CN214996342U - Integrated protection channel for stairwell - Google Patents

Integrated protection channel for stairwell Download PDF

Info

Publication number
CN214996342U
CN214996342U CN202120704287.1U CN202120704287U CN214996342U CN 214996342 U CN214996342 U CN 214996342U CN 202120704287 U CN202120704287 U CN 202120704287U CN 214996342 U CN214996342 U CN 214996342U
Authority
CN
China
Prior art keywords
ladder
support
stair
stairwell
supports
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120704287.1U
Other languages
Chinese (zh)
Inventor
金松
武传祥
隋海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202120704287.1U priority Critical patent/CN214996342U/en
Application granted granted Critical
Publication of CN214996342U publication Critical patent/CN214996342U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction scaffolding technical field especially relates to a stairwell integration protection passageway of going up people. The stair is arranged on the upper surface of an installed stair and used for enabling personnel to move up and down at positions where the stair is not installed in a stair well, and comprises a ladder which is arranged obliquely upwards and two supports which are arranged on the left side and the right side of the ladder, the two supports are connected and fixed into a stable whole through a plurality of connecting rods, and the ladder is supported above the stair through the supports; the support comprises a front support and a rear support, the front support is arranged at the bottom end of the ladder, and the bottom of the front support is supported at the bottom of the ladder; rear supporting columns are arranged on two sides of the top end of the ladder and are arranged at the top end of the ladder, and the bottom of each rear supporting column is flush with the bottom of the ladder; the bottom of the ladder is supported by a support beam, and two ends of the support beam are respectively fixedly connected with the front support column and the rear support column; the both sides of ladder have with the extending direction parallel guardrail, the both ends of guardrail are fixed respectively on preceding pillar and back pillar.

Description

Integrated protection channel for stairwell
Technical Field
The utility model relates to a construction scaffolding technical field especially relates to a stairwell integration protection passageway of going up people.
Background
The prefabricated members are used more and more in the existing building construction, and the concrete prefabricated members produced in factories are used for replacing the pouring construction on site, so that the construction progress can be greatly improved. In the existing building construction, a mode of combining cast-in-place and prefabricated parts is mostly adopted, and the prefabricated parts are adopted for trivial components such as stairs, and the weighing structure of a building main body, and the like, are cast-in-place.
When in construction, the stair girders are cast in situ along with the building main body, and the stair of the prefabricated member can be constructed only after the construction of the stair girders is finished, so that the stair cannot be installed during cast-in-situ operation. This results in a lag of one floor compared to the stairway and the cast-in-place working floor, and the constructor cannot reach the cast-in-place working floor through the installed stairway.
At present, a simple boarding passage is often constructed temporarily by using a steel pipe scaffold and the like, however, the construction of the constructed temporary passage needs to be disassembled and rebuilt without raising a layer, and time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
The utility model discloses stairwell integration protection passageway.
The technical problem to be solved is that: the construction speed of the stair in the construction of the conventional prefabricated member stair is slower than the pouring speed, so that a constructor cannot reach a poured operation layer through the stair.
In order to solve the technical problem, the utility model discloses stairwell integration protection passageway adopts following scheme.
The stair well integrated protection channel is arranged on the upper surface of an installed stair and used for enabling personnel to move up and down at a position where the stair is not installed in the stair well, and comprises a step which is obliquely and upwards arranged for the personnel to walk and two supports arranged on the left side and the right side of the step, the two supports are connected and fixed into a stable whole through a plurality of connecting rods, and the step is erected right above the stair through the supports;
the support comprises a front support and a rear support, the front support is arranged at the bottom end of the ladder, and the bottom of the front support is supported at the bottom of the ladder; rear supporting columns are arranged on two sides of the top end of the ladder and are arranged at the top end of the ladder, and the bottom of each rear supporting column is flush with the bottom of the ladder; the bottom of the ladder is supported by a support beam, and two ends of the support beam are respectively fixedly connected with the front support column and the rear support column;
the both sides of ladder have with the extending direction parallel guardrail, the both ends of guardrail are fixed respectively on preceding pillar and back pillar.
Preferably, the support further comprises an upper cross beam, and two ends of the upper cross beam are respectively connected with the tops of the front pillar and the rear pillar of the support.
Preferably, the middle parts of the beams of the two supports are connected through a suspender, and a hoisting point is fixed in the middle of the suspender and used for hoisting and moving the crane.
Preferably, the support and the cross rod are made of square steel tubes, and two ends of the cross rod of the support are fixed on the support through welding.
Preferably, the support further comprises a lower cross beam, and two ends of the lower cross beam are respectively connected with the bottoms of the front pillar and the rear pillar of the support.
Preferably, the ladder is made of a steel plate, and the ladder is welded and fixed on the support beam.
In the building construction adopting the prefabricated stairway, the construction of the stairway can be slower than that of the main body because the stairway needs to be installed by depending on the constructed stairwell main body. The constructor needs to temporarily set up a suggested scaffold from the stairway to the cast construction layer of the main body. And the construction does not raise one floor and the scaffold needs to be disassembled again and rebuilt.
The utility model discloses stairwell integration protection passageway compares with prior art, has following beneficial effect:
the method changes the original mode of temporarily building the scaffold, designs an integrated construction channel, and installs the channel
On the upper surface of the staircase, a pouring construction layer is communicated with the finished staircase and the main body. Personnel can freely go up and down through the integrated construction channel. Meanwhile, after the construction is carried out for one layer, the whole construction channel can be integrally hoisted upwards through a tower crane or a crane. The disassembly and the re-construction are not needed at every time, and time and labor are saved.
Specifically, the two supports are connected into an integral frame structure through the left support and the right support through the connecting rod, a ladder used for stepping on the tower is installed between the two supports, and meanwhile, because the stairwell is provided with adjacent edges, guardrails are further arranged on two sides of the ladder.
Because the stair are inclined, in order to stably set the stair right above the completed stair, the support comprises a front support and a rear support which are different in height, the front support is arranged at the bottom of the stair, the bottom of the front support is also supported at the bottom of the stair, the rear support is supported at the top of the stair, the bottom of the rear support is supported at the top of the stair, and meanwhile, the bottom of the rear support is flush with the bottom of the stair, so that a person can horizontally move to the bottom of the stair through the floor and continuously upwards after reaching the top of the stair, and the person can reach a pouring construction layer of a main body structure through the stair. When the ladder type is required to be moved, the whole channel can be lifted only by using a steel wire rope to be tied on the bracket or constructing the bracket through the lifting hook.
Drawings
FIG. 1 is a side view of the stairwell integrated protection passageway of the present invention after installation;
fig. 2 is a perspective view of the stair well integrated protection channel of the utility model.
Description of reference numerals: 1-stairs; 2-ladder, 3-front supporting leg, 4-rear supporting leg, 5-supporting beam, 6-upper beam, 7-lower beam, 8-connecting rod, 9-hanging rod and 10-guardrail.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings. It is to be understood that the description of the embodiments herein is for purposes of illustration and explanation only and is not intended to limit the invention.
In the present invention, unless otherwise specified, the use of directional terms such as "upper, lower, left, and right" generally means upper, lower, left, and right as illustrated with reference to fig. 1; "inner and outer" refer to the inner and outer relative to the profile of the components themselves. The present invention will be described in detail with reference to the accompanying drawings in conjunction with embodiments.
In order to solve current prefab stair 1 in the construction speed of stair 1 will be slower than the speed of pouring, lead to constructor can't reach the problem on the operation layer of pouring through stair 1, the utility model provides a stairwell integration protection passageway, as shown in figure 1 and figure 2.
The stair well integrated protection channel is arranged on the upper surface of an installed stair 1 and used for personnel to move up and down at a position where the stair 1 is not installed in the stair well, and is characterized in that,
the stair comprises a stair 2 which is obliquely and upwards arranged for people to walk and two supports arranged on the left side and the right side of the stair 2, wherein the two supports are connected and fixed into a stable whole through a plurality of connecting rods 8, and the stair 2 is supported and arranged right above the stair 1 through the supports;
the support comprises a front support and a rear support, the front support is arranged at the bottom end of the ladder 2, and the bottom of the front support is supported at the bottom of the stair 1; rear struts are arranged on two sides of the top end of the ladder 2 and are arranged at the top end of the ladder 2, and the bottoms of the rear struts are flush with the bottom of the ladder 2; the bottom of the ladder 2 is supported by a support beam 5, and two ends of the support beam 5 are respectively fixedly connected with a front support column and a rear support column;
the step 2 has guard rails 10 on both sides thereof in parallel with the extending direction thereof, and both ends of the guard rails 10 are fixed to the front and rear pillars, respectively.
The step 2 is a tread for a worker to walk, is preferably configured like the step 2 of the stair 1, and may also be configured as a flat plate with a rough upper surface, and is preferably made of a steel plate supported by a support beam 5 at the bottom to prevent deformation. The supporting beams 5 comprise two supporting beams arranged on the left side and the right side of the bottom of the ladder 2, the two supporting beams 5 are respectively connected with the two supports, and specifically, the two ends of each supporting beam 5 are fixedly arranged on the front supporting leg 3 and the rear supporting leg 4. The fixing mode can be welding or clamping band for detachable connection. Guard rails 10 are arranged on two sides of the ladder 2, the extension directions of the guard rails 10 and the ladder 2 are the same, and people on the ladder 2 are protected.
For the convenience of arrangement, the support further comprises an upper cross beam 6, and two ends of the upper cross beam 6 are respectively connected with the tops of the front pillar and the rear pillar of the support. The middle parts of the beam through parts of the two supports are connected through a suspender 9, and a hoisting point is fixed in the middle of the suspender 9 and used for hoisting and moving of a crane. The hoisting point can be a preset lifting hook or a hook for hanging the steel wire rope, and the like, and can be determined according to the matching of heavy equipment in actual use.
Simultaneously in order to increase the fastness of preceding landing leg 3 and back landing leg 4, the support still includes bottom end rail 7, and the both ends of bottom end rail 7 are connected with the bottom of the preceding pillar of support and back pillar respectively.
Preferably, the ladder 2 is made of a steel plate, and the ladder 2 is welded and fixed on the support beam 5.
The support, the cross rod and the connecting rod 8 are made of square steel pipes and are fixedly connected through welding, and as shown in figure 2, the support, the cross rod and the connecting rod 8 jointly form a stable frame structural part.
The above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.

Claims (6)

1. The stair well integrated protection channel is arranged on the upper surface of an installed stair (1) and used for personnel to move up and down at a position where the stair (1) is not installed in the stair well,
the ladder comprises a ladder (2) which is obliquely and upwards arranged for people to walk and two supports arranged on the left side and the right side of the ladder (2), wherein the two supports are connected and fixed into a stable whole through a plurality of connecting rods (8), and the ladder (2) is supported above the ladder (1) through the supports;
the support comprises a front support and a rear support, the front support is arranged at the bottom end of the ladder (2), and the bottom of the front support is supported at the bottom of the stair (1); rear struts are arranged on two sides of the top end of the ladder (2), the rear struts are arranged on the top end of the ladder (2), and the bottoms of the rear struts are flush with the bottom of the ladder (2); the bottom of the ladder (2) is supported by a support beam (5), and two ends of the support beam (5) are respectively fixedly connected with the front support and the rear support;
two sides of the ladder (2) are provided with guardrails (10) parallel to the extending direction, and two ends of each guardrail (10) are respectively fixed on the front support and the rear support.
2. The stairwell integrated protection channel according to claim 1, characterized in that the support further comprises an upper cross beam (6), both ends of the upper cross beam (6) being connected with the top of the front and rear pillars of the support, respectively.
3. The stairwell integrated protection channel according to claim 2, wherein the middle parts of the beam passages of the two supports are connected through a suspender (9), and a lifting point is fixed in the middle of the suspender (9) and used for lifting and moving by a crane.
4. The stairwell integrated protection channel according to claim 1, wherein the support and the cross bar are made of square steel tubes, and two ends of the cross bar of the support are fixed on the support through welding.
5. The stairwell integrated protection channel according to claim 1, characterized in that the support further comprises a lower cross beam (7), both ends of the lower cross beam (7) being connected to the bottom of the front and rear pillars of the support, respectively.
6. The stairwell integrated protection channel according to claim 1, characterized in that the ladder (2) is made of steel plate, and the ladder (2) is welded and fixed on the support beam (5).
CN202120704287.1U 2021-04-07 2021-04-07 Integrated protection channel for stairwell Expired - Fee Related CN214996342U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120704287.1U CN214996342U (en) 2021-04-07 2021-04-07 Integrated protection channel for stairwell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120704287.1U CN214996342U (en) 2021-04-07 2021-04-07 Integrated protection channel for stairwell

Publications (1)

Publication Number Publication Date
CN214996342U true CN214996342U (en) 2021-12-03

Family

ID=79096638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120704287.1U Expired - Fee Related CN214996342U (en) 2021-04-07 2021-04-07 Integrated protection channel for stairwell

Country Status (1)

Country Link
CN (1) CN214996342U (en)

Similar Documents

Publication Publication Date Title
AU2010346421B2 (en) Scaffold and methods for installing or removing such a scaffold
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
CN108360380B (en) Bridge pier column construction operation platform and construction method thereof
CN107227814B (en) A kind of large cantilever concrete structure section construction method
WO2022252829A1 (en) Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building
CN107100361B (en) Inner support aluminum dipping form device and its installation method are climbed outside a kind of
KR20190041189A (en) Modular work platform of a long span bridge main tower rebar and construction method using the same
JP2010133084A (en) Method of constructing hollow high structure
CN112267692A (en) Assembly type building component hoisting comprehensive equipment and construction method thereof
CN214996342U (en) Integrated protection channel for stairwell
CN116607426A (en) Arch bridge outsourcing concrete construction platform system and construction method
CN105370027A (en) Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure
CN212176682U (en) Shaped temporary stair with combined operating platform at scissor ladder position
CN215670884U (en) Assembly type building staircase operation platform
JP6590512B2 (en) Staircase temporary scaffolding
CN114961212A (en) Operation platform for reducing critical space height of assembly type staircase and construction method thereof
CN210598244U (en) Movable operation and protection platform for assembled building stairwell
JP2706742B2 (en) Construction method of reinforced concrete stairs, stair handrail precast concrete slab and stair step formwork used for it
KR20010097315A (en) Pier scaffolding and the pier construction method for using pier scaffolding
CN112854702A (en) Large-span silo roof construction platform and erection method
CN105178602A (en) Building construction system
JP2016204983A5 (en)
JP4011722B2 (en) Hanging stairs
JP2874576B2 (en) Moving scaffold for retaining wall construction
CN220434088U (en) Mobile stair steel platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211203