The mounting jig A may be fixed by a band-shaped fastening member L. In addition, the mounting interval of the mounting jig A is 2000 mm ± 400 mm as a standard.

取付治具Aの支持固定具1は、図3に示すように、鋼管鉄塔の主柱材Pに当接して固定される当接固定部3と、ブラケット具2を取り付ける支持台部4により形成されている。   As shown in FIG. 3, the support fixture 1 of the mounting jig A is formed by an abutment fixing portion 3 that abuts and is fixed to the main pillar material P of the steel pipe tower, and a support base portion 4 to which the bracket tool 2 is attached. Has been.

また、当接固定部3は、図2(b)・図3に示すように、横向きコ字枠状の鋼材によって形成されている。この鋼材の上下両辺における中央に、主柱材Pの外周曲率に合致するような円弧状の当接溝部5が形成されている。   Moreover, the contact fixing | fixed part 3 is formed with the steel material of a horizontal U-shaped frame shape, as shown in FIG.2 (b) and FIG. An arcuate contact groove portion 5 is formed in the center on both the upper and lower sides of the steel material so as to match the outer peripheral curvature of the main pillar material P.

鋼材の左右両端の上方位置には、図3に示すように、取付孔部6が形成されている。そして、鋼材の当接溝部5を主柱材Pの側面にあてがった状態で、主柱材Pに1本の締結部材Lを巻回し、主柱材Pに支持固定具1が固定されている。   As shown in FIG. 3, mounting holes 6 are formed at positions above the left and right ends of the steel material. And in the state which applied the contact groove part 5 of steel materials to the side surface of the main pillar material P, the one fastening member L is wound around the main pillar material P, and the support fixture 1 is being fixed to the main pillar material P. .

即ち、締結部材Lは、Uボルトの各両端に設けたネジ部分を、鋼材の取付孔部6に後ろ側から挿入し、鋼材の前側においてナット7で締結することにより、主柱材Pに支持固定具1が固定されるのである。   That is, the fastening member L is supported by the main column P by inserting the screw portions provided at both ends of the U-bolt into the steel mounting hole 6 from the rear side and fastening with the nut 7 on the front side of the steel material. The fixing tool 1 is fixed.

支持固定具1の支持台部4は、図2(a)(b)・図3に示すように、上方から見て略台形状で、側面から見て略三角形状に形成された、直角アングル状に形成されている。この支持台部4により、主柱材Pから所定の距離を確保しているのである。   As shown in FIGS. 2A, 2B and 3, the support base 4 of the support fixture 1 has a substantially trapezoidal shape when viewed from above, and is formed into a substantially triangular shape when viewed from the side. It is formed in a shape. A predetermined distance is secured from the main pillar material P by the support base 4.

また、ブラケット具2は、図2(a)(b)・図3に示すように、支持固定具1の支持台部4に載置して固定される載置固定部8と、ステップボルト取付用のアングルBを挟み込んで固定する挟持部9により形成されている。載置固定部8は、直角アングル状の鋼材により形成されている。   Further, as shown in FIGS. 2A, 2B, and 3, the bracket device 2 includes a mounting fixing portion 8 that is mounted and fixed on the support base portion 4 of the support fixing device 1, and a step bolt attachment. It is formed by the clamping part 9 which clamps and fixes the angle B for use. The mounting fixing portion 8 is formed of a steel material having a right angle.

このブラケット具2は、前後に移動できるように支持固定具1の支持台部4に取り付けられている。   This bracket tool 2 is attached to the support base part 4 of the support fixture 1 so that it can move back and forth.

具体的には、図3に示すように、支持固定具1の支持台部4に、前後一対の長孔10、10が直列状に形成されている。長孔10、10は、およそ60mmの長さを備えている。   Specifically, as shown in FIG. 3, a pair of front and rear long holes 10, 10 are formed in series on the support base 4 of the support fixture 1. The long holes 10 and 10 have a length of approximately 60 mm.

また、支持台部4の長孔10、10に対応して、ブラケット具2の載置固定部8には、前後一対の長孔11、11が直列状に形成されている。   A pair of front and rear long holes 11 and 11 are formed in series in the mounting and fixing portion 8 of the bracket 2 corresponding to the long holes 10 and 10 of the support base portion 4.

即ち、支持台部4の長孔10、10と載置固定部8の長孔11、11を合致させるようにして支持台部4の上に載置固定部8を載置し、ボルト・ナット部材を介して、支持台部4の上に載置固定部8を固定するのである。   That is, the mounting and fixing portion 8 is placed on the supporting base portion 4 so that the long holes 10 and 10 of the supporting base portion 4 and the long holes 11 and 11 of the mounting and fixing portion 8 are aligned with each other. The mounting fixing part 8 is fixed on the support base part 4 via the member.

そして、ブラケット具2の載置固定部8を前側に移動させて支持台部4に固定したときには、ブラケット具2の先端部に取り付けるステップボルト取付用のアングルBが、鉄塔のリブ付きフランジ継手や部材取付用プレート類等の付属部位よりも外側に位置することとなる。   And when the mounting fixing part 8 of the bracket tool 2 is moved to the front side and fixed to the support base part 4, the angle B for attaching the step bolt attached to the tip part of the bracket tool 2 is the flanged flange joint of the steel tower, It will be located outside the attached parts such as member mounting plates.

ブラケット具2の挟持部9は、図2(a)・図3に示すように、載置固定部8の先端部に固定された等辺山形鋼材を用いた受け板部12と、該受け板部12にあてがわれる等辺山形鋼材を用いた当て板部13により形成されている。   As shown in FIGS. 2A and 3, the holding portion 9 of the bracket tool 2 includes a receiving plate portion 12 using an equilateral mountain-shaped steel material fixed to the distal end portion of the mounting fixing portion 8, and the receiving plate portion. 12 is formed by a contact plate portion 13 using an equilateral mountain-shaped steel material applied to 12.

そして、ステップボルト取付用のアングルBを受け板部12と当て板部13により挟み込んで固定するのである。   Then, the angle B for attaching the step bolt is received and fixed between the receiving plate portion 12 and the contact plate portion 13.

受け板部12と当て板部13のそれぞれには、図3に示すように、4個の孔部が設けられ、この孔部にボルトが挿入されて、反対側からナット7で締結されるようになっている。また、ステップボルト取付用のアングルBにも、複数の孔部16が設けられている。   As shown in FIG. 3, each of the receiving plate portion 12 and the contact plate portion 13 is provided with four holes, and bolts are inserted into the holes and fastened with nuts 7 from the opposite side. It has become. A plurality of holes 16 are also provided in the angle B for attaching the step bolt.

即ち、受け板部12と当て板部13により、ステップボルト取付用のアングルBを挟み込み、受け板部12と当て板部13の孔部とアングルBの孔部16を合致させて、ボルト・ナットで締結して固定するのである。   That is, the angle B for attaching the step bolt is sandwiched between the receiving plate portion 12 and the contact plate portion 13, and the holes of the receiving plate portion 12, the contact plate portion 13 and the hole portion 16 of the angle B are made to coincide with each other. It is fastened and fixed with.

このステップボルト取付用のアングルBは、図1・図3に示すように、等辺山形鋼材を用いて長尺状に形成されている。このアングルBは、ステップボルトSを40cmの等間隔に合計8本を取り付けるものである。また、ステップボルトSを片面ずつ交互に取り付けられる、直角アングル材による等辺山形鋼材(L65×6を標準とする)を基本構造としている。   As shown in FIGS. 1 and 3, the angle B for attaching the step bolt is formed in a long shape using an equilateral mountain-shaped steel material. This angle B is for attaching a total of eight step bolts S at equal intervals of 40 cm. Further, the basic structure is an equilateral mountain-shaped steel material (L65 × 6 is standard) made of a right-angled angle material, on which step bolts S can be alternately attached to each side.

鋼管鉄塔に沿って上下方向に配置されたステップボルト取付用のアングルBの端部同士は、図4(b)に示すように、所定の継手部材14を介して、直列に連結されている。   The ends of the angle B for attaching the step bolts arranged in the vertical direction along the steel pipe tower are connected in series via a predetermined joint member 14 as shown in FIG.

尚、ステップボルト取付用のアングルBは、図4(a)(b)に示すように、ノンクライム機構15の上下においては、互いに切り離して配置される。このとき、取付治具Aからの振り放し距離は、500mm以内としている。   In addition, as shown in FIGS. 4A and 4B, the angle B for attaching the step bolt is arranged separately from each other at the top and bottom of the non-climb mechanism 15. At this time, the swinging distance from the mounting jig A is set to be within 500 mm.

この他、図5に示すように、ステップボルト取付用のアングルBには、新設用の昇降用墜落防止装置17を取り付けることができる。   In addition to this, as shown in FIG. 5, a newly installed elevating fall prevention device 17 can be attached to the angle B for attaching the step bolt.

具体的には、図5に示すように、ステップボルト取付用のアングルBに50mm間隔で設けた5つの孔部16を利用して、新設用の昇降用墜落防止装置17を取り付けている。   Specifically, as shown in FIG. 5, a new fall-preventing fall-preventing device 17 is attached using five holes 16 provided at an angle B for step bolt attachment at intervals of 50 mm.

この新設用の昇降用墜落防止装置17は、図5・図6(a)(b)に示すように、鋼板を円弧状に折り曲げて形成されたユニバーサル金具18でガイドレール19を支持し、2本のユニバーサル金具固定ボルトTでステップボルト取付用のアングルBに固定される。   As shown in FIGS. 5 and 6 (a) and 6 (b), the newly installed fall / fall prevention device 17 supports the guide rail 19 with a universal bracket 18 formed by bending a steel plate into an arc shape. It is fixed to the angle B for attaching the step bolt with the universal metal fixing bolt T.

(鉄塔構成部材としての腹材Qに設置される取付治具A)
この取付治具Aは、図7に示すように、鉄塔構成部材としての腹材Qに設置され、腹材Qにステップボルト取付用のアングルBを固定している。
(Mounting jig A installed on abdominal material Q as a steel tower component)
As shown in FIG. 7, the mounting jig A is installed on a belly material Q as a steel tower constituting member, and an angle B for attaching a step bolt is fixed to the belly material Q.

取付治具Aは、図8(a)・図9に示すように、所定の間隔を開けて腹材Qに固定される2個の脚部20と、前端部にステップボルト取付用のアングルBを固設できるブラケット具21により構成されている。   As shown in FIGS. 8 (a) and 9, the mounting jig A includes two legs 20 fixed to the abdomen Q at a predetermined interval, and an angle B for attaching a step bolt to the front end. It is comprised by the bracket tool 21 which can fix.

2個の脚部20は、図9に示すように、所定の長さを有する直角アングル状の鋼材により形成されている。また、図10に示すように、脚部20を形成するアングル鋼材の先端部には、方形状の固定板22が溶接により固定されており、この固定板22には、ボルトを挿入する孔23が設けられている。さらに、脚部20を形成するアングル鋼材の一側壁には、長孔24が設けられている。   As shown in FIG. 9, the two leg portions 20 are formed of a steel material having a right angle and having a predetermined length. As shown in FIG. 10, a square-shaped fixing plate 22 is fixed to the front end portion of the angle steel material forming the leg portion 20 by welding, and a hole 23 for inserting a bolt is inserted into the fixing plate 22. Is provided. Further, a long hole 24 is provided on one side wall of the angle steel material forming the leg portion 20.

それぞれの脚部20は、図9・図10に示すように、長孔24が設けられているアングル鋼材の一側壁を腹材Qに当接させ、腹材QにU字型ボルト25を巻回して、腹材Qに固定されている。   As shown in FIGS. 9 and 10, each leg portion 20 has one side wall of an angle steel material provided with a long hole 24 in contact with the web material Q, and a U-shaped bolt 25 is wound around the web material Q. Turned and fixed to the abdomen Q.

即ち、U字型ボルト25は、自身の各両端に設けたネジ部分を、脚部20の長孔24に挿入し、ナット26で締結することにより、腹材Qに脚部20が固定されるのである。   That is, the U-shaped bolt 25 is fixed to the abdomen Q by inserting screw portions provided at both ends of the U-shaped bolt 25 into the long holes 24 of the leg portion 20 and fastening with the nuts 26. It is.

このようにして、図8(a)・図9に示すように、2個の脚部20が、所定の間隔を開けて腹材Qに固定されている。   In this way, as shown in FIGS. 8A and 9, the two leg portions 20 are fixed to the abdomen Q with a predetermined interval.

また、2個の脚部20は、長孔24におけるU字型ボルト25とナット26の締結位置を調節することにより、前後に移動できるように腹材Qに取り付けられている。   The two legs 20 are attached to the abdomen Q so that they can move back and forth by adjusting the fastening position of the U-shaped bolt 25 and nut 26 in the long hole 24.

ブラケット具21は、図8(b)・図9に示すように、載置固定部27と、ステップボルト取付用のアングルBを挟み込んで固定する挟持部28により形成されている。この載置固定部27は、直角アングル状の鋼材により形成されている。   As shown in FIGS. 8B and 9, the bracket tool 21 is formed by a mounting fixing portion 27 and a clamping portion 28 that sandwiches and fixes the angle B for attaching the step bolt. The mounting fixing portion 27 is formed of a steel material having a right angle.

さらに、載置固定部27は、図9に示すように、2個の脚部20の端部を掛け渡すように配置している支持掛架部29に固定されている。   Further, as shown in FIG. 9, the mounting fixing portion 27 is fixed to a support hanging portion 29 that is arranged so as to span the end portions of the two leg portions 20.

この支持掛架部29は、図8(b)(c)・図9に示すように、所定の長さを有する直角アングル状の鋼材により形成されている。また、図8(c)・図9に示すように、支持掛架部29を形成するアングル鋼材の垂直壁の両端部には、それぞれ長孔30、30が設けられている。   As shown in FIGS. 8B, 8 </ b> C, and 9, the support hanging portion 29 is formed of a steel material having a right angle and a predetermined length. Further, as shown in FIGS. 8C and 9, long holes 30 and 30 are provided at both ends of the vertical wall of the angle steel material forming the support hanging portion 29, respectively.

そして、図9に示すように、支持掛架部29を形成するアングル鋼材の水平壁の上に、ブラケット具21を固定している。具体的には、ブラケット具21を形成する載置固定部27の基端部分を、支持掛架部29を形成するアングル鋼材の水平壁の上に載せ、溶接により固定しているのである。   And as shown in FIG. 9, the bracket tool 21 is being fixed on the horizontal wall of the angle steel material which forms the support hanging part 29. As shown in FIG. Specifically, the base end portion of the mounting fixing portion 27 that forms the bracket tool 21 is placed on the horizontal wall of the angle steel material that forms the support hanging portion 29 and is fixed by welding.

また、ブラケット具21を固定している支持掛架部29は、その垂直壁を脚部20の固定板22に当接させた状態で脚部20に固定されている。   In addition, the support hanging portion 29 that fixes the bracket tool 21 is fixed to the leg portion 20 with its vertical wall abutting against the fixing plate 22 of the leg portion 20.

即ち、図10に示すように、支持掛架部29の長孔30、30と脚部20の孔23を合致させ、ボルト・ナット部材を介して、脚部20に支持掛架部29を固定するのである。   That is, as shown in FIG. 10, the long holes 30 and 30 of the support hanging part 29 and the holes 23 of the leg part 20 are matched, and the support hanging part 29 is fixed to the leg part 20 through bolts and nut members. To do.

このとき、支持掛架部29の長孔30、30におけるボルト・ナット部材の締結位置を調節することにより、2個の脚部20の端部を掛け渡すように配置している支持掛架部29は、左右に移動できるように脚部20に取り付けられている。   At this time, by adjusting the fastening position of the bolt and nut member in the long holes 30 and 30 of the support hanging portion 29, the support hanging portion arranged so as to span the ends of the two leg portions 20 29 is attached to the leg part 20 so that it can move to right and left.

ブラケット具21の挟持部28は、図9に示すように、載置固定部27の先端部に固定された等辺山形鋼材を用いた受け板部31と、該受け板部31にあてがわれる等辺山形鋼材を用いた当て板部32により形成されている。   As shown in FIG. 9, the clamping portion 28 of the bracket tool 21 includes a receiving plate portion 31 using an equilateral mountain-shaped steel material fixed to the distal end portion of the mounting fixing portion 27, and an equal side applied to the receiving plate portion 31. It is formed by a backing plate portion 32 using an angle steel material.

そして、ステップボルト取付用のアングルBを受け板部31と当て板部32により挟み込んで固定するのである。   Then, the angle B for attaching the step bolt is received and fixed between the receiving plate portion 31 and the contact plate portion 32.

受け板部31と当て板部32のそれぞれには、4個の孔部が設けられ、この孔部にボルトが挿入されて、反対側からナットで締結されるようになっている。   Each of the receiving plate portion 31 and the contact plate portion 32 is provided with four holes, and bolts are inserted into the holes and fastened with nuts from the opposite side.

尚、図7乃至図10に示すそれぞれの脚部20は、鋼管状の腹材Qに固定されているものであるが、本発明はこれに限定されることはない。    Each of the leg portions 20 shown in FIGS. 7 to 10 is fixed to the steel tubular abdomen Q, but the present invention is not limited to this.

例えば、図11に示すように、脚部20を、アングル状の腹材Qに固定するものであっても差し支えない。   For example, as shown in FIG. 11, the leg 20 may be fixed to the angled belly material Q.

このとき、それぞれの脚部20は、図12に示すように、長孔24が設けられているアングル鋼材の一側壁をアングル状の腹材Qに当接させ、腹材Qと略同形状の三角型ボルト33を巻回して、腹材Qに固定されている。   At this time, as shown in FIG. 12, each leg portion 20 has one side wall of the angle steel material provided with the long holes 24 abutted against the angled abdominal material Q, and has substantially the same shape as the abdominal material Q. A triangular bolt 33 is wound around and fixed to the abdomen Q.

(鉄塔に取り付けられている昇降機用のレールRに設置される取付治具A)
この取付治具Aは、図13(a)(b)・図14に示すように、鉄塔に取り付けられている昇降機用のレールRに設置され、レールRにステップボルト取付用のアングルBを固定している。
(Mounting jig A installed on the rail R for elevators attached to the tower)
As shown in FIGS. 13 (a), (b) and FIG. 14, the mounting jig A is installed on an elevator rail R attached to a steel tower, and an angle B for attaching a step bolt is fixed to the rail R. is doing.

この昇降機用のレールRは、一般的にピンラック方式を採用している。   The rail R for the elevator generally adopts a pin rack system.

取付治具Aは、図15に示すように、前端部にステップボルト取付用のアングルBを固設できるブラケット具40により形成されている。   As shown in FIG. 15, the mounting jig A is formed by a bracket tool 40 capable of fixing an angle B for attaching a step bolt to the front end portion.

ブラケット具40は、図14・図15に示すように、昇降機用のレールRに当接して固定される当接固定部41と、この当接固定部41の先端部に取り付けられた、ステップボルト取付用のアングルBを挟み込んで固定する挟持部42により形成されている。   As shown in FIGS. 14 and 15, the bracket device 40 includes a contact fixing portion 41 that is fixed in contact with the rail R for the elevator, and a step bolt that is attached to the tip of the contact fixing portion 41. It is formed by the clamping part 42 which clamps and fixes the angle B for attachment.

ブラケット具40の当接固定部41は、図15に示すように、直角アングル状の鋼材により形成されている。また、当接固定部41を形成するアングル鋼材の、昇降機用のレールRに当接する垂直壁には、コ字型ボルト43を挿入する一対の孔44が、2段に設けられている。   As shown in FIG. 15, the contact fixing part 41 of the bracket tool 40 is formed of a steel material having a right angle. In addition, a pair of holes 44 into which the U-shaped bolts 43 are inserted are provided in two stages on the vertical wall of the angle steel material forming the contact fixing portion 41 that contacts the elevator rail R.

そして、昇降機用のレールRにブラケット具40の当接固定部41を当接させ、コ字型ボルト43により昇降機用のレールRを挟み込むようにして、コ字型ボルト43の両端ネジ部分を孔44に挿入し、反対側からナットで締結して固定するのである。   Then, the abutting and fixing portion 41 of the bracket 40 is brought into contact with the rail R for the elevator, and the rail R for the elevator is sandwiched by the U-shaped bolt 43 so that the screw portions at both ends of the U-shaped bolt 43 are perforated. It is inserted into 44 and fastened with a nut from the opposite side and fixed.

ブラケット具40の挟持部42は、図15に示すように、当接固定部41の先端部に固定された等辺山形鋼材を用いた受け板部45と、該受け板部45にあてがわれる等辺山形鋼材を用いた当て板部46により形成されている。   As shown in FIG. 15, the holding portion 42 of the bracket tool 40 includes a receiving plate portion 45 using an equilateral mountain-shaped steel material fixed to the distal end portion of the contact fixing portion 41, and an equilateral side applied to the receiving plate portion 45. It is formed by a backing plate portion 46 using an angle steel material.

そして、図13(b)に示すように、ステップボルト取付用のアングルBを受け板部45と当て板部46により挟み込んで固定するのである。   Then, as shown in FIG. 13 (b), the angle B for attaching the step bolt is sandwiched and fixed by the receiving plate portion 45 and the contact plate portion 46.

受け板部45と当て板部46のそれぞれには、4個の孔部が設けられ、この孔部にボルトが挿入されて、反対側からナットで締結されるようになっている。   Each of the receiving plate portion 45 and the contact plate portion 46 is provided with four holes. Bolts are inserted into the holes and fastened with nuts from the opposite side.

この他、図13(a)に示すように、取付治具Aを介して昇降機用のレールRに固定しているステップボルト取付用のアングルBには、新設用の昇降用墜落防止装置17を取り付けることができる。   In addition, as shown in FIG. 13 (a), a newly installed climbing prevention device 17 for raising and lowering is provided on the angle B for attaching the step bolt fixed to the rail R for the elevator through the mounting jig A. Can be attached.

具体的には、ステップボルト取付用のアングルBに50mm間隔で設けた5つの孔部16を利用して、新設用の昇降用墜落防止装置17を取り付けている。   Specifically, the newly installed elevating fall prevention device 17 is attached using the five holes 16 provided in the angle B for attaching the step bolt at intervals of 50 mm.

本発明に係る鉄塔構成部材等における昇降用ステップボルトの取付装置は、鉄塔の昇降用として利用される以外に、例えば、コンクリート柱、鋼管ポール、煙突等の如き円筒形の構造物の昇降ステップ等としても、幅広く利用することができる。   The lifting / lowering step bolt mounting device in the steel tower component according to the present invention is used for lifting the steel tower, for example, a lifting / lowering step of a cylindrical structure such as a concrete column, a steel pipe pole, a chimney, etc. However, it can be used widely.

鉄塔構成部材としての主柱材に取付治具が設置され、この取付治具を介して主柱材にステップボルト取付用のアングルが固定され、このアングルにステップボルトを取り付けた状態を示す一部拡大の側面図である。A mounting jig is installed on the main pillar material as a steel tower component, and the step bolt mounting angle is fixed to the main pillar material via this mounting jig, and a part showing the state where the step bolt is attached to this angle It is an enlarged side view. 鉄塔の主柱材への取付治具の組付状態を示すもので、(a)は断面図、(b)は側面図である。The assembly | attachment state to the main pillar material of a steel tower is shown, (a) is sectional drawing, (b) is a side view. 取付治具により鉄塔の主柱材にステップボルト取付用のアングルが固定される状態を示す分解斜視図である。It is a disassembled perspective view which shows the state by which the angle for step bolt attachment is fixed to the main pillar material of a steel tower with an attachment jig. 主柱材にノンクライム機構を取り付けた状態を示すもので、(a)は平面図、(b)は側面図である。The state which attached the non-climb mechanism to the main pillar material is shown, (a) is a top view and (b) is a side view. 取付治具を介して鉄塔の主柱材にステップボルト取付用のアングルが固定され、このアングルに昇降用墜落防止装置を取り付けた状態を示す斜視図である。It is a perspective view which shows the state which fixed the angle for step bolt attachment to the main pillar material of the steel tower via the attachment jig, and attached the fall prevention apparatus for raising / lowering to this angle. 昇降用墜落防止装置の具体的構成を示すもので、(a)は一部拡大の平面図、(b)は正面図である。The concrete structure of the fall prevention apparatus for raising / lowering is shown, (a) is a partially expanded plan view, (b) is a front view. 鉄塔構成部材としての腹材に取付治具が設置され、この取付治具を介して腹材にステップボルト取付用のアングルが固定され、このアングルにステップボルトを取り付けた状態を示す正面図である。It is a front view showing a state in which a mounting jig is installed on the abdominal material as a steel tower constituting member, an angle for attaching the step bolt is fixed to the abdominal material via the mounting jig, and the step bolt is attached to this angle. . 鋼管状の腹材に固定される取付治具の構成を示すもので、(a)は平面図、(b)は側面図、(c)は支持掛架部の断面図である。The structure of the attachment jig | tool fixed to a steel tubular abdomen is shown, (a) is a top view, (b) is a side view, (c) is sectional drawing of a support hanging part. 鉄塔構成部材としての腹材に取付治具が設置され、この取付治具を介して腹材にステップボルト取付用のアングルが固定され、このアングルにステップボルトを取り付けた状態を示す分解斜視図である。In the exploded perspective view showing a state where a mounting jig is installed on the abdominal material as a steel tower constituting member, and an angle for attaching the step bolt is fixed to the abdominal material via the mounting jig, and the step bolt is attached to this angle is there. 鉄塔構成部材としての腹材に取付治具が設置され、この取付治具を介して腹材にステップボルト取付用のアングルが固定され、このアングルにステップボルトを取り付けた状態を示す分解斜視図である。In the exploded perspective view showing a state where a mounting jig is installed on the abdominal material as a steel tower constituting member, and an angle for attaching the step bolt is fixed to the abdominal material via the mounting jig, and the step bolt is attached to this angle is there. アングル状の腹材に取付治具が設置され、この取付治具を介して腹材にステップボルト取付用のアングルが固定され、このステップボルト取付用のアングルにステップボルトを取り付けた状態を示す分解斜視図である。A mounting jig is installed on the angled belly, and the step bolt mounting angle is fixed to the belly through the mounting jig, and the step bolt is attached to the step bolt mounting angle. It is a perspective view. アングル状の腹材に固定される取付治具の構成を示す側面図である。It is a side view which shows the structure of the attachment jig fixed to an angled belly material. 昇降機用のレールへの取付治具の設置状態を示すもので、(a)はこの取付治具を介してレールにステップボルト取付用のアングルが固定され、このアングルに昇降用墜落防止装置を取り付けた状態を示す正面図、(b)はこのアングルにステップボルトを取り付けた状態を示す側面図である。This shows the installation state of the mounting jig to the rail for the elevator. (A) is the step bolt mounting angle fixed to the rail via this mounting jig, and the lifting prevention device is attached to this angle. (B) is a side view showing a state in which a step bolt is attached to this angle. 取付治具を介して昇降機用のレールにステップボルト取付用のアングルが固定され、このアングルにステップボルトを取り付けた状態を示す断面図である。It is sectional drawing which shows the state which fixed the angle for step bolt attachment to the rail for elevators via the attachment jig, and attached the step bolt to this angle. 鉄塔に取り付けたレールに取付治具が設置され、この取付治具を介してレールにステップボルト取付用のアングルが固定され、このアングルにステップボルトを取り付けた状態を示す分解斜視図である。It is an exploded perspective view showing a state where a mounting jig is installed on a rail attached to a steel tower, an angle for attaching a step bolt is fixed to the rail via the mounting jig, and a step bolt is attached to this angle. 鋼管鉄塔の主柱材への、台形金具を用いたステップボルトの従来の取り付け例を示す斜視図である。It is a perspective view which shows the example of the conventional attachment of the step bolt using the trapezoid metal fitting to the main pillar material of a steel pipe tower. 鋼管鉄塔の主柱材への、バンド部材を用いたステップボルトの従来の取り付け例を示す斜視図である。It is a perspective view which shows the example of the conventional attachment of the step bolt using the band member to the main pillar material of a steel pipe tower.

符号の説明Explanation of symbols

A…取付治具
B…ステップボルト取付用のアングル
P…主柱材
L…締結部材
S…ステップボルト
T…ユニバーサル金具固定ボルト
W…台形金具
1…支持固定具
2…ブラケット具
3…当接固定部
4…支持台部
5…当接溝部
6…取付孔部
7…ナット
8…載置固定部
9…挟持部
10…長孔
11…長孔
12…受け板部
13…当て板部
14…継手部材
15…ノンクライム機構
16…孔部
17…昇降用墜落防止装置(新設用)
18…ユニバーサル金具
19…ガイドレール
20…脚部
21…ブラケット具
22…固定板
23…孔
24…長孔
25…U字型ボルト
26…ナット
27…載置固定部
28…挟持部
29…支持掛架部
30…長孔
31…受け板部
32…当て板部
33…三角型ボルト
40…ブラケット具
41…当接固定部
42…挟持部
43…コ字型ボルト
45…受け板部
46…当て板部
A ... Mounting jig B ... Step bolt mounting angle P ... Main pillar material L ... Fastening member S ... Step bolt T ... Universal bracket fixing bolt W ... Trapezoidal bracket 1 ... Support fixture 2 ... Bracket fixture 3 ... Abutting fixation Part 4 ... Supporting base part 5 ... Contact groove part 6 ... Mounting hole part 7 ... Nut 8 ... Placement fixing part 9 ... Holding part 10 ... Long hole 11 ... Long hole 12 ... Receiving plate part 13 ... Baking plate part 14 ... Joint Member 15 ... Non-climb mechanism 16 ... Hole 17 ... Fall prevention device for raising and lowering (for new installation)
DESCRIPTION OF SYMBOLS 18 ... Universal metal fitting 19 ... Guide rail 20 ... Leg part 21 ... Bracket tool 22 ... Fixing plate 23 ... Hole 24 ... Long hole 25 ... U-shaped bolt 26 ... Nut 27 ... Mounting fixing part 28 ... Holding part 29 ... Support hook Stand 30 ... Long hole 31 ... Receiving plate portion 32 ... Retaining plate portion 33 ... Triangular bolt 40 ... Bracket tool 41 ... Contact fixing portion 42 ... Holding portion 43 ... U-shaped bolt 45 ... Receiving plate portion 46 ... Retaining plate Part

Claims (20)

鉄塔構成部材等に設置される複数の取付治具と、この取付治具により鉄塔構成部材等に固定されるステップボルト取付用の垂直部材から成ることを特徴とする鉄塔構成部材等における昇降用ステップボルトの取付装置。   Steps for ascending / descending in tower building members and the like characterized by comprising a plurality of mounting jigs installed on the steel tower constituent members and the like, and vertical members for attaching step bolts fixed to the steel tower constituent members and the like by the mounting jigs Bolt mounting device. ステップボルト取付用の垂直部材は、等辺山形鋼材を用いて長尺状のアングルにより形成され、このアングルに、ステップボルトを取り付けるための孔部を設けている請求項1に記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The vertical member for attaching the step bolt is formed by a long angle using an equilateral mountain-shaped steel material, and a hole for attaching the step bolt is provided in this angle. Equipment for step-up / down step bolts. ステップボルト取付用の垂直部材は、複数のステップボルトを等間隔に、また、複数のステップボルトについて、取付角度を90度ずらしながらアングルに固定可能である請求項1または2に記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The vertical member for attaching the step bolt can be fixed to the plurality of step bolts at equal intervals, and the plurality of step bolts can be fixed to the angle while shifting the attachment angle by 90 degrees. Mounting device for step-up / down step bolts, etc. 鉄塔構成部材等としての主柱材に、取付治具が設置される請求項1乃至3のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting device of the raising / lowering step bolt in the steel tower structural member etc. in any one of Claim 1 thru | or 3 with which a mounting jig is installed in the main pillar material as a steel tower structural member. 取付治具は、主柱材に固定される支持固定具と、前端部にステップボルト取付用のアングルを固設できるブラケット具を備えている請求項4に記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting jig includes a support fixture that is fixed to the main column member, and a bracket that can fix a step bolt mounting angle at the front end portion thereof. Bolt mounting device. 支持固定具は、主柱材に当接して固定される当接固定部と、ブラケット具を取り付ける支持台部により形成されている請求項4または5に記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   6. A step-up / down bolt for a steel tower constituting member or the like according to claim 4 or 5, wherein the support fixture is formed by an abutment fixing portion that is fixed in contact with the main pillar member and a support base portion to which the bracket device is attached. Mounting device. ブラケット具は、支持固定具の支持台部に載置して固定される載置固定部と、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成されている請求項4乃至6のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The bracket device is formed by a mounting fixing portion that is mounted and fixed on a support base portion of the supporting fixture, and a clamping portion that clamps and fixes an angle for attaching a step bolt. An apparatus for attaching a step bolt for lifting and lowering in a steel tower constituting member or the like. ブラケット具は、前後に移動できるように支持固定具の支持台部に取り付けられている請求項4乃至7のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting device of the raising / lowering step bolt in the steel tower structural member etc. in any one of Claim 4 thru | or 7 with which the bracket tool is attached to the support stand part of a support fixture so that it can move back and forth. ブラケット具の挟持部は、載置固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成され、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで固定する請求項4乃至8のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The clamping part of the bracket tool is formed by a receiving plate part using an equilateral mountain-shaped steel material fixed to the tip part of the mounting fixing part, and a contact plate part using an equilateral mountain-shaped steel material applied to the receiving plate part, 9. A step bolt mounting device for a tower tower member or the like according to any one of claims 4 to 8, wherein the step bolt mounting angle is sandwiched and fixed by a receiving plate portion and a backing plate portion. 鉄塔構成部材等としての腹材に、取付治具が設置される請求項1乃至3のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting device of the raising / lowering step bolt in the steel tower structural member etc. in any one of the Claims 1 thru | or 3 with which a mounting jig is installed in the belly material as a steel tower structural member. 取付治具は、所定の間隔を開けて腹材に固定される2個の脚部と、前端部にステップボルト取付用のアングルを固設できるブラケット具により構成されている請求項10に記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting jig is composed of two legs that are fixed to the abdomen with a predetermined interval, and a bracket that can fix a step bolt mounting angle at the front end. A device for attaching an elevating step bolt in a steel tower component or the like. ブラケット具は、載置固定部と、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成され、載置固定部は、2個の脚部の端部を掛け渡すように配置している支持掛架部に固定されている請求項10または11に記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The bracket device is formed by a mounting fixing portion and a clamping portion that clamps and fixes an angle for attaching the step bolt, and the mounting fixing portion is arranged so as to span the end portions of the two leg portions. The mounting device of the raising / lowering step bolt in the steel tower structural member etc. of Claim 10 or 11 currently fixed to the support hanging part. 2個の脚部は、前後に移動できるように腹材に取り付けられている請求項10乃至12のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting device for the step-up / down bolt in the steel tower constituting member or the like according to any one of claims 10 to 12, wherein the two leg portions are attached to the abdomen so as to be movable back and forth. 2個の脚部の端部を掛け渡すように配置している支持掛架部は、左右に移動できるように脚部に取り付けられている請求項10乃至13のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The tower structural member according to any one of claims 10 to 13, wherein the support hanging portion disposed so as to span the ends of the two leg portions is attached to the leg portion so as to be movable left and right. Mounting device for step-up / down step bolts, etc. ブラケット具の挟持部は、載置固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成され、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで固定する請求項10乃至14のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The clamping part of the bracket tool is formed by a receiving plate part using an equilateral mountain-shaped steel material fixed to the tip part of the mounting fixing part, and a contact plate part using an equilateral mountain-shaped steel material applied to the receiving plate part, 15. The step bolt mounting device for elevating / lowering step bolts in a steel tower constituting member or the like according to claim 10, wherein the step bolt mounting angle is sandwiched and fixed by a receiving plate portion and a backing plate portion. 鉄塔構成部材等としての昇降機用のレールに、取付治具が設置される請求項1乃至3のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting device of the step bolt for raising / lowering in the steel tower structural member etc. in any one of Claim 1 thru | or 3 with which a mounting jig is installed in the rail for elevators as a steel tower structural member. 取付治具は、前端部にステップボルト取付用のアングルを固設できるブラケット具により形成されている請求項16に記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting device of the raising / lowering step bolt in the steel tower structural member etc. of Claim 16 currently formed with the bracket tool which can fix the angle for step bolt attachment to the front-end part. ブラケット具は、昇降機用のレールに当接して固定される当接固定部と、この当接固定部の先端部に取り付けられた、ステップボルト取付用のアングルを挟み込んで固定する挟持部により形成されている請求項16または17に記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The bracket device is formed by a contact fixing portion that is fixed in contact with a rail for an elevator, and a clamping portion that is attached to a tip end portion of the contact fixing portion and sandwiches and fixes an angle for attaching a step bolt. The mounting device of the raising / lowering step bolt in the steel tower structural member etc. of Claim 16 or 17. ブラケット具の挟持部は、当接固定部の先端部に固定された等辺山形鋼材を用いた受け板部と、該受け板部にあてがわれる等辺山形鋼材を用いた当て板部により形成され、ステップボルト取付用のアングルを受け板部と当て板部により挟み込んで固定する請求項16乃至18のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The clamping part of the bracket tool is formed by a receiving plate part using an equilateral mountain-shaped steel material fixed to the distal end portion of the contact fixing part, and a contact plate part using an equilateral mountain-shaped steel material applied to the receiving plate part, The mounting device for the step bolt for raising / lowering in the steel tower structural member etc. in any one of Claims 16 thru | or 18 which clamps and fixes the angle for step bolt attachment between a receiving plate part and a contact plate part. ステップボルト取付用の垂直部材に、昇降用墜落防止装置を取り付けた請求項1乃至19のいずれかに記載の鉄塔構成部材等における昇降用ステップボルトの取付装置。   The mounting device of the raising / lowering step bolt in the steel tower structural member etc. in any one of Claim 1 thru | or 19 which attached the falling prevention device for raising / lowering to the vertical member for step bolt attachment.
JP2007093519A 2007-03-30 2007-03-30 Ascending/descending step-bolt mounting device for steel-tower constituting member or the like Pending JP2008253091A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007093519A JP2008253091A (en) 2007-03-30 2007-03-30 Ascending/descending step-bolt mounting device for steel-tower constituting member or the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007093519A JP2008253091A (en) 2007-03-30 2007-03-30 Ascending/descending step-bolt mounting device for steel-tower constituting member or the like

Publications (1)

Publication Number Publication Date
JP2008253091A true JP2008253091A (en) 2008-10-16

Family

ID=39977387

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007093519A Pending JP2008253091A (en) 2007-03-30 2007-03-30 Ascending/descending step-bolt mounting device for steel-tower constituting member or the like

Country Status (1)

Country Link
JP (1) JP2008253091A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104505771A (en) * 2014-12-31 2015-04-08 国家电网公司 Overhead ground wire lifter
CN104993422A (en) * 2015-06-29 2015-10-21 广东电网有限责任公司电力科学研究院 Line inspection robot on-line and off-line device and line inspection robot on-line and off-line system provided with same
JP2015190148A (en) * 2014-03-27 2015-11-02 中国電力株式会社 Simple scaffold
CN106246094A (en) * 2016-10-10 2016-12-21 国网江苏省电力公司扬州市江都区供电公司 A kind of novel mounting attachment and using method thereof
CN108358018A (en) * 2018-04-13 2018-08-03 北京国网富达科技发展有限责任公司 A kind of attachment device of electric power pylon lifting device guide rail
KR20210142968A (en) * 2020-05-19 2021-11-26 한국전력공사 Climbing device for attaching and detaching of falling-prevention

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5770347A (en) * 1980-10-20 1982-04-30 Paloma Ind Ltd Storage type gas water heater
JPH03104361A (en) * 1989-09-18 1991-05-01 Nec Corp Telephone set
JPH11200615A (en) * 1998-01-09 1999-07-27 Ntt Hokkaido Mobile Communications Network Inc Detachable ladder

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5770347A (en) * 1980-10-20 1982-04-30 Paloma Ind Ltd Storage type gas water heater
JPH03104361A (en) * 1989-09-18 1991-05-01 Nec Corp Telephone set
JPH11200615A (en) * 1998-01-09 1999-07-27 Ntt Hokkaido Mobile Communications Network Inc Detachable ladder

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015190148A (en) * 2014-03-27 2015-11-02 中国電力株式会社 Simple scaffold
CN104505771A (en) * 2014-12-31 2015-04-08 国家电网公司 Overhead ground wire lifter
CN104993422A (en) * 2015-06-29 2015-10-21 广东电网有限责任公司电力科学研究院 Line inspection robot on-line and off-line device and line inspection robot on-line and off-line system provided with same
CN104993422B (en) * 2015-06-29 2017-05-10 广东电网有限责任公司电力科学研究院 Line inspection robot on-line and off-line device and line inspection robot on-line and off-line system provided with same
CN106246094A (en) * 2016-10-10 2016-12-21 国网江苏省电力公司扬州市江都区供电公司 A kind of novel mounting attachment and using method thereof
CN108358018A (en) * 2018-04-13 2018-08-03 北京国网富达科技发展有限责任公司 A kind of attachment device of electric power pylon lifting device guide rail
KR20210142968A (en) * 2020-05-19 2021-11-26 한국전력공사 Climbing device for attaching and detaching of falling-prevention
KR102437370B1 (en) * 2020-05-19 2022-08-30 한국전력공사 Climbing device for attaching and detaching of falling-prevention

Similar Documents

Publication Publication Date Title
JP2008253091A (en) Ascending/descending step-bolt mounting device for steel-tower constituting member or the like
US20210238872A1 (en) Temporary safety railing system and method
JP2010185185A (en) Temporary handrail and its construction method
JP4716948B2 (en) Safety rope support bracket
CN110593544A (en) Steel column safety operation platform
US20040094681A1 (en) Bracket element
WO2008112381A2 (en) Industrial hangers for framing and method of fabricating the same
JP2016089601A (en) Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower
JP2006249800A (en) Construction scaffold support tool and construction scaffold
EP0338142B1 (en) Stanchion or post
JP5773469B1 (en) Suspended scaffolding
JP6170229B1 (en) Parent tug
JP2008267030A (en) Method and device for supporting anchor bolt for building structure
KR200443586Y1 (en) Wire support device
KR102420849B1 (en) Safety rope fixing mechanism for coupling a clamp
JP2011174301A (en) Method for ensuring safety of work on roof and mounting tool for safety measures used therefor
JP2008255689A (en) Column installing tool of temporary handrail and forming method of temporary handrail
JP3234035U (en) Handrail fixture
JPH11107218A (en) Suspended scaffold and method of assembly construction thereof
JPH11200615A (en) Detachable ladder
JP7409780B2 (en) Hanging equipment for hanging scaffolds and hanging scaffolding
JPH07197646A (en) Ladder fixture in steel frame erection and ladder and installing method thereof
JPH08128191A (en) Stopper construction of suspension device, etc., of scaffolding
JP7391284B1 (en) Scaffold board fixing device and elevator work car device using the same
JP2002262420A (en) Temporary arm equipment for power-transmission steel tower and installation method for the equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100309

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110607

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110927

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120206