CN103084817A - Industry cylindrical furnace radiant furnace pipe installing device and installing method - Google Patents

Industry cylindrical furnace radiant furnace pipe installing device and installing method Download PDF

Info

Publication number
CN103084817A
CN103084817A CN2012105949606A CN201210594960A CN103084817A CN 103084817 A CN103084817 A CN 103084817A CN 2012105949606 A CN2012105949606 A CN 2012105949606A CN 201210594960 A CN201210594960 A CN 201210594960A CN 103084817 A CN103084817 A CN 103084817A
Authority
CN
China
Prior art keywords
furnace
cantilever beam
newel
tube
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105949606A
Other languages
Chinese (zh)
Other versions
CN103084817B (en
Inventor
王龙科
杨伟林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Engineering Group Co Ltd
Sinopec Ningbo Engineering Co Ltd
Sinopec Ningbo Technology Research Institute
Sinopec Fifth Construction Co Ltd
Original Assignee
Sinopec Engineering Group Co Ltd
Sinopec Ningbo Engineering Co Ltd
Sinopec Ningbo Technology Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Engineering Group Co Ltd, Sinopec Ningbo Engineering Co Ltd, Sinopec Ningbo Technology Research Institute filed Critical Sinopec Engineering Group Co Ltd
Priority to CN201210594960.6A priority Critical patent/CN103084817B/en
Publication of CN103084817A publication Critical patent/CN103084817A/en
Application granted granted Critical
Publication of CN103084817B publication Critical patent/CN103084817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an industry cylindrical furnace radiant furnace pipe installing device and an installing method. The mechanism comprises a fixing base plate, a central pillar, a supporting rod, and a cantilever beam. The base plate is arranged at the bottom end of the central pillar. The base plate is fixed on an industry cylindrical furnace. One end of the supporting rod is fixedly connected with one end of the cantilever beam to form two sides of a triangle. Sleeve cylinders which are located on an identical straight line are respectively arranged on the supporting rod and at the other end of the cantilever beam. The supporting rod and the cantilever beam are sleeved on the central pillar through sleeve cylinders and can rotate with the central pillar in 360 degrees. On base of the construction method of the mechanism, a U-shaped furnace pipe is hanged on the cantilever beam, and then a handle is pushed to rotate the U-shaped pipe to a suitable location. A lifting device is used for lifting up the furnace pipe to an installing location to be installed. The mechanism and the construction method are used for greatly eliminating constructing quantity of a scaffold. Construction of a furnace top lining can be completed in advance. The construction of a furnace top lining can not have influences on the installion of the furnace pipe. Furthermore, the mechanism can be used and dismantled repeatedly, and the construction cost can be saved.

Description

Erecting device and the installation method of industry cylindrical furnace radiating furnace tube
Technical field
The present invention relates to the chemical industry equipment field, specifically refer to a kind of erecting device and installation method of industrial cylindrical furnace radiating furnace tube.
Background technology
Existing industrial cylindrical furnace radiant section furnace pipe construction is all 2 one group usually, be prefabricated into U-shaped, carrying out the scene installs, the conventional mounting mode has 2 kinds, the one, the radiant section furnace top board is not gone up, completely take around scaffold, adopt 25 tons or 50 tons of truck cranes that U-shaped boiler tube is re-layed stove roof plate after installation one by one, the method must be taken full scaffold around cylindrical furnace, workload is very large, re-lay top board after the boiler tube installation in addition, had a strong impact on the top liner construction, larger on the construction period impact of project; Another is by the hole for hoist on the radiation furnace roof, adopt 25 tons or 50 tons of truck cranes that boiler tube is lifted up into burner hearth, with scaffold as support, first deposit in burner hearth, then will deposit into boiler tube in burner hearth by lifting device such as jack or some supplementary means such as manual cucurbit, scaffold and hang one by one the boiler tube installation site, the method drawback is that difficulty of construction is large, and the cycle is long.
Summary of the invention
To be to provide a kind of manufacturings simple, easy to operate, the erecting device of the efficient industrial cylindrical furnace radiating furnace tube of construction to above-mentioned technical problem in order to solve in the present invention, reaches the purpose of simplifying construction procedure, shortening the time limit of constructing.
Another technical problem to be solved by this invention is to provide the installation method of the industrial cylindrical furnace radiating furnace tube of a kind of construction procedure simplification, short construction period.
with regard to the installation machinery of industrial cylindrical furnace radiating furnace tube, the present invention solves the problems of the technologies described above the technical scheme that adopts, a kind of installation machinery of industrial cylindrical furnace radiating furnace tube, comprise base plate, newel, support bar, base plate is fixed on industrial bottom of cylinder, newel is fixed on above base plate, the end that cantilever beam is used for lifting is provided with hanger, support bar one end and cantilever beam are fixedly connected to form leg-of-mutton both sides, the other end of support bar and cantilever beam is respectively equipped with the sleeve that is on same straight line, support bar and cantilever beam are located on newel and can rotate around newel 360 degree by jacket casing.
Preferably, above-mentioned newel top is provided with the top supporting rod that is fixedly connected with industrial cylinder furnace roof, and top supporting rod can overcome the moment of torsion of overarm arm, reduces the intensity of newel and base, reaches the purpose of saving material.
Preferably, the position on above-mentioned newel below the cantilever beam sleeve is provided with supporting plate, and supporting plate is fixed on newel by reinforcement.The external diameter of supporting plate has reinforcement to be connected with newel greater than the external diameter of sleeve below supporting plate.
Preferably, above-mentioned support bar is provided with the handle for manually-operated, and the setting height(from bottom) of handle is advisable for ordinary person's chest locations.
Preferably, a side of above-mentioned overarm arm lifting is provided with plug, and the radius of plug is greater than the radius of overarm arm pipe.Radiant tube landing during the effect of plug is can prevent from lifting.
Preferably, be provided with the ring flat-plate that annular is strengthened sleeve intensity in above-mentioned sleeve, use ring flat-plate can reduce sleeve thickness and save material, and the gap of reducing between sleeve and newel strengthen stability.
with regard to industrial cylindrical furnace radiating furnace tube installation method, this method is that the construction method that solves the problems of the technologies described above comprises the steps: above-mentioned erecting device vertically is placed in the cylindrical furnace middle part, and be fixed in cylindrical furnace bottom by base plate, top supporting rod is fixed in the cylindrical furnace top, then utilize the U-shaped pipe that crane will preset to hang on the cantilever beam-ends that machinery is installed, workmen's driving handle makes cantilever beam structures rotate around newel, forward boiler tube to position to be installed, mount 2 lifting ropes on the suitable position of boiler tube such as center of gravity, lifting device such as the manual cucurbit of rotating on hanger are promoted to the installation site with boiler tube, the workmen shifts onto on the boiler tube lift hook position boiler tube is parallel again, the operation lifting device drops on suspension hook boiler tube, install again.
Repeat above-mentioned steps, whole radiant tubes are installed.
The cylindrical furnace radiant coil is all to be prefabricated into U-shapedly usually, and 2 one group is all generally to use the crane lifting radiant tube.
Compared with prior art, adopt installation machinery of the present invention and construction method, have following significant technique effect: 1, adopt this machinery to construct, greatly reduced the construction volume of scaffold; 2, the construction of Roof lining also can be fulfiled ahead of schedule, can not install boiler tube to exert an influence; 3, this machinery can repeat to remove and use, and saves construction cost.
Description of drawings
Fig. 1 is the structural representation of machinery;
Fig. 2 is the top view of machinery;
Wherein: 1, newel; 2, sleeve; 3, ring flat-plate; 4, supporting plate; 5, reinforcement; 6, base plate; 7, handle; 8, support bar; 9, hanger; 10, cantilever beam; 11, top supporting rod; 12, plug
The specific embodiment
Structural representation below in conjunction with Fig. 1 machinery is done further detailed description.The size of machinery, the kind of material, and the installation site of parts can be chosen according to the needs of construction.Being fixedly connected with of machinery can be for welding, be threaded and riveted joint etc., reaches requirement of strength and gets final product.As embodiment, the mode of being fixedly connected with adopts welding to the below with whole optimal design of machinery.
Machinery should be drawn the construction material cutting plan according to the specification of cylindrical furnace radiant section, and material cutting plan should meet the following requirements: cantilever beam 10 length must be less than the radius of boiler tube suspension hook to the cylindrical furnace center, and machinery is highly slightly also lower than lift hook position; Should take into full account the control of welding deformation in the mechanical welding termination process.
Machinery production is generally selected following material: newel 1 is selected seamless carbon steel tube; Sleeve 2 is generally selected seamless carbon steel tube; Cantilever beam 10 and support bar 8 adopt seamless carbon steel tube; Handle 7 adopts seamless carbon steel tube; Ring flat-plate 3, reinforcement 5 plates adopt carbon steel sheet; Supporting plate 4, plug 12, hanger 9, fixation steel plate all adopt carbon steel sheet; Top supporting rod 11 adopts angle steel, hangs jack on hanger 9, and jack is used for promoting radiant tube, and jack is a kind of lifting device that often uses in construction, as cucurbit.The safety coefficient of jack will meet the safe construction requirement.Except jack, also can use electric hoist etc.
Make this machinery, first a fixation steel plate is welded in newel 1 position at the bottom of all-radiant furnace, the welding method of section weldering between this steel plate and drop-bottom are used, and then center ring flat-plate 3, supporting plate 4 and reinforcement 5 plates on welding newel 1, take full weld, the control welding deformation; Then newel 1 is vertical straight, the up and down sleeve 2 of packing into, the gap of inspection newel 1 and sleeve ring flat-plate 3 requires newel 1 and ring flat-plate 3 gaps suitable, generally surpasses 5mm; It is fixing that gusset 5 adopt to be strengthened in newel 1 bottom, is welded on the steel plate on radiation bottom centre post 1, takes the mode of full weld; Top supporting rod 11 is made T-shaped, adopts the support angle steel to be fixed on the beam of radiation top convection current framework, and three top supporting rods 11 are welded and fixed with furnace roof, the position that furnace roof does not have the demifacet of top supporting rod 11 welding to enter as Tube sling; And then the cantilever beam 10 of electroplating equipment wielding machine, support bar 8, plug 12 and handle 7, full weld is all taked in this welding; Rotate at last this machinery, check rotating effect, can suitably add some butter in sleeve 2, to facilitate the rotation of this machinery.
Fig. 2 has provided mechanical top view, in order to show the structure of top supporting rod 11.Top supporting rod 11 does not only have the T-shaped structure in figure, can be designed to as required a word structure, perhaps rice word structure.
A kind of industrial cylindrical furnace radiating furnace tube installation method, be based on that above-mentioned machinery realizes, first will hang oneself from a beam arm 10 rotation to the position that can hang in U-shaped boiler tube, then use crane will prefabricated U-shaped boiler tube to be placed on plug 12 inboards on the arm 10 of hanging oneself from a beam, prevent that boiler tube from skidding off; Then the workmen rotates overarm arm 10 by the active force on handle 7 or support bar 8, and U-shaped boiler tube is rotated to the position that is suitable for installing; Then mount 2 lifting ropes on U-shaped pipe correct position such as center of gravity, then use lifting device on hanger 9 such as manual cucurbit or electric hoist that boiler tube is promoted to the installation site, U-shaped boiler tube is installed.
Repeat above-mentioned steps, U-shaped radiating furnace tube in whole industrial cylindrical furnaces can be installed.Realize the step of above-mentioned installation process, can use a small amount of scaffold and manpower.
Installation machinery of the present invention and construction method, on probation in certain 3,300,000 ton/years of diesel oil hydrogenation project, certain 600,000 ton/years of a plurality of engineering project such as Aromatic Hydrocarbon United Plant.Through check, in using, engineering brought into play outstanding effect, realized that the utilization of resources is high, improved the significant beneficial effect such as efficiency of construction and construction quality.

Claims (7)

1. the erecting device of an industrial cylindrical furnace radiating furnace tube, it is characterized in that: comprise the base plate (6) on being arranged at the bottom of industrial cylindrical furnace, newel (1), support bar (8) and overarm arm (10), wherein, described cantilever beam (10) one ends are rotatably connected on described newel (1), the other end is provided with hanger (9), the bottom of newel (1) connects described base plate (6), one end of support bar (8) is rotatably connected on described newel (1), the other end of support bar (8) is connected on described cantilever beam (10), described newel (1), support bar (8) is connected 10 with cantilever beam) three connects rear formation triangular frame structure.
2. the erecting device of industrial cylindrical furnace radiating furnace tube according to claim 1, it is characterized in that: described support bar (8) and described cantilever beam (10) are rotatably connected on described newel (1) by each self-corresponding sleeve (2) respectively; Wherein corresponding to sleeve (2) support of described support bar (8) on described base plate, described newel (1) is provided with supporting plate (4), corresponding to sleeve (2) support of described cantilever beam (10) on this supporting plate (4).
3. the erecting device of industrial cylindrical furnace radiating furnace tube according to claim 2, it is characterized in that: the below of described supporting plate (4) is provided with the reinforcement (5) that is fixed on newel (1).
4. the erecting device of according to claim 1,2 or 3 described industrial cylindrical furnace radiating furnace tubes is characterized in that: the top of described newel (1) is provided with being used for of being connected with industrial cylindrical furnace and strengthens the top supporting rod (11) that supports.
5. profit requires the erecting device of 1 described industrial cylindrical furnace radiating furnace tube, it is characterized in that: described support bar (8) bottom is provided with the handle (7) that manually-operated is used.
6. profit requires the erecting device of 2 or 3 described industrial cylindrical furnace radiating furnace tubes, it is characterized in that: be provided with the annular ring flat-plate (3) of strengthening sleeve intensity in described sleeve (2).
7. use the erecting device of above-mentioned industrial cylindrical furnace radiating furnace tube to carry out the installation method of radiating furnace tube, it is characterized in that comprising the following steps:
Above-mentioned erecting device vertically is placed in stove middle part, and base plate (6) is fixed with the bottom of stove, and top supporting rod (11) is fixed with the top of stove,
Utilize on the described cantilever beam (10) that crane is lifted into U-shaped radiant tube,
Rotate described support bar (8) and cantilever beam (10), this radiant tube forwarded to the position of installation,
Then mount 2 lifting ropes on boiler tube, by the lifting device on hanger (9), boiler tube is promoted to the installation site and installs, boiler tube is installed.
Repeat above-mentioned steps, whole radiant tubes are installed.
CN201210594960.6A 2012-12-31 2012-12-31 The installation method of industry cylindrical furnace radiating furnace tube Active CN103084817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210594960.6A CN103084817B (en) 2012-12-31 2012-12-31 The installation method of industry cylindrical furnace radiating furnace tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210594960.6A CN103084817B (en) 2012-12-31 2012-12-31 The installation method of industry cylindrical furnace radiating furnace tube

Publications (2)

Publication Number Publication Date
CN103084817A true CN103084817A (en) 2013-05-08
CN103084817B CN103084817B (en) 2015-08-26

Family

ID=48198214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210594960.6A Active CN103084817B (en) 2012-12-31 2012-12-31 The installation method of industry cylindrical furnace radiating furnace tube

Country Status (1)

Country Link
CN (1) CN103084817B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060308A (en) * 2017-03-17 2017-08-18 南通理工学院 A kind of operation platform outside window
CN114507773A (en) * 2020-11-15 2022-05-17 上海梅山钢铁股份有限公司 Online quick replacement method for W-shaped radiant tube of continuous annealing furnace

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060283825A1 (en) * 2005-06-08 2006-12-21 Mhe Technologies, Inc. Movable girder mounted jib
CN201052948Y (en) * 2007-06-14 2008-04-30 刘祖政 Portable crane
CN201545631U (en) * 2009-10-29 2010-08-11 吉林省电力有限公司四平供电公司 Lifting appliance for electrical equipment
CN102275830A (en) * 2011-05-31 2011-12-14 中国一冶集团有限公司 Pillar type hoisting method
CN203171202U (en) * 2012-12-31 2013-09-04 中石化宁波工程有限公司 Installation device for radiation furnace tubes of industrial cylindrical furnace

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060283825A1 (en) * 2005-06-08 2006-12-21 Mhe Technologies, Inc. Movable girder mounted jib
CN201052948Y (en) * 2007-06-14 2008-04-30 刘祖政 Portable crane
CN201545631U (en) * 2009-10-29 2010-08-11 吉林省电力有限公司四平供电公司 Lifting appliance for electrical equipment
CN102275830A (en) * 2011-05-31 2011-12-14 中国一冶集团有限公司 Pillar type hoisting method
CN203171202U (en) * 2012-12-31 2013-09-04 中石化宁波工程有限公司 Installation device for radiation furnace tubes of industrial cylindrical furnace

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060308A (en) * 2017-03-17 2017-08-18 南通理工学院 A kind of operation platform outside window
CN107060308B (en) * 2017-03-17 2022-11-04 南通理工学院 Outside-window operation rack
CN114507773A (en) * 2020-11-15 2022-05-17 上海梅山钢铁股份有限公司 Online quick replacement method for W-shaped radiant tube of continuous annealing furnace

Also Published As

Publication number Publication date
CN103084817B (en) 2015-08-26

Similar Documents

Publication Publication Date Title
CN1856644B (en) Method of conducting service on a wind turbine using equipment mounted on the hub
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN202358849U (en) Small-size suspension crane
CN203499229U (en) Operating platform for construction of elevator shaft
CN204899180U (en) Steel construction jar body aerial working platform simply sets up device
CN202544468U (en) Drawbar-type electrical steel tubular rod
CN103084817B (en) The installation method of industry cylindrical furnace radiating furnace tube
CN201703776U (en) Inverted lifting device of storage tank
CN213351278U (en) Lifting device for flip-chip welding of tank wall of vertical storage tank
CN201793330U (en) Gantry hanger frame device
CN211169571U (en) Wind power tower cylinder single-car hoisting and pulling device
CN203474231U (en) Steel bar tower safety hoisting device
CN200971610Y (en) Guide lifting platform device for chimney
CN203171202U (en) Installation device for radiation furnace tubes of industrial cylindrical furnace
CN103193148A (en) Railway locomotive roof lifting component and lifting frame
CN202055506U (en) Umbrella-shaped platform easy to assemble and disassemble for top construction in spherical container
CN2839223Y (en) The construction lifting appliance in floor type steel structure circle storehouse
CN103924811B (en) A kind of preparation method of large-scale cylindrical storage tank
CN210480628U (en) Rotatory hoist of two-way self-balancing
CN203187370U (en) Inner mast hoisting device
CN103017538B (en) Integral lifting tool for anode roasting fire wall
CN205976431U (en) Tube -shape structures hydraulic pressure slipform promotes construction platform
CN207932896U (en) Ring beam and ring rail integral hoisting tool
CN215482358U (en) Bridge high pier steel bar installation operation device
CN218480600U (en) Auxiliary device for hanging and installing large boiler drum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160630

Address after: 510145, No. 73-83, No. seven, No. sixteen, Zhongshan Road, Liwan District, Guangdong, Guangzhou

Patentee after: THE FIFTH CONSTRUCTION COMPANY OF SINOPEC

Patentee after: SINOPEC Ningbo Engineering Company Limited

Patentee after: SINOPEC Ningbo Technology Research Institute Co., Ltd.

Patentee after: SINOPEC Engineering (Group) Co., Ltd.

Address before: 315103 Ningbo high tech Zone, Zhejiang, academician Road, No. 660

Patentee before: SINOPEC Ningbo Engineering Company Limited

Patentee before: SINOPEC Ningbo Technology Research Institute Co., Ltd.

Patentee before: SINOPEC Engineering (Group) Co., Ltd.