JP2016089601A - Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower - Google Patents

Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower Download PDF

Info

Publication number
JP2016089601A
JP2016089601A JP2014235981A JP2014235981A JP2016089601A JP 2016089601 A JP2016089601 A JP 2016089601A JP 2014235981 A JP2014235981 A JP 2014235981A JP 2014235981 A JP2014235981 A JP 2014235981A JP 2016089601 A JP2016089601 A JP 2016089601A
Authority
JP
Japan
Prior art keywords
curing net
suspension scaffold
antenna support
tower
communication tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2014235981A
Other languages
Japanese (ja)
Inventor
幸二 合田
Koji Aida
幸二 合田
田中 栄二
Eiji Tanaka
栄二 田中
山下 和彦
Kazuhiko Yamashita
和彦 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2014235981A priority Critical patent/JP2016089601A/en
Publication of JP2016089601A publication Critical patent/JP2016089601A/en
Pending legal-status Critical Current

Links

Images

Abstract

PROBLEM TO BE SOLVED: To provide an apparatus for installing a suspended scaffold and a curing net that are used in painting work of a communications steel tower and can be easily installed and removed.SOLUTION: An apparatus for installing a suspended scaffold and a curing net that are disposed in an antenna support of a communications steel tower having an upper support and a lower support comprises: a plurality of suspended scaffold frames each comprising an upper horizontal member disposed on upper surfaces of components constituting the upper support, a pair of vertical members connected to vicinities of both ends of the upper horizontal member, and a lower horizontal member disposed to mutually connect ends of the pair of vertical members not connected to the upper horizontal member; upper connection components connecting the plurality of suspended scaffold frames near the connections between the upper horizontal members and the vertical members; lower connection components connecting the plurality of suspended scaffold frames near the connections between the vertical members and the lower horizontal members; floor members disposed via the lower connection components; and an apparatus for disposing a substantially cylindrical curing net around the communications steel tower.SELECTED DRAWING: Figure 5

Description

本発明は、通信用鉄塔の塗装工事において、作業者が乗る作業用足場と、ケレン屑や塗料の飛沫が周辺に飛散するのを防ぐための養生ネットを設置する装置に関するものである。  TECHNICAL FIELD The present invention relates to an apparatus for installing a work scaffold on which an operator rides and a curing net for preventing splashes of kelen debris and paint from splashing in the vicinity in the painting work of a communication tower.

一般に通信用鉄塔は、地上もしくは建物の屋上から縦方向に沿って立設される鉄塔本体と、鉄塔本体から横方向に突出するアンテナ支持部とを備えている。前記鉄塔本体の構造としては、トラス構造、ラーメン構造または単柱構造がある。  Generally, a communication tower includes a tower main body that is erected along the vertical direction from the ground or the roof of a building, and an antenna support that protrudes laterally from the tower main body. The structure of the steel tower body includes a truss structure, a ramen structure, or a single pillar structure.

前記トラス構造の鉄塔本体は、縦方向に沿って配置され、鉄塔本体の上端まで延びる複数の主柱材と、横方向に配置され、主柱材同士を連結する複数の水平材と、主柱材や水平材と傾斜するように配置される複数の斜材とを備えている。  The truss structure steel tower main body is arranged along the vertical direction and extends to the upper end of the steel tower main body, a plurality of main pillar materials arranged in the horizontal direction and connecting the main pillar materials to each other, and the main pillar And a plurality of diagonal members arranged so as to be inclined.

前記ラーメン構造の鉄塔本体は、縦方向に沿って配置され、鉄塔本体の上端まで延びる複数の主柱材と、横方向に配置され、主柱材同士を連結する複数の水平材とを備えている。  The tower body of the ramen structure includes a plurality of main pillar members that are arranged along the vertical direction and extend to the upper end of the tower main body, and a plurality of horizontal members that are arranged in the lateral direction and connect the main pillar members to each other. Yes.

前記単柱構造の鉄塔本体は、両端にフランジ部を有する円筒状の鋼管を複数連設し、縦方向に沿って配置される各鋼管がフランジ部同士をボルトナットで接合されて構成されている。  The steel tower body having a single pillar structure is formed by connecting a plurality of cylindrical steel pipes having flange portions at both ends, and the steel pipes arranged along the longitudinal direction are joined to each other by bolts and nuts. .

前記アンテナ支持部の構造は、一般に図1および図2に示すようなアーム方式と、図3および図4に示すようなリング方式とが採用されている。なお、図1から図4のアンテナ支持部の構造例において、鉄塔本体は単柱構造の場合を示しているが、鉄塔本体がトラス構造およびラーメン構造の場合においても、アンテナ支持部の構造はアーム方式またはリング方式が採用されている。  As the structure of the antenna support portion, an arm system as shown in FIGS. 1 and 2 and a ring system as shown in FIGS. 3 and 4 are generally adopted. In addition, in the structural example of the antenna support part of FIGS. 1 to 4, the steel tower body has a single pillar structure, but even when the steel tower body has a truss structure and a ramen structure, the structure of the antenna support part is an arm. A method or a ring method is adopted.

前記アーム方式のアンテナ支持部120は、図1に示すように、鉄塔本体110の上部に複数のアンテナ支持柱102を立設固定するための上側支持部121と下側支持部122とで構成されている。この上側支持部121および下側支持部122は、図2に示すように、H形鋼,山形鋼または溝形鋼からなる一対の腕金主材123,123を鉄塔本体110から横方向に突出させるようにして配置して、鉄塔本体110を構成する鋼管111の外周に固定されているアーム固定材124にボルトナットで固定されるとともに、一対の腕金主材123,123を連結するようにして、一対の腕金主材123,123の先端部に支持柱取付用ブラケット125が取り付けられて構成されている。また、前記支持柱取付用ブラケット125を介してアンテナ支持柱102が立設固定される。なお、図示していないが、通信用のアンテナは前記アンテナ支持柱102に設置される。  As shown in FIG. 1, the arm-type antenna support part 120 is composed of an upper support part 121 and a lower support part 122 for standingly fixing a plurality of antenna support pillars 102 to the upper part of the tower main body 110. ing. As shown in FIG. 2, the upper support portion 121 and the lower support portion 122 project a pair of arm metal main members 123, 123 made of H-shaped steel, angle steel, or channel steel from the tower body 110 in the lateral direction. A pair of arm metal main members 123, 123 are connected to the arm fixing member 124 fixed to the outer periphery of the steel pipe 111 constituting the tower main body 110 with bolts and nuts, A support post mounting bracket 125 is attached to the distal end portion of the brace main material 123, 123. Further, the antenna support pillar 102 is erected and fixed via the support pillar mounting bracket 125. Although not shown, a communication antenna is installed on the antenna support pillar 102.

前記リング方式のアンテナ支持部130は、図3に示すように、鉄塔本体110の上部に複数のアンテナ支持柱102を立設固定するための上側支持部131と下側支持部132とで構成されている。この上側支持部131および下側支持部132は、図4に示すように、H形鋼,山形鋼または溝形鋼からなる接続部材133を鉄塔本体110の外周に放射状に配置して、鉄塔本体110を構成する鋼管111の外周に固定されているリング固定材134にボルトナットで固定されるとともに、接続部材133の先端部を円形に形成したリング部材135で連結して構成されている。また、上側支持部131および下側支持部132のリング部材135には支持柱取付用ブラケット136が取り付けられており、この支持柱取付用ブラケット136を介してアンテナ支持柱102が立設固定される。なお、図示していないが、通信用のアンテナは前記アンテナ支持柱102に設置される。  As shown in FIG. 3, the ring-type antenna support part 130 includes an upper support part 131 and a lower support part 132 for standing and fixing a plurality of antenna support pillars 102 on the top of the tower main body 110. ing. As shown in FIG. 4, the upper support portion 131 and the lower support portion 132 are arranged such that connecting members 133 made of H-shaped steel, angle steel, or grooved steel are arranged radially on the outer periphery of the tower main body 110, 110 is fixed to a ring fixing member 134 fixed to the outer periphery of the steel pipe 111 constituting the 110 with bolts and nuts, and the connecting member 133 is connected to a ring member 135 having a circular end. A support column mounting bracket 136 is attached to the ring members 135 of the upper support portion 131 and the lower support portion 132, and the antenna support column 102 is erected and fixed via the support column mounting bracket 136. . Although not shown, a communication antenna is installed on the antenna support pillar 102.

通信用鉄塔の構成部材の表面には、防錆や周辺環境との調和のために、溶融亜鉛めっき処理や塗装などの表面処理が施されているが、これらの表面処理は経年により劣化するため、定期的に補修塗装を施している。通信用鉄塔の塗装工事では、ケレン屑や塗料の飛沫が周辺に飛散するのを防ぐために、養生ネットで通信用鉄塔を囲った状態で塗装工事が行われている。養生ネットを通信用鉄塔の周囲に設置する方法として、従来は通信用鉄塔の周囲に鋼管等からなる組立足場を地上もしくは建物の屋上より組み立て、金具や紐を用いて前記組立足場に養生ネットを取り付ける方法が採られていた。  The surface of the components of the communication tower is subjected to surface treatments such as hot dip galvanizing and painting for rust prevention and harmony with the surrounding environment, but these surface treatments deteriorate over time. Regular repairs are applied. In the construction work of the communication tower, the paint work is carried out in a state where the communication tower is surrounded by a curing net in order to prevent scattering of keren waste and paint from the surrounding area. As a method of installing a curing net around a communication tower, conventionally, an assembly scaffold made of steel pipes, etc. is assembled around the communication tower from the ground or from the roof of the building, and the curing net is attached to the assembly scaffold using metal fittings and strings. The method of attaching was taken.

従来の組立足場では、鋼管等からなる組立足場を地上もしくは建物の屋上より組み立てるため、数多くの鋼管等の部材を必要とし、部材の搬入,組立足場の組み立ておよび解体撤去に手間がかかるという問題があった。また、養生ネットを金具や紐を用いて組立足場に取り付けるため、養生ネットの取り付けおよび取り外しに手間がかかるという問題もあった。  In conventional assembly scaffolds, assembling scaffolds made of steel pipes or the like are assembled from the ground or the roof of a building, so many members such as steel pipes are required, and it takes time to carry in the assembly of the members, assembly of the assembly scaffolds, and dismantling. there were. In addition, since the curing net is attached to the assembly scaffold using metal fittings and strings, there is a problem that it takes time to attach and remove the curing net.

そのため、地上もしくは建物の屋上から組み立てる組立足場ではなく、吊り足場を用いる方法が採用されている。例えば、アンテナ支持部がリング方式のトラス構造鉄塔において、板状体の中央部に鉄塔の基部が入る大きさの開口部を有し、作業者が当該板状体の上を歩行可能な足場を設け、当該足場を、中央部の開口部に鉄塔の基部を入れて設置し、当該足場をアンテナ支持部から垂下した三本以上の線状体に支持させ、当該線状体を巻き上げまたは繰り出す手段を設け、これらの線状体の長さを変化させることにより上記足場を昇降自在とし、当該足場の外周縁または下面から当該鉄塔を略囲繞する大きさの略筒状の養生ネットを当該鉄塔に沿って垂下させる方法が提案されている(例えば、特許文献1参照。)。  Therefore, a method using a suspended scaffold is adopted instead of an assembly scaffold assembled from the ground or the roof of a building. For example, in a truss structure steel tower with an antenna support, an opening having a size that allows the base of the steel tower to enter the center of the plate-like body, and a scaffold on which an operator can walk on the plate-like body is provided. Means for installing the scaffold with the base of the steel tower placed in the opening in the center, supporting the scaffold on three or more linear bodies suspended from the antenna support, and rolling up or feeding the linear body The scaffold can be raised and lowered by changing the lengths of these linear bodies, and a substantially cylindrical curing net of a size that substantially surrounds the steel tower from the outer peripheral edge or the lower surface of the scaffold is attached to the steel tower. There has been proposed a method of hanging along (see, for example, Patent Document 1).

実用新案登録第3122935号公報Utility Model Registration No. 3122935

しかしながら、アンテナ支持部がリング方式のトラス構造鉄塔で採用されている従来の吊り足場の場合、吊り足場自体を昇降させるために大型のウインチやワイヤー等の昇降設備が必要となり、さらに養生ネットを昇降させるためのウインチやワイヤー等の昇降設備も必要となることから、昇降設備が大掛かりで複雑となり、吊り足場の設置や解体に手間がかかるという問題があった。  However, in the case of a conventional suspension scaffold where the antenna support is adopted in a ring-type truss structure steel tower, a lifting device such as a large winch or wire is required to raise and lower the suspension scaffold itself, and the curing net is also raised and lowered. Since lifting equipment such as a winch and a wire is also required, the lifting equipment is large and complicated, and there is a problem that it takes time to install and dismantle the suspension scaffold.

また、アンテナ支持部がリング方式のトラス構造鉄塔で採用されている従来の吊り足場は、鉄塔本体の下部で組み立てられて、昇降設備によりアンテナ支持部の直ぐ下の位置まで上昇させて設置されるため、塔体幅が鉄塔本体の上部より下部の方が広くなるトラス構造鉄塔またはラーメン構造鉄塔の場合、吊り足場の幅を下部の塔体幅よりも広くする必要がある。したがって、吊り足場の面積が大きくなることから、吊り足場を構成する部材の数が多くなり、さらに部材サイズも大きくなるため、吊り足場の設置や解体に手間がかかるという問題があった。  In addition, the conventional suspension scaffold in which the antenna support is adopted in the ring-type truss structure steel tower is assembled at the lower part of the tower main body, and is installed by raising it to a position just below the antenna support by the lifting equipment. Therefore, in the case of a truss structure steel tower or a ramen structure steel tower where the tower width is wider at the lower part than the upper part of the steel tower body, the suspension scaffold needs to be wider than the lower tower width. Therefore, since the area of the suspension scaffold is increased, the number of members constituting the suspension scaffold is increased, and the size of the member is also increased. Therefore, there is a problem that it takes time to install and disassemble the suspension scaffold.

また、アンテナ支持部がリング方式のトラス構造鉄塔で採用されている従来の吊り足場を、アーム方式またはリング方式のアンテナ支持部が複数段設置されている通信用鉄塔に適用した場合、吊り足場は、鉄塔本体の下部で組み立てられて、昇降設備により下段のアンテナ支持部の直ぐ下の位置まで上昇させて設置されるため、下段のアンテナ支持部を解体し撤去しない限り、下段のアンテナ支持部より上方には吊り足場を設置することができないという問題があった。  In addition, when the conventional suspension scaffolding used for the ring-type truss structure steel tower is applied to a communication tower with multiple stages of arm-type or ring-type antenna support parts, the suspension scaffold is Because it is assembled at the lower part of the tower body and raised by the lifting equipment to a position just below the lower antenna support part, unless the lower antenna support part is disassembled and removed, the lower antenna support part There was a problem that a suspension scaffold could not be installed above.

そこで、本発明の課題は、吊り足場を昇降させることなく、通信用鉄塔のアンテナ支持部に直接設置する構造とすることで、吊り足場を昇降させるための昇降設備を不要とし、吊り足場の設置や解体が容易にできる吊り足場を提供することにある。  Therefore, an object of the present invention is to provide a structure that is directly installed on the antenna support part of the communication tower without raising and lowering the suspension scaffold, thereby eliminating the need for lifting equipment for raising and lowering the suspension scaffold. It is to provide a suspension scaffold that can be easily disassembled.

また、アーム方式またはリング方式のアンテナ支持部が複数段設置されている通信用鉄塔においても、下段のアンテナ支持部を解体し撤去することなく、下段のアンテナ支持部よりも上方に設置することができる吊り足場を提供することにある。  In addition, even in a communication tower in which a plurality of stages of arm type or ring type antenna support parts are installed, it is possible to install the antenna support part above the lower antenna support part without disassembling and removing the lower antenna support part. It is to provide a suspension scaffold that can be used.

また、本発明の吊り足場を使用する場合において、通信用鉄塔の周囲に設置する養生ネットを任意の高さに容易に設置することができる養生ネットの設置装置を提供することにある。  Moreover, when using the suspension scaffold of this invention, it is providing the installation apparatus of the curing net which can install the curing net installed around a communication tower at arbitrary height easily.

上記の課題を解決するため、本発明の通信用鉄塔の塗装工事に用いられる吊り足場および養生ネット設置装置は、通信用鉄塔に複数のアンテナ支持柱を立設固定するための、上側支持部と下側支持部とを有するアンテナ支持部に設置される吊り足場および養生ネットを設置する装置であって、アンテナ支持部の上側支持部を構成する部材の上面に設置され、両端が上側支持部から水平方向に突出する長さに形成されている上側水平材と、前記上側水平材の両端部付近に各々接続されて、上側水平材に対して鉛直方向に配置され、上側水平材に接続されていない側の端部がアンテナ支持部の下側支持部より下方に突出する長さに形成されている一対の垂直材と、前記一対の垂直材の上側水平材に接続されていない側の端部同士を接続するように設置される下側水平材とを有する複数の吊り足場用フレームと、前記複数の吊り足場用フレームを各吊り足場用フレームの上側水平材と垂直材の接続部付近で接続する上側接続部材と、前記複数の吊り足場用フレームを各吊り足場用フレームの垂直材と下側水平材の接続部付近で接続する下側接続部材と、下側接続部材を介して設置される床材と、略筒状の養生ネットを通信用鉄塔の周囲に設置する装置とで構成されていることを特徴としている。  In order to solve the above problems, the suspension scaffold and curing net installation device used in the communication tower painting work of the present invention includes an upper support section for standingly fixing a plurality of antenna support pillars to the communication tower. An apparatus for installing a suspension scaffold and a curing net installed on an antenna support unit having a lower support unit, installed on the upper surface of a member constituting the upper support unit of the antenna support unit, both ends from the upper support unit An upper horizontal member formed in a length protruding in the horizontal direction and connected to the vicinity of both ends of the upper horizontal member, arranged in a vertical direction with respect to the upper horizontal member, and connected to the upper horizontal member. A pair of vertical members formed with a length that protrudes downward from the lower support portion of the antenna support portion, and an end portion of the pair of vertical members not connected to the upper horizontal member To connect each other A plurality of suspension scaffold frames having a lower horizontal member placed thereon, and an upper connection member that connects the plurality of suspension scaffold frames in the vicinity of the connection portion between the upper horizontal member and the vertical member of each suspension scaffold frame, A lower connecting member for connecting the plurality of suspension scaffolding frames in the vicinity of the connecting portion between the vertical member and the lower horizontal member of each suspension scaffolding frame, a floor member installed via the lower connecting member, and a substantially cylinder It is characterized by being comprised with the apparatus which installs a shaped curing net | network around the communication tower.

また、略筒状の養生ネットを通信用鉄塔の周囲に設置する装置は、通信用鉄塔の周囲に設置される略筒状の養生ネットと、アンテナ支持部の上側支持部を構成する部材の上面に設置され、両端が上側支持部から水平方向に突出する長さに形成されている養生ネット用水平材と、養生ネット用水平材の両端に設置される滑車と、通信用鉄塔の基部付近に設置されるウインチとを有しており、前記養生ネットの上端部にはワイヤーが固定されていること、前記ワイヤーは養生ネット用水平材の両端に設置されている滑車を介してウインチに巻き付けられていること、前記ワイヤーをウインチにより引き出しまたは巻き取りすることで、養生ネットを通信用鉄塔に沿って昇降自在に設けたことを特徴としている。  Moreover, the apparatus which installs a substantially cylindrical curing net around a communication tower is a substantially cylindrical curing net installed around a communication tower and the upper surface of a member constituting the upper support part of the antenna support part. Near the base of the telecommunication tower and the horizontal material for the curing net, both ends of which are protruded horizontally from the upper support, the pulleys installed at both ends of the horizontal material for the curing net A winch to be installed, and a wire is fixed to the upper end of the curing net, and the wire is wound around the winch via pulleys installed at both ends of the horizontal material for the curing net. In addition, the curing net is provided so as to be movable up and down along the communication tower by pulling out or winding the wire with a winch.

本発明の通信用鉄塔の塗装工事に用いられる吊り足場および養生ネット設置装置によれば、吊り足場を通信用鉄塔のアンテナ支持部に直接設置するため、通信用鉄塔の下部で組み立てられた吊り足場をアンテナ支持部の直ぐ下の位置まで上昇させる必要がなく、吊り足場自体を昇降させるための大型のウインチやワイヤー等の昇降設備が不要となり、養生ネットを昇降させるためのウインチやワイヤー等の昇降設備だけとなることから、昇降設備が大掛かりとならず、吊り足場の設置や解体に手間がかからず容易に行うことができる。  According to the suspension scaffold and curing net installation apparatus used for the communication tower painting work of the present invention, the suspension scaffold assembled at the lower part of the communication tower in order to install the suspension scaffold directly on the antenna support portion of the communication tower. There is no need to raise the cable to the position directly below the antenna support, and there is no need for lifting equipment such as a large winch or wire to raise or lower the suspension scaffold itself, and raising or lowering a winch or wire to raise or lower the curing net. Since there is only equipment, the lifting equipment does not become large, and it is easy to install and disassemble the suspension scaffold without any trouble.

また、通信用鉄塔の下部で組み立てられた吊り足場をアンテナ支持部の直ぐ下の位置まで上昇させて設置するのではなく、吊り足場を通信用鉄塔のアンテナ支持部に直接設置することから、吊り足場の幅を通信用鉄塔の下部の塔体幅よりも広くする必要がないため、吊り足場を構成する部材の数が多くなったり、部材サイズが大きくなることがなく、吊り足場の設置や解体に手間がかからず容易に行うことができる。  In addition, the suspension scaffold assembled at the lower part of the communication tower is not set up to a position just below the antenna support part, but is installed directly on the antenna support part of the communication tower. Since there is no need to make the width of the scaffold wider than the tower width at the bottom of the communication tower, the number of members constituting the suspension scaffold does not increase and the size of the members does not increase. It can be done easily without much trouble.

また、吊り足場を通信用鉄塔のアンテナ支持部に直接設置するため、アーム方式またはリング方式のアンテナ支持部が複数段設置されている通信用鉄塔においても、アンテナ支持部を解体し撤去することなく、下段のアンテナ支持部よりも上方のアンテナ支持部に吊り足場を設置することができる。  In addition, since the suspension scaffold is installed directly on the antenna support section of the communication tower, even in a communication tower where multiple stages of arm or ring antenna support sections are installed, the antenna support section is not disassembled and removed. The suspension scaffold can be installed on the antenna support part above the lower antenna support part.

また、養生ネットの上端部にはワイヤーが固定され、前記ワイヤーは養生ネット用水平材の両端に設置されている滑車を介してウインチに巻き付けられており、前記ワイヤーをウインチにより引き出しまたは巻き取りすることで、養生ネットを通信用鉄塔に沿って昇降自在に設けているので、養生ネットを通信用鉄塔に対して任意の高さに容易に設置することができる。  Further, a wire is fixed to the upper end of the curing net, and the wire is wound around the winch via pulleys installed at both ends of the horizontal material for the curing net, and the wire is pulled out or wound by the winch. Thus, since the curing net is provided so as to move up and down along the communication tower, the curing net can be easily installed at an arbitrary height with respect to the communication tower.

さらに、養生ネットは、吊り足場の外周縁または下面から垂下するのではなく、通信用鉄塔のアンテナ支持部に取り付けられた養生ネット用水平材から垂下するようにしたから、養生ネットの外径に合わせて吊り足場の幅を設定する必要はなく、養生ネットの外径に合わせて養生ネット用水平材の長さを設定すればよい。したがって、養生ネットの外径に合わせて吊り足場の幅を大きくする必要がないことから、吊り足場を構成する部材の数が多くなったり、部材サイズが大きくなることがないため、吊り足場の設置や解体に手間がかからず容易に行うことができる。  In addition, the curing net is not suspended from the outer periphery or bottom surface of the suspension scaffold, but is suspended from the horizontal material for the curing net attached to the antenna support of the communication tower. It is not necessary to set the width of the suspension scaffold together, and the length of the horizontal material for the curing net may be set according to the outer diameter of the curing net. Therefore, since there is no need to increase the width of the suspension scaffold according to the outer diameter of the curing net, the number of members constituting the suspension scaffold does not increase and the member size does not increase. And can be easily done without the hassle of dismantling.

単柱構造鉄塔のアーム方式のアンテナ支持部の一例を示す正面図である。It is a front view which shows an example of the arm-type antenna support part of a single pillar structure steel tower. 単柱構造鉄塔のアーム方式のアンテナ支持部の一例を示す上面図である。It is a top view which shows an example of the arm type antenna support part of a single pillar structure steel tower. 単柱構造鉄塔のリング方式のアンテナ支持部の一例を示す正面図である。It is a front view which shows an example of the ring-type antenna support part of a single pillar structure steel tower. 単柱構造鉄塔のリング方式のアンテナ支持部の一例を示す上面図である。It is a top view which shows an example of the ring-type antenna support part of a single pillar structure steel tower. アンテナ支持部がアーム方式の単柱構造鉄塔に設置された吊り足場の一例を示す正面図である。It is a front view which shows an example of the suspension scaffold with which the antenna support part was installed in the arm-type single pillar structure steel tower. アンテナ支持部がアーム方式の単柱構造鉄塔に設置された吊り足場の一例を示す上面図である。It is a top view which shows an example of the suspension scaffold with which the antenna support part was installed in the arm type single pillar structure steel tower. 図6のB−B線から見た吊り足場用フレームの正面図である。It is a front view of the frame for suspension scaffolds seen from the BB line of FIG. 図5のA−A線から見た吊り足場の平面図である。It is a top view of the suspension scaffold seen from the AA line of FIG. 図8の吊り足場平面への床材の設置状態を示す平面図である。It is a top view which shows the installation state of the flooring to the suspension scaffold plane of FIG. 床材の斜視図である。It is a perspective view of a flooring. 略筒状の養生ネットをアンテナ支持部がアーム方式の単柱構造鉄塔の周囲に設置する装置の一例を示す上面図である。It is a top view which shows an example of the apparatus which installs a substantially cylindrical curing net in the circumference | surroundings of the single pillar structure steel tower whose antenna support part is an arm system. 図11のC−C線から見た養生ネット用水平材の正面図である。It is a front view of the horizontal material for a curing net seen from CC line of FIG. 図11のC−C線から見た養生ネットの設置状態を示す正面図である。It is a front view which shows the installation state of the curing net seen from the CC line of FIG. 図11のD−D線から見た養生ネットの設置状態を示す正面図である。It is a front view which shows the installation state of the curing net seen from the DD line | wire of FIG. アンテナ支持部がリング方式の単柱構造鉄塔に設置された吊り足場の一例を示す正面図である。It is a front view which shows an example of the suspension scaffold with which the antenna support part was installed in the ring-type single pillar structure steel tower. アンテナ支持部がリング方式の単柱構造鉄塔に設置された吊り足場の一例を示す上面図である。It is a top view which shows an example of the suspension scaffold with which the antenna support part was installed in the ring-type single pillar structure steel tower. 図16のF−F線から見た吊り足場用フレームの正面図である。It is a front view of the frame for suspension scaffolds seen from the FF line of FIG. 図15のE−E線から見た吊り足場の平面図である。It is a top view of the suspension scaffold seen from the EE line | wire of FIG. 図18の吊り足場平面への床材の設置状態を示す平面図である。It is a top view which shows the installation state of the flooring to the suspension scaffold plane of FIG. 略筒状の養生ネットをアンテナ支持部がリング方式の単柱構造鉄塔の周囲に設置する装置の一例を示す上面図である。It is a top view which shows an example of the apparatus which installs a substantially cylindrical curing net in the circumference | surroundings of a single pillar structure steel tower whose antenna support part is a ring system. 図20のG−G線から見た養生ネット用水平材の正面図である。It is a front view of the horizontal material for a curing net seen from the GG line of FIG. 図20のG−G線から見た養生ネットの設置状態を示す正面図である。It is a front view which shows the installation state of the curing net seen from the GG line of FIG. 図20のH−H線から見た養生ネットの設置状態を示す正面図である。It is a front view which shows the installation state of the curing net seen from the HH line | wire of FIG. リング方式のアンテナ支持部が2段設置されているトラス構造鉄塔への吊り足場および養生ネットの設置状態を示す正面図である。It is a front view which shows the installation state of the suspension scaffold to the truss structure steel tower in which the ring type antenna support part is installed in two steps, and a curing net.

以下、本発明の実施形態を、添付の図面を参照しながら詳細に説明する。  Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

一般に通信用鉄塔は、地上もしくは建物の屋上から縦方向に沿って立設される鉄塔本体と、鉄塔本体から横方向に突出するアンテナ支持部とを備えている。前記鉄塔本体の構造としては、トラス構造、ラーメン構造または単柱構造がある。  Generally, a communication tower includes a tower main body that is erected along the vertical direction from the ground or the roof of a building, and an antenna support that protrudes laterally from the tower main body. The structure of the steel tower body includes a truss structure, a ramen structure, or a single pillar structure.

前記アンテナ支持部の構造は、一般にアーム方式とリング方式とが採用されている。アンテナ支持部の構造例として、図1に単柱構造鉄塔のアーム方式のアンテナ支持部の一例を示す正面図、図2に単柱構造鉄塔のアーム方式のアンテナ支持部の一例を示す上面図、図3に単柱構造鉄塔のリング方式のアンテナ支持部の一例を示す正面図、図4に単柱構造鉄塔のリング方式のアンテナ支持部の一例を示す上面図を示す。なお、図1から図4のアンテナ支持部の構造例において、鉄塔本体は単柱構造の場合を示しているが、鉄塔本体がトラス構造およびラーメン構造の場合においても、アンテナ支持部の構造はリング方式またはアーム方式が採用されている。  As the structure of the antenna support portion, an arm method and a ring method are generally employed. As an example of the structure of the antenna support portion, FIG. 1 is a front view showing an example of an arm-type antenna support portion of a single-column tower, FIG. 2 is a top view showing an example of an arm-type antenna support portion of a single-column structure tower, FIG. 3 is a front view showing an example of a ring-type antenna support part of a single-column structure tower, and FIG. 4 is a top view showing an example of a ring-type antenna support part of a single-column structure tower. In the example of the structure of the antenna support portion of FIGS. 1 to 4, the tower body has a single pillar structure, but the structure of the antenna support section is a ring even when the tower body has a truss structure and a ramen structure. The system or the arm system is adopted.

まず、図1および図2に示す単柱構造鉄塔のアーム方式のアンテナ支持部について説明する。単柱構造鉄塔100は、地上もしくは建物の屋上から縦方向に沿って立設される鉄塔本体110と、鉄塔本体110から横方向に突出するアンテナ支持部120とを備えている。鉄塔本体110は、両端にフランジ部112を有する円筒状の鋼管111を複数連設し、縦方向に沿って配置される各鋼管111がフランジ部同士112,112をボルトナットで接合されて構成されている。  First, the arm-type antenna support portion of the single-column tower shown in FIGS. 1 and 2 will be described. The single-pillar structure tower 100 includes a tower main body 110 that is erected along the vertical direction from the ground or the roof of the building, and an antenna support 120 that protrudes laterally from the tower main body 110. The steel tower body 110 is formed by connecting a plurality of cylindrical steel pipes 111 having flange portions 112 at both ends, and the steel pipes 111 arranged along the longitudinal direction are joined to each other with the flange portions 112 and 112 by bolts and nuts. ing.

前記アーム方式のアンテナ支持部120は、図1に示すように、鉄塔本体110の上部に複数のアンテナ支持柱102を立設固定するための上側支持部121と下側支持部122とで構成されている。この上側支持部121および下側支持部122は、図2に示すように、H形鋼,山形鋼または溝形鋼からなる一対の腕金主材123,123を鉄塔本体110から横方向に突出させるようにして配置して、鉄塔本体110を構成する鋼管111の外周に固定されているアーム固定材124にボルトナットで固定されるとともに、一対の腕金主材123,123を連結するようにして、一対の腕金主材123,123の先端部に支持柱取付用ブラケット125が取り付けられて構成されている。なお、図2は上側支持部121の構造を示しているが、下側支持部122も上側支持部121と同じ構造である。  As shown in FIG. 1, the arm-type antenna support part 120 is composed of an upper support part 121 and a lower support part 122 for standingly fixing a plurality of antenna support pillars 102 to the upper part of the tower main body 110. ing. As shown in FIG. 2, the upper support portion 121 and the lower support portion 122 project a pair of arm metal main members 123, 123 made of H-shaped steel, angle steel, or channel steel from the tower body 110 in the lateral direction. A pair of arm metal main members 123, 123 are connected to the arm fixing member 124 fixed to the outer periphery of the steel pipe 111 constituting the tower main body 110 with bolts and nuts, A support post mounting bracket 125 is attached to the distal end portion of the brace main material 123, 123. 2 shows the structure of the upper support 121, the lower support 122 has the same structure as the upper support 121. FIG.

また、上側支持部121の支持柱取付用ブラケット125と下側支持部122の支持柱取付用ブラケット125とを介してアンテナ支持柱102が立設固定される。なお、図示していないが、通信用のアンテナは前記アンテナ支持柱102に設置される。  Further, the antenna support column 102 is erected and fixed through the support column mounting bracket 125 of the upper support portion 121 and the support column mounting bracket 125 of the lower support portion 122. Although not shown, a communication antenna is installed on the antenna support pillar 102.

次に、図3および図4に示す単柱構造鉄塔のリング方式のアンテナ支持部について説明する。前記リング方式のアンテナ支持部130は、図3に示すように、鉄塔本体110の上部に複数のアンテナ支持柱102を立設固定するための上側支持部131と下側支持部132とで構成されている。この上側支持部131および下側支持部132は、図4に示すように、H形鋼,山形鋼または溝形鋼からなる接続部材133を鉄塔本体110の外周に放射状に配置して、鉄塔本体110を構成する鋼管111の外周に固定されているリング固定材134にボルトナットで固定されるとともに、接続部材133の先端部を円形に形成したリング部材135で連結して構成されている。なお、図4は上側支持部131の構造を示しているが、下側支持部132も上側支持部131と同じ構造である。  Next, the ring-type antenna support portion of the single pillar structure tower shown in FIGS. 3 and 4 will be described. As shown in FIG. 3, the ring-type antenna support part 130 includes an upper support part 131 and a lower support part 132 for standing and fixing a plurality of antenna support pillars 102 on the top of the tower main body 110. ing. As shown in FIG. 4, the upper support portion 131 and the lower support portion 132 are arranged such that connecting members 133 made of H-shaped steel, angle steel, or grooved steel are arranged radially on the outer periphery of the tower main body 110, 110 is fixed to a ring fixing member 134 fixed to the outer periphery of the steel pipe 111 constituting the 110 with bolts and nuts, and the connecting member 133 is connected to a ring member 135 having a circular end. 4 shows the structure of the upper support portion 131, the lower support portion 132 has the same structure as the upper support portion 131.

また、上側支持部131および下側支持部132のリング部材135には支持柱取付用ブラケット136が取り付けられており、この上側支持部131の支持柱取付用ブラケット136と下側支持部132の支持柱取付用ブラケット136とを介してアンテナ支持柱102が立設固定される。なお、図示していないが、通信用のアンテナは前記アンテナ支持柱102に設置される。  A support column mounting bracket 136 is mounted on the ring member 135 of the upper support portion 131 and the lower support portion 132, and the support column mounting bracket 136 and the lower support portion 132 of the upper support portion 131 are supported. The antenna support column 102 is erected and fixed via the column mounting bracket 136. Although not shown, a communication antenna is installed on the antenna support pillar 102.

本発明の通信用鉄塔の塗装工事に用いられる吊り足場および養生ネット設置装置について説明する。まず、上記のアンテナ支持部120がアーム方式の単柱構造鉄塔100に本発明の吊り足場および養生ネット設置装置を設置する場合について説明する。図5はアンテナ支持部がアーム方式の単柱構造鉄塔に設置された吊り足場の一例を示す正面図、図6はアンテナ支持部がアーム方式の単柱構造鉄塔に設置された吊り足場の一例を示す上面図、図7は図6のB−B線から見た吊り足場用フレームの正面図、図8は図5のA−A線から見た吊り足場の平面図、図9は図8の吊り足場平面への床材の設置状態を示す平面図、図10は床材の斜視図である。  The suspension scaffold and curing net installation device used for the painting work of the communication tower of the present invention will be described. First, the case where the above-mentioned antenna support unit 120 installs the suspension scaffold and the curing net installation device of the present invention on the arm-type single pillar structure tower 100 will be described. FIG. 5 is a front view showing an example of a suspension scaffold in which an antenna support unit is installed on an arm-type single-column tower. FIG. 6 is an example of a suspension scaffold in which an antenna support unit is installed on an arm-type single-column tower. FIG. 7 is a front view of the suspension scaffold frame seen from the line BB in FIG. 6, FIG. 8 is a plan view of the suspension scaffold seen from the line AA in FIG. 5, and FIG. FIG. 10 is a perspective view of the flooring, and FIG. 10 is a plan view showing the installation state of the flooring on the suspended scaffold plane.

本発明の吊り足場1および養生ネット設置装置は、複数の吊り足場用フレーム2と、複数の吊り足場用フレーム2を接続する上側接続部材3と、複数の吊り足場用フレーム2を接続する下側接続部材4と、下側接続部材4を介して設置される床材5と、略筒状の養生ネット6を通信用鉄塔の周囲に設置する装置7とで構成されている。  The suspension scaffold 1 and the curing net installation device of the present invention include a plurality of suspension scaffold frames 2, an upper connection member 3 that connects the plurality of suspension scaffold frames 2, and a lower side that connects the plurality of suspension scaffold frames 2. The connecting member 4, the floor material 5 installed via the lower connecting member 4, and a device 7 for installing a substantially cylindrical curing net 6 around the communication tower.

前記吊り足場用フレーム2は、上側水平材8と垂直材9と下側水平材10とで構成されている。前記上側水平材8は、鉄塔本体110からアンテナ支持部120が突出する方向に対して直角方向で、アンテナ支持部120の上側支持部121を構成する部材の上面に配置され、Vボルトなどの固定具11を用いて一対の腕金主材123に固定されている。また、前記上側水平材8は、両端が上側支持部121から水平方向に突出する長さに形成されている。  The suspension scaffold frame 2 includes an upper horizontal member 8, a vertical member 9, and a lower horizontal member 10. The upper horizontal member 8 is arranged on a top surface of a member constituting the upper support 121 of the antenna support 120 in a direction perpendicular to the direction in which the antenna support 120 protrudes from the tower main body 110, and is fixed with a V bolt or the like. It is fixed to the pair of arm metal main members 123 using the tool 11. In addition, the upper horizontal member 8 is formed to have such a length that both ends protrude from the upper support portion 121 in the horizontal direction.

前記垂直材9は、一方の端部が上側水平材8の両端部付近に各々ボルトナットで接続されて、上側水平材8に対して鉛直方向に配置されている。また、前記垂直材9は、上側水平材8に接続されていない側の端部がアンテナ支持部120の下側支持部122より下方に突出する長さに形成されている。  The vertical member 9 is disposed in the vertical direction with respect to the upper horizontal member 8, with one end connected to both ends of the upper horizontal member 8 by bolts and nuts. Further, the vertical member 9 is formed in such a length that the end portion on the side not connected to the upper horizontal member 8 projects downward from the lower support portion 122 of the antenna support portion 120.

また、前記垂直材9には、上側水平材8に接続されている側の端部付近に上側接続部材3と接続するための上側接続部材用の接続具12が設けられており、上側水平材8に接続されていない側の端部付近には、下側接続部材4と接続するための下側接続部材用の接続具13が設けられている。また、前記垂直材9には、必要に応じて、手摺材15を接続するための手摺材用の接続具14が1つ以上設けられている。前記上側接続部材用の接続具12、下側接続部材用の接続具13および手摺材用の接続具14には、Uボルトやクランプが用いられる。  Further, the vertical member 9 is provided with an upper connecting member 12 for connection with the upper connecting member 3 in the vicinity of the end connected to the upper horizontal member 8, and the upper horizontal member 9. A connection tool 13 for a lower connection member for connecting to the lower connection member 4 is provided in the vicinity of the end on the side not connected to 8. Further, the vertical member 9 is provided with one or more connecting members 14 for the handrail material for connecting the handrail material 15 as necessary. U-bolts and clamps are used for the upper connection member 12, the lower connection member 13, and the handrail connection 14.

前記下側水平材10は、上側水平材8の両端に接続されている一対の垂直材9において、上側水平材8に接続されていない側の端部同士を接続するように配置され、Uボルトやクランプなどの下側水平材用の接続具16を用いて垂直材9に固定されている。  The lower horizontal member 10 is disposed so as to connect ends of the pair of vertical members 9 connected to both ends of the upper horizontal member 8 and not connected to the upper horizontal member 8, and U bolts. It is fixed to the vertical member 9 using a connecting member 16 for the lower horizontal member such as a clamp.

前記吊り足場用フレーム2は、1つのアンテナ支持部120に2つ以上の吊り足場フレーム2を所定の間隔を開けて設置される。なお、図5から図9に示すアンテナ支持部120がアーム方式の単柱構造鉄塔100に設置された吊り足場1の例では、一方のアンテナ支持部120に2つの吊り足場フレーム2を設置し、もう一方のアンテナ支持部120に2つの吊り足場フレーム2を設置した状態を示している。  In the suspension scaffold frame 2, two or more suspension scaffold frames 2 are installed at a predetermined interval on one antenna support portion 120. In the example of the suspension scaffold 1 in which the antenna support 120 shown in FIGS. 5 to 9 is installed on the arm-type single-pillar structure tower 100, two suspension scaffold frames 2 are installed on one antenna support 120, The state which installed the two suspension scaffold frames 2 in the other antenna support part 120 is shown.

前記上側接続部材3は、複数の吊り足場用フレーム2,2,・・・を接続するようにして、各吊り足場用フレーム2,2,・・・の垂直材9,9,・・・に設けられた上側接続部材用の接続具12を介して設置される。また、前記上側接続部材3の長さは、2つのアンテナ支持部120,120(図6において左右のアンテナ支持部)の支持柱取付用ブラケット125,125間の距離よりも長く形成されている。  The upper connection member 3 connects the plurality of suspension scaffold frames 2, 2,... To the vertical members 9, 9,. It installs via the connection tool 12 for provided upper side connection members. The length of the upper connection member 3 is longer than the distance between the support pillar mounting brackets 125, 125 of the two antenna support portions 120, 120 (left and right antenna support portions in FIG. 6).

前記下側接続部材4は、複数の吊り足場用フレーム2,2,・・・を接続するようにして、各吊り足場用フレーム2,2,・・・の垂直材9,9,・・・に設けられた下側接続部材用の接続具13を介して設置される。また、前記下側接続部材4の長さは、2つのアンテナ支持部120,120(図6において左右のアンテナ支持部)の支持柱取付用ブラケット125,125間の距離よりも長く、上側接続部材3と同じ長さに形成されている。  The lower connection member 4 connects a plurality of suspension scaffold frames 2, 2,... So that the vertical members 9, 9,. It installs via the connection tool 13 for the lower side connection members provided in this. The length of the lower connecting member 4 is longer than the distance between the support pillar mounting brackets 125, 125 of the two antenna support portions 120, 120 (left and right antenna support portions in FIG. 6). The same length as 3 is formed.

前記床材5は、図10に示すように、床材用水平材18を所定の間隔を開けて平行に並べ、その床材用水平材18の両端部を床材用横架材19によって接続し、床材用水平材18と床材用横架材19とで囲まれた範囲にエキスパンドメタルやパンチングメタルなどの鋼板21を張設して構成されている。また、前記床材用横架材19には、2つ以上の係止用フック20が取り付けられており、この係止用フック20を介して、吊り足場用フレーム2の一方の垂直材9に接続されている下側接続部材4と、もう一方の垂直材9に接続されている下側接続部材4とに床材5を掛け渡すことで、下側接続部材間4に床材5が敷設される。  As shown in FIG. 10, the flooring 5 is arranged in parallel with a horizontal flooring 18 with a predetermined interval, and both ends of the horizontal flooring 18 are connected by a horizontal flooring 19 for flooring. In addition, a steel plate 21 such as expanded metal or punching metal is stretched in a range surrounded by the horizontal material 18 for flooring and the horizontal member 19 for flooring. In addition, two or more locking hooks 20 are attached to the floor material 19 for the flooring, and one vertical member 9 of the suspension scaffold frame 2 is connected to the flooring horizontal member 19 via the locking hooks 20. The floor material 5 is laid between the lower connection members 4 by spanning the floor material 5 between the connected lower connection member 4 and the lower connection member 4 connected to the other vertical member 9. Is done.

吊り足場1には、必要に応じて手摺材15が設置される。手摺材15には、吊り足場用フレーム2の垂直材9に取り付けられる第1手摺材15aと、上側接続部材3に取り付けられる第2手摺材15bと、第1手摺材15aに取り付けられる第3手摺材15cと、下側接続部材4に取り付けられる第4手摺材15dとがある。第1手摺材15aは、複数の吊り足場用フレーム2,2,・・・の垂直材9,9,・・・に設けられた手摺材用の接続具14を介して、複数の吊り足場用フレーム2,2,・・・を接続するようにして設置される。また、第1手摺材15aの長さは、2つのアンテナ支持部120,120(図6において左右のアンテナ支持部)の支持柱取付用ブラケット125,125間の距離よりも長く、上側接続部材3および下側接続部材4と同じ長さに形成されている。第2手摺材15bは、吊り足場用フレーム2の一方の垂直材9に接続されている上側接続部材3の端部と、もう一方の垂直材9に接続されている上側接続部材3の端部とを接続するようにして設置される。なお、上側接続部材3と第2手摺材15bとの接続には、自在クランプなどの接続具17が用いられる。第3手摺材15cは、吊り足場用フレーム2の一方の垂直材9に接続されている第1手摺材15aの端部と、もう一方の垂直材9に接続されている第1手摺材15aの端部とを接続するようにして設置される。なお、第1手摺材15aと第3手摺材15cとの接続には、自在クランプなどの接続具17が用いられる。第4手摺材15dは、吊り足場用フレーム2の一方の垂直材9に接続されている下側接続部材4の端部と、もう一方の垂直材9に接続されている下側接続部材4の端部とを接続するようにして設置される。なお、下側接続部材4と第4手摺材15dとの接続には、自在クランプなどの接続具17が用いられる。  A handrail material 15 is installed on the suspension scaffold 1 as necessary. The handrail material 15 includes a first handrail material 15a attached to the vertical member 9 of the suspension scaffold frame 2, a second handrail material 15b attached to the upper connection member 3, and a third handrail attached to the first handrail material 15a. There are a material 15c and a fourth handrail material 15d attached to the lower connection member 4. The first handrail material 15a is for a plurality of suspension scaffolds via handrail material connectors 14 provided on the vertical members 9, 9,... Of the plurality of suspension scaffold frames 2, 2,. It is installed so as to connect the frames 2, 2,. Further, the length of the first handrail material 15a is longer than the distance between the support pillar mounting brackets 125, 125 of the two antenna support portions 120, 120 (left and right antenna support portions in FIG. 6), and the upper connection member 3 And the same length as the lower connecting member 4. The second handrail material 15b includes an end portion of the upper connection member 3 connected to one vertical member 9 of the suspension scaffold frame 2 and an end portion of the upper connection member 3 connected to the other vertical member 9. And installed so as to connect. Note that a connection tool 17 such as a universal clamp is used to connect the upper connection member 3 and the second handrail material 15b. The third handrail material 15c includes an end portion of the first handrail material 15a connected to one vertical member 9 of the suspension scaffold frame 2 and a first handrail material 15a connected to the other vertical member 9. It is installed so as to connect the end. Note that a connection tool 17 such as a free clamp is used to connect the first handrail material 15a and the third handrail material 15c. The fourth handrail material 15d includes the end of the lower connection member 4 connected to one vertical member 9 of the suspension scaffold frame 2 and the lower connection member 4 connected to the other vertical member 9. It is installed so as to connect the end. A connecting tool 17 such as a universal clamp is used to connect the lower connecting member 4 and the fourth handrail material 15d.

前記略筒状の養生ネット6を通信用鉄塔の周囲に設置する装置7は、通信用鉄塔の周囲に設置される略筒状の養生ネット6と、アンテナ支持部120の上側支持部121を構成する部材の上面に設置される養生ネット用水平材22と、養生ネット用水平材22の両端に設置される滑車23と、通信用鉄塔の基部付近に設置されるウインチ26とを有している。図11は略筒状の養生ネット6をアンテナ支持部120がアーム方式の単柱構造鉄塔100の周囲に設置する装置7の一例を示す上面図、図12は図11のC−C線から見た養生ネット用水平材22の正面図、図13は図11のC−C線から見た養生ネット6の設置状態を示す正面図、図14は図11のD−D線から見た養生ネット6の設置状態を示す正面図である。  The apparatus 7 for installing the substantially cylindrical curing net 6 around the communication tower comprises the substantially cylindrical curing net 6 installed around the communication tower and the upper support part 121 of the antenna support part 120. The horizontal member 22 for the curing net installed on the upper surface of the member to be cured, the pulley 23 installed at both ends of the horizontal member 22 for the curing net, and the winch 26 installed near the base of the communication tower. . FIG. 11 is a top view showing an example of a device 7 for installing the substantially cylindrical curing net 6 around the single-pillar structure tower 100 with the antenna support 120 being an arm system, and FIG. 12 is a view taken along the line CC in FIG. FIG. 13 is a front view showing the installation state of the curing net 6 as viewed from the line CC in FIG. 11, and FIG. 14 is a curing net as viewed from the line DD in FIG. 6 is a front view showing an installation state of FIG.

前記養生ネット用水平材22は、鉄塔本体110からアンテナ支持部120が突出する方向に対して直角方向で、アンテナ支持部120の上側支持部121を構成する部材の上面に配置され、Vボルトなどの固定具11を用いて一対の腕金主材123に固定されている。前記養生ネット用水平材22の長さは、両端が上側支持部121から水平方向に突出する長さで、養生ネット用水平材22から垂下する養生ネット6の外径に応じた長さに形成されている。また、前記養生ネット用水平材22の両端には、滑車接続具25を介して滑車23が設置されている。  The horizontal material 22 for the curing net is disposed on the upper surface of a member constituting the upper support portion 121 of the antenna support portion 120 in a direction perpendicular to the direction in which the antenna support portion 120 protrudes from the tower main body 110, and is a V bolt or the like. Are fixed to a pair of arm metal main members 123 using the fixing tool 11. The length of the horizontal net 22 for the curing net is such that both ends protrude in the horizontal direction from the upper support portion 121 and is formed according to the outer diameter of the curing net 6 hanging from the horizontal net 22 for the curing net. Has been. In addition, pulleys 23 are installed on both ends of the curing net horizontal member 22 via pulley connectors 25.

前記養生ネット6は、略筒状に形成されており、通信用鉄塔の外周を覆って、養生ネット6の中で塗装作業を行うことができる大きさに形成されている。前記養生ネット6は、上端部にワイヤー24が固定されており、前記ワイヤー24は養生ネット用水平材22の両端に設置されている滑車23を介して、通信用鉄塔の基部付近に設置されているウインチ26に巻き付けられている。これにより、前記ワイヤー24をウインチ26により引き出しまたは巻き取りすることで、養生ネット6が通信用鉄塔に沿って昇降自在に設置される。  The curing net 6 is formed in a substantially cylindrical shape, and is formed in such a size that the outer periphery of the communication tower can be covered and a painting operation can be performed in the curing net 6. The curing net 6 has a wire 24 fixed to its upper end, and the wire 24 is installed near the base of the communication tower via pulleys 23 installed at both ends of the horizontal material 22 for the curing net. It is wound around the winch 26. Thereby, the curing net 6 is installed so as to be movable up and down along the communication tower by pulling out or winding the wire 24 by the winch 26.

略筒状の養生ネット6を通信用鉄塔の周囲に設置するには、ワイヤー24をウインチ26により巻き取って、養生ネット6の上端部を通信用鉄塔の下部から上方に向けて上昇させ、養生ネット6を吊り足場1の直ぐ下の位置まで上昇させることにより、養生ネット6を通信用鉄塔に沿って垂下させて設置される。  In order to install the substantially cylindrical curing net 6 around the communication tower, the wire 24 is wound up by the winch 26, and the upper end of the curing net 6 is raised upward from the lower part of the communication tower. By raising the net 6 to a position just below the suspension scaffold 1, the curing net 6 is suspended along the communication tower.

通信用鉄塔の鉄塔本体110の塗装工事を行う場合、図14に示すように、通信用鉄塔の周囲に設置した養生ネット6の中で、アンテナ支持部120の下側支持部122を構成する部材から吊り下げられた作業用ワイヤー28を通信用鉄塔に沿って垂下させ、この作業用ワイヤー28にチェア型ゴンドラ27を固着し、前記作業用ワイヤー28によってチェア型ゴンドラ27を昇降させて作業を行う。なお、前記チェア型ゴンドラ27の代わりにチェアハーネスを用いてもかまわない。  When painting the tower main body 110 of the communication tower, as shown in FIG. 14, members constituting the lower support part 122 of the antenna support part 120 in the curing net 6 installed around the communication tower. The work wire 28 suspended from the work is suspended along the communication tower, a chair-type gondola 27 is fixed to the work wire 28, and the chair-type gondola 27 is lifted and lowered by the work wire 28. . A chair harness may be used instead of the chair type gondola 27.

次に、アンテナ支持部130がリング方式の単柱構造鉄塔100に本発明の吊り足場および養生ネット設置装置を設置する場合について説明する。図15はアンテナ支持部がリング方式の単柱構造鉄塔に設置された吊り足場の一例を示す正面図、図16はアンテナ支持部がリング方式の単柱構造鉄塔に設置された吊り足場の一例を示す上面図、図17は図16のF−F線から見た吊り足場用フレームの正面図、図18は図15のE−E線から見た吊り足場の平面図、図19は図18の吊り足場平面への床材の設置状態を示す平面図である。  Next, the case where the antenna support 130 installs the suspension scaffold and the curing net installation device of the present invention on the ring-type single pillar structure tower 100 will be described. FIG. 15 is a front view showing an example of a suspended scaffolding in which an antenna support unit is installed on a ring-type single-column tower. FIG. 16 is an example of a suspended scaffolding in which an antenna support unit is installed on a ring-type single-column tower. FIG. 17 is a front view of the suspension scaffold frame seen from the line FF in FIG. 16, FIG. 18 is a plan view of the suspension scaffold seen from the line EE in FIG. 15, and FIG. It is a top view which shows the installation state of the flooring to a suspended scaffold plane.

アンテナ支持部130がリング方式の単柱構造鉄塔100に設置される吊り足場1および養生ネット設置装置は、アーム方式のアンテナ支持部120に設置される吊り足場1および養生ネット設置装置と同様に、複数の吊り足場用フレーム2と、複数の吊り足場用フレーム2を接続する上側接続部材3と、複数の吊り足場用フレーム2を接続する下側接続部材4と、下側接続部材4を介して設置される床材5と、略筒状の養生ネット6を通信用鉄塔の周囲に設置する装置7とで構成されている。  The suspension scaffold 1 and the curing net installation device in which the antenna support unit 130 is installed in the ring-type single pillar structure tower 100 are similar to the suspension scaffold 1 and the curing net installation device installed in the arm type antenna support unit 120. Via a plurality of suspension scaffold frames 2, an upper connection member 3 that connects the plurality of suspension scaffold frames 2, a lower connection member 4 that connects the plurality of suspension scaffold frames 2, and a lower connection member 4 The flooring material 5 to be installed and the apparatus 7 for installing a substantially cylindrical curing net 6 around the communication tower.

前記吊り足場用フレーム2は、上側水平材8と垂直材9と下側水平材10とで構成されている。前記上側水平材8は、アンテナ支持部130の上側支持部131を構成する部材の上面に配置され、Vボルトなどの固定具11を用いて接続部材133またはリング部材135に固定されている。また、前記上側水平材8は、アンテナ支持部130の外径よりも長く、両端が上側支持部131から水平方向に突出する長さに形成されている。  The suspension scaffold frame 2 includes an upper horizontal member 8, a vertical member 9, and a lower horizontal member 10. The upper horizontal member 8 is disposed on the upper surface of a member constituting the upper support portion 131 of the antenna support portion 130, and is fixed to the connection member 133 or the ring member 135 using a fixture 11 such as a V bolt. The upper horizontal member 8 is longer than the outer diameter of the antenna support part 130 and has a length that protrudes from the upper support part 131 in the horizontal direction at both ends.

前記垂直材9は、一方の端部が上側水平材8の両端部付近に各々ボルトナットで接続されて、上側水平材8に対して鉛直方向に配置されている。また、前記垂直材9は、上側水平材8に接続されていない側の端部がアンテナ支持部130の下側支持部132より下方に突出する長さに形成されている。  The vertical member 9 is disposed in the vertical direction with respect to the upper horizontal member 8, with one end connected to both ends of the upper horizontal member 8 by bolts and nuts. Further, the vertical member 9 is formed in such a length that the end portion on the side not connected to the upper horizontal member 8 protrudes downward from the lower support portion 132 of the antenna support portion 130.

また、前記垂直材9には、上側水平材8に接続されている側の端部付近に上側接続部材3と接続するための上側接続部材用の接続具12が設けられており、上側水平材8に接続されていない側の端部付近には、下側接続部材4と接続するための下側接続部材用の接続具13が設けられている。また、前記垂直材9には、必要に応じて、手摺材15を接続するための手摺材用の接続具14が1つ以上設けられている。前記上側接続部材用の接続具12、下側接続部材用の接続具13および手摺材用の接続具14には、Uボルトやクランプが用いられる。  Further, the vertical member 9 is provided with an upper connecting member 12 for connection with the upper connecting member 3 in the vicinity of the end connected to the upper horizontal member 8, and the upper horizontal member 9. A connection tool 13 for a lower connection member for connecting to the lower connection member 4 is provided in the vicinity of the end on the side not connected to 8. Further, the vertical member 9 is provided with one or more connecting members 14 for the handrail material for connecting the handrail material 15 as necessary. U-bolts and clamps are used for the upper connection member 12, the lower connection member 13, and the handrail connection 14.

前記下側水平材10は、上側水平材8の両端に接続されている一対の垂直材9において、上側水平材8に接続されていない側の端部同士を接続するように配置され、Uボルトやクランプなどの下側水平材用の接続具16を用いて垂直材9に固定されている。  The lower horizontal member 10 is disposed so as to connect ends of the pair of vertical members 9 connected to both ends of the upper horizontal member 8 and not connected to the upper horizontal member 8, and U bolts. It is fixed to the vertical member 9 using a connecting member 16 for the lower horizontal member such as a clamp.

前記吊り足場用フレーム2は、1つのアンテナ支持部130に2つ以上の吊り足場フレーム2を所定の間隔を開けて設置される。なお、図15から図19に示すアンテナ支持部130がリング方式の単柱構造鉄塔100に設置された吊り足場1の例では、アンテナ支持部130に4つの吊り足場フレーム2を設置した状態を示している。  In the suspension scaffold frame 2, two or more suspension scaffold frames 2 are installed at a predetermined interval on one antenna support portion. In addition, in the example of the suspension scaffold 1 in which the antenna support portion 130 illustrated in FIGS. 15 to 19 is installed in the ring-type single-pillar structure tower 100, a state in which four suspension scaffold frames 2 are installed in the antenna support portion 130 is illustrated. ing.

前記上側接続部材3は、複数の吊り足場用フレーム2,2,・・・を接続するようにして、各吊り足場用フレーム2,2,・・・の垂直材9,9,・・・に設けられた上側接続部材用の接続具12を介して設置される。また、前記上側接続部材3の長さは、アンテナ支持部130の外径よりも長く形成されている。  The upper connection member 3 connects the plurality of suspension scaffold frames 2, 2,... To the vertical members 9, 9,. It installs via the connection tool 12 for provided upper side connection members. Further, the length of the upper connecting member 3 is longer than the outer diameter of the antenna support portion 130.

前記下側接続部材4は、複数の吊り足場用フレーム2,2,・・・を接続するようにして、各吊り足場用フレーム2,2,・・・の垂直材9,9,・・・に設けられた下側接続部材用の接続具13を介して設置される。また、前記下側接続部材4の長さは、アンテナ支持部130の外径よりも長く、上側接続部材3と同じ長さに形成されている。  The lower connection member 4 connects a plurality of suspension scaffold frames 2, 2,... So that the vertical members 9, 9,. It installs via the connection tool 13 for the lower side connection members provided in this. Further, the length of the lower connecting member 4 is longer than the outer diameter of the antenna support portion 130 and is formed to the same length as the upper connecting member 3.

吊り足場1には、必要に応じて手摺材15が設置される。手摺材15には、吊り足場用フレーム2の垂直材9に取り付けられる第1手摺材15aと、上側接続部材3に取り付けられる第2手摺材15bと、第1手摺材15aに取り付けられる第3手摺材15cと、下側接続部材4に取り付けられる第4手摺材15dとがある。第1手摺材15aは、複数の吊り足場用フレーム2,2,・・・の垂直材9,9,・・・に設けられた手摺材用の接続具14を介して、複数の吊り足場用フレーム2,2,・・・を接続するようにして設置される。また、第1手摺材15aの長さは、アンテナ支持部130の外径よりも長く、上側接続部材3および下側接続部材4と同じ長さに形成されている。第2手摺材15bは、吊り足場用フレーム2の一方の垂直材9に接続されている上側接続部材3の端部と、もう一方の垂直材9に接続されている上側接続部材3の端部とを接続するようにして設置される。なお、上側接続部材3と第2手摺材15bとの接続には、自在クランプなどの接続具17が用いられる。第3手摺材15cは、吊り足場用フレーム2の一方の垂直材9に接続されている第1手摺材15aの端部と、もう一方の垂直材9に接続されている第1手摺材15aの端部とを接続するようにして設置される。なお、第1手摺材15aと第3手摺材15cとの接続には、自在クランプなどの接続具17が用いられる。第4手摺材15dは、吊り足場用フレーム2の一方の垂直材9に接続されている下側接続部材4の端部と、もう一方の垂直材9に接続されている下側接続部材4の端部とを接続するようにして設置される。なお、下側接続部材4と第4手摺材15dとの接続には、自在クランプなどの接続具17が用いられる。  A handrail material 15 is installed on the suspension scaffold 1 as necessary. The handrail material 15 includes a first handrail material 15a attached to the vertical member 9 of the suspension scaffold frame 2, a second handrail material 15b attached to the upper connection member 3, and a third handrail attached to the first handrail material 15a. There are a material 15c and a fourth handrail material 15d attached to the lower connection member 4. The first handrail material 15a is for a plurality of suspension scaffolds via handrail material connectors 14 provided on the vertical members 9, 9,... Of the plurality of suspension scaffold frames 2, 2,. It is installed so as to connect the frames 2, 2,. Further, the length of the first handrail material 15 a is longer than the outer diameter of the antenna support portion 130, and is formed to have the same length as the upper connection member 3 and the lower connection member 4. The second handrail material 15b includes an end portion of the upper connection member 3 connected to one vertical member 9 of the suspension scaffold frame 2 and an end portion of the upper connection member 3 connected to the other vertical member 9. And installed so as to connect. Note that a connection tool 17 such as a universal clamp is used to connect the upper connection member 3 and the second handrail material 15b. The third handrail material 15c includes an end portion of the first handrail material 15a connected to one vertical member 9 of the suspension scaffold frame 2 and a first handrail material 15a connected to the other vertical member 9. It is installed so as to connect the end. Note that a connection tool 17 such as a free clamp is used to connect the first handrail material 15a and the third handrail material 15c. The fourth handrail material 15d includes the end of the lower connection member 4 connected to one vertical member 9 of the suspension scaffold frame 2 and the lower connection member 4 connected to the other vertical member 9. It is installed so as to connect the end. A connecting tool 17 such as a universal clamp is used to connect the lower connecting member 4 and the fourth handrail material 15d.

また、下側接続部材4の一方の端部に接続されている第4手摺材15dの中央部付近と、もう一方の端部に接続されている第4手摺材15dの中央部付近とを接続するようにして、複数の床材設置用部材29が設置される。また、前記床材設置用部材29は、複数の吊り足場用フレーム2,2,・・・の下側水平材10と接続されている。なお、床材設置用部材29と第4手摺材15dとの接続、および床材設置用部材29と下側水平材10との接続には、自在クランプなどの接続具17が用いられる。  Further, the vicinity of the center portion of the fourth handrail material 15d connected to one end portion of the lower connection member 4 and the vicinity of the center portion of the fourth handrail material 15d connected to the other end portion are connected. In this manner, a plurality of floor material installation members 29 are installed. The floor material installation member 29 is connected to the lower horizontal material 10 of the plurality of suspension scaffold frames 2, 2. Note that a connecting tool 17 such as a universal clamp is used for connection between the floor material installation member 29 and the fourth handrail material 15d and connection between the floor material installation member 29 and the lower horizontal material 10.

前記床材5は、図10に示すように、床材用水平材18を所定の間隔を開けて平行に並べ、その床材用水平材18の両端部を床材用横架材19によって接続し、床材用水平材18と床材用横架材19とで囲まれた範囲にエキスパンドメタルやパンチングメタルなどの鋼板21を張設して構成されている。また、前記床材用横架材19には、2つ以上の係止用フック20が取り付けられており、この係止用フック20を介して、吊り足場用フレーム2の垂直材9に接続されている下側接続部材4と、床材設置用部材29とに床材5を掛け渡すことで、下側接続部材間4に床材5が敷設される。  As shown in FIG. 10, the flooring 5 is arranged in parallel with a horizontal flooring 18 with a predetermined interval, and both ends of the horizontal flooring 18 are connected by a horizontal flooring 19 for flooring. In addition, a steel plate 21 such as expanded metal or punching metal is stretched in a range surrounded by the horizontal material 18 for flooring and the horizontal member 19 for flooring. Further, two or more locking hooks 20 are attached to the floor material 19 for the flooring, and connected to the vertical member 9 of the suspension scaffold frame 2 via the locking hooks 20. The floor material 5 is laid between the lower connection members 4 by passing the floor material 5 between the lower connection member 4 and the floor material installation member 29.

前記略筒状の養生ネット6を通信用鉄塔の周囲に設置する装置7は、通信用鉄塔の周囲に設置される略筒状の養生ネット6と、アンテナ支持部130の上側支持部131を構成する部材の上面に設置される養生ネット用水平材22と、養生ネット用水平材22の両端に設置される滑車23と、通信用鉄塔の基部付近に設置されるウインチ26とを有している。図20は略筒状の養生ネット6をアンテナ支持部130がリング方式の単柱構造鉄塔100の周囲に設置する装置7の一例を示す上面図、図21は図20のG−G線から見た養生ネット用水平材22の正面図、図22は図20のG−G線から見た養生ネット6の設置状態を示す正面図、図23は図20のH−H線から見た養生ネット6の設置状態を示す正面図である。  The apparatus 7 for installing the substantially cylindrical curing net 6 around the communication tower includes the substantially cylindrical curing net 6 installed around the communication tower and the upper support part 131 of the antenna support part 130. The horizontal member 22 for the curing net installed on the upper surface of the member to be cured, the pulley 23 installed at both ends of the horizontal member 22 for the curing net, and the winch 26 installed near the base of the communication tower. . 20 is a top view showing an example of a device 7 for installing the substantially cylindrical curing net 6 around the single pillar structure tower 100 in which the antenna support 130 is a ring system, and FIG. 21 is a view taken along line GG in FIG. 22 is a front view of the horizontal material 22 for the curing net, FIG. 22 is a front view showing the installation state of the curing net 6 as seen from the GG line in FIG. 20, and FIG. 23 is a curing net as seen from the HH line in FIG. 6 is a front view showing an installation state of FIG.

前記養生ネット用水平材22は、アンテナ支持部130の上側支持部131を構成する部材の上面に配置され、Vボルトなどの固定具11を用いて接続部材133またはリング部材135に固定されている。前記養生ネット用水平材22の長さは、両端が上側支持部131から水平方向に突出する長さで、養生ネット用水平材22から垂下する養生ネット6の外径に応じた長さに形成されている。また、養生ネット用水平材22の両端には、滑車接続具25を介して滑車23が設置されている。  The horizontal member 22 for the curing net is disposed on the upper surface of a member constituting the upper support portion 131 of the antenna support portion 130, and is fixed to the connection member 133 or the ring member 135 using a fixture 11 such as a V bolt. . The length of the horizontal material 22 for the curing net is a length in which both ends protrude in the horizontal direction from the upper support portion 131 and is formed according to the outer diameter of the curing net 6 hanging from the horizontal material 22 for the curing net. Has been. In addition, pulleys 23 are installed on both ends of the horizontal member 22 for the curing net via pulley connector 25.

前記養生ネット6は、略筒状に形成されており、通信用鉄塔の外周を覆って、養生ネット6の中で塗装作業を行うことができる大きさに形成されている。前記養生ネット6は、上端部にワイヤー24が固定されており、前記ワイヤー24は養生ネット用水平材22の両端に設置されている滑車23を介して、通信用鉄塔の基部付近に設置されているウインチ26に巻き付けられている。これにより、前記ワイヤー24をウインチ26により引き出しまたは巻き取りすることで、養生ネット6が通信用鉄塔に沿って昇降自在に設置される。  The curing net 6 is formed in a substantially cylindrical shape, and is formed in such a size that the outer periphery of the communication tower can be covered and a painting operation can be performed in the curing net 6. The curing net 6 has a wire 24 fixed to its upper end, and the wire 24 is installed near the base of the communication tower via pulleys 23 installed at both ends of the horizontal material 22 for the curing net. It is wound around the winch 26. Thereby, the curing net 6 is installed so as to be movable up and down along the communication tower by pulling out or winding the wire 24 by the winch 26.

略筒状の養生ネット6を通信用鉄塔の周囲に設置するには、ワイヤー24をウインチ26により巻き取って、養生ネット6の上端部を通信用鉄塔の下部から上方に向けて上昇させ、養生ネット6を吊り足場1の直ぐ下の位置まで上昇させることにより、養生ネット6を通信用鉄塔に沿って垂下させて設置される。  In order to install the substantially cylindrical curing net 6 around the communication tower, the wire 24 is wound up by the winch 26, and the upper end of the curing net 6 is raised upward from the lower part of the communication tower. By raising the net 6 to a position just below the suspension scaffold 1, the curing net 6 is suspended along the communication tower.

通信用鉄塔の鉄塔本体110の塗装工事を行う場合、図23に示すように、通信用鉄塔の周囲に設置した養生ネット6の中で、アンテナ支持部130の下側支持部132を構成する部材から吊り下げられた作業用ワイヤー28を通信用鉄塔に沿って垂下させ、この作業用ワイヤー28にチェア型ゴンドラ27を固着し、前記作業用ワイヤー28によってチェア型ゴンドラ27を昇降させて作業を行う。なお、前記チェア型ゴンドラ27の代わりにチェアハーネスを用いてもかまわない。  When painting the tower body 110 of the communication tower, as shown in FIG. 23, members constituting the lower support part 132 of the antenna support part 130 in the curing net 6 installed around the communication tower. The work wire 28 suspended from the work is suspended along the communication tower, a chair-type gondola 27 is fixed to the work wire 28, and the chair-type gondola 27 is lifted and lowered by the work wire 28. . A chair harness may be used instead of the chair type gondola 27.

上記の構成により、本発明の通信用鉄塔の塗装工事に用いられる吊り足場1および養生ネット設置装置は、吊り足場1を通信用鉄塔のアンテナ支持部120,130に直接設置するため、通信用鉄塔の下部で組み立てられた吊り足場1をアンテナ支持部120,130の直ぐ下の位置まで上昇させる必要がなく、吊り足場1自体を昇降させるための大型のウインチやワイヤー等の昇降設備が不要となることから、昇降設備が大掛かりとならず、吊り足場1の設置や解体に手間がかからず容易に行うことができる。  With the above configuration, the suspension scaffold 1 and the curing net installation device used for the communication tower painting work of the present invention directly install the suspension scaffold 1 on the antenna support portions 120 and 130 of the communication tower. It is not necessary to raise the suspension scaffold 1 assembled at the lower part to a position immediately below the antenna support portions 120 and 130, and lifting equipment such as a large winch or wire for raising and lowering the suspension scaffold 1 itself is not required. For this reason, the lifting equipment does not require a large scale, and the installation and disassembly of the suspension scaffold 1 does not take time and can be easily performed.

また、通信用鉄塔の下部で組み立てられた吊り足場をアンテナ支持部120,130の直ぐ下の位置まで上昇させて設置するのではなく、吊り足場1を通信用鉄塔のアンテナ支持部120,130に直接設置することから、吊り足場1の幅を通信用鉄塔の下部の塔体幅よりも広くする必要がないため、吊り足場1を構成する部材の数が多くなったり、部材サイズが大きくなることがなく、吊り足場1の設置や解体に手間がかからず容易に行うことができる。  In addition, the suspension scaffold assembled in the lower part of the communication tower is not raised to a position immediately below the antenna support sections 120 and 130, but the suspension scaffold 1 is attached to the antenna support sections 120 and 130 of the communication tower. Because it is installed directly, it is not necessary to make the suspension scaffold 1 wider than the tower width at the bottom of the communication tower, so the number of members constituting the suspension scaffold 1 is increased and the member size is increased. Therefore, it is easy to install and dismantle the suspension scaffold 1 without any trouble.

また、通信用鉄塔のアンテナ支持部120,130に取り付けられた養生ネット用水平材22から垂下させた養生ネット6は、養生ネット6の上端部に固定されているワイヤー24が、養生ネット用水平材22の両端に設置されている滑車23を介してウインチ26に巻き付けられており、前記ワイヤー24をウインチ26により引き出しまたは巻き取りすることで、養生ネット6を通信用鉄塔に沿って昇降自在に設けているので、養生ネット6を通信用鉄塔に対して任意の高さに容易に設置することができる。  Further, the curing net 6 suspended from the curing net horizontal member 22 attached to the antenna support portions 120 and 130 of the communication tower has a wire 24 fixed to the upper end portion of the curing net 6 and the horizontal for the curing net. It is wound around a winch 26 via pulleys 23 installed at both ends of the material 22, and by pulling out or winding the wire 24 by the winch 26, the curing net 6 can be raised and lowered along the communication tower. Since it is provided, the curing net 6 can be easily installed at an arbitrary height with respect to the communication tower.

さらに、養生ネット6は、通信用鉄塔のアンテナ支持部120,130に取り付けられた養生ネット用水平材22から垂下するようにしたから、養生ネット6の外径に合わせて吊り足場1の幅を設定する必要はなく、養生ネット6の外径に合わせて養生ネット用水平材22の長さを設定すればよい。したがって、養生ネット6の外径に合わせて吊り足場1の幅を大きくする必要がないことから、吊り足場1を構成する部材の数が多くなったり、部材サイズが大きくなることがないため、吊り足場1の設置や解体に手間がかからず容易に行うことができる。  Furthermore, since the curing net 6 hangs down from the horizontal material 22 for the curing net attached to the antenna support portions 120 and 130 of the communication tower, the width of the suspension scaffold 1 is adjusted according to the outer diameter of the curing net 6. It is not necessary to set, and the length of the horizontal material 22 for the curing net may be set according to the outer diameter of the curing net 6. Therefore, since it is not necessary to increase the width of the suspension scaffold 1 according to the outer diameter of the curing net 6, the number of members constituting the suspension scaffold 1 does not increase and the member size does not increase. Installation and dismantling of the scaffold 1 can be performed easily without any effort.

また、本発明の通信用鉄塔の塗装工事に用いられる吊り足場1および養生ネット設置装置は、複数の吊り足場用フレーム2と、複数の吊り足場用フレーム2を接続する上側接続部材3と、複数の吊り足場用フレーム2を接続する下側接続部材4と、下側接続部材4を介して設置される床材5と、略筒状の養生ネット6を通信用鉄塔の周囲に設置する装置7とで構成されており、簡単な構成であることから、吊り足場1および養生ネット設置装置の設置や解体に手間がかからず容易に行うことができる。また、通信用鉄塔のアンテナ支持部120,130に直接設置した吊り足場1の上を作業者が乗ったり歩いたりできるので、アンテナ支持部120,130の塗装作業やチェア型ゴンドラ27の作業用ワイヤー28の調整ができ、通信用鉄塔の塗装作業を円滑に行うことができる。  Moreover, the suspension scaffold 1 and the curing net installation apparatus used for the construction work of the communication tower of the present invention include a plurality of suspension scaffold frames 2, a plurality of upper connection members 3 that connect the plurality of suspension scaffold frames 2, and a plurality of suspension scaffold frames 2. A lower connecting member 4 for connecting the suspension scaffold frame 2, a flooring 5 installed via the lower connecting member 4, and a device 7 for installing a substantially cylindrical curing net 6 around the communication tower. Therefore, the installation and disassembly of the suspension scaffold 1 and the curing net installation device does not take time and can be easily performed. Further, since the worker can get on or walk on the suspension scaffold 1 directly installed on the antenna support portions 120 and 130 of the communication tower, the work for painting the antenna support portions 120 and 130 and the work wire for the chair type gondola 27 are provided. 28 can be adjusted, and the painting work of the communication tower can be performed smoothly.

上記の説明では、アンテナ支持部120,130がアーム方式およびリング方式の単柱構造鉄塔100に本発明の通信用鉄塔の塗装工事に用いられる吊り足場1および養生ネット設置装置を設置した場合について説明したが、鉄塔本体110の構造がトラス構造およびラーメン構造の場合においても、同様の構成で本発明の吊り足場1および養生ネット設置装置を設置することができる。また、アンテナ支持部120,130が複数段設置されている通信用鉄塔においても、同様の構成で下段のアンテナ支持部120,130より上方のアンテナ支持部120,130に本発明の吊り足場1および養生ネット設置装置を設置することができる。例として、アンテナ支持部130がリング方式のトラス構造鉄塔101に本発明の吊り足場1および養生ネット設置装置を設置する場合について説明する。図24は、リング方式のアンテナ支持部が2段設置されているトラス構造鉄塔への吊り足場および養生ネットの設置状態を示す正面図である。  In the above description, the antenna support sections 120 and 130 are described in the case where the suspension scaffold 1 and the curing net installation device used for the painting construction of the communication tower of the present invention are installed on the single pillar structure tower 100 of the arm system and the ring system. However, even when the structure of the steel tower body 110 is a truss structure or a ramen structure, the suspension scaffold 1 and the curing net installation device of the present invention can be installed with the same configuration. In addition, in a communication tower in which a plurality of antenna support portions 120 and 130 are installed, the suspension scaffold 1 and the present invention can be attached to the antenna support portions 120 and 130 above the lower antenna support portions 120 and 130 with the same configuration. A curing net installation device can be installed. As an example, the case where the antenna support 130 installs the suspension scaffold 1 and the curing net installation device of the present invention on the ring-type truss structure tower 101 will be described. FIG. 24 is a front view showing an installation state of a suspension scaffold and a curing net on a truss structure steel tower in which two ring-type antenna support portions are installed.

図24に示すように、まず、上段のアンテナ支持部130に複数の吊り足場用フレーム2を設置する。次に、前記複数の吊り足場用フレーム2,2,・・・を接続するようにして、各吊り足場用フレーム2,2,・・・の垂直材9,9,・・・に設けられた上側接続部材用の接続具12を介して上側接続部材3を設置し、複数の吊り足場用フレーム2,2,・・・を接続するようにして、各吊り足場用フレーム2,2,・・・の垂直材9,9,・・・に設けられた下側接続部材用の接続具13を介して下側接続部材4を設置する。次に、床材5を下側接続部材間4に敷設して、上段のアンテナ支持部130に本発明の吊り足場1が設置される。  As shown in FIG. 24, a plurality of suspension scaffold frames 2 are first installed on the upper antenna support portion 130. Next, the plurality of suspension scaffold frames 2, 2,... Are connected to the vertical members 9, 9,. The upper connection member 3 is installed via the connection member 12 for the upper connection member, and a plurality of suspension scaffold frames 2, 2,... The lower connecting member 4 is installed through the connecting member 13 for the lower connecting member provided on the vertical members 9, 9,. Next, the flooring 5 is laid between the lower connection members 4, and the suspension scaffold 1 of the present invention is installed on the upper antenna support portion 130.

次に、略筒状の養生ネット6を通信用鉄塔の周囲に設置する装置7を設置する。まず、両端に滑車23が設置されている前記養生ネット用水平材22を、上段のアンテナ支持部130の上側支持部131を構成する部材の上面に設置する。略筒状の養生ネット6の上端部に固定されているワイヤー24を養生ネット用水平材22の両端に設置されている滑車23を介して、通信用鉄塔の基部付近に設置されているウインチ26に巻き付けて、本発明の養生ネット設置装置が設置される。これにより、前記ワイヤー24をウインチ26により引き出しまたは巻き取りすることで、養生ネット6が通信用鉄塔に沿って昇降自在に設置される。  Next, the apparatus 7 which installs the substantially cylindrical curing net 6 around a communication tower is installed. First, the horizontal member 22 for the curing net having the pulleys 23 installed at both ends is installed on the upper surface of a member constituting the upper support 131 of the upper antenna support 130. A winch 26 installed in the vicinity of the base of the communication tower through a pulley 23 installed on both ends of the horizontal member 22 for the curing net with wires 24 fixed to the upper end of the substantially cylindrical curing net 6. The curing net installation device of the present invention is installed. Thereby, the curing net 6 is installed so as to be movable up and down along the communication tower by pulling out or winding the wire 24 by the winch 26.

略筒状の養生ネット6を通信用鉄塔の周囲に設置するには、ワイヤー24をウインチ26により巻き取って、養生ネット6の上端部を通信用鉄塔の上方に向けて上昇させ、養生ネット6を上段のアンテナ支持部130に設置した吊り足場1の直ぐ下の位置まで上昇させることにより、養生ネット6を通信用鉄塔に沿って垂下させて設置される。なお、通信用鉄塔に沿って垂下させる養生ネット6は、上段のアンテナ支持部130と下段のアンテナ支持部130の間に設置することができ、また、養生ネット6の外径を下段のアンテナ支持部130の外径よりも大きくすることで、上段のアンテナ支持部130に設置した吊り足場1の直ぐ下の位置から通信用鉄塔の下部までの間に設置することもできる。  In order to install the substantially cylindrical curing net 6 around the communication tower, the wire 24 is wound up by the winch 26 and the upper end of the curing net 6 is raised above the communication tower. Is raised to a position just below the suspension scaffold 1 installed on the antenna support portion 130 on the upper stage, so that the curing net 6 is suspended along the communication tower. The curing net 6 that hangs down along the communication tower can be installed between the upper antenna support 130 and the lower antenna support 130, and the outer diameter of the curing net 6 is lower than the antenna support. By making it larger than the outer diameter of the part 130, it can also be installed between the position immediately below the suspension scaffold 1 installed on the upper antenna support part 130 and the lower part of the communication tower.

上記の構成により、本発明の通信用鉄塔の塗装工事に用いられる吊り足場1および養生ネット設置装置は、通信用鉄塔の下部で組み立てた吊り足場1をアンテナ支持部120,130の直ぐ下の位置まで上昇させて設置するのではなく、吊り足場1を通信用鉄塔の上段のアンテナ支持部120,130に直接設置するため、アーム方式およびリング方式のアンテナ支持部120,130が複数段設置されている通信用鉄塔においても、アンテナ支持部120,130を解体し撤去することなく、下段のアンテナ支持部120,130よりも上方に設置することができる。  With the above-described configuration, the suspension scaffold 1 and the curing net installation device used for the painting work of the communication tower of the present invention are positioned immediately below the antenna support portions 120 and 130 with the suspension scaffold 1 assembled at the lower part of the communication tower. In order to install the suspension scaffold 1 directly on the antenna support sections 120 and 130 on the upper stage of the communication tower, a plurality of arm-type and ring-type antenna support sections 120 and 130 are installed. Also in the communication tower, the antenna support portions 120 and 130 can be installed above the lower antenna support portions 120 and 130 without dismantling and removing them.

1 吊り足場
2 吊り足場用フレーム
3 上側接続部材
4 下側接続部材
5 床材
6 養生ネット
7 略筒状の養生ネットを通信用鉄塔の周囲に設置する装置
8 上側水平材
9 垂直材
10 下側水平材
11 固定具
12 上側接続部材用の接続具
13 下側接続部材用の接続具
14 手摺材用の接続具
15 手摺材
15a 第1手摺材
15b 第2手摺材
15c 第3手摺材
15d 第4手摺材
16 下側水平材用の接続具
17 接続具
18 床材用水平材
19 床材用横架材
20 係止用フック
21 鋼板
22 養生ネット用水平材
23 滑車
24 ワイヤー
25 滑車接続具
26 ウインチ
27 チェア型ゴンドラ
28 作業用ワイヤー
29 床材設置用部材
100 単柱構造鉄塔
101 トラス構造鉄塔
102 アンテナ支持柱
110 鉄塔本体
111 鋼管
112 フランジ部
120 アーム方式のアンテナ支持部
121 上側支持部
122 下側支持部
123 腕金主材
124 アーム固定材
125 支持柱取付用ブラケット
130 リング方式のアンテナ支持部
131 上側支持部
132 下側支持部
133 接続部材
134 リング固定材
135 リング部材
136 支持柱取付用ブラケット
DESCRIPTION OF SYMBOLS 1 Suspended scaffold 2 Suspended scaffold 3 Upper connection member 4 Lower connection member 5 Floor material 6 Curing net 7 Device which installs a substantially cylindrical curing net around the communication tower 8 Upper horizontal material 9 Vertical material 10 Lower side Horizontal material 11 Fixing tool 12 Connecting tool for upper connecting member 13 Connecting tool for lower connecting member 14 Connecting tool for handrail material 15 Handrail material 15a First handrail material 15b Second handrail material 15c Third handrail material 15d Fourth Handrail material 16 Connecting material for lower horizontal material 17 Connecting device 18 Horizontal material for flooring material 19 Horizontal material for flooring material 20 Hook for locking 21 Steel plate 22 Horizontal material for curing net 23 Pulley 24 Wire 25 Pulley connecting tool 26 Winch 27 Chair-type gondola 28 Work wire 29 Floor material installation member 100 Single pillar structure steel tower 101 Truss structure steel tower 102 Antenna support pillar 110 Steel tower body 111 Steel pipe 112 Flange portion 120 Arm-type antenna support portion 121 Upper support portion 122 Lower support portion 123 Arm metal main member 124 Arm fixing material 125 Support column mounting bracket 130 Ring-type antenna support portion 131 Upper support portion 132 Lower support portion 133 Connecting member 134 Ring fixing material 135 Ring member 136 Bracket for supporting column mounting

Claims (2)

通信用鉄塔に複数のアンテナ支持柱を立設固定するための、上側支持部と下側支持部とを有するアンテナ支持部に設置される吊り足場および養生ネットを設置する装置であって、
アンテナ支持部の上側支持部を構成する部材の上面に設置され、両端が上側支持部から水平方向に突出する長さに形成されている上側水平材と、
前記上側水平材の両端部付近に各々接続されて、上側水平材に対して鉛直方向に配置され、上側水平材に接続されていない側の端部がアンテナ支持部の下側支持部より下方に突出する長さに形成されている一対の垂直材と、
前記一対の垂直材の上側水平材に接続されていない側の端部同士を接続するように設置される下側水平材と、
を有する複数の吊り足場用フレームと、
前記複数の吊り足場用フレームを各吊り足場用フレームの上側水平材と垂直材の接続部付近で接続する上側接続部材と、
前記複数の吊り足場用フレームを各吊り足場用フレームの垂直材と下側水平材の接続部付近で接続する下側接続部材と、
下側接続部材を介して設置される床材と、
略筒状の養生ネットを通信用鉄塔の周囲に設置する装置と、
で構成されていることを特徴とする通信用鉄塔の塗装工事に用いられる吊り足場および養生ネット設置装置。
A device for installing a suspension scaffold and a curing net installed on an antenna support unit having an upper support unit and a lower support unit for standingly fixing a plurality of antenna support columns to a communication tower,
An upper horizontal member that is installed on the upper surface of a member that constitutes the upper support portion of the antenna support portion, and that is formed to have a length in which both ends protrude in the horizontal direction from the upper support portion;
Connected near both ends of the upper horizontal member, arranged in the vertical direction with respect to the upper horizontal member, and the end on the side not connected to the upper horizontal member is below the lower support portion of the antenna support portion A pair of vertical members formed in a protruding length;
A lower horizontal member installed to connect ends of the pair of vertical members not connected to the upper horizontal member;
A plurality of suspension scaffold frames,
An upper connection member for connecting the plurality of suspension scaffold frames in the vicinity of a connection portion between the upper horizontal member and the vertical member of each suspension scaffold frame;
A lower connection member for connecting the plurality of suspension scaffold frames in the vicinity of a connection portion between the vertical member and the lower horizontal member of each suspension scaffold frame;
Floor materials installed via lower connecting members;
A device that installs a substantially cylindrical curing net around the communication tower;
A suspension scaffold and a curing net installation device used for painting construction of a communication tower characterized by comprising:
請求項1に記載の略筒状の養生ネットを通信用鉄塔の周囲に設置する装置は、
通信用鉄塔の周囲に設置される略筒状の養生ネットと、
アンテナ支持部の上側支持部を構成する部材の上面に設置され、両端が上側支持部から水平方向に突出する長さに形成されている養生ネット用水平材と、
養生ネット用水平材の両端に設置される滑車と、
通信用鉄塔の基部付近に設置されるウインチと、
を有しており、
前記養生ネットの上端部にはワイヤーが固定されていること、
前記ワイヤーは養生ネット用水平材の両端に設置されている滑車を介してウインチに巻き付けられていること、
前記ワイヤーをウインチにより引き出しまたは巻き取りすることで、養生ネットを通信用鉄塔に沿って昇降自在に設けたこと、
を特徴とする通信用鉄塔の塗装工事に用いられる吊り足場および養生ネット設置装置。
An apparatus for installing the substantially cylindrical curing net according to claim 1 around a communication tower,
A substantially cylindrical curing net installed around the communication tower;
A horizontal material for a curing net that is installed on the upper surface of a member that constitutes the upper support portion of the antenna support portion and that has both ends formed in a length that protrudes horizontally from the upper support portion;
Pulleys installed at both ends of the horizontal material for the curing net,
A winch installed near the base of the communication tower,
Have
A wire is fixed to the upper end of the curing net;
The wire is wound around the winch via pulleys installed at both ends of the horizontal material for the curing net,
By pulling out or winding the wire with a winch, a curing net was provided so as to freely move up and down along the communication tower.
Suspension scaffold and curing net installation device used for painting construction of communication towers characterized by
JP2014235981A 2014-11-04 2014-11-04 Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower Pending JP2016089601A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014235981A JP2016089601A (en) 2014-11-04 2014-11-04 Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014235981A JP2016089601A (en) 2014-11-04 2014-11-04 Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower

Publications (1)

Publication Number Publication Date
JP2016089601A true JP2016089601A (en) 2016-05-23

Family

ID=56019201

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014235981A Pending JP2016089601A (en) 2014-11-04 2014-11-04 Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower

Country Status (1)

Country Link
JP (1) JP2016089601A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110061339A (en) * 2019-04-15 2019-07-26 深圳市律远汇智科技有限公司 A kind of antenna assembly with safeguard function applied to 5G communication iron tower
JP2020124664A (en) * 2019-02-04 2020-08-20 東京電力ホールディングス株式会社 Steel tower maintenance method and steel tower maintenance device
US10826155B2 (en) * 2016-09-16 2020-11-03 Commscope Technologies Llc Technician platform for antenna mount
CN112378380A (en) * 2020-11-05 2021-02-19 国动网络通信集团江西有限公司 Detection device and method for communication tower

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10826155B2 (en) * 2016-09-16 2020-11-03 Commscope Technologies Llc Technician platform for antenna mount
JP2020124664A (en) * 2019-02-04 2020-08-20 東京電力ホールディングス株式会社 Steel tower maintenance method and steel tower maintenance device
CN110061339A (en) * 2019-04-15 2019-07-26 深圳市律远汇智科技有限公司 A kind of antenna assembly with safeguard function applied to 5G communication iron tower
CN110061339B (en) * 2019-04-15 2021-01-01 广州配天通信技术有限公司 Antenna device with protection function applied to 5G communication tower
CN112378380A (en) * 2020-11-05 2021-02-19 国动网络通信集团江西有限公司 Detection device and method for communication tower

Similar Documents

Publication Publication Date Title
JP2016089601A (en) Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower
JP2015061965A (en) Highrise building and maintenance method for the same
CN110593544A (en) Steel column safety operation platform
JP6655840B2 (en) Crane equipment used at the construction site of reinforced concrete buildings
JP4716948B2 (en) Safety rope support bracket
JP2016211234A (en) Vertical net pre-installation method
JP2010242429A (en) Demolition method for steel tower
JP2019052477A (en) Safety device for temporary scaffold
JP5589183B2 (en) Cylindrical structure scaffolding apparatus and moving method thereof
JP6099993B2 (en) Method of constructing outer wall membrane for tower
CN210888012U (en) Steel column safety operation platform
JP2011162298A (en) Installing construction method and device for overhead crane
JP3149454U (en) Temporary column for handrail
CN103821336B (en) A kind of fixed high-altitude long-span construction operation platform of rope and construction method thereof
JP2013113007A (en) Method and device for temporarily constructing net for steel tower and method and system for repairing steel tower
JP2011153479A (en) Method for repairing exterior wall
JP5670152B2 (en) Cable rack installation method in the vertical direction and cable rack mounting brackets used in the method
JP2015212495A (en) Scaffold device, and construction method for concrete skeleton using the same
JP6318076B2 (en) Steel tower dismantling method and steel tower dismantling apparatus
JP6059176B2 (en) Mobile lifting scaffold for assembling temporary elevated jetty
KR20170109973A (en) Lower cage of gang form with supporting tool
JP2011106114A (en) Method for constructing stage for high-place work
JP2018017106A (en) Device and method for stretching net
JPH1088786A (en) Scaffold for columnar structure
JP2011177211A (en) Device for spreading net to steel pipe support