CN205804190U - A kind of travelling bridge for the guardrail construction that builds a bridge - Google Patents
A kind of travelling bridge for the guardrail construction that builds a bridge Download PDFInfo
- Publication number
- CN205804190U CN205804190U CN201620718955.5U CN201620718955U CN205804190U CN 205804190 U CN205804190 U CN 205804190U CN 201620718955 U CN201620718955 U CN 201620718955U CN 205804190 U CN205804190 U CN 205804190U
- Authority
- CN
- China
- Prior art keywords
- bridge
- suspension rod
- platform
- upright supports
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a kind of travelling bridge for the guardrail construction that builds a bridge, it includes support means, cantilever arrangement and cape device;One end of cantilever arrangement connects support means, and the other end connects cape device.This utility model is for the guardrail model sheetinstallat that builds a bridge, the operation suspension bracket reinforcing and dismantle, have assembled simple, safe and reliable, artificial conveniently moving is quick, the features such as benefit is obvious, can be widely used in the construction fields such as guardrail installation, template construction, concreting that build a bridge, be an instrument of high-altitude guardrail template construction, simultaneously can be used for other unsettled construction operations of high-altitude facade.
Description
Technical field
This utility model relates to building and field of bridge construction, particularly to a kind of shifting for the guardrail construction that builds a bridge
Dynamic suspension bracket.
Background technology
The guardrail of science of bridge building, when concrete construction, needs first to install inside and outside two side templates, and workman can be safely
Standing in and install inner side template on bridge floor, and for the unsettled template in outside, the operating platform that workmen does not stand, the past leads to
Being often to set up scaffold from ground, workmen stands in external mold on the landing stage of scaffold and installs work, or uses crane etc. large-scale
Plant equipment coordinative construction.
Generally, work high above the ground is set up the landing stage of scaffold or uses the heavy mechanical equipment coordinative constructions such as crane to be stranded
Difficult more, efficiency of construction is low, high material consumption, and construction cost is higher.And, big by place limitations affect, once run under bridge
It is to need under river, zanjon, ramp, Soft Soil Layer, or somewhere bridge to be frequently open to traffic, or the heavy-duty machinery that needs under bridge frequently to pass through sets
Standby, then set up scaffold difficulty relatively big, even without safety guarantee.
Utility model content
The purpose of this utility model is to provide a kind of travelling bridge for the guardrail construction that builds a bridge, above-mentioned to solve
The problem proposed in background technology.
For achieving the above object, the following technical scheme of this utility model offer:
A kind of travelling bridge for the guardrail construction that builds a bridge, including support means 1, cantilever arrangement 2 and cape device
3;It is characterized in that: one end of described cantilever arrangement 2 is fixing connects support means 1, the other end is fixing connects cape device 3;Institute
Stating support means 1 is rectangle, and support means 1 includes upright supports bar 4, hound 5 and counterweight platform 6, and described hound 5 is fixing even
Being connected between upright supports bar 4, one end of described upright supports bar 4 is fixedly connected on one end of hound 5, and its other end is vertical
Being fixedly connected on a side of counterweight platform 6, the other end of hound 5 is fixedly connected on another side of counterweight platform 6, described counterweight
Pole 7 it is fixedly connected with between platform 6 and upright supports bar 4;Described cape device 3 includes operating platform 8, outer suspension rod 9 and infantile tic
Bar 10, described operating platform 8 is rectangular configuration, and operating platform 8 is laid scaffold board 11, and a side of described operating platform 8 hangs down
Directly being fixed in the bottom of outer suspension rod 9, another two vertical side edge centers are fixed in the bottom of interior suspension rod 10, described outer suspension rod 9 and behaviour
Make to be installed with between the side of platform 8 pole 7, between described interior suspension rod 10 and the side of operating platform 8, be installed with pole 7, institute
State and between outer suspension rod 9, be connected with connecting rod 12, between described outer suspension rod 9 and interior suspension rod 10, be connected with connecting rod 12;Described cantilever arrangement 2
Including choosing armed lever 13, crossbeam 14 and track girder 15, described in choose one end of armed lever 13 and be vertically fixed in outer suspension rod 9 and outer suspension rod 10
Top, the other end is vertically fixed on upright supports bar 4, and described crossbeam 14 is vertically located in be chosen between armed lever 13, described track
Beam 15 is parallel to choose armed lever 13 and is vertically fixed in crossbeam 14 midpoint, is provided with pole 7 between described crossbeam 14 and outer suspension rod 9, described
Be installed with pole 7 between crossbeam 14 and upright supports bar 4, described in choose and be installed with hound between armed lever 13 and upright supports bar 4
Bar 5
As further program of the utility model: be provided with roller 16 bottom described counterweight platform 6, roller wheel shaft is provided with leads
To handle 17, idler wheel bottom is provided with guide rail 18.
As this utility model further scheme: be provided with supporting leg 19 bottom described counterweight platform 6, supporting leg top is provided with hands
Handle 20.
As this utility model further scheme: described track girder 15 is provided with electric block 21.
As this utility model further scheme: described interior suspension rod 10 is provided with walkway 22.
As this utility model further scheme: described outer suspension rod 9 and operating platform 8 outside are provided with protection network 23.
As this utility model further scheme: be placed with mass 24 on described counterweight platform 6.
Compared with prior art, the beneficial effects of the utility model are: this utility model is used for the guardrail construction that builds a bridge
Travelling bridge, by outwards leaning out certain working place on bridge floor, ensure model sheetinstallat cape by applying mass
Center of gravity is on bridge floor, and cape keeps stable, i.e. ensure that the safety constructed in high-altitude, saves again substantial amounts of scaffold support
System, saves substantial contribution, has a simple in construction, construction safety, conveniently moving, flexibly, and during construction, floor space is little, construction effect
The features such as rate is high, benefit is obvious, can be widely used in the construction necks such as build a bridge guardrail installation, template construction, concreting
Territory, is an instrument of high-altitude guardrail model sheetinstallat, simultaneously can be used for other unsettled construction operations of high-altitude facade.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is this utility model working state figure for the mobile cape of the guardrail constructing operation that builds a bridge.
Wherein: 1 support means, 2 cantilever arrangement, 3 cape devices, 4 upright supports bars, 5 hounds, 6 counterweight platforms, 7 poles,
8 operating platforms, 9 outer suspension rods, suspension rod in 10,11 scaffold boards, 12 connecting rods, 13 choose armed lever, 14 crossbeams, 15 track girders, 16 rollers, and 17
Caster assembly therefor, 18 guide rails, 19 supporting legs, 20 handles, 21 electric blocks, 22 walkwaies, 23 protection networks, 24 mass.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the technical scheme of this patent is described in more detail.
As illustrated in fig. 1 and 2, a kind of travelling bridge for the guardrail construction that builds a bridge, it includes support means 1, cantilever
Device 2 and cape device 3;One end of cantilever arrangement 2 is fixing connects support means 1, and the other end is fixing connects cape device 3, hangs
Table apparatus 3 includes operating platform 8, outer suspension rod 9 and interior suspension rod 10, and operating platform 8 is rectangular configuration, and it lays scaffold board 11,
The two ends of one frame of operating platform 8 are vertically fixed in the bottom of two outer suspension rods 9, and another two vertical side edge centers are fixed in
The bottom of interior suspension rod 10, is installed with pole 7, interior suspension rod 10 and operating platform 8 between outer suspension rod 9 and the side of operating platform 8
It is installed with pole 7 between side, is connected with connecting rod 12 between outer suspension rod 9, between outer suspension rod 9 and interior suspension rod 10, is connected with connecting rod
12, support means 1 is rectangle, and it includes upright supports bar 4, hound 5 and counterweight platform 6, and hound 5 is fixedly connected on column and props up
Between strut 4, one end of upright supports bar 4 is fixedly connected on one end of hound 5, and its other end is vertically fixedly connected on counterweight
One side of platform 6, the other end of hound 5 is fixedly connected on another side of counterweight platform 6, counterweight platform 6 and upright supports bar 4 it
Between be fixedly connected with pole 7, cantilever arrangement 2 includes choosing armed lever 13, crossbeam 14 and track girder 15, chooses one end of armed lever 13 vertically solid
Being connected to outer suspension rod 9 and the top of outer suspension rod 10, the other end is vertically fixed on upright supports bar 4, and crossbeam 14 is vertically located in be chosen
Between armed lever 13, track girder 15 is parallel to choose armed lever 13 and is vertically fixed in crossbeam 14 midpoint, is provided with between crossbeam 14 and outer suspension rod 9
Pole 7, is installed with pole 7 between crossbeam 14 and upright supports bar 4, choose and be installed with diagonal brace between armed lever 13 and upright supports bar 4
Bar bar 5, is provided with roller 16 bottom counterweight platform 6, roller wheel shaft is provided with caster assembly therefor 17, and idler wheel bottom is provided with guide rail 18, counterweight
6 two side end of platform are provided with supporting leg 19, and supporting leg top is provided with handle 20, and track girder 15 is provided with electric block 21, interior suspension rod 10
It is provided with walkway 22, outer suspension rod 9 and operating platform 8 outside and is provided with protection network 23.
This utility model for build a bridge guardrail construction travelling bridge, upright supports bar 4, choose armed lever 13, crossbeam 14,
The lateral keel of track girder 15 and counterweight platform 6 all uses No. 10 standard I-steel to make, and longitudinal Os Draconis of counterweight platform 6 use double
Spelling No. 14 standard I-steel to make, hound 5, outer suspension rod 9, interior suspension rod 10 and connecting rod 12 all use 45 × 5mm angle steel to make.
During construction, the installation procedure of guardrail construction travelling bridge is: 1) cleaning ground;2) counterweight platform 6 is assembled;3) installation is vertical
Post support bar 4;4) upright supports bar 4 and counterweight platform 6 are bolted plate and connect into an entirety;5) device of encorbelmenting is assembled
2;6) device 2 of encorbelmenting is bolted plate with upright supports bar 4 and connects into an entirety;7) place on counterweight platform 6 and join
Weight 24;8) hound 5 between upright supports bar 4 is installed;9) outer suspension rod 9 is installed;10) operating platform 8 is installed;11) install
Interior suspension rod 10 and connecting rod 12;12) electric block 21 is installed on track girder 15;13) promote for the guardrail construction that builds a bridge
Travelling bridge is in place.
As it is shown on figure 3, this utility model for build a bridge guardrail construction travelling bridge when practicality, operating platform 8
Leaning out outside guardrail, operating platform 8 provides a unsettled platform stood and work for workman, and the load of operating platform 8 mainly leads to
Cross outer suspension rod 9 and interior suspension rod 10 passes to choose armed lever 13, then passed to upright supports bar 4 by choosing armed lever 13, finally propped up by column
Work load is passed to roller 16, hound 5, pole 7 and 12 balanced actions of connecting rod by strut 4, and roller 16 is standard component, it
Can ensure that suspension bracket passes through Manual-pushing or traction machine traction realizes advancing, retreating and the action such as stopping, counterweight platform 6 is shelved
Mass 24 can prevent for build a bridge guardrail construction travelling bridge overturn under work load effect, it is ensured that execute
Work safety.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment party
Formula, in the ken that one skilled in the relevant art is possessed, it is also possible on the premise of without departing from this patent objective
Make a variety of changes.
Claims (7)
1., for a travelling bridge for the guardrail construction that builds a bridge, fill including support means (1), cantilever arrangement (2) and cape
Put (3);It is characterized in that: one end of described cantilever arrangement (2) is fixing connects support means (1), the other end is fixing connects cape
Device (3);Described support means (1) is rectangle, and support means (1) includes upright supports bar (4), hound (5) and counterweight platform
(6), described hound (5) is fixedly connected between upright supports bar (4), and one end of described upright supports bar (4) is fixing to be connected
In one end of hound (5), its other end is vertically fixedly connected on a side of counterweight platform (6), and the other end of hound (5) is solid
Surely it is connected to another side of counterweight platform (6), between described counterweight platform (6) and upright supports bar (4), is fixedly connected with pole
(7);Described cape device (3) includes operating platform (8), outer suspension rod (9) and interior suspension rod (10), and described operating platform (8) is square
Shape structure, operating platform (8) is laid scaffold board (11), and a side of described operating platform (8) is vertically fixed in outer suspension rod (9)
Bottom, another two vertical side edge centers are fixed in the bottom of interior suspension rod (10), described outer suspension rod (9) and operating platform (8)
It is installed with pole (7) between side, between described interior suspension rod (10) and the side of operating platform (8), is installed with pole (7), described
It is connected with connecting rod (12) between outer suspension rod (9), between described outer suspension rod (9) and interior suspension rod (10), is connected with connecting rod (12);Described
Cantilever arrangement (2) includes choosing armed lever (13), crossbeam (14) and track girder (15), described in choose one end of armed lever (13) and be vertically fixed in
Outer suspension rod (9) and the top of outer suspension rod (10), the other end is vertically fixed on upright supports bar (4), and described crossbeam (14) is vertical
Being fixedly arranged on and choose between armed lever (13), described track girder (15) is parallel to choose armed lever (13) and is vertically fixed in crossbeam (14) midpoint, institute
State and between crossbeam (14) and outer suspension rod (9), be provided with pole (7), be installed with between described crossbeam (14) and upright supports bar (4) and prop up
Bar (7), described in choose and between armed lever (13) and upright supports bar (4), be installed with hound bar (5).
The most according to claim 1 a kind of for build a bridge guardrail construction travelling bridge, it is characterised in that described in join
Weight platform (6) bottom is provided with roller (16), and roller wheel shaft is provided with caster assembly therefor (17), and idler wheel bottom is provided with guide rail (18).
The most according to claim 1 a kind of for build a bridge guardrail construction travelling bridge, it is characterised in that described in join
Weight platform (6) bottom is provided with supporting leg (19), and supporting leg top is provided with handle (20).
A kind of travelling bridge for the guardrail construction that builds a bridge the most according to claim 1, it is characterised in that described rail
Road beam (15) is provided with electric block (21).
A kind of travelling bridge for the guardrail construction that builds a bridge the most according to claim 1, it is characterised in that in described
Suspension rod (10) is provided with walkway (22).
A kind of travelling bridge for the guardrail construction that builds a bridge the most according to claim 1, it is characterised in that outside described
Suspension rod (9) and operating platform (8) outside are provided with protection network (23).
The most according to claim 1 a kind of for build a bridge guardrail construction travelling bridge, it is characterised in that described in join
It is placed with mass (24) on weight platform (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620718955.5U CN205804190U (en) | 2016-07-07 | 2016-07-07 | A kind of travelling bridge for the guardrail construction that builds a bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620718955.5U CN205804190U (en) | 2016-07-07 | 2016-07-07 | A kind of travelling bridge for the guardrail construction that builds a bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205804190U true CN205804190U (en) | 2016-12-14 |
Family
ID=58141409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620718955.5U Expired - Fee Related CN205804190U (en) | 2016-07-07 | 2016-07-07 | A kind of travelling bridge for the guardrail construction that builds a bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205804190U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558381A (en) * | 2017-10-17 | 2018-01-09 | 南宁钛银科技有限公司 | A kind of movable type bridge, which is built, uses protective platform |
CN108049315A (en) * | 2018-01-07 | 2018-05-18 | 北京鼎翰科技有限公司 | A kind of travelling bridge for the guardrail construction that builds a bridge |
CN108316158A (en) * | 2018-04-23 | 2018-07-24 | 腾达建设集团股份有限公司 | Protection canopy and its application process |
CN108708277A (en) * | 2018-06-29 | 2018-10-26 | 中国葛洲坝集团第工程有限公司 | Overpass bridge bottom wire laying device |
CN109016139A (en) * | 2018-08-13 | 2018-12-18 | 卢莺莺 | A kind of bridge construction agitator tank and its application method |
CN110593131A (en) * | 2019-10-16 | 2019-12-20 | 合肥正浩机械科技有限公司 | Cross-sliding avoiding beam falling device of bridge girder erection machine and beam falling method thereof |
CN112211412A (en) * | 2020-10-26 | 2021-01-12 | 中建四局第三建设有限公司 | Gravity-center-adjustable overhanging discharging platform |
CN112482223A (en) * | 2020-11-02 | 2021-03-12 | 中交二公局东萌工程有限公司 | Method for cutting expansion joint of bridge guardrail |
CN112630301A (en) * | 2020-12-22 | 2021-04-09 | 宁波市产城生态建设集团有限公司 | Bridge maintenance of detecting a flaw equipment |
-
2016
- 2016-07-07 CN CN201620718955.5U patent/CN205804190U/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558381A (en) * | 2017-10-17 | 2018-01-09 | 南宁钛银科技有限公司 | A kind of movable type bridge, which is built, uses protective platform |
CN108049315A (en) * | 2018-01-07 | 2018-05-18 | 北京鼎翰科技有限公司 | A kind of travelling bridge for the guardrail construction that builds a bridge |
CN108049315B (en) * | 2018-01-07 | 2018-10-30 | 温州建丰建设有限公司 | A kind of travelling bridge for the guardrail construction that builds a bridge |
CN108316158A (en) * | 2018-04-23 | 2018-07-24 | 腾达建设集团股份有限公司 | Protection canopy and its application process |
CN108708277A (en) * | 2018-06-29 | 2018-10-26 | 中国葛洲坝集团第工程有限公司 | Overpass bridge bottom wire laying device |
CN109016139A (en) * | 2018-08-13 | 2018-12-18 | 卢莺莺 | A kind of bridge construction agitator tank and its application method |
CN110593131A (en) * | 2019-10-16 | 2019-12-20 | 合肥正浩机械科技有限公司 | Cross-sliding avoiding beam falling device of bridge girder erection machine and beam falling method thereof |
CN112211412A (en) * | 2020-10-26 | 2021-01-12 | 中建四局第三建设有限公司 | Gravity-center-adjustable overhanging discharging platform |
CN112211412B (en) * | 2020-10-26 | 2022-03-29 | 中建四局第三建设有限公司 | Gravity-center-adjustable overhanging discharging platform |
CN112482223A (en) * | 2020-11-02 | 2021-03-12 | 中交二公局东萌工程有限公司 | Method for cutting expansion joint of bridge guardrail |
CN112630301A (en) * | 2020-12-22 | 2021-04-09 | 宁波市产城生态建设集团有限公司 | Bridge maintenance of detecting a flaw equipment |
CN112630301B (en) * | 2020-12-22 | 2024-01-23 | 宁波市产城生态建设集团有限公司 | Bridge inspection maintenance equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205804190U (en) | A kind of travelling bridge for the guardrail construction that builds a bridge | |
CN106939707B (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN206328678U (en) | Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN206143646U (en) | Bridge construction slip -form system | |
CN109184190A (en) | It climbs and carries integrated beam type hydraulic climbing platform and its installation method | |
CN202544854U (en) | Lining trolley for subway station | |
CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
CN105317205B (en) | The construction method and equipment therefor of a kind of elevator | |
CN202954552U (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN204662931U (en) | Roof decorations base plate retractility sliding support frame | |
CN104790644B (en) | Extending and contracting sliding support frame for roof decorative bottom boards | |
CN206784172U (en) | Overpass anti-collision wall formwork hoisting conveyance | |
CN219280494U (en) | Tower beam temporary consolidation supporting structure for bridge tower stability control | |
CN203285050U (en) | Combined type Bailey frame multifunctional platform carried by sliding formwork to rise and fall | |
CN203147030U (en) | Mobile under-hanging operating platform for construction of laying gas pipeline along bridge | |
CN204662929U (en) | A kind of cross-line walking fence operation device | |
RU146202U1 (en) | Dismountable flyovers for the quick arrangement of bridge crossings | |
CN106320190A (en) | Platform of bridge maintenance, consolidation and suspension construction | |
CN207727440U (en) | Whole self-crawling type integrated platform for bridge tower construction | |
CN213653209U (en) | Integrated construction movable platform for bridge flange plate | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN201762664U (en) | Bracket for mounting guardrail templates in bridge building | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161214 Termination date: 20210707 |