CN208166363U - A kind of brick handling bogey for building - Google Patents
A kind of brick handling bogey for building Download PDFInfo
- Publication number
- CN208166363U CN208166363U CN201820747668.6U CN201820747668U CN208166363U CN 208166363 U CN208166363 U CN 208166363U CN 201820747668 U CN201820747668 U CN 201820747668U CN 208166363 U CN208166363 U CN 208166363U
- Authority
- CN
- China
- Prior art keywords
- brick
- plate
- handling
- self
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011449 brick Substances 0.000 title claims abstract description 61
- 238000003466 welding Methods 0.000 claims description 17
- 238000000034 method Methods 0.000 abstract description 7
- 229910000831 Steel Inorganic materials 0.000 abstract description 6
- 230000009471 action Effects 0.000 abstract description 6
- 230000008569 process Effects 0.000 abstract description 6
- 239000010959 steel Substances 0.000 abstract description 6
- 238000005516 engineering process Methods 0.000 abstract description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000001154 acute effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to build equipment technology field more particularly to a kind of brick handling bogey for building.Including hydraulic cylinder cooperation self-locking device work; the design of self-locking device, which is self-possessed during lifting by pressing device, compresses brick; brick is locked again under the action of hydraulic cylinder; play double protection; without manual handling; it is time-consuming and laborious to solve manual handling building block, both inconvenience or unsafe problem;It is not necessarily in the handling process by brick again stacking, brick handling work can be carried out by control lifting machine and hydraulic cylinder works, easy to operate work efficiency is high, and needing before solving handling will be on brick again stacking to pallet, it is time-consuming and laborious, ineffective problem;Two sides brick is close in the setting of two side baffles and fixed sleeving to prevent brick from falling, and solving the problems, such as that high-altitude steel wire rope shakes causes brick risk of falling high.
Description
Technical field
The utility model relates to build equipment technology field more particularly to a kind of brick handling bogey for building.
Background technique
It is generally used and manually removes on remote brick to metope or on scaffold when building trade lays bricks wall at present.Small brick
Such as eight or five bricks and 95 bricks are removed relatively labor-saving.But big brick has more than ten five to two ten kilogram weights.This building block
Volume is big, weight weight, and manual handling is time-consuming and laborious, both inconvenient or dangerous;According to mechanical handling, generally matched by steel cable
The form for closing supporting plate carries out handling, and the general space segmentation stacking of brick needs to arrive brick again stacking before ground, handling
On pallet, working efficiency is not only low, and shaking in high-altitude steel wire rope causes brick risk of falling high.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of building for above-mentioned technical deficiency
With brick handling bogey, using hydraulic cylinder cooperation self-locking device work, the design of self-locking device is during lifting
It is self-possessed by pressing device and compresses brick, brick is locked again under the action of hydraulic cylinder, plays duplicate protection work
With it is time-consuming and laborious to solve manual handling building block, both inconvenient or unsafe problem;It is not necessarily in the handling process by brick
Block stacking again can carry out brick handling work by control lifting machine and hydraulic cylinder works, and easy to operate work efficiency is high,
It solves and needs on brick again stacking to pallet before handling, time-consuming and laborious, ineffective problem;Two side baffles and
Two sides brick is close in the setting of fixed sleeving to prevent brick from falling, and solving high-altitude steel wire rope and shaking causes brick to fall
Fall the high problem of risk.
In order to solve the above technical problems, technical solution used by the utility model is:Including fixed frame, hanging ring, self-locking
Tight device and pressing device;Both ends are fixedly welded with support plate inside fixed frame;Run through in the middle part of support plate and is welded with guiding axis;
Fixed frame top center position is provided with fixed plate in the direction of the width;Pressing device is mounted on fixed frame lower inside;Hanging ring
It is arranged above fixed frame, hanging ring bottom uniform welding there are multiple lifting booms;The welding of at the top of self-locking device and lifting boom bottom;
Pressing device includes sliding block, hydraulic cylinder, auxiliary connecting plate and connecting rod;Sliding block and guiding axis are slidably connected;The fixed weldering in sliding block side
It is connected to push plate;Pass through auxiliary connecting plate welding in the middle part of two push plates.
The technical program is advanced optimized, the push plate bottom side is fixedly welded with pressing plate;Fixation is set on the right side of pressing plate
It is equipped with rubber pad;Uniform welding has multiple fixed sleevings to left side pressing plate on both sides of the middle in the height direction;Two in the middle part of the pressing plate of right side
Uniform welding has multiple baffles in the height direction for side;Fixed sleeving and baffle are corresponding;Baffle and fixed sleeving are slidably connected.
The technical program is advanced optimized, is provided with fixing axle at the top of the auxiliary connecting plate;Bearing connects at the top of fixing axle
It is connected to nutted rod;Two nutted rods are connected by connecting rod bearings at both ends;Connecting rod middle part and fixed plate top center position bearing
Connection;It is connected in the middle part of two auxiliary connecting plates by hydraulic cylinder both ends shaft.
The technical program is advanced optimized, the self-locking device includes upending frame and pull rod;At the top of upending frame and rise
Boom foot welding;Upending frame on both sides of the middle is welded with connecting shaft;Fixing axle two sides are welded with connection at the top of auxiliary connecting plate
Seat;Attachment base is connected with connecting shaft by pull rod both ends shaft;The width of upending frame assists the length of connecting plate less than twice.
Compared with prior art, the utility model has the following advantages that:1, hydraulic cylinder cooperation self-locking device work, it is self-locking
The design of tight device, which is self-possessed during lifting by pressing device, compresses brick, again by brick under the action of hydraulic cylinder
It is locked, plays double protection, it is time-consuming and laborious to solve manual handling building block, both inconvenient or unsafe ask
Topic;2, in the handling process without that can carry out brick again stacking brick by control lifting machine and hydraulic cylinder works and hang
Work is transported, easy to operate work efficiency is high, solves and needs on brick again stacking to pallet before handling, and it is time-consuming and laborious,
Ineffective problem;3, two sides brick is close in the setting of two side baffles and fixed sleeving to prevent brick from falling, and solve
High-altitude steel wire rope, which shakes, causes brick to fall risk high problem.
Detailed description of the invention
Fig. 1 is a kind of general assembly isometric side view of brick handling bogey for building.
Fig. 2 is a kind of pressing device internal structure chart of brick handling bogey for building.
Fig. 3 is a kind of self-locking device internal structure partial sectional view of brick handling bogey for building.
In figure:1, fixed frame;101, support plate;102, guiding axis;103, fixed plate;2, hanging ring;201, lifting boom;3, certainly
Locking device;301, upending frame;302, pull rod;303, connecting shaft;304, attachment base;4, pressing device;401, sliding block;402, liquid
Cylinder pressure;403, connecting plate is assisted;404, connecting rod;405, push plate;406, pressing plate;407, rubber pad;408, fixed sleeving;409, it keeps off
Plate;410, fixing axle;411, nutted rod.
Specific embodiment
To make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment
And referring to attached drawing, the utility model is further described.It should be understood that these descriptions are merely illustrative, and do not really want
Limit the scope of the utility model.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid not
Necessarily obscure the concept of the utility model.
Specific embodiment one:In conjunction with shown in Fig. 1-3, a kind of brick handling bogey for building it is characterized in that:Packet
Include fixed frame 1, hanging ring 2, self-locking device 3 and pressing device 4;1 inside both ends of fixed frame are fixedly welded with support plate 101;
Run through in the middle part of support plate 101 and is welded with guiding axis 102;1 top center position of fixed frame is provided with fixed plate in the direction of the width
103;Pressing device 4 is mounted on 1 lower inside of fixed frame;Hanging ring 2 is arranged above fixed frame 1, and 2 bottom uniform welding of hanging ring has
Multiple lifting booms 201;3 top of self-locking device and the welding of 201 bottom of lifting boom;Pressing device 4 includes sliding block 401, hydraulic cylinder
402, connecting plate 403 and connecting rod 404 are assisted;Sliding block 401 and guiding axis 102 are slidably connected;401 side of sliding block, which is fixedly welded with, to push away
Plate 405;It is welded in the middle part of two push plates 405 by auxiliary connecting plate 403;405 bottom side of push plate is fixedly welded with pressing plate 406;Pressing plate
406 right sides are fixedly installed rubber pad 407;Uniform welding has multiple fixations to 406 on both sides of the middle of left side pressing plate in the height direction
Casing 408;Uniform welding has multiple baffles 409 to 406 on both sides of the middle of right side pressing plate in the height direction;Fixed sleeving 408 and gear
Plate 409 is corresponding;Baffle 409 and fixed sleeving 408 are slidably connected;Fixing axle 410 is provided at the top of auxiliary connecting plate 403;It is fixed
410 top bearing of axis is connected with nutted rod 411;Two nutted rods 411 are connected by 404 bearings at both ends of connecting rod;In connecting rod 404
Portion is connected with 103 top center position bearing of fixed plate;It is connected in the middle part of two auxiliary connecting plates 403 by 402 both ends shaft of hydraulic cylinder;
Self-locking device 3 includes upending frame 301 and pull rod 302;301 top of upending frame and the welding of 201 bottom of lifting boom;Upending frame 301
On both sides of the middle is welded with connecting shaft 303;410 two sides of fixing axle are welded with attachment base 304 at the top of auxiliary connecting plate 403;Connection
Seat 304 is connected with connecting shaft 303 by 302 both ends shaft of pull rod;The width of upending frame 301 assists connecting plate 403 less than twice
Length.
In use, step 1 controls hydraulic pump by pcl and works to control hydraulic cylinder 402, rise in conjunction with shown in Fig. 1-3
Before hanging, hydraulic cylinder 402 works, and 402 telescopic rod of hydraulic cylinder, which stretches out, pushes auxiliary connecting plate 403 to move to two sides, to drive push plate
405 move to two sides, while push plate 405 is moved to two sides band movable slider 401 along guiding axis 102 to two Slideslips, band dynamic pressure
Plate 406 is moved to two, and pressing plate 406 is opened, and drives baffle 409 along fixes sleeve inner wall while pressing plate 406 is moved to two sides
Outside Slideslip;Because the setting of fixed plate 103 is at 1 middle part of fixed frame, auxiliary connecting plate 403 passes through fixation during moving to two sides
Axis 410 drives nutted rod 411 to move to two sides, to drive connecting rod 404 to rotate clockwise, under the action of connecting rod 404
Left side nutted rod 411 is rotated counterclockwise around fixing axle 410 on the left of left side, and right side nutted rod 411 is counterclockwise around right side fixing axle 410
Rotation, for connecting rod 404 always about 103 center point symmetry of fixed plate, two sides fixing axle 410 arrives central point during rotation
Distance is identical always, and push plate 405 is synchronous to open to two sides;Auxiliary connecting plate 403 drives the connection of two sides while moving to two sides
Seat 304 moves synchronously, if keeping hanging ring 2 motionless, drives pull rod 302 around 303 up time of connecting shaft when attachment base 304 is moved to two sides
Needle rotation, so that bottom pressing device 4 is driven to move upwards, when 402 telescopic rod of hydraulic cylinder moves to top, two pressing plates
406 are opened to maximum;Because of the length of less than the twice auxiliary connecting plate 403 of width of upending frame 301;(0.6 meter of left side of brick stacking width
The right side, length are greater than 301 width of upending frame less than the maximum distance between two push plates 405)The design width rate of fixed frame 1 is greater than code
Pile width, baffle 409 and fixed sleeving 408 can block the brick of two sides when wirerope shakes during lifting, play
Certain protective role, solving high-altitude steel wire rope and shaking causes brick risk of falling high.
Pressing device 4 is inserted in downwards by step 2 in conjunction with shown in Fig. 1-3 from the top of stacking brick,(Lift by crane stacking brick
The total height of block is less than 0.3 meter)406 bottom of pressing plate is adjusted to proper height, hydraulic cylinder 402 is then controlled and withdraws, it is similarly hydraulic
Brick is clamped by auxiliary connecting plate 403, push plate 405 and pressing plate 406 when cylinder 402 is withdrawn, 406 bottom width rate of pressing plate is greater than upper
Fang Kuandu, so first by bottom stacking brick fixation in clamping process, the rubber pad 407 of 406 side of pressing plate has one
Fixed elasticity can prevent clamping force from locally crossing the crushing of senior general's brick in clamping process;Lift hanging ring 2, hanging ring 2 then up
It drives upending frame 301 to synchronize by lifting boom 201 during moving upwards to move upwards, drawing when upending frame 301 moves upwards
Dynamic pull rod 302, the angle between pull rod 302 and horizontal plane is acute angle, and the angle between pull rod 302 and upending frame 301 is obtuse angle,
So the sum of the gravity of bottom pressing device 4 and brick can be divided into the pressure in the middle part of horizontal direction and the pulling force along pull rod 302;?
Brick is fixed under the action of pressure in the middle part of horizontal direction, so being compressed brick by being self-possessed during lifting, hydraulic
Brick is locked again under the action of cylinder 402, plays double protection, solves the time-consuming expense of manual handling building block
Power, both inconvenient or unsafe problem;In the handling process without by brick again stacking, by control lifting machine and hydraulic
The work of cylinder 402 can carry out brick handling work, and easy to operate work efficiency is high, need brick again before solving handling
It is time-consuming and laborious in stacking to pallet, ineffective problem.
The control mode of the utility model is automatically controlled by controller, and the control circuit of controller passes through this field
Technical staff's simple programming can be realized, belong to the common knowledge of this field, and the utility model is mainly used to protect machine
Tool device, so the utility model is not explained control mode and circuit connection.
It should be understood that the above-mentioned specific embodiment of the utility model is used only for exemplary illustration or explains this reality
With novel principle, without constituting limitations of the present invention.Therefore, in the spirit and scope without departing from the utility model
In the case of any modification, equivalent substitution, improvement and etc. done, should be included within the scope of protection of this utility model.In addition,
The appended claims for the utility model are intended to cover to fall into attached claim scope and boundary or this range and boundary
Whole change and modification in equivalent form.
Claims (4)
1. a kind of brick handling bogey for building, it is characterised in that:Including fixed frame (1), hanging ring (2), self-locking device
(3) and pressing device (4);The internal both ends of fixed frame (1) are fixedly welded with support plate (101);Run through in the middle part of support plate (101)
It is welded with guiding axis (102);Fixed frame (1) top center position is provided with fixed plate (103) in the direction of the width;Pressing device
(4) it is mounted on fixed frame (1) lower inside;Above fixed frame (1), hanging ring (2) bottom uniform welding has more for hanging ring (2) setting
A lifting boom (201);The welding of at the top of self-locking device (3) and lifting boom (201) bottom;Pressing device (4) includes sliding block
(401), hydraulic cylinder (402), auxiliary connecting plate (403) and connecting rod (404);Sliding block (401) and guiding axis (102) are slidably connected;
Sliding block (401) side is fixedly welded with push plate (405);Pass through auxiliary connecting plate (403) welding in the middle part of two push plates (405).
2. a kind of brick handling bogey for building according to claim 1, it is characterised in that:Push plate (405) bottom
Side is fixedly welded with pressing plate (406);Rubber pad (407) are fixedly installed on the right side of pressing plate (406);In the middle part of left side pressing plate (406)
Uniform welding has multiple fixed sleevings (408) in the height direction for two sides;Right side pressing plate (406) on both sides of the middle is in the height direction
Uniform welding has multiple baffles (409);Fixed sleeving (408) and baffle (409) are corresponding;Baffle (409) and fixed sleeving
(408) it is slidably connected.
3. a kind of brick handling bogey for building according to claim 1, it is characterised in that:It assists connecting plate (403)
Top is provided with fixing axle (410);Bearing is connected with nutted rod (411) at the top of fixing axle (410);Two nutted rods (411) pass through
The connection of connecting rod (404) bearings at both ends;It is connected in the middle part of connecting rod (404) with fixed plate (103) top center position bearing;Two is auxiliary
It helps in the middle part of connecting plate (403) and is connected by hydraulic cylinder (402) both ends shaft.
4. a kind of brick handling bogey for building according to claim 3, it is characterised in that:Self-locking device (3)
Including upending frame (301) and pull rod (302);The welding of at the top of upending frame (301) and lifting boom (201) bottom;In upending frame (301)
Portion two sides are welded with connecting shaft (303);Fixing axle (410) two sides are welded with attachment base at the top of auxiliary connecting plate (403)
(304);Attachment base (304) is connected with connecting shaft (303) by pull rod (302) both ends shaft;The width of upending frame (301) is less than
The length of twice of auxiliary connecting plate (403).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820747668.6U CN208166363U (en) | 2018-05-19 | 2018-05-19 | A kind of brick handling bogey for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820747668.6U CN208166363U (en) | 2018-05-19 | 2018-05-19 | A kind of brick handling bogey for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208166363U true CN208166363U (en) | 2018-11-30 |
Family
ID=64363746
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820747668.6U Expired - Fee Related CN208166363U (en) | 2018-05-19 | 2018-05-19 | A kind of brick handling bogey for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208166363U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112520560A (en) * | 2020-11-18 | 2021-03-19 | 山东省科学院海洋仪器仪表研究所 | Automatic correction and recovery method after clamp unbalance |
-
2018
- 2018-05-19 CN CN201820747668.6U patent/CN208166363U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112520560A (en) * | 2020-11-18 | 2021-03-19 | 山东省科学院海洋仪器仪表研究所 | Automatic correction and recovery method after clamp unbalance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107522125A (en) | A kind of portable device for lifting of power engineering | |
CN108892060A (en) | A kind of crane upper mechanism is from dismantling device, crane and tears method open certainly | |
CN103863938A (en) | Safe lifting device for conveying wind tunnel test car | |
CN202449788U (en) | Special crane device for wall bricks | |
CN105271024B (en) | Tower crane with windproof structure | |
CN208166363U (en) | A kind of brick handling bogey for building | |
CN203159089U (en) | Telescopic lifting platform for tower crane in cylinder wall construction | |
CN101446083B (en) | Dropping method for large-tonnage steel liner of drilled pile | |
CN108002249A (en) | Substation equipment maintenance and repair small space boom hoisting | |
CN110331845A (en) | A kind of housing construction platform | |
CN210133816U (en) | Pneumatic lifting appliance for prestressed high-strength concrete pipe pile | |
CN105293301B (en) | Windproof tower crane | |
CN207048281U (en) | A kind of ore deposit Jiao groove feed hopper liner installation system | |
CN106567383A (en) | Movable type lowering frame and lowering method for heavy reinforcement cages | |
CN206886632U (en) | A kind of cable channel cover plate handling device | |
CN210855091U (en) | Simple movable heavy object vertical lifting equipment | |
CN215626205U (en) | Auxiliary crane device for ALC wallboard installation | |
JP5654280B2 (en) | Jib crane and its dismantling method | |
CN105293299B (en) | Windproof derrick crane for building | |
CN208500178U (en) | A kind of building hanging basket for house construction engineering | |
CN209924414U (en) | Construction platform with blocking net for building | |
CN206665992U (en) | A kind of plant equipment mast-up | |
CN207259027U (en) | A kind of rotation positioning device for sandbox | |
CN205226226U (en) | Large -scale gallows of taking a trial run of counter weight space adjustable | |
CN105417346A (en) | Aircraft main rotor suspension |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181130 Termination date: 20190519 |
|