CN206143646U - Bridge construction slip -form system - Google Patents

Bridge construction slip -form system Download PDF

Info

Publication number
CN206143646U
CN206143646U CN201621201957.3U CN201621201957U CN206143646U CN 206143646 U CN206143646 U CN 206143646U CN 201621201957 U CN201621201957 U CN 201621201957U CN 206143646 U CN206143646 U CN 206143646U
Authority
CN
China
Prior art keywords
frame
tower crane
rack
rack main
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621201957.3U
Other languages
Chinese (zh)
Inventor
蔡国利
刘春蕊
潘永奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621201957.3U priority Critical patent/CN206143646U/en
Application granted granted Critical
Publication of CN206143646U publication Critical patent/CN206143646U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a bridge construction slip -form system, including rack work platform, jacking power transmission element and dun bi, rack work platform includes the rack main part, central tower crane is installed to rack main part top, the tower crane davit is all installed at both ends about the tower crane of center, and is two sets of all be equipped with lifting hook of tower crane on the tower crane davit, in installing, rack main part below climbs foot mechanism, the interior foot mechanism of climbing climbs the frame under with including the frame that swashes, rack main part below still is equipped with jacking power transmission element, mound outer surface of the wall is equipped with the combination steel form, be equipped with typed wall bolt in the mound wall, the last support bracket that is connected with of typed wall bolt, L type support still is equipped with attaches the wall cat ladder. The utility model discloses a simple structure has simplified the construction process, has shortened the time limit for a project, has practiced thrift construction cost greatly, has guaranteed the safety of high mound construction, has improved high mound quality of concrete construction greatly, and the convenience is demolishd to the slipform.

Description

A kind of bridge construction slip-form system
Technical field
This utility model is related to bridge technology field, specially a kind of bridge construction slip-form system.
Background technology
Bridge construction is the most important thing in high-speed railway construction, its life-span and peace with high-speed railway in use It is closely bound up entirely.Slding form operation because its progress is fast, reduce investment outlay and favored being particularly well-suited to Construction of High Pier.Adopt With slip-form construction technique, construction quality not only can be improved, construction cost can also be reduced, shorten the duration, be accelerated engineering and enter Degree.The high pier shaft hydraulic slip-form construction technology of science of bridge building is road across having during zanjon broad valley using high pier Bridge alternatives Effect measure, both can ensure that circuit was smooth, can reduce investment outlay again.In the last few years, Slip Form Construction Technique was in Bridges in Our Country construction In be used widely.There is problems with the high pier bridge slding form operation of the most of high-speed railways of prior art:(1) sliding formwork is climbed Rise apparatus structure design complicated, cause working procedure more, the whole work progress duration lengthens, and increases construction economy cost. (2) due to being high pier operation, complex structure removes difficult, and labor intensity is high, is not easy to operation, and safety is low.(3) climb It is unreasonable that device is designed, and causes high pier concrete construction quality low, is unfavorable for the lasting stability of engineering, there is potential safety hazard.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction slip-form system, to solve to propose in above-mentioned background technology Problem.
For achieving the above object, this utility model provides following technical scheme:
A kind of bridge construction slip-form system, including rack work platformses, jacking force transmission mechanism and Dun Bi, the rack work Platform includes rack main body, is provided with center tower crane, the center tower crane or so two ends and is mounted on above the rack main body Tower crane arm, is equipped with crane hook on tower crane arm described in two groups, Nei Pa feet mechanism is provided with below the rack main body, and Nei Pa feet mechanism is external in hydraulic lifting oil cylinder, and the Nei Pa feet mechanism includes climbing frame and lower climbing frame, under the rack main body Side is additionally provided with jacking force transmission mechanism, and the jacking force transmission mechanism includes outer sleeve frame and interior stock, and interior stock is enclosed within outer sleeve frame, The upper climbing frame is coupled with outer sleeve frame, and outer sleeve frame is coupled with rack work platformses, and the outer sleeve frame both sides are equipped with infantile tic foot Hand cradle, the rack work platformses surrounding are provided with L-type support, and the L-type support bottom is connected with Dun Bi, the pier wall appearance Face is provided with combined steel formwork, and through-wall bolt is provided with the pier wall, and Support bracket, the L-type are connected with the through-wall bolt Support is additionally provided with attached wall cat ladder.
Preferably, the rack main body adopts shaped steel rod member and gusset piece bolt composition.
Preferably, connection is rotated by crossed roller turntable bearing between the center tower crane and rack main body.
Preferably, the upper climbing frame is identical with the size of lower climbing frame, structure.
Compared with prior art, the beneficial effects of the utility model are:The bridge construction slip-form system, climbing device make Used time, the concrete Dun Bi for having been solidified with hollow pier as load main body, within climb the upper climbing frame and lower climbing frame and liquid of bracket institution The oil-lifting jar that bears down on one is climbing equipment main body, and cylinder piston rod is hinged with upper climbing frame with lower climbing frame and cylinder body, upper climbing frame and overcoat Frame is coupled, and outer sleeve frame is coupled with rack work platformses, fixes a rising by one between cylinder piston rod and cylinder body, so as to complete Climb operation into climbing frame, pier wall embedded wall penetration bolt, then connect thereon Support bracket, upper climbing frame and lower climbing frame to climb boots equal Prop up on Support bracket, climbed as the strong point upwards.The utility model simple structure, simplifies working procedure, shortens Duration, greatly save construction cost, it is ensured that the safety of high pier construction, substantially increase high pier concrete construction quality, and Sliding formwork is removed convenient.
Description of the drawings
Fig. 1 is this utility model structural representation.
In figure:1 rack work platformses, 11 rack main bodys, 2 center tower cranes, 21 tower crane arms, 22 crane hooks, climb foot in 3 Mechanism, climbing frame on 31,32 times climbing frames, 4 jacking force transmission mechanisms, 41 outer sleeve frames, stock in 42,5 interior hung scaffolds, 6L type supports, 7 Dun Bi, 71 combined steel formworks, 72 through-wall bolts, 721 Support brackets, 8 attached wall cat ladders.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only this utility model a part of embodiment, rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Fig. 1 is referred to, this utility model provides a kind of technical scheme:
A kind of bridge construction slip-form system, including rack work platformses 1, jacking force transmission mechanism 4 and pier wall 7, rack work Platform 1 includes rack main body 11, and rack main body 11 adopts universal rod body and gusset piece bolt composition, installs above rack main body 11 There is center tower crane 2, tower crane 2 or so two ends in center are mounted on tower crane arm 21, are equipped with tower crane and hang on two groups of tower crane arms 21 Hook 22, and center tower crane 2 rises with sliding formwork, center tower crane 2 using double cantilever crane hook forms, to reduce counterweight, central tower Hang and connection is rotated by crossed roller turntable bearing between 2 and rack main body 11, center tower crane 2 two-way feeding can rotate.
Nei Pa feet mechanism 3 is installed below rack main body 11, and Nei Pa feet mechanism 3 is external in hydraulic lifting oil cylinder, adopted The double oil cylinder parallel connection quantitative systems of single pump, small volume, lightweight, compact conformation and landing are steady, are capable of achieving to lift operation, inside climb foot Mechanism 3 includes climbing frame 31 and lower climbing frame 32, and upper climbing frame 31 is coupled with outer sleeve frame 41, and outer sleeve frame 41 and rack work platformses 1 Connection, Nei Pa feet mechanism 3 rely on upper climbing frame 31 and the alternating of lower climbing frame 32 to rise, and reach the rising of sliding formwork, and 31 He of upper climbing frame The size of lower climbing frame 32, structure are identical.
Jacking force transmission mechanism 4 is additionally provided with below rack main body 11, jacking force transmission mechanism 4 includes outer sleeve frame 41 and interior stock 42, and interior stock 42 is enclosed within outer sleeve frame 41, outer sleeve frame 41 and interior stock 42 are assembled using shaped steel rod member, and sliding formwork is outer stock Relative motion between 41 and interior stock 42 and constantly climb, be to ensure that lifting is steady, is additionally provided with directive wheel, outward between outer sleeve frame 41 41 both sides of stock are equipped with interior hung scaffold 5, are easy to needs of constructing, while also improving working security.
1 surrounding of rack work platformses is provided with L-type support 6, and 6 bottom of L-type support is connected with pier wall 7, to increase sliding formwork Stability, while conserving as pier construction to increase the stability of sliding formwork, 7 outer surface of pier wall is provided with combined steel formwork 71, increases Plus 7 structural stability of pier wall, through-wall bolt 72 is provided with pier wall 7, then connect Support bracket 721,31 He of upper climbing frame thereon The boots of climbing of lower climbing frame 32 are propped up on Support bracket 721, are climbed as the strong point upwards, and L-type support 6 is additionally provided with attached wall cat ladder 8, it is easy to climb construction.
The operation principle of this utility model climbing device:The concrete pier wall 7 for having been solidified with hollow pier as load main body, within The upper climbing frame 31 and lower climbing frame 32 and hydraulic lifting oil cylinder for climbing bracket institution 3 is climbing equipment main body, and cylinder piston rod is with Climbing frame 32 and cylinder body are hinged with upper climbing frame 31, and upper climbing frame 31 is coupled with outer sleeve frame 41, outer sleeve frame 41 and rack work platformses 1 Connect, a rising is fixed by one between cylinder piston rod and cylinder body, climb operation so as to complete climbing frame, 7 embedded wall penetration of pier wall Bolt 72, then connects Support bracket 721 thereon, and upper climbing frame 31 and lower climbing frame 32 climb boots on Support bracket 721, with This is climbed upwards for the strong point.
Specific workflow is:Start to climb after concrete sliding formwork after the health preserving of 10h or so is irrigated, first by upper climbing frame 31 Four supporting leg constriction sizes, then by specialized operations human users hydraulic control panel switch, two jacking cylinder piston rods It is supported on lower climbing frame 32, the jacking upwards simultaneously of two cylinder bodies, and whole sliding formwork is driven upwards by upper climbing frame 31 and outer sleeve frame 41 Climb, treat that stroke reaches 1.5m and stops climbing, adjust special rod member, stretch out four supporting legs, prop up and climbing on support, then manipulate Hydraulic control panel, reclaims piston rod and drives lower climbing frame 32, and interior stock 42 rises in place, and 32 supporting leg of lower climbing frame is supported, Operation of climbing also includes attached wall cat ladder 8, puts steel wire rope etc.
Sliding formwork is divided to two parts to dismantle:First is interior climbing device 3 and jacking force transmission mechanism 4 inside pier shaft, bag Include climbing frame 31 and lower climbing frame 32, outer sleeve frame 41 and interior stock 42, hydraulic lifting oil cylinder etc.;Part II is to include that rack works All external structures such as platform 1, interior hung scaffold 5, L-type support 6, and strictly disassembly sequence and work high above the ground are pressed in demolishing process Safety is sequentially carried out.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, Be appreciated that these embodiments can be carried out various changes in the case of without departing from principle of the present utility model and spirit, repair Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of bridge construction slip-form system, including rack work platformses (1), jacking force transmission mechanism (4) and Dun Bi (7), which is special Levy and be:The rack work platformses (1) include rack main body (11), are provided with center tower crane above the rack main body (11) (2), center tower crane (2) the left and right two ends are mounted on tower crane arm (21), are equipped with tower crane arm (21) described in two groups Crane hook (22), is provided with Nei Pa feet mechanism (3), and Nei Pa feet mechanism (3) is external in liquid below the rack main body (11) Bear down on one oil-lifting jar, and the Nei Pa feet mechanism (3) includes upper climbing frame (31) and lower climbing frame (32), below the rack main body (11) also Jacking force transmission mechanism (4) is provided with, the jacking force transmission mechanism (4) includes outer sleeve frame (41) and interior stock (42), and interior stock (42) it is enclosed within outer sleeve frame (41), the upper climbing frame (31) is coupled with outer sleeve frame (41), and outer sleeve frame (41) is flat with rack work Platform (1) couples, and outer sleeve frame (41) both sides are equipped with interior hung scaffold (5), and rack work platformses (1) surrounding is provided with L-type support (6), L-type support (6) bottom are connected with Dun Bi (7), and Dun Bi (7) outer surface is provided with combined steel formwork (71), through-wall bolt (72) is provided with the Dun Bi (7), be connected with Support bracket (721) on the through-wall bolt (72), and on The boots of climbing of climbing frame (31) and lower climbing frame (32) are propped up on Support bracket (721), and the L-type support (6) is additionally provided with attached wall cat ladder (8)。
2. a kind of bridge construction slip-form system according to claim 1, it is characterised in that:The rack main body (11) adopts Shaped steel rod member and gusset piece bolt composition.
3. a kind of bridge construction slip-form system according to claim 1, it is characterised in that:The center tower crane (2) and net Connection is rotated by crossed roller turntable bearing between frame body (11).
4. a kind of bridge construction slip-form system according to claim 1, it is characterised in that:The upper climbing frame (31) and under climb The size of frame (32), structure are identical.
CN201621201957.3U 2016-11-08 2016-11-08 Bridge construction slip -form system Expired - Fee Related CN206143646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621201957.3U CN206143646U (en) 2016-11-08 2016-11-08 Bridge construction slip -form system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621201957.3U CN206143646U (en) 2016-11-08 2016-11-08 Bridge construction slip -form system

Publications (1)

Publication Number Publication Date
CN206143646U true CN206143646U (en) 2017-05-03

Family

ID=58624864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621201957.3U Expired - Fee Related CN206143646U (en) 2016-11-08 2016-11-08 Bridge construction slip -form system

Country Status (1)

Country Link
CN (1) CN206143646U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560992A (en) * 2018-03-14 2018-09-21 扬州中创模板有限公司 The construction equipment and concrete placings construction method of towering structure
CN109610320A (en) * 2018-11-13 2019-04-12 柳州煜乾机械装备股份公司 A kind of band crane slip form construction device and construction method
CN109797964A (en) * 2019-01-30 2019-05-24 中建四局第六建筑工程有限公司 A kind of lifting platform system of integrated tower crane
CN110644373A (en) * 2019-10-14 2020-01-03 中交武汉港湾工程设计研究院有限公司 Automatic positioning bearing platform for inner cavity of inclined tower column
CN113526372A (en) * 2021-06-11 2021-10-22 浙江省建设工程机械集团有限公司 Double-pier-body construction tower crane and viaduct construction method
CN114232486A (en) * 2021-12-15 2022-03-25 江西省交通工程集团有限公司 Construction method of thin-wall pier template climbing frame and material lifting frame

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560992A (en) * 2018-03-14 2018-09-21 扬州中创模板有限公司 The construction equipment and concrete placings construction method of towering structure
CN108560992B (en) * 2018-03-14 2023-10-31 扬州市中润模板有限公司 Construction equipment for high-rise structure and concrete pouring construction method
CN109610320A (en) * 2018-11-13 2019-04-12 柳州煜乾机械装备股份公司 A kind of band crane slip form construction device and construction method
CN109797964A (en) * 2019-01-30 2019-05-24 中建四局第六建筑工程有限公司 A kind of lifting platform system of integrated tower crane
CN110644373A (en) * 2019-10-14 2020-01-03 中交武汉港湾工程设计研究院有限公司 Automatic positioning bearing platform for inner cavity of inclined tower column
CN110644373B (en) * 2019-10-14 2021-08-17 中交武汉港湾工程设计研究院有限公司 Automatic positioning bearing platform for inner cavity of inclined tower column
CN113526372A (en) * 2021-06-11 2021-10-22 浙江省建设工程机械集团有限公司 Double-pier-body construction tower crane and viaduct construction method
CN113526372B (en) * 2021-06-11 2024-01-12 浙江省建设工程机械集团有限公司 Double pier body construction tower crane and viaduct construction method
CN114232486A (en) * 2021-12-15 2022-03-25 江西省交通工程集团有限公司 Construction method of thin-wall pier template climbing frame and material lifting frame
CN114232486B (en) * 2021-12-15 2024-04-02 江西省交通工程集团有限公司 Construction method of thin-wall pier template climbing frame and material lifting frame

Similar Documents

Publication Publication Date Title
CN206143646U (en) Bridge construction slip -form system
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN201826525U (en) Climbing shuttering system device for buildings
CN203923919U (en) Support cast-in-place case beam side sliding system
CN202023360U (en) Hydraulic climbing die plate for building construction
WO2013120419A1 (en) Hydraulic lifting self-climbing template system
CN102587645A (en) Climbing supporting mechanism having expansion and automatic meshing functions, and construction method thereof
CN202544854U (en) Lining trolley for subway station
CN110284703A (en) A kind of light-duty climbing form system of screw rod promotion
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN111997344A (en) Folding arm wheel loader and building method of building outer wall construction platform
CN102296548B (en) Hydraulic truss type moving hanging basket for bridge maintenance and construction method thereof
CN204609261U (en) Movable up-down builds scaffold by laying bricks or stones
CN202519975U (en) Reciprocating slip form platform
CN106401606B (en) Template trestle trolley
CN207078938U (en) A kind of terrace project multifunctional crane
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN202899608U (en) Climbing device of building construction hydraulic pressure template
CN217205572U (en) Steel construction stair strutting arrangement
CN216405121U (en) Cantilever hydraulic climbing frame system for variable cross-section hollow pier construction
CN215331330U (en) Scaffold frame for municipal works that protecting effect is good
CN109944164A (en) Self-elevating hollow thin-wall pier roller die system and construction method thereof
CN205114897U (en) That climbs formula braced system in tower built -in is put has bad luck device certainly
CN212406023U (en) Construction scaffold
CN209907435U (en) Pipe rack platform truck for comprehensive pipe rack building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503

Termination date: 20191108

CF01 Termination of patent right due to non-payment of annual fee