CN215887959U - Hanging flower basket of encorbelmenting is used in aqueduct construction - Google Patents
Hanging flower basket of encorbelmenting is used in aqueduct construction Download PDFInfo
- Publication number
- CN215887959U CN215887959U CN202122408685.1U CN202122408685U CN215887959U CN 215887959 U CN215887959 U CN 215887959U CN 202122408685 U CN202122408685 U CN 202122408685U CN 215887959 U CN215887959 U CN 215887959U
- Authority
- CN
- China
- Prior art keywords
- aqueduct
- basket
- frame
- hanging
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses an overhanging hanging basket for aqueduct construction, which comprises a support frame arranged at the top of an aqueduct body, a traveling mechanism arranged at the bottom of the support frame and used for driving the support frame to move along the length direction of the aqueduct body, and two hanging basket bodies symmetrically arranged at the left side and the right side of the support frame. The utility model has simple structure and reasonable design, the hanging basket bodies are respectively arranged on the two sides of the support frame, and the traveling mechanism drives the support frame and the hanging basket bodies to move along the length direction of the aqueduct body, so that the hanging basket is convenient to move, the simultaneous construction of the stop block concrete to be constructed on the left side and the right side of the aqueduct body can be realized, the construction efficiency is high, the construction period is effectively shortened, the scaffold frames are prevented from being arranged on the two sides of the aqueduct body to construct the stop block concrete, the time and the labor are saved, and the safety is good; the length of support frame can be adjusted according to the width of aqueduct groove body, makes this hanging flower basket of encorbelmenting can be applicable to the aqueduct of different width, and application scope is wide, convenient to popularize and use.
Description
Technical Field
The utility model belongs to the technical field of building construction equipment, and particularly relates to an overhanging hanging basket for aqueduct construction.
Background
The aqueduct is a water delivery building built in the air, usually because the channel is built when crossing with obstacles such as road, mountain dashes, valley, etc., it takes an important position in the canal system water delivery building, it is one of the crossing buildings with wider application, the structure of the aqueduct body is 'U' -shaped thin shell concrete, simple beam structure, the cross section of the aqueduct body is a semicircle plus straight section, in the construction process of the aqueduct, the aqueduct is most likely to need to cross over the field gully, river, etc., the construction condition is worse; the steel pipe column Bailey beam bracket system is usually adopted for aqueduct tank body construction, a shaped steel template is adopted for an inner mold and an outer mold of the tank body, and the number of times of turnover of the template of the tank body is more, and the thickness of the outer mold is higher during template design, so that before concrete construction of the aqueduct tank body, block concrete at the top of a bent frame cannot be constructed in advance, and the block concrete construction needs to be carried out after the outer mold plate of the aqueduct tank body is removed; if a truck crane commonly used in municipal engineering is adopted to be matched with a hanging basket for construction, when the relief of the geographical position of the aqueduct construction section is large, the crane has certain overturning risk and large potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that the shortcomings in the prior art are overcome, and the overhanging hanging basket for aqueduct construction is provided, has the advantages of simple structure, reasonable design and small volume, realizes the construction of stop block concrete to be constructed on the left side and the right side of an aqueduct body, has high construction efficiency, effectively shortens the construction period, avoids the installation of scaffold on the two sides of the aqueduct body to construct the stop block concrete, saves time and labor, has good safety and is convenient to popularize and use.
In order to solve the technical problems, the utility model adopts the technical scheme that: the utility model provides a aqueduct construction is with hanging flower basket of encorbelmenting which characterized in that: the hanging basket comprises a support frame arranged at the top of an aqueduct body, a traveling mechanism arranged at the bottom of the support frame and used for driving the support frame to move along the length direction of the aqueduct body, and two hanging basket bodies symmetrically arranged at the left side and the right side of the support frame;
the supporting frame comprises a rectangular adjustable frame and a stopper which is arranged on the rectangular adjustable frame and is used for limiting the installation position of the rectangular adjustable frame;
two the structure of hanging flower basket body is the same, the hanging flower basket body is in including setting up cat ladder and the setting on the adjustable frame of rectangle are in the frame that hangs of cat ladder bottom, it includes horizontal bearing plate and a plurality of vertical fender rod that all set up on horizontal bearing plate to hang the frame to and set up the horizontal protection component between two adjacent vertical fender rods, it is a plurality of vertical fender rod is laid along the circumference of horizontal bearing plate.
Foretell aqueduct construction is with hanging flower basket of encorbelmenting, its characterized in that: the rectangular adjustable frame comprises two adjustable supporting rods which are arranged in parallel and a fixed supporting rod which is connected to the end parts of the two adjustable supporting rods;
the two adjustable supporting rods have the same structure, and each adjustable supporting rod comprises a supporting sleeve, two supporting rods which are symmetrically arranged on the left side and the right side of the supporting sleeve and are in sliding fit with the supporting sleeve, and a bolt locking piece for locking the supporting rods and the supporting sleeve;
the fixed support rods are two in number, the two fixed support rods correspond to the two hanging basket bodies one to one, and the crawling ladder is arranged on the fixed support rods.
Foretell aqueduct construction is with hanging flower basket of encorbelmenting, its characterized in that: the number of the limiting devices is two, the limiting devices are respectively arranged on the left side and the right side of the aqueduct body, the limiting devices comprise vertical limiting rods arranged on the supporting rods and limiting wheels sleeved on the vertical limiting rods, and the circumferential outer side surfaces of the limiting wheels are attached to the side surfaces of the aqueduct body.
Foretell aqueduct construction is with hanging flower basket of encorbelmenting, its characterized in that: the walking mechanism comprises two walking wheels arranged at the bottom of the support sleeve, and the number of the walking wheels at the bottom of the support sleeve is two.
Foretell aqueduct construction is with hanging flower basket of encorbelmenting, its characterized in that: the horizontal protective assembly is characterized in that the number of the horizontal protective assemblies is multiple, each horizontal protective assembly comprises a plurality of horizontal protective rods, the horizontal protective rods are arranged along the height direction of the vertical protective rods, the horizontal protective rods positioned at the bottommost part in the horizontal protective rods are bottom horizontal protective rods, and a baffle is arranged between the bottom horizontal protective rods and the horizontal bearing plate.
Foretell aqueduct construction is with hanging flower basket of encorbelmenting, its characterized in that: the ladder stand includes two vertical support pole and sets up the step board between two vertical support pole, vertical support pole's top and fixed stay fixed connection, vertical support pole's bottom with level protection subassembly fixed connection, the quantity of step board is a plurality of, and is a plurality of the step board is evenly laid along vertical support pole's direction of height.
Foretell aqueduct construction is with hanging flower basket of encorbelmenting, its characterized in that: the hanging basket body further comprises a dense mesh type safety net arranged on the outer side surface of the hanging frame.
Compared with the prior art, the utility model has the following advantages:
1. the support frame is arranged to provide mounting positions for the two hanging basket bodies, the two hanging basket bodies are conveniently mounted on the left side and the right side of the support frame respectively, the length of the support frame can be adjusted according to the width of the aqueduct body, the support frame can adapt to aqueduct bodies with different widths, the overhanging hanging basket can be further suitable for aqueducts with different widths, and the application range of the overhanging hanging basket is widened.
2. According to the utility model, the travelling mechanism is arranged to drive the support frame and the hanging basket bodies on the two sides of the support frame to move along the length direction of the aqueduct body, so that the overhanging hanging basket is convenient to move according to the positions of the stop block concrete to be constructed on the two sides of the aqueduct body, and further, the stop block concrete to be constructed in the overhanging hanging basket is convenient for workers to construct, and the overhanging hanging basket is convenient to move, time-saving and labor-saving.
3. According to the utility model, the hanging basket bodies are respectively arranged on the two sides of the support frame, and the construction of the stop block concrete to be constructed on the left side and the right side of the aqueduct body can be simultaneously realized by using the overhanging hanging basket, so that the construction efficiency is high, and the construction period is effectively shortened.
In conclusion, the utility model has simple structure and reasonable design, the hanging basket bodies are respectively arranged on the two sides of the support frame, the traveling mechanism drives the support frame and the hanging basket bodies to move along the length direction of the aqueduct body, the movement is convenient, the simultaneous construction of the stop block concrete to be constructed on the left side and the right side of the aqueduct body can be realized, the construction efficiency is high, the construction period is effectively shortened, the scaffold frames are prevented from being arranged on the two sides of the aqueduct body to construct the stop block concrete, the time and the labor are saved, and the safety is good; the length of support frame can be adjusted according to the width of aqueduct groove body, makes this hanging flower basket of encorbelmenting can be applicable to the aqueduct of different width, and application scope is wide, convenient to popularize and use.
The technical solution of the present invention is further described in detail by the accompanying drawings and embodiments.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of a connection structure of a rectangular adjustable frame and a connecting rod according to the present invention.
FIG. 3 is a schematic view of the connection structure of the fixed support rod, the support rod and the basket body.
Description of reference numerals:
1-aqueduct body; 2-horizontal bearing plate; 3-vertical guard bar;
4, fixing a support rod; 5, supporting the sleeve; 6, supporting rods;
7-vertical limiting rod; 8, a limiting wheel; 9-a traveling wheel;
10-horizontal guard bar; 11-a baffle; 12-vertical support bars;
13-a step; 14-locking bolt; 15-locking nut;
16-a reinforcing connecting rod; 17-a connecting rod; 18-stop block concrete.
Detailed Description
As shown in fig. 1, the utility model comprises a support frame arranged at the top of an aqueduct body 1, a traveling mechanism arranged at the bottom of the support frame and used for driving the support frame to move along the length direction of the aqueduct body 1, and two hanging basket bodies symmetrically arranged at the left side and the right side of the support frame;
the supporting frame comprises a rectangular adjustable frame and a stopper which is arranged on the rectangular adjustable frame and is used for limiting the installation position of the rectangular adjustable frame;
two the structure of hanging flower basket body is the same, the hanging flower basket body is in including setting up cat ladder and the setting on the adjustable frame of rectangle are in the hanging frame of cat ladder bottom, it includes horizontal bearing plate 2 and a plurality of vertical fender rod 3 that all set up on horizontal bearing plate 2 to and set up the horizontal protection subassembly between two adjacent vertical fender rod 3, it is a plurality of vertical fender rod 3 is laid along the circumference of horizontal bearing plate 2.
In this embodiment, it should be noted that the support frame is arranged to provide mounting positions for the two basket bodies, so that the two basket bodies are respectively mounted on the left side and the right side of the support frame, and the length of the support frame can be adjusted according to the width of the aqueduct groove body 1, so that the support frame can adapt to aqueduct groove bodies 1 with different widths, and further, the overhanging basket can be suitable for aqueducts with different widths, and the application range of the overhanging basket is improved; the travelling mechanism is arranged to drive the support frame and the hanging basket bodies on the two sides of the support frame to move along the length direction of the aqueduct body 1, so that the overhanging hanging basket is convenient to move according to the positions of the stop block concrete 18 to be constructed on the two sides of the aqueduct body 1, and further, workers can construct the stop block concrete 18 to be constructed in the overhanging hanging basket conveniently, and the hanging basket is convenient to move, time-saving and labor-saving; through set up a hanging flower basket body respectively in the both sides of support frame, utilize a hanging flower basket of encorbelmenting to realize that aqueduct groove body 1 left and right sides treats the simultaneous construction of dog concrete 18 of being under construction, the efficiency of construction is high, has effectively shortened construction cycle.
In the embodiment, the length of the rectangular adjustable frame is fixed, and the rectangular adjustable frame is adjusted by adjusting the width of the rectangular adjustable frame, so that the width of the rectangular adjustable frame is larger than the width of the aqueduct body 1, the rectangular adjustable frame is convenient to mount on the aqueduct body 1, and two hanging basket bodies on two sides of the rectangular adjustable frame are respectively positioned on the left side and the right side of the aqueduct body 1; the installation position of the rectangular adjustable frame on the aqueduct groove body 1 is limited by arranging the limiting stopper, so that the position of the support frame is prevented from being deviated when the support frame moves along the length direction of the aqueduct groove body 1, the stability and the safety of the support frame are effectively improved, and the using effect is good.
In this embodiment, be convenient for the staff through setting up the cat ladder and creep between aqueduct groove body 1 and hanging the frame through the cat ladder, the staff treats the dog concrete 18 of being under construction in hanging the frame and is under construction, hangs the frame and comprises horizontal bearing plate 2, a plurality of vertical fender rod 3 and a plurality of horizontal protection component, protects the staff who hangs in the frame through a plurality of vertical fender rod 3 and a plurality of horizontal protection component, and the security is good.
As shown in fig. 1 and fig. 2, in this embodiment, the rectangular adjustable frame includes two adjustable support rods arranged in parallel and a fixed support rod 4 connected to the ends of the two adjustable support rods;
the two adjustable support rods have the same structure, and each adjustable support rod comprises a support sleeve 5, two support rods 6 which are symmetrically arranged at the left side and the right side of the support sleeve 5 and are in sliding fit with the support sleeve 5, and a bolt locking piece for locking the support rods 6 and the support sleeve 5;
the fixed support rods 4 are two in number, the two fixed support rods 4 correspond to the two hanging basket bodies one to one, and the crawling ladder is arranged on the fixed support rods 4.
In this embodiment, a connecting rod 17 is arranged between the two supporting sleeves 5 of the two adjustable supporting rods, and the connection of the two adjustable supporting rods is strengthened by the connecting rod 17.
In this embodiment, two hanging flower basket bodies are respectively for being located the left hanging flower basket body of aqueduct groove body 1 and the right hanging flower basket body that is located aqueduct groove body 1 right side, and two fixed support rods 4 are respectively for being located the left fixed support pole of aqueduct groove body 1 and the right fixed support pole that is located aqueduct groove body 1 right side, and left hanging flower basket body welding is on left fixed support pole, and right hanging flower basket body welding is on right fixed support pole.
In the embodiment, when in actual use, the length of the support rod 6 extending into the support sleeve 5 at the two ends of the support sleeve 5 is adjusted to realize the adjustment of the length of the adjustable support rod, the bolt locking piece comprises a locking bolt 14 and a locking nut 15, one end of the support rod 6 extends into the support sleeve 5, the supporting rod 6 is in sliding fit with the supporting sleeve 5, a plurality of first locking holes are arranged on the supporting sleeve 5 along the length direction, a plurality of second locking holes matched with the first locking holes are arranged on the support rod 6 along the length direction of the support rod, a locking bolt 14 passes through the first locking holes and the second locking holes to be connected with a locking nut 15, so that the support rod 6 is connected with the support sleeve 5, the support rod 6 and the support sleeve 5 are detachably connected through the bolt locking piece, the installation and the disassembly are convenient, and the length of the support rod can be adjusted conveniently.
As shown in fig. 1, in this embodiment, the number of the stoppers is two, two stoppers are respectively disposed on the left and right sides of the aqueduct body 1, each stopper includes a vertical limiting rod 7 disposed on the support rod 6 and a limiting wheel 8 sleeved on the vertical limiting rod 7, and the circumferential outer side surface of the limiting wheel 8 is attached to the side surface of the aqueduct body 1.
In this embodiment, in actual use, the two position limiters may be disposed on the two support rods of the same adjustable support rod, or the two position limiters may be disposed on the two support rods of different adjustable support rods, and the installation position of the rectangular adjustable frame on the aqueduct body 1 is limited by disposing the two position limiters on the rectangular adjustable frame.
In this embodiment, the vertical limiting rod 7 and the support rod 6 are vertically arranged, and when the support frame moves along the length direction of the aqueduct groove body 1, the limiting wheel 8 is in rolling fit with the side surface of the aqueduct groove body 1.
In this embodiment, the limiting wheel 8 is preferably a roller.
As shown in fig. 1, in this embodiment, the traveling mechanism includes two traveling wheels 9 disposed at the bottom of the support sleeve 5, and the number of the traveling wheels 9 at the bottom of each support sleeve 5 is two.
In this embodiment, the bottom of the support sleeve 5 of two adjustable support rods all is provided with two walking wheels 9, two walking wheels 9 are located the both ends of support sleeve 5 respectively, and walking wheels 9 are preferably the universal wheel that has the brake.
As shown in fig. 1 and fig. 3, in this embodiment, the number of the horizontal protection assemblies is multiple, each horizontal protection assembly includes multiple horizontal protection rods 10, the multiple horizontal protection rods 10 are arranged along the height direction of the vertical protection rod 3, the horizontal protection rod 10 located at the bottommost position in the multiple horizontal protection rods 10 is a bottom horizontal protection rod, and a baffle 11 is arranged between the bottom horizontal protection rod and the horizontal bearing plate 2.
In this embodiment, be provided with baffle 11 between horizontal fender rod in bottom and the horizontal bearing plate 2, avoid staff's foot to stretch out the hanging flower basket body, the security is good.
As shown in fig. 2 and 3, in this embodiment, the ladder stand includes two vertical support rods 12 and a ladder board 13 disposed between the two vertical support rods 12, the top ends of the vertical support rods 12 are fixedly connected to the fixed support rod 4, the bottom ends of the vertical support rods 12 are fixedly connected to the horizontal protection assembly, the number of the ladder boards 13 is multiple, and the ladder boards 13 are uniformly arranged along the height direction of the vertical support rods 12.
In this embodiment, the top of two vertical support rods 12 all welds with fixed support rod 4, and the bottom of two vertical support rods 12 all welds with the horizontal protective assembly of hanging flower basket body in the horizontal protective assembly that is located the topmost horizontal protective rod 10.
In this embodiment, during practical use, still be provided with two strengthening connecting rods 16 on the hanging flower basket body, strengthening connecting rod 16 with the cat ladder is located respectively the both sides of hanging flower basket body.
In this embodiment, the hanging basket body further comprises a close mesh type safety net arranged on the outer side surface of the hanging frame.
In the embodiment, the dense mesh type safety net is arranged on the outer side face of the hanging frame to enclose the whole hanging frame, so that the safety is good.
When the adjustable rectangular aqueduct is used specifically, the width of the adjustable rectangular frame is adjusted according to the width of the aqueduct body 1, the adjustable rectangular frame is arranged at the top of the aqueduct body 1, and two limiters at the bottom of the adjustable rectangular frame are respectively positioned at the left side and the right side of the aqueduct body 1; then, the rectangular adjustable frame is moved according to the position of the stop block concrete 18 to be constructed until the hanging basket body is opposite to the position of the stop block concrete 18 to be constructed, the travelling wheels 9 are locked, a worker enters the hanging frame through the ladder plate 13 of the ladder stand to construct the stop block concrete 18 to be constructed until the construction of the stop block concrete 18 to be constructed is completed, and the worker climbs to the top of the aqueduct groove body 1 through the ladder plate 13 of the ladder stand again to complete the construction of the stop block concrete 18 to be constructed; when the next stopper concrete 18 to be constructed needs to be constructed, the brake of the travelling wheel 9 is firstly opened, then the rectangular adjustable frame is moved according to the position of the next stopper concrete 18 to be constructed until the hanging basket body is opposite to the position of the stopper concrete 18 to be constructed, the travelling wheel 9 is locked, and the next stopper concrete 18 to be constructed is constructed. The utility model has simple structure and reasonable design, the hanging basket bodies are respectively arranged on the two sides of the support frame, and the traveling mechanism drives the support frame and the hanging basket bodies to move along the length direction of the aqueduct body, so that the hanging basket is convenient to move, the simultaneous construction of the stop block concrete to be constructed on the left side and the right side of the aqueduct body can be realized, the construction efficiency is high, the construction period is effectively shortened, the scaffold frames are prevented from being arranged on the two sides of the aqueduct body to construct the stop block concrete, the time and the labor are saved, and the safety is good; the length of support frame can be adjusted according to the width of aqueduct groove body, makes this hanging flower basket of encorbelmenting can be applicable to the aqueduct of different width, and application scope is wide, convenient to popularize and use.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and all simple modifications, changes and equivalent structural changes made to the above embodiment according to the technical spirit of the present invention still fall within the protection scope of the technical solution of the present invention.
Claims (7)
1. The utility model provides a aqueduct construction is with hanging flower basket of encorbelmenting which characterized in that: the hanging basket comprises a support frame arranged at the top of an aqueduct body (1), a traveling mechanism arranged at the bottom of the support frame and used for driving the support frame to move along the length direction of the aqueduct body (1), and two hanging basket bodies symmetrically arranged at the left side and the right side of the support frame;
the supporting frame comprises a rectangular adjustable frame and a stopper which is arranged on the rectangular adjustable frame and is used for limiting the installation position of the rectangular adjustable frame;
two the structure of hanging flower basket body is the same, the hanging flower basket body is including setting up cat ladder and setting on the adjustable frame of rectangle are in the hanging frame of cat ladder bottom, it includes horizontal bearing plate (2) and a plurality of vertical fender rod (3) that all set up on horizontal bearing plate (2) to and set up the horizontal protection subassembly between two adjacent vertical fender rod (3), and is a plurality of vertical fender rod (3) are laid along the circumference of horizontal bearing plate (2).
2. The overhanging basket for aqueduct construction according to claim 1, characterized in that: the rectangular adjustable frame comprises two adjustable supporting rods which are arranged in parallel and a fixed supporting rod (4) which is connected with the end parts of the two adjustable supporting rods;
the two adjustable supporting rods have the same structure, and each adjustable supporting rod comprises a supporting sleeve (5), two supporting rods (6) which are symmetrically arranged on the left side and the right side of the supporting sleeve (5) and are in sliding fit with the supporting sleeve (5), and a bolt locking piece for locking the supporting rods (6) and the supporting sleeve (5);
the number of the fixed supporting rods (4) is two, the two fixed supporting rods (4) correspond to the two hanging basket bodies one by one, and the crawling ladder is arranged on the fixed supporting rods (4).
3. The overhanging basket for aqueduct construction according to claim 2, characterized in that: the number of stopper is two, two the stopper sets up respectively in the left and right sides of aqueduct groove body (1), the stopper is established spacing wheel (8) on vertical gag lever post (7) including vertical gag lever post (7) and the cover that sets up on bracing piece (6), the circumference lateral surface of spacing wheel (8) is laminated with the side of aqueduct groove body (1) mutually.
4. The overhanging basket for aqueduct construction according to claim 2, characterized in that: running gear is including setting up walking wheel (9) in support sleeve (5) bottom, every the quantity of support sleeve (5) bottom walking wheel (9) is two.
5. The overhanging basket for aqueduct construction according to claim 1, characterized in that: the number of horizontal protection components is a plurality of, every horizontal protection component all includes a plurality of horizontal protection poles (10), and is a plurality of horizontal protection pole (10) are laid along the direction of height of vertical protection pole (3), and is a plurality of horizontal protection pole (10) that lie in the bottommost among horizontal protection pole (10) are bottom horizontal protection pole, be provided with baffle (11) between bottom horizontal protection pole and horizontal bearing plate (2).
6. The overhanging basket for aqueduct construction according to claim 2, characterized in that: the cat ladder includes two vertical support pole (12) and riser (13) of setting between two vertical support pole (12), the top and the fixed stay pole (4) fixed connection of vertical support pole (12), the bottom of vertical support pole (12) with level protection subassembly fixed connection, the quantity of riser (13) is a plurality of, and is a plurality of the direction of height of riser (13) along vertical support pole (12) is evenly laid.
7. The overhanging basket for aqueduct construction according to claim 1, characterized in that: the hanging basket body further comprises a dense mesh type safety net arranged on the outer side surface of the hanging frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122408685.1U CN215887959U (en) | 2021-09-30 | 2021-09-30 | Hanging flower basket of encorbelmenting is used in aqueduct construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122408685.1U CN215887959U (en) | 2021-09-30 | 2021-09-30 | Hanging flower basket of encorbelmenting is used in aqueduct construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215887959U true CN215887959U (en) | 2022-02-22 |
Family
ID=80348233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122408685.1U Active CN215887959U (en) | 2021-09-30 | 2021-09-30 | Hanging flower basket of encorbelmenting is used in aqueduct construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215887959U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114960437A (en) * | 2022-05-24 | 2022-08-30 | 中国水利水电科学研究院 | Walking type mobile operation trolley for external construction of large aqueduct |
CN115354840A (en) * | 2022-09-06 | 2022-11-18 | 山东省水利科学研究院 | Movable field aerial work platform |
-
2021
- 2021-09-30 CN CN202122408685.1U patent/CN215887959U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114960437A (en) * | 2022-05-24 | 2022-08-30 | 中国水利水电科学研究院 | Walking type mobile operation trolley for external construction of large aqueduct |
CN115354840A (en) * | 2022-09-06 | 2022-11-18 | 山东省水利科学研究院 | Movable field aerial work platform |
CN115354840B (en) * | 2022-09-06 | 2024-02-27 | 山东省水利科学研究院 | Movable field aerial work platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215887959U (en) | Hanging flower basket of encorbelmenting is used in aqueduct construction | |
CN205804190U (en) | A kind of travelling bridge for the guardrail construction that builds a bridge | |
CN204876578U (en) | Building construction system | |
CN110616735A (en) | Template system for retaining wall and construction method of retaining wall | |
CN213061745U (en) | Basket protective structure is hung to continuous beam bridge construction template | |
CN104278830A (en) | Integral combined scaffold | |
CN108005373A (en) | Integrated lifting platform system and assembling method thereof | |
CN211644382U (en) | Tower crane attached stay bar walkway platform system | |
CN216240384U (en) | Operation platform assembly with ladder stand suitable for steel structure high altitude installation | |
CN214989509U (en) | Integrated wall-attached device based on synchronous climbing of light steel platform | |
CN113404278B (en) | Self-climbing type protection frame and climbing method thereof | |
CN212926984U (en) | Movable suspension operating platform | |
CN104818859B (en) | The installation method of orbit traffic overhead station operation platform | |
CN204876575U (en) | Building construction system | |
CN205296792U (en) | A lifting scaffold | |
CN210685313U (en) | Safe convenient house steel connection structure | |
CN210767825U (en) | Turnover formwork construction system | |
CN209874468U (en) | Construction hydraulic pressure template climbing device | |
CN209099893U (en) | A kind of construction guard fender | |
CN209874433U (en) | Assembly type integral moving operation frame | |
CN112723094A (en) | Integrated wall-attached device based on synchronous climbing of light steel platform | |
CN207863449U (en) | Disk buckle type scaffold new type of safe cat ladder | |
CN108775016B (en) | Concrete support horizontal movement adjustable hanging basket | |
CN213710261U (en) | Scaffold with safety protection structure for building construction | |
CN105003075A (en) | Building construction system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |