CN211644382U - Tower crane attached stay bar walkway platform system - Google Patents

Tower crane attached stay bar walkway platform system Download PDF

Info

Publication number
CN211644382U
CN211644382U CN201922168356.7U CN201922168356U CN211644382U CN 211644382 U CN211644382 U CN 211644382U CN 201922168356 U CN201922168356 U CN 201922168356U CN 211644382 U CN211644382 U CN 211644382U
Authority
CN
China
Prior art keywords
walkway
tower crane
walkway platform
vertical rods
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922168356.7U
Other languages
Chinese (zh)
Inventor
陈爽
许晓彬
李媛媛
张元�
叶建英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 7 Group Co Ltd
Original Assignee
Shanghai Construction No 7 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 7 Group Co Ltd filed Critical Shanghai Construction No 7 Group Co Ltd
Priority to CN201922168356.7U priority Critical patent/CN211644382U/en
Application granted granted Critical
Publication of CN211644382U publication Critical patent/CN211644382U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型公开了一种塔机附着撑杆走道平台系统,其包括至少一个走道平台装置,走道平台装置包括置于塔机附着撑杆的顶部的走道平台,走道平台的两侧分别固定有栏杆扶手,走道平台的底部固定有多对竖杆,且每对竖杆的两个竖杆分别位于塔机附着撑杆的两侧,每一对竖杆之间均固定有横杆,且横杆位于塔机附着撑杆的底部,每一对竖杆中的两根竖杆与走道平台的底部两端分别固定有斜撑。整个结构除走道平台外均为可拆解结构,方便结构的存储和运输;结构稳定性好,完全满足操作人员行走要求及安全保护要求;走道平台系统采用模块化结构形式,大大节约现场安装时间及成本,使用后可回收重复利用,节约材料及成本。

Figure 201922168356

The utility model discloses a walkway platform system attached to a tower crane, which comprises at least one walkway platform device, the walkway platform device comprises a walkway platform placed on the top of a tower crane attached support rod, and railings are respectively fixed on both sides of the walkway platform There are many pairs of vertical rods fixed at the bottom of the handrail and the aisle platform, and the two vertical rods of each pair of vertical rods are located on both sides of the tower crane attachment struts respectively. It is located at the bottom of the tower crane attachment strut, and two vertical bars in each pair of vertical bars are respectively fixed with diagonal braces at both ends of the bottom of the walkway platform. The entire structure except the aisle platform is a disassembled structure, which is convenient for storage and transportation of the structure; the structure has good stability and fully meets the requirements of the operator's walking and safety protection requirements; the aisle platform system adopts a modular structure, which greatly saves on-site installation time It can be recycled and reused after use, saving materials and costs.

Figure 201922168356

Description

塔机附着撑杆走道平台系统Tower crane attached strut walkway platform system

技术领域technical field

本实用新型涉及塔机附着撑杆走道技术领域,特别是涉及一种塔机附着撑杆走道平台系统。The utility model relates to the technical field of a tower crane attached strut walkway, in particular to a tower crane attached strut walkway platform system.

背景技术Background technique

外附着式塔机当超过一定高度时,塔司及相关塔机操作人员在攀爬塔机时,会选择搭乘施工电梯到结构楼层,再通过塔机附着撑杆走到塔身标准节中。由于塔机附着撑杆通长截面尺寸较小,人员在塔机附着撑杆上走动时会存在相当大的坠落风险。When the externally attached tower crane exceeds a certain height, the tower operator and related tower crane operators will choose to take the construction elevator to the structural floor when climbing the tower crane, and then walk to the standard section of the tower body through the tower crane attached strut. Due to the small size of the entire length of the tower crane attachment strut, there is a considerable risk of falling when people walk on the tower crane attachment strut.

实用新型内容Utility model content

本实用新型针对现有技术存在的问题和不足,提供一种新型的塔机附着撑杆走道平台系统。Aiming at the problems and deficiencies existing in the prior art, the utility model provides a novel tower crane attachment strut walkway platform system.

本实用新型是通过下述技术方案来解决上述技术问题的:The utility model solves the above-mentioned technical problems through the following technical solutions:

本实用新型提供一种塔机附着撑杆走道平台系统,其特点在于,其包括至少一个走道平台装置,所述走道平台装置包括置于塔机附着撑杆的顶部的走道平台,所述走道平台的两侧分别固定有栏杆扶手,所述走道平台的底部固定有多对竖杆,且每对竖杆的两个竖杆分别位于塔机附着撑杆的两侧,每一对竖杆之间均固定有横杆,且所述横杆位于塔机附着撑杆的底部,每一对竖杆中的两根竖杆与走道平台的底部两端分别固定有斜撑。The utility model provides a walkway platform system for tower crane attachment struts, which is characterized in that it includes at least one walkway platform device, and the walkway platform device comprises a walkway platform placed on the top of the tower crane attachment strut, the walkway platform There are railings and handrails fixed on both sides of the walkway platform, and there are many pairs of vertical rods fixed on the bottom of the walkway platform, and the two vertical rods of each pair of vertical rods are located on both sides of the tower crane attachment strut, between each pair of vertical rods. A horizontal bar is fixed, and the horizontal bar is located at the bottom of the tower crane attachment strut, and two vertical bars in each pair of vertical bars and the two ends of the bottom of the walkway platform are respectively fixed with diagonal braces.

较佳地,所述走道平台包括走道框架和走道钢板,所述走道钢板铺设在走道框架上。Preferably, the walkway platform includes a walkway frame and a walkway steel plate, and the walkway steel plate is laid on the walkway frame.

较佳地,所述走道框架由三根横梁和两根纵梁焊接而成形成日字型走道框架。Preferably, the walkway frame is welded by three beams and two longitudinal beams to form a Japanese-shaped walkway frame.

较佳地,所述走道框架两端的横梁上分别固定有两个吊耳。Preferably, two lifting lugs are respectively fixed on the beams at both ends of the walkway frame.

较佳地,每一横梁的侧边均固定有与成对竖杆一一对应的两个带有第一销轴孔的连接板,每一对竖杆中的两根竖杆上均开设有第二销轴孔,所述第一销轴孔和对应第二销轴孔通过销轴连接以使得竖杆与走道框架连接。Preferably, the sides of each beam are fixed with two connecting plates with first pin holes corresponding to the pair of vertical rods one-to-one, and two vertical rods in each pair of vertical rods are provided with The second pin shaft hole, the first pin shaft hole and the corresponding second pin shaft hole are connected by a pin shaft so that the vertical rod is connected with the walkway frame.

较佳地,两根所述纵梁上固定有定位柱,所述栏杆扶手安装至各定位柱内并用开口销固定。Preferably, positioning columns are fixed on the two longitudinal beams, and the railings are installed in each positioning column and fixed with cotter pins.

较佳地,所述竖杆采用方管,所述横杆采用角钢,所述斜撑采用角钢,所述横梁采用方管,所述纵梁采用长角钢。Preferably, the vertical bars are made of square tubes, the cross bars are made of angle steel, the diagonal braces are made of angle steel, the cross beams are made of square tubes, and the longitudinal beams are made of long angle steel.

较佳地,所述走道框架两端的横梁和竖杆在内侧安装斜撑和横杆,所述走道框架中间的横梁和竖杆在两侧均安装斜撑和横杆。Preferably, diagonal braces and horizontal bars are installed on the inner side of the beams and vertical bars at both ends of the walkway frame, and diagonal braces and horizontal bars are installed on both sides of the horizontal beams and vertical bars in the middle of the walkway frame.

较佳地,所述走道平台装置具有多个时,相邻走道平台装置的走道平台相靠,通过相邻走道平台上的横梁和竖杆上的销轴孔,利用双头销轴分别将相邻走道平台上的横梁和竖杆连接。Preferably, when there are multiple aisle platform devices, the aisle platforms of adjacent aisle platform devices are adjacent to each other, and through the pin holes on the horizontal beams and the vertical rods on the adjacent aisle platforms, the double-ended pins are used to respectively connect the phases. The beams and vertical bars on the adjacent walkway platform are connected.

较佳地,所述栏杆扶手上布设有密目防护网。Preferably, a dense mesh protective net is arranged on the handrail of the railing.

在符合本领域常识的基础上,上述各优选条件,可任意组合,即得本实用新型各较佳实例。On the basis of conforming to common knowledge in the art, the above preferred conditions can be arbitrarily combined to obtain preferred examples of the present invention.

本实用新型的积极进步效果在于:The positive progressive effect of the present utility model is:

1、整个结构都选用型钢作为主材料,制作方便、重量轻、成本低;1. The whole structure uses section steel as the main material, which is convenient to manufacture, light in weight and low in cost;

2、整个结构除走道平台外均为可拆解结构,方便结构的存储和运输;2. The entire structure except the aisle platform is a disassembled structure, which is convenient for the storage and transportation of the structure;

3、走道平台上设置吊耳,既方便走道平台系统的吊装,也方便后续塔机附着撑杆的吊装,提高塔机附着撑杆吊装过程的安全性;3. The lifting lugs are set on the walkway platform, which not only facilitates the hoisting of the walkway platform system, but also facilitates the subsequent hoisting of the tower crane attachment struts, and improves the safety of the tower crane attachment strut hoisting process;

4、结构稳定性好,完全满足操作人员行走要求及安全保护要求;4. Good structural stability, fully meet the operator's walking requirements and safety protection requirements;

5、走道平台系统采用模块化结构形式,大大节约现场安装时间及成本,使用后可回收重复利用,节约材料及成本;5. The aisle platform system adopts a modular structure, which greatly saves on-site installation time and cost, and can be recycled and reused after use, saving materials and costs;

6、本系统在塔机附着撑杆安装之前在地面进行拼装,极大的降低了施工的危险性,能够有效保障施工人员人身财产安全。6. The system is assembled on the ground before the tower crane is attached to the strut, which greatly reduces the risk of construction and can effectively protect the personal and property safety of construction workers.

附图说明Description of drawings

图1为本实用新型较佳实施例的塔机附着撑杆走道平台系统的安装示意图。FIG. 1 is a schematic diagram of installation of a tower crane attached strut walkway platform system according to a preferred embodiment of the present invention.

图2和3为本实用新型较佳实施例的塔机附着撑杆走道平台系统的组成示意图。2 and 3 are schematic diagrams of the composition of the tower crane attached strut walkway platform system according to the preferred embodiment of the present invention.

图4为本实用新型较佳实施例的走道平台的组成示意图。FIG. 4 is a schematic diagram of the composition of the walkway platform according to the preferred embodiment of the present invention.

具体实施方式Detailed ways

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present utility model clearer, the technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. The embodiments described above are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

如图1-4所示,本实施例提供一种塔机附着撑杆走道平台系统,其包括两个走道平台装置100,塔机附着撑杆走道平台系统安装于塔机附着撑杆200上,主要用于塔机相关操作人员由建筑楼层通过塔机附着撑杆200行走至塔机标准节上使用。不同塔机附着撑杆200可根据其长度,使用适当数量的走道平台装置100拼装其上,满足操作人员行走要求。As shown in Figures 1-4, this embodiment provides a tower crane attached strut walkway platform system, which includes two walkway platform devices 100, the tower crane attached strut walkway platform system is installed on the tower crane attached strut 200, It is mainly used for tower crane related operators to walk from the building floor to the tower crane standard section through the tower crane attachment strut 200. Different tower crane attachment struts 200 can be assembled on them by using an appropriate number of aisle platform devices 100 according to their lengths to meet the walking requirements of operators.

所述走道平台装置100包括置于塔机附着撑杆200的顶部的走道平台101,所述走道平台101的两侧分别固定有栏杆扶手102,所述栏杆扶手102上布设有密目防护网103,所述走道平台101的底部固定有多对竖杆104,且每对竖杆的两个竖杆104分别位于塔机附着撑杆200的两侧,每一对竖杆104之间均固定有横杆105,且所述横杆105位于塔机附着撑杆200的底部,每一对竖杆中的两根竖杆104与走道平台101的底部两端分别固定有斜撑106,所述竖杆104采用方管,所述横杆105采用角钢,所述斜撑106采用角钢。The walkway platform device 100 includes a walkway platform 101 placed on the top of the tower crane attachment strut 200. Both sides of the walkway platform 101 are respectively fixed with handrails 102, and the handrails 102 are provided with dense mesh protection nets 103. , the bottom of the walkway platform 101 is fixed with a plurality of pairs of vertical rods 104, and the two vertical rods 104 of each pair of vertical rods are located on both sides of the tower crane attachment struts 200, and each pair of vertical rods 104 are fixed between The horizontal bar 105, and the horizontal bar 105 is located at the bottom of the tower crane attachment strut 200, the two vertical bars 104 in each pair of vertical bars and the bottom ends of the walkway platform 101 are respectively fixed with diagonal braces 106. The rod 104 adopts a square tube, the cross bar 105 adopts an angle steel, and the diagonal brace 106 adopts an angle steel.

其中,所述走道平台101包括走道框架1011和走道钢板1012,所述走道钢板1012铺设在走道框架1011上,所述走道框架1011由三根横梁1013和两根纵梁1014焊接而成形成日字型走道框架,所述横梁1013采用方管,所述纵梁1014采用长角钢,所述走道框架1011两端的横梁1013上分别固定有两个吊耳1015。The walkway platform 101 includes a walkway frame 1011 and a walkway steel plate 1012, the walkway steel plate 1012 is laid on the walkway frame 1011, and the walkway frame 1011 is welded by three beams 1013 and two longitudinal beams 1014 to form a Japanese shape For the walkway frame, the beam 1013 is made of square tubes, the longitudinal beam 1014 is made of long angle steel, and two lifting ears 1015 are respectively fixed on the beams 1013 at both ends of the walkway frame 1011 .

每一横梁1013的侧边均固定有与成对竖杆104一一对应的两个带有第一销轴孔的连接板1016,每一对竖杆中的两根竖杆104上均开设有第二销轴孔,所述第一销轴孔和对应第二销轴孔通过销轴107连接以使得竖杆104与走道框架1011连接,两根所述纵梁1014上固定有定位柱1017,所述栏杆扶手102安装至各定位柱1017内并用开口销固定。The sides of each beam 1013 are fixed with two connecting plates 1016 with first pin holes corresponding to the pair of vertical rods 104 one-to-one, and two vertical rods 104 in each pair of vertical rods are provided with The second pin shaft hole, the first pin shaft hole and the corresponding second pin shaft hole are connected by the pin shaft 107 so that the vertical rod 104 is connected with the walkway frame 1011, and the two longitudinal beams 1014 are fixed with positioning columns 1017, The handrail 102 is installed into each positioning post 1017 and fixed with cotter pins.

进一步地,所述走道框架两端的横梁1013和竖杆104在内侧安装斜撑106和横杆105,所述走道框架中间的横梁1013和竖杆104在两侧均安装斜撑106和横杆105。Further, diagonal braces 106 and cross bars 105 are installed on the inner side of the beams 1013 and vertical bars 104 at both ends of the walkway frame, and diagonal braces 106 and cross bars 105 are installed on both sides of the horizontal beam 1013 and vertical bars 104 in the middle of the walkway frame. .

当塔机附着撑杆200长度较长,需要多节走道平台装置拼装到一起时,将两节相邻走道平台装置的走道平台靠在一起,然后通过相邻走道平台上的横梁1013及竖杆104上的销轴孔,利用双头销轴将两节走道平台装置连接起来。When the length of the tower crane attachment strut 200 is long, and multiple sections of aisle platform devices are required to be assembled together, the aisle platforms of two adjacent sections of aisle platform devices should be brought together, and then pass the beams 1013 and vertical bars on the adjacent aisle platforms. The pin hole on 104 is used to connect the two sections of the aisle platform device with a double-ended pin.

塔机附着撑杆走道平台系统的安装方法包括:走道平台系统安装时,首先将走道平台101与竖杆104连接起来,再将斜撑106两端分别连接到横梁1013及竖杆104上。然后将拼装好的部分整体吊起放置在塔机附着撑杆200上,走道平台101置于塔机附着撑杆200上方,竖杆104分别置于塔机附着撑杆200两侧。之后将横杆105两端分别连接到两根竖杆104上。以上各部件之间均通过销轴107进行连接。最后再将栏杆扶手102安装到走道平台101的各定位柱1017内,并用开口销固定。The installation method of the tower crane attached strut walkway platform system includes: when the walkway platform system is installed, firstly connect the walkway platform 101 and the vertical pole 104, and then connect the two ends of the diagonal brace 106 to the beam 1013 and the vertical pole 104 respectively. Then, the assembled part is hoisted and placed on the tower crane attachment strut 200 as a whole, the walkway platform 101 is placed above the tower crane attachment strut 200, and the vertical rods 104 are placed on both sides of the tower crane attachment strut 200 respectively. Afterwards, the two ends of the horizontal bar 105 are respectively connected to the two vertical bars 104 . The above components are all connected by pins 107 . Finally, the handrail 102 is installed into each positioning column 1017 of the walkway platform 101, and fixed with a split pin.

拼装时,每根横梁1013均与两根竖杆104连接,安装到塔机附着撑杆200上时,两根竖杆104会分别置于塔机附着撑杆200两侧,以此保证走道平台系统水平方向不会发生移动。斜撑106的两端分别与横梁1013端部及竖杆104下端部连接,以此形成三角形结构,保证整体结构的稳定性。When assembled, each beam 1013 is connected with two vertical rods 104. When installed on the tower crane attachment strut 200, the two vertical rods 104 will be placed on both sides of the tower crane attachment strut 200 respectively, so as to ensure the walkway platform. The system does not move horizontally. The two ends of the diagonal brace 106 are respectively connected with the end of the beam 1013 and the lower end of the vertical rod 104 to form a triangular structure to ensure the stability of the overall structure.

虽然以上描述了本实用新型的具体实施方式,但是本领域的技术人员应当理解,这些仅是举例说明,本实用新型的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本实用新型的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更和修改均落入本实用新型的保护范围。Although the specific embodiments of the present invention are described above, those skilled in the art should understand that these are only examples, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principle and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.

Claims (10)

1.一种塔机附着撑杆走道平台系统,其特征在于,其包括至少一个走道平台装置,所述走道平台装置包括置于塔机附着撑杆的顶部的走道平台,所述走道平台的两侧分别固定有栏杆扶手,所述走道平台的底部固定有多对竖杆,且每对竖杆的两个竖杆分别位于塔机附着撑杆的两侧,每一对竖杆之间均固定有横杆,且所述横杆位于塔机附着撑杆的底部,每一对竖杆中的两根竖杆与走道平台的底部两端分别固定有斜撑。1. a tower crane attachment strut walkway platform system is characterized in that, it comprises at least one walkway platform device, and the walkway platform device comprises the walkway platform placed on the top of the tower crane attachment strut, and two of the walkway platform The sides are respectively fixed with railings and handrails, the bottom of the walkway platform is fixed with a plurality of pairs of vertical rods, and the two vertical rods of each pair of vertical rods are located on both sides of the tower crane attachment struts, and each pair of vertical rods are fixed between There is a cross bar, and the cross bar is located at the bottom of the tower crane attachment strut, and two vertical bars in each pair of vertical bars and the two ends of the bottom of the walkway platform are respectively fixed with diagonal braces. 2.如权利要求1所述的塔机附着撑杆走道平台系统,其特征在于,所述走道平台包括走道框架和走道钢板,所述走道钢板铺设在走道框架上。2 . The tower crane-attached strut walkway platform system according to claim 1 , wherein the walkway platform comprises a walkway frame and a walkway steel plate, and the walkway steel plate is laid on the walkway frame. 3 . 3.如权利要求2所述的塔机附着撑杆走道平台系统,其特征在于,所述走道框架由三根横梁和两根纵梁焊接而成形成日字型走道框架。3 . The tower crane-attached strut walkway platform system according to claim 2 , wherein the walkway frame is welded by three beams and two longitudinal beams to form a Japanese-shaped walkway frame. 4 . 4.如权利要求3所述的塔机附着撑杆走道平台系统,其特征在于,所述走道框架两端的横梁上分别固定有两个吊耳。4 . The tower crane-attached strut walkway platform system according to claim 3 , wherein two lifting ears are respectively fixed on the beams at both ends of the walkway frame. 5 . 5.如权利要求3所述的塔机附着撑杆走道平台系统,其特征在于,每一横梁的侧边均固定有与成对竖杆一一对应的两个带有第一销轴孔的连接板,每一对竖杆中的两根竖杆上均开设有第二销轴孔,所述第一销轴孔和对应第二销轴孔通过销轴连接以使得竖杆与走道框架连接。5. The tower crane attachment strut walkway platform system according to claim 3, characterized in that, the side of each beam is fixed with two pairs of vertical rods with first pin holes corresponding to each other one-to-one. A connecting plate, two vertical rods in each pair of vertical rods are provided with second pin shaft holes, and the first pin shaft holes and the corresponding second pin shaft holes are connected by a pin shaft so that the vertical rods are connected with the walkway frame . 6.如权利要求3所述的塔机附着撑杆走道平台系统,其特征在于,两根所述纵梁上固定有定位柱,所述栏杆扶手安装至各定位柱内并用开口销固定。6 . The tower crane attachment strut walkway platform system according to claim 3 , wherein positioning columns are fixed on the two longitudinal beams, and the railings are installed in each positioning column and fixed with cotter pins. 7 . 7.如权利要求3所述的塔机附着撑杆走道平台系统,其特征在于,所述竖杆采用方管,所述横杆采用角钢,所述斜撑采用角钢,所述横梁采用方管,所述纵梁采用长角钢。7. The tower crane attachment strut walkway platform system according to claim 3, characterized in that, the vertical rod adopts a square tube, the horizontal bar adopts an angle steel, the diagonal bracing adopts an angle steel, and the cross beam adopts a square tube , the longitudinal beam adopts long angle steel. 8.如权利要求3所述的塔机附着撑杆走道平台系统,其特征在于,所述走道框架两端的横梁和竖杆在内侧安装斜撑和横杆,所述走道框架中间的横梁和竖杆在两侧均安装斜撑和横杆。8. The tower crane attachment strut walkway platform system of claim 3, wherein the cross beams and vertical bars at both ends of the walkway frame are installed with diagonal braces and cross bars on the inner side, and the cross beams and vertical bars in the middle of the walkway frame are installed. The pole is fitted with diagonal braces and cross bars on both sides. 9.如权利要求3所述的塔机附着撑杆走道平台系统,其特征在于,所述走道平台装置具有多个时,相邻走道平台装置的走道平台相靠,通过相邻走道平台上的横梁和竖杆上的销轴孔,利用双头销轴分别将相邻走道平台上的横梁和竖杆连接。9. The tower crane attachment strut walkway platform system of claim 3, wherein when the walkway platform device has a plurality of, the walkway platforms of adjacent walkway platform devices The pin shaft holes on the beams and the vertical rods are used to connect the beams and vertical rods on the adjacent aisle platforms respectively by double-ended pins. 10.如权利要求1所述的塔机附着撑杆走道平台系统,其特征在于,所述栏杆扶手上布设有密目防护网。10. The tower crane-attached strut walkway platform system according to claim 1, wherein a dense mesh protective net is arranged on the handrail.
CN201922168356.7U 2019-12-06 2019-12-06 Tower crane attached stay bar walkway platform system Expired - Fee Related CN211644382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922168356.7U CN211644382U (en) 2019-12-06 2019-12-06 Tower crane attached stay bar walkway platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922168356.7U CN211644382U (en) 2019-12-06 2019-12-06 Tower crane attached stay bar walkway platform system

Publications (1)

Publication Number Publication Date
CN211644382U true CN211644382U (en) 2020-10-09

Family

ID=72694809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922168356.7U Expired - Fee Related CN211644382U (en) 2019-12-06 2019-12-06 Tower crane attached stay bar walkway platform system

Country Status (1)

Country Link
CN (1) CN211644382U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111003642A (en) * 2019-12-06 2020-04-14 上海建工七建集团有限公司 Tower crane attached stay rod walkway platform system and installation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111003642A (en) * 2019-12-06 2020-04-14 上海建工七建集团有限公司 Tower crane attached stay rod walkway platform system and installation method thereof
CN111003642B (en) * 2019-12-06 2025-01-14 上海建工七建集团有限公司 Tower crane attached support pole walkway platform system and installation method thereof

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN210507141U (en) Movable tensioning platform
CN214195484U (en) An all-steel attached lifting scaffold
CN110185247A (en) Mobile outrigger platform
CN211499713U (en) All-steel attached lifting scaffold
CN201665992U (en) Whole lifting platform of large steel net frame
CN211644382U (en) Tower crane attached stay bar walkway platform system
CN105442853A (en) Long-span deformed steel truss and floor steel structure installation and construction method
CN104278830A (en) Integral combined scaffold
CN212895943U (en) Operation platform device for binding small-section pier column reinforcing steel bars
CN205857026U (en) A kind of movable type bridge anticollision barrier construction operation chassis
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN113404278B (en) Self-climbing type protection frame and climbing method thereof
CN204212388U (en) Integral combined scaffolding
CN111003642B (en) Tower crane attached support pole walkway platform system and installation method thereof
CN209837748U (en) Top bracing type protective frame
CN211006345U (en) A lattice ladder
CN212129859U (en) Detachable steel structure aerial work operating platform
CN204754150U (en) Disc type node scaffolding
CN206126696U (en) A detachable indoor hoist for buckling restrained brace
CN207131053U (en) Shaped steel platform for construction
CN219569531U (en) A construction platform for adding elevators
CN218621853U (en) High mound reinforcing bar installation truss structure
CN212954042U (en) Lattice formula cable saddle hoist and mount portal
CN111910905A (en) A vertical main frame of a lifting operation safety protection platform for high-rise building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201009