China
Prior art keywords
connecting rod
oil tank
storage tank
center
scale storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120391757XU
Other languages
Chinese (zh)
Inventor
于学恭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201120391757XU priority Critical patent/CN202299367U/en
Application granted granted Critical
Publication of CN202299367U publication Critical patent/CN202299367U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a hanging bracket for quick construction of the outer wall of a large-scale storage tank. A rotating mechanism is sleeved in a manhole in the center of the upper end of an oil tank; connecting rods are symmetrically mounted on two sides of the rotating mechanism; the connecting rod on one side radially extends out of the outer side wall of the oil tank and then a steel wire rope is hung on the connecting rod; a hanging basket is connected to the tail end of the steel wire rope; a lever block is arranged in the middle of the steel wire rope; and a counterbalance body is arranged on the connecting rod on the other side. As the rotating mechanism is mounted in the center of the manhole on the arch crown at the top of the oil tank, the manhole is taken as a rotating center, the hanging basket is arranged at the tail end of one connecting rod, and the lever block is adopted to control the lifting of the hanging basket, the hanging bracket has the advantages that the structure is simple, the design is reasonable, the structural behavior of the oil tank is not changed, a support frame is eliminated, the construction efficiency is greatly improved, and the safety is enhanced; besides, the construction period is greatly shortened, a lot of scaffolds and labor cost are saved, the hanging bracket can be used repeatedly, the economic benefit is remarkable, and the hanging bracket is suitable for popularization and implementation.

Description

Large-scale storage tank outer wall rapid construction suspension bracket
Technical field
The utility model relates to the antiseptic aid of a kind of steel oil tank outer wall, particularly relates to a kind of large-scale storage tank outer wall rapid construction suspension bracket.
Background technology
Industries such as petrochemical industry, metallurgy, building materials, the grain and oil all kinds steel storage tank that is widely used.Volume is bigger, and volume is 500M3-3000M3 usually, and its external surface carries out anticorrosion and various installation and maintenance operations all needs work high above the ground.Existing construction operation method adopts the construction of all round victory scaffold usually, shows as to use the scaffold enormous amount, often needs tens days ability of twenties workmans assembled, and need remove with equal time, wastes a large amount of human and material resources.Efficiency is low, and safety is not high.
The utility model content
For overcoming the deficiency that prior art exists, the utility model provides a kind of large-scale storage tank outer wall rapid construction suspension bracket.
Technical scheme: a kind of large-scale storage tank outer wall rapid construction suspension bracket; Rotating mechanism of suit in the manhole of the center, upper end of oil tank; The bilateral symmetry of this rotating mechanism is equipped with connecting rod; Wherein be hung with wire rope behind the radially protruding oil tank lateral wall of a lateral connector bar, the terminal hanging basket that connects of wire rope, the wire rope middle part is provided with Lever Blocks; The opposite side connecting rod is provided with balance weight body.
Said rotating mechanism comprises a flange of fixing with center, oil tank upper end man-hole opening coupling, and this flange center is vertically fixed with axle, and this outside is set with roller bearing, and two connecting rods are separately fixed at the overcoat or the bearing support both sides of roller bearing.
Said rotating mechanism comprises a flange of fixing with center, oil tank upper end man-hole opening coupling, and this flange center is provided with through hole or blind hole, is set with a central rotating shaft through thrust bearing in the hole, and two connecting rods are separately fixed at the both sides of central rotating shaft.
The vault radian coupling of said connecting rod and oil tank upside.
On said connecting rod, be set with a road wheel, the vault lateral wall is fitted on this road wheel and the oil tank.
Road wheel comprises a main wheel, and two directive wheels and a support wheel, two directive wheels are positioned at the inboard of main wheel and are similar on same straight line with main wheel, and support wheel tilts to be installed in the main wheel outside.
Said connecting rod adopts sleeve pipe extension type connecting rod, and sleeve pipe docking port place utilizes the screw of screwing.
The beneficial effect of the utility model:
1, vault manhole center is equipped with rotating mechanism to the utility model on oil tank top, utilizes manhole to be center of rotation, hanging basket is set and utilizes Lever Blocks control hanging basket to go up and down at the connecting rod end; It is simple in structure; Reasonable in design, do not change the structural performance of oil tank itself, save bracing frame; Efficiency of construction greatly is improved, and safety is strengthened.Adopt full hall mouthful scaffold with respect to existing form of construction work; Fragmentary installation, detection, quality inspection etc., the work that needs twenties workmans ability assembling in tens days to accomplish, the utility model only needs two or three workman in one day, to get final product assembled; Time saving and energy saving and safety good; Greatly the reduction of erection time, save a large amount of scaffolds and labour cost, remarkable in economical benefits.
2, connecting rod is done 360 degree rotations and stopped at any time around center of rotation, can guarantee the needs of rapid construction, changes construction location as required arbitrarily, and is quick and easy.In addition, dismounting and set up is all very fastly again implemented easily.
3, bracing frame of the utility model and column can satisfy the purpose of repeatedly using repeatedly.The oil tank external wall construction that utilizes the connecting rod of extension type can satisfy different model uses.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the semi-section structural representation of the top rotating mechanism of Fig. 1;
Fig. 3 is the semi-section structural representation of another kind of top rotating mechanism;
Fig. 4 is a kind of connecting rod sketch map of stretching structure;
Fig. 5 is the road wheel perspective view;
Fig. 6 is the side structure sketch map of Fig. 5.
Label 1 is a tank body among the figure, and 2 is the top vault of tank body, and 3 is road wheel, and 4 is connecting rod, and 51 is roller bearing; 52 is thrust bearing, and 6 is flange, and 7 is central fixed shaft, and 8 is central rotating shaft, and 9 is base; 10 is center, upper end manhole, and 11 is lower end sidewall manhole, and 12 is anticorrosive coat, and 13 is hanging basket, and 14 is wire rope; 15 is balance weight body, and 16 is universal joint, and 17 is fixing hole, and 18 is Lever Blocks.41a and 41b are respectively the interior loop bar (pipe) of (arc) scalable connecting rod, and 42 is the outer tube of (arc) scalable connecting rod, and 43 are the screw of screwing.
The specific embodiment
Embodiment one: referring to Fig. 1, this large-scale storage tank outer wall rapid construction suspension bracket is to utilize the manhole 10 at oil tank vault center as center of rotation, rotating mechanism of suit in center manhole 10.Referring to Fig. 2; Rotating mechanism comprises a flange 6 of fixing with center, oil tank upper end man-hole opening coupling; These flange 6 centers are vertically fixed with axle 7, and these axle 7 outsides are set with overcoat or the bearing support both sides that roller bearing 51, two connecting rods 4 are separately fixed at roller bearing.Connecting rod 4 matees with the vault radian of oil tank upside.Wherein a lateral connector bar 4 is hung with wire rope 14 after leaning out tank skin 1-1.5m, the wire rope 14 terminal hanging baskets 13 that connect, and wire rope 14 middle parts are provided with Lever Blocks 18; Opposite side connecting rod 4 is provided with balance weight body 15.On said connecting rod, be set with a road wheel 4, the vault lateral wall is fitted on this road wheel 4 and the oil tank.
Construction workman in the hanging basket 13 can realize the up-down of hanging basket through controlling Lever Blocks 18, rotates the rotation that can realize hanging basket through the connecting rod 4 that drives on the tank deck, moves and can put in place rapidly, and is simple and quick.
Embodiment two: referring to Fig. 3; Content and embodiment one are basic identical; Something in common does not repeat, and different is: rotating mechanism comprises a flange 6 of fixing with center, oil tank upper end man-hole opening coupling, and these flange 6 centers are provided with through hole or blind hole; Be set with the both sides that a central rotating shaft 8, two connecting rods 4 are separately fixed at central rotating shaft 8 through thrust bearing in the hole.
Embodiment three: referring to Fig. 4, content and embodiment one are basic identical, and something in common does not repeat, and different is: the connecting rod of present embodiment is a bushing type, thereby can stretch so that satisfy the oil tank construction needs of different-diameter.This bushing type connecting rod comprises two interior loop bar (pipe) 41a in two ends and 41b, and the outer tube 42 in middle part is provided with the screw 43 of screwing and is used for fixing between the internal and external casing.
Embodiment four: referring to Fig. 5 and 6; Content and embodiment one are basic identical; Something in common does not repeat, and different is: road wheel comprises 32, two directive wheels 33 of a main wheel and a support wheel 34; Two directive wheels 33 are positioned at the inboard of main wheel 32 and are similar on same straight line with main wheel, and support wheel 34 tilts to be installed in the main wheel outside.

Claims (7)

1. large-scale storage tank outer wall rapid construction suspension bracket; It is characterized in that: rotating mechanism of suit in the manhole of the center, upper end of oil tank; The bilateral symmetry of this rotating mechanism is equipped with connecting rod; Wherein be hung with wire rope behind the radially protruding oil tank lateral wall of a lateral connector bar, the terminal hanging basket that connects of wire rope, the wire rope middle part is provided with Lever Blocks; The opposite side connecting rod is provided with balance weight body.
2. large-scale storage tank outer wall rapid construction suspension bracket according to claim 1; It is characterized in that: said rotating mechanism; Comprise a flange of fixing with center, oil tank upper end man-hole opening coupling; This flange center is vertically fixed with axle, and this outside is set with roller bearing, and two connecting rods are separately fixed at the overcoat or the bearing support both sides of roller bearing.
3. large-scale storage tank outer wall rapid construction suspension bracket according to claim 1; It is characterized in that: said rotating mechanism; Comprise a flange of fixing with center, oil tank upper end man-hole opening coupling; This flange center is provided with through hole or blind hole, is set with a central rotating shaft through thrust bearing in the hole, and two connecting rods are separately fixed at the both sides of central rotating shaft.
4. large-scale storage tank outer wall rapid construction suspension bracket according to claim 1 is characterized in that: the vault radian coupling of said connecting rod and oil tank upside.
5. large-scale storage tank outer wall rapid construction suspension bracket according to claim 4 is characterized in that: on said connecting rod, be set with a road wheel, the vault lateral wall is fitted on this road wheel and the oil tank.
6. according to claim 1 or 5 described large-scale storage tank outer wall rapid construction suspension brackets; It is characterized in that: road wheel comprises a main wheel; Two directive wheels and a support wheel, two directive wheels are positioned at the inboard of main wheel and are similar on same straight line with main wheel, and support wheel tilts to be installed in the main wheel outside.
7. large-scale storage tank outer wall rapid construction suspension bracket according to claim 1 is characterized in that: said connecting rod adopts sleeve pipe extension type connecting rod, and sleeve pipe docking port place utilizes the screw of screwing.
CN201120391757XU 2011-10-15 2011-10-15 Hanging bracket for quick construction of outer wall of large-scale storage tank Expired - Lifetime CN202299367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120391757XU CN202299367U (en) 2011-10-15 2011-10-15 Hanging bracket for quick construction of outer wall of large-scale storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120391757XU CN202299367U (en) 2011-10-15 2011-10-15 Hanging bracket for quick construction of outer wall of large-scale storage tank

Publications (1)

Publication Number Publication Date
CN202299367U true CN202299367U (en) 2012-07-04

Family

ID=46368293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120391757XU Expired - Lifetime CN202299367U (en) 2011-10-15 2011-10-15 Hanging bracket for quick construction of outer wall of large-scale storage tank

Country Status (1)

Country Link
CN (1) CN202299367U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433985A (en) * 2011-10-15 2012-05-02 于学恭 Quick construction hanging bracket for external wall of large storage tank
CN105350763A (en) * 2015-11-13 2016-02-24 中国一冶集团有限公司 Guide rail-type construction hanging basket for chimney beacon paint and construction method
CN105442827A (en) * 2015-11-13 2016-03-30 中国一冶集团有限公司 Chimney beacon paint surrounding rope type construction basket and method
CN113356555A (en) * 2021-07-01 2021-09-07 中建三局集团有限公司 Vertical storage tank facade anticorrosive rust cleaning auxiliary device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433985A (en) * 2011-10-15 2012-05-02 于学恭 Quick construction hanging bracket for external wall of large storage tank
CN102433985B (en) * 2011-10-15 2013-11-20 于学恭 Quick construction hanging bracket for external wall of large storage tank
CN105350763A (en) * 2015-11-13 2016-02-24 中国一冶集团有限公司 Guide rail-type construction hanging basket for chimney beacon paint and construction method
CN105442827A (en) * 2015-11-13 2016-03-30 中国一冶集团有限公司 Chimney beacon paint surrounding rope type construction basket and method
CN105350763B (en) * 2015-11-13 2018-10-23 中国一冶集团有限公司 A kind of guide tracked construction hanging basket of chimney navigation mark paint and construction method
CN113356555A (en) * 2021-07-01 2021-09-07 中建三局集团有限公司 Vertical storage tank facade anticorrosive rust cleaning auxiliary device
CN113356555B (en) * 2021-07-01 2022-06-17 中建三局集团有限公司 Vertical storage tank facade anticorrosion rust cleaning auxiliary device

Similar Documents

Publication Publication Date Title
CN202299367U (en) Hanging bracket for quick construction of outer wall of large-scale storage tank
CN204917742U (en) Portable portal crane is used in piping erection
CN101936536B (en) Method for constructing ship chimney section
CN203996840U (en) A kind of buoy quoit hanger
CN101434366A (en) Hoisting tool and hoisting method for column component
CN204055185U (en) A kind of heavy vehicle tyre removing machine
CN102433985B (en) Quick construction hanging bracket for external wall of large storage tank
CN202299366U (en) Quick construction hanger for inner wall of large storage tank
CN202518926U (en) Multi-direction rotary type lifting appliance
CN104912315A (en) Rotary suspended working platform
CN205422071U (en) Rear cantilever type garage parking
CN201214598Y (en) Column crane special for movable arm type tower erection
CN201918287U (en) Assembly tooling for isolating switch
CN203740906U (en) Portal crane
CN102605940A (en) Rapid construction hanging bracket for inner wall of spherical tank
CN206051351U (en) Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form
CN206069211U (en) One kind is conveniently replaceable electric block and bottle gouard moved by hands mono beam crane in bridge type
CN207192175U (en) A kind of municipal bridge steel pipe transmission device
CN201433051Y (en) Large-scale rack lower boom double-track single-beam lifting crane
CN106185597A (en) A kind of large-scale Analytic Tower merogenesis special hanger for hoisting and hanging method
CN202292000U (en) Hinge type piping system turnover device
CN202398995U (en) Disassembling device for couplings
CN103084817A (en) Industry cylindrical furnace radiant furnace pipe installing device and installing method
CN205023810U (en) Anticorrosive operation platform in jar
CN202672693U (en) Spherical tank inner wall rapid construction hanging bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120704

Effective date of abandoning: 20131120

RGAV Abandon patent right to avoid regrant