CN107859315A - Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket - Google Patents

Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket Download PDF

Info

Publication number
CN107859315A
CN107859315A CN201711072148.6A CN201711072148A CN107859315A CN 107859315 A CN107859315 A CN 107859315A CN 201711072148 A CN201711072148 A CN 201711072148A CN 107859315 A CN107859315 A CN 107859315A
Authority
CN
China
Prior art keywords
hanging basket
fixedly connected
circular arc
basket body
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711072148.6A
Other languages
Chinese (zh)
Inventor
孙美琪
孙世立
卢立龙
孙健
张艳杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhong Yi Building Engineering Co Ltd
Original Assignee
Beijing Zhong Yi Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhong Yi Building Engineering Co Ltd filed Critical Beijing Zhong Yi Building Engineering Co Ltd
Priority to CN201711072148.6A priority Critical patent/CN107859315A/en
Publication of CN107859315A publication Critical patent/CN107859315A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32—Hoisting devices; Safety devices
    • E04G3/325—Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a kind of circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket, its drip irrigation device be include hanging basket body, be fixedly connected on intrinsic two elevators of hanging basket, be fixedly connected on the intrinsic electric cabinet of hanging basket, located at top of building and for hanging basket body suspension arrangement and the steel wire rope between suspension arrangement and hanging basket body;Steel wire rope upper end is connected with suspension arrangement, and lower end is connected with elevator, and hanging basket body is in circular arc frame-shaped, and its radian is adapted to circular wall body phase;Electric cabinet control elevator climbs upwards along steel wire rope, drives hanging basket body to move upwards.The hanging basket of hanging basket and annular using circular arc frame-shaped can be preferably with building circular wall be bonded, be more convenient to construction of the worker to circular wall on hanging basket, it is more safe.

Description

Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket
Technical field
The present invention relates to a kind of work high above the ground building machinery, more particularly to a kind of circular arc hanging basket and with circular arc hanging basket The annular hanging basket being spliced.
Background technology
Hanging basket is the building machinery of architectural engineering work high above the ground.Hanging basket is that one kind can substitute traditional scaffold, can be mitigated Labor intensity, improve operating efficiency, and the new high-rise working equipment reused.The use of building hanging basket has been increasingly becoming A kind of trend, external wall construction, curtain wall installation, heat preservation construction and maintenance cleaning exterior wall in skyscraper etc., which is higher by operation, to be obtained It is widely recognized as, while available for the operation of the engineerings such as large tank, bridge and dam.
As shown in figure 1, the overall rectangular shapes of existing hanging basket Q, when hanging basket Q is used for the wall construction of rotunda 7, square The hanging basket Q of shape can not be adapted to well with circular wall, in addition to hanging basket Q relatively presses close to wall except center section, both ends with Space existing for wall can be very big, and when work high above the ground, wind easily pours into hanging basket Q from this space, influences hanging basket Q stabilization.
The content of the invention
It is an object of the present invention to provide a kind of circular arc hanging basket, can be pasted well with the circular wall of building Close, the preferably construction for circular wall.
It is a further object to provide a kind of annular hanging basket, is spliced by foregoing circular arc hanging basket, energy Enough increase the working space of worker so that worker easily can construct to whole circular wall.
The present invention above-mentioned technical purpose technical scheme is that:A kind of circular arc hanging basket, including Hanging basket body, it is fixedly connected on intrinsic two elevators of hanging basket, is fixedly connected on the intrinsic electric cabinet of hanging basket, located at building Build at the top of thing and be used for the suspension arrangement of hanging basket body and the steel wire rope between suspension arrangement and hanging basket body; Steel wire rope one end is connected with suspension arrangement, and the other end is connected with elevator, and hanging basket body is in integrally circular arc frame-shaped, its arc Spend and be adapted with the wall of circle;Electric cabinet control elevator climbs upwards along steel wire rope, drives hanging basket body to move upwards.
By using above-mentioned technical proposal, elevator is controlled by electric cabinet, elevator climbs upwards along steel wire rope, Hanging basket body is driven to move upwards, the hanging basket of circular arc frame-shaped preferably can be bonded with circular wall, more convenient and work Construction of the people on hanging basket to circular wall;In addition during work high above the ground, wind-force is larger, compared to the hanging basket of progress, circular arc Gap between hanging basket and wall is smaller, reduces pouring into for wind so that hanging basket is not easy to rock, more safe.
Preferably, hanging basket body includes curved plate, vertical two divider frames for being fixed in curved plate rear and front end, consolidated Surely it is connected between two divider frames and is located at the sill of the circular arc of curved plate upper surface, is fixedly connected on two guardrails The middle cross beam of circular arc between frame and above the sill and it is fixedly connected between two divider frames and is located at middle horizontal stroke The entablature of circular arc above beam;Sill, middle cross beam and entablature are respectively positioned in same arc surface, and are arranged in arcuate bottom Plate both sides.
By using above-mentioned technical proposal, hanging basket is in integrally the frame structure of circular arc, before its structural strength is ensured Put, the contact area of hanging basket and wind is small, is more beneficial for work high above the ground.
Preferably, protection network is fixedly connected between sill and middle cross beam, protection network is symmetrical in the both sides of curved plate Set.
By using above-mentioned technical proposal, it can prevent the pin of people from being skidded off from hanging basket bottom, so as to be stuck in sill and arc Between shape bottom plate.
Preferably, multiple X-type support bars are fixedly connected between middle cross beam and entablature, between adjacent X-type support bar It is connected with each other;The elevator is respectively fixedly connected with two divider frames, and the electric cabinet is fixedly connected in hanging basket body On X-type support bar on side away from wall.
By using above-mentioned technical proposal, the structural strength of hanging basket body can be strengthened;And elevator is located at hanging basket body Both sides, balance when can keep the hanging basket to rise.
Preferably, it is respectively equipped with a universal wheel on four angles of curved plate lower surface.
By using above-mentioned technical proposal, facilitate the movement of hanging basket body on the ground.
Preferably, suspension arrangement is set to two, and it includes being fixedly connected on top of building and at its top edge The first fixed mount, be fixedly connected on top of building and away from the second fixed mount at its top edge and be fixedly connected Inclined cross bar above the first fixed mount and the second fixed mount;First fixed mount and the second fixed mount are arranged in parallel, cross bar Arranged along the radial direction of the circular top of building, and cross bar and divider frame be located in same perpendicular, its rear end and the Two fixed mounts are affixed, and building is stretched out in front end, and the height of the rear end of cross bar is less than the height of its front end;The steel wire rope upper end with The front end connection of cross bar, lower end is connected with elevator, and steel wire rope lower end pass through the incoming line of elevator after be located at elevator Lower section.
By using above-mentioned technical proposal, the cross bar being in tilted layout is fixed by the first fixed mount of front and rear distribution, second Frame is fixed at the top of building, enhances the stability of suspension arrangement and the support performance to hanging basket.
Preferably, divider frame upper surface is fixedly connected with guide device, including is fixedly connected on the branch of divider frame upper surface Support seat and two parallel guide reels being rotationally connected with support base, the axis of guide reel are vertical with divider frame;Two are drawn Formed with gap between deflector roll, steel wire rope lower end passes through the incoming line for entering elevator behind the gap, and steel wire rope is built with close Build the periphery CONTACT WITH FRICTION of the guide reel of the wall of thing.
By using above-mentioned technical proposal, when elevator drives hanging basket body to be climbed upwards along steel wire rope, steel wire rope with Close to the periphery CONTACT WITH FRICTION of the guide reel of the wall of building so that steel wire rope produces tensile force at guide reel, more has Beneficial to climbing for elevator.
Preferably, the first fixed mount also includes the guider below cross bar, and guider includes being located under cross bar The guide rod and pulley of side, one end of guide rod are fixedly connected on the first fixed mount, and the other end is connected with pulley and stretched out and builds Build beyond the region of objective existence;The distance between pulley and the first fixed mount are less than the distance between front end and first fixed mount of cross bar, steel wire rope Upper end is connected after bypassing pulley with the front end of cross bar, and part of the steel wire rope between pulley and guide reel forms one with vertical direction The angle of individual acute angle 10-15 degree.
By using above-mentioned technical proposal, the steel wire rope being in tilted layout can produce a horizontal component perpendicular to wall, This horizontal component can be put on wall by elastic anti-shaking device, while elastic anti-shaking device will be hung with certain support force Basket body is supported on wall, it is therefore prevented that the front and rear of hanging basket body rocks.
Preferably, circular arc hanging basket also includes elastic anti-shaking device, and elastic anti-shaking device is with hanging basket body close to wall Side is fixedly connected;Elastic anti-shaking device includes the horizontal cylinder on the side for the close wall for being fixedly connected on hanging basket body Support shaft, two sleeves being sheathed on cylindrical support axle, be in tilted layout two of one end and one of sleeve connection tiltedly Bar, the fixed seat located at the brace other end and the wall for being vertically directed wheel, directive wheel and building with fixed seat rotation connection Body CONTACT WITH FRICTION;Cylindrical support axle position is arranged symmetrically in the middle part of hanging basket body, two sleeves along in the middle part of cylindrical support axle, tiltedly Bar one end is articulated with sleeve outer peripheral face, and the other end is articulated with fixed seat side, and two braces and cylindrical support axle are located at two Part between sleeve forms an isosceles triangle;
At the middle part of cylindrical support axle, offered along the length direction of cylindrical support axle and slide vertically groove, sliding groove is by cylinder branch Axle up/down perforation is supportted, and the length of sliding groove is less than the length of cylindrical support axle;On sleeve radially direction offer it is perpendicular Straight through hole, through hole are located at sleeve medium position and are connected with sliding groove, and the diameter of through hole is identical with the groove width of sliding groove;Set Gag lever post is fixedly connected with cylinder, gag lever post is each passed through through hole and sliding groove and the upper and lower surface of its both ends and sleeve is fixed and connected Connect;
Horizontal cylindrical bar is respectively fixedly connected with the inside of two braces, the axis of two cylindrical bars is located on the same line, And the diameter parallel with cylindrical support axle;Spring is provided between brace, both ends of the spring is sheathed on two cylindrical bars respectively, and It is fixedly connected with two cylindrical bars.
By using above-mentioned technical proposal, elevator is controlled by electric cabinet, elevator climbs upwards along steel wire rope, band Dynamic hanging basket body moves upwards.The steel wire rope being in tilted layout can produce a horizontal component perpendicular to wall, this level point Power is put on wall by directive wheel, and wall can produce a reaction force to directive wheel, and directive wheel is by support base to oblique Bar produces pressure, and the brace of compression forces two end motions of the sleeve simultaneously to support shaft;The angle that now two braces are formed becomes Greatly, spring is stretched, and the distance between hanging basket body and wall diminish, and directive wheel is supported hanging basket body with certain support force In on wall, it is therefore prevented that hanging basket body moves forward and backward.
During hanging basket body is close to wall, spring produces a resistance between two braces so that hanging basket delays Slow close wall, rather than quickly close wall, add the stability of hanging basket body so that stand intrinsic in hanging basket People is more safe.There is frictional force between directive wheel and wall simultaneously, which increases the friction between hanging basket body and wall Power so that hanging basket body is not easy double swerve.
Preferably, the lateral surface of the divider frame of the adjacent hanging basket body mutually abuts, and by bolt through mutually The divider frame of abutting, two adjacent hanging basket bodies are fixed.
By using above-mentioned technical proposal, the hanging basket of annular increases the work area of hanging basket, adds the work of worker Industry space so that worker easily can construct to whole circular wall.
In summary, the invention has the advantages that:
1. the wall that the hanging basket of circular arc can be preferably with circle is bonded, more convenient and worker is on hanging basket to circular wall Construction, it is and safer;
2. elastic anti-shaking device not only solves hanging basket and rocks problem in high aerial, also cause connecing between hanging basket body and wall Touch and become a kind of flexible contact, add stability of the hanging basket during rocking;
3. the hanging basket of annular increases the work area of hanging basket, the working space of worker is added so that worker can be easily Whole circular wall is constructed.
Brief description of the drawings
Fig. 1 is the schematic diagram of the circular wall mates of rectangular hanging basket and building;
Fig. 2 is the schematic diagram of the circular wall mates of circular arc hanging basket and building;
Fig. 3 is the overall structure diagram of circular arc hanging basket;
Fig. 4 is the overall structure diagram of elastic anti-shaking device;
Fig. 5 is the overall structure diagram of annular hanging basket.
In figure, 1, hanging basket body;11st, curved plate;12nd, divider frame;13rd, sill;14th, middle cross beam;15th, entablature; 16th, protection network;17th, X-type support bar;18th, universal wheel;2nd, elevator;21st, incoming line;3rd, electric cabinet;4th, suspension arrangement;41st, One fixed mount;42nd, the second fixed mount;43rd, cross bar;5th, elastic anti-shaking device;51st, sleeve;511st, through hole;52nd, brace;53rd, it is solid Reservation;531st, groove is inserted;532nd, rectangular channel;54th, directive wheel;55th, gag lever post;56th, cylindrical bar;57th, spring;6th, steel wire rope;7、 Building;8th, guide device;81st, support base;82nd, guide reel;9th, guider;91st, guide rod;92nd, pulley;10th, cylinder branch Support axle;101st, sliding groove;Q, hanging basket.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical reference Represent.It should be noted that the word "front", "rear" used below in description, "left", "right", " on ", " under ", " bottom surface " and " top surface " refers to the direction in accompanying drawing, and word " interior " and " outer " are referred respectively to towards or away from particular elements geometric center Direction.
Embodiment 1
A kind of circular arc hanging basket, as shown in Fig. 2 it include hanging basket body 1, the elevator being fixedly connected in hanging basket body 12, Be fixedly connected on electric cabinet 3 in hanging basket body 1, the suspension arrangement 4 above hanging basket and for hanging basket body 1, with And the elastic anti-shaking device 5 on hanging basket body 1.Steel wire rope 6, steel wire rope are provided between suspension arrangement 4 and hanging basket body 1 6 upper ends are connected with suspension arrangement 4, and lower end is connected with elevator 2, and elevator 2 is controlled by electric cabinet 3, elevator 2 along Steel wire rope 6 climbs upwards, drives hanging basket body 1 to move upwards, elastic anti-shaking device 5 is by one end after the extruding of hanging basket body 1 Contacted with the wall of building 7, add the frictional force between hanging basket body 1 and wall so that hanging basket body 1 is not susceptible to shake It is dynamic.
With reference to Fig. 3, it is in circular arc frame-shaped that hanging basket body 1 is overall, and its radian is adapted to the circular wall body phase of building 7.Hang Basket body 1 includes curved plate 11, is vertically fixed in two divider frames 12 of the rear and front end of curved plate 11, is fixedly connected on two Sill 13 between individual divider frame 12, it is fixedly connected between two divider frames 12 and positioned at the middle cross beam of the top of sill 13 14 and it is fixedly connected between two divider frames 12 and positioned at the entablature 15 of the top of middle cross beam 14.The arc of curved plate 11 Degree is adapted to circular wall body phase, and sill 13, middle cross beam 14 and entablature 15 are arcuation, and the radian and curved plate 11 Radian be adapted, and sill 13, middle cross beam 14 and entablature 15 are all located in same arc surface, located at curved plate 11 both sides, so as to constitute the arc guardrail of the both sides of hanging basket body 1;Sill 13 is fixedly connected on the upper surface of curved plate 11, Protection network 16 is fixedly connected between sill 13 and middle cross beam 14, protection network 16 is symmetrical arranged in the both sides of curved plate 11, It can prevent the pin of people from skidding off, so as to be stuck between sill 13 and curved plate 11;Between middle cross beam 14 and entablature 15 Multiple X-type support bars 17 are fixedly connected with, is connected with each other between adjacent X-type support bar 17, the structure of hanging basket body 1 can be strengthened Intensity.
And a universal wheel 18 is respectively equipped with four angles of the lower section of curved plate 11, facilitates hanging basket body 1 to exist Motion on ground.
Elevator 2 is set to two, in hanging basket body 1, is respectively fixedly connected with two divider frames 12.Electric cabinet 3 The side away from wall in hanging basket body 1 is arranged in, is fixedly connected on X-type support bar 17, facilitates the operation of operating personnel.
Suspension arrangement 4 is at the top of building 7, totally two.Suspension arrangement 4 include being fixedly connected on the top of building 7 and The first fixed mount 41 at its top edge, it is fixedly connected on the top of building 7 and second solid away from its top edge Determine frame 42 and be fixedly connected on the first fixed mount 41 and the cross bar 43 of the top of the second fixed mount 42.First fixed mount 41 and Two fixed mounts 42 are arranged parallel to, the radial direction arrangement of circular top of the cross bar 43 along building 7, and cross bar 43 and guardrail Frame 12 is located in same perpendicular, and its rear end is connected with the second fixed mount 42, and building 7 is stretched out in front end;And cross bar 43 inclines Tiltedly arrangement, the height of the rear end of cross bar 43 are less than the height of its front end.The upper end of steel wire rope 6 is connected with the front end of cross bar 43, lower end Be connected with elevator 2, and the lower end of steel wire rope 6 through after the incoming line 21 of elevator 2 positioned at the lower section of elevator 2.
Guide device 8 is fixedly connected with the upper end of divider frame 12, guide device 8 is located at the top of elevator 2, can lifted Guiding function is played the top of machine 2 to steel wire rope 6.
Guide device 8 includes being fixedly connected on the support base 81 of the upper surface of divider frame 12 and is rotationally connected with support The guide reel 82 of two parallel arrangements on seat 81, the axis of guide reel 82 are vertical with divider frame 12.Between two guide reels 82 Formed with gap, the lower end of steel wire rope 6 passes through the incoming line 21 for entering elevator 2 behind the gap, steel wire rope 6 with close to building The periphery CONTACT WITH FRICTION of the guide reel 82 of 7 wall.When elevator 2 drives hanging basket body 1 to be climbed upwards along steel wire rope 6, The periphery CONTACT WITH FRICTION of steel wire rope 6 and the guide reel 82 of the wall close to building 7 so that steel wire rope 6 is at guide reel 82 Tensile force is produced, is more beneficial for climbing for elevator 2.
Position on the first fixed mount 41 below cross bar 43 is provided with guider 9, and guider 9 includes being oriented to Bar 91 and pulley 92, guide rod 91 are located at the lower section of cross bar 43, and the one end of guide rod 91 is connected with the first fixed mount 41, the other end and cunning The connection of wheel 92, and stretch out outside building 7.The distance between fixed mount 41 of pulley 92 and first is less than the front end and first of cross bar 43 The distance between fixed mount 41, the upper end of steel wire rope 6 are connected after bypassing pulley 92 with the front end of cross bar 43 so that steel wire rope 6 is in cunning With vertical direction shape in an angle, the angle is preferably 10-15 degree for part between wheel 92 and guide reel 82.
Hanging basket body 1 is during upward motion, and due to being work high above the ground, suffered wind-force is larger, easily shakes, Therefore flexible anti-shaking device 5 is set between hanging basket body 1 and wall.
With reference to Fig. 4, horizontal cylindrical support axle 10 is fixedly connected with the side of the close wall of hanging basket body 1, circle Post support shaft 10 is located at the middle part of hanging basket body 1.Elastic anti-shaking device 5 includes sleeve 51, brace 52, cube-shaped fixed seat 53 and directive wheel 54, sleeve 51 be arranged to two, be sheathed on cylindrical support axle 10, two sleeves 51 are along cylindrical support axle 10 Middle part be arranged symmetrically;Brace 52 is arranged to two, is located in the same horizontal plane, and brace 52 is respectively arranged on one of sleeve 51 Between fixed seat 53, the part between two sleeves 51 of two braces 52 and cylindrical support axle 10 forms an isosceles Triangle;The one end of brace 52 is articulated with the outer peripheral face of sleeve 51, and the other end is articulated with the side of fixed seat 53,53 two sides of fixed seat All offer and insert groove 531, the end of brace 52 is be hinged with the formation of fixed seat 53 in groove 531 positioned at inserting.
Vertical rectangular channel 532 is offered on the face of wall in fixed seat 53, rectangular channel 532 is located at fixed seat 53 Medium position, directive wheel 54 are rotatablely connected in rectangular channel 532 and with fixed seat 53 vertically, and directive wheel 54 connects with wall friction Touch, and the setting direction of directive wheel 54 is moved for permission directive wheel 54 along wall in the vertical direction.
Offered on cylindrical support axle 10 along the length direction of cylindrical support axle 10 and slide vertically groove 101, sliding groove 101 It is less than cylinder branch positioned at the medium position of cylindrical support axle 10, and by the up/down perforation of cylindrical support axle 10, the length of sliding groove 101 Support the length of axle 10;Radially direction offers vertical through hole 511 on sleeve 51, and through hole 511 is located in sleeve 51 Portion, and through hole 511 is connected with sliding groove 101, and the diameter of through hole 511 is identical with the groove width of sliding groove 101.It is solid on sleeve 51 Surely gag lever post 55 is connected with, gag lever post 55 is each passed through through hole 511 and sliding groove 101, and the both ends of gag lever post 55 and sleeve 51 Upper and lower surface is fixedly connected, and gag lever post 55 is to be slidably connected with sliding groove 101.So gag lever post 55 can prevent sleeve 51 around circle Post support shaft 10 rotates so that sleeve 51 can only slide along sliding groove 101.
Horizontal cylindrical bar 56 is respectively fixedly connected with two inner sides of brace 52, cylindrical bar 56 is located at the middle position of brace Put, and the axis of two cylindrical bars 56 is located on the same line, the diameter parallel with cylindrical support axle 10;Between brace 52 Provided with spring 57, the both ends of spring 57 are sheathed on two cylindrical bars 56 respectively, and are fixedly connected with two cylindrical bars 56.
During specific works, elevator 2 is controlled by electric cabinet 3, elevator 2 climbs upwards along steel wire rope 6, drives hanging basket Body 1 moves upwards.The steel wire rope 6 being in tilted layout can produce a horizontal component perpendicular to wall, and this horizontal component leads to Cross directive wheel 54 to put on wall, wall can produce a reaction force to directive wheel 54, and directive wheel 54 passes through support base 81 Pressure is produced to brace 52, the brace 52 of compression forces two sleeves 51 simultaneously to the 10 liang of end motions of cylindrical support axle;Now two The angle that individual brace 52 is formed becomes big, and spring 57 is stretched, and the distance between hanging basket body 1 and wall diminish, directive wheel 54 with Hanging basket body 1 is supported on wall by certain support force, it is therefore prevented that the front and rear of hanging basket body 1 rocks.
During hanging basket body 1 is close to wall, spring 57 produces a resistance between two braces 52 so that hangs Basket is slowly close to wall, rather than quickly close wall, adds the stability of hanging basket body 1 so that stand in hanging basket sheet People in body 1 is more safe.There is frictional force between directive wheel 54 and wall simultaneously, which increases hanging basket body 1 and wall Between frictional force so that hanging basket body 1 is not easy double swerve.
When two sleeves 51 move to the both ends of sliding groove 101, gag lever post 55 abuts with the both ends of sliding groove 101, sleeve 51 stop motions.Therefore the length of sliding groove 101 needs to be limited, it is impossible to which oversize, otherwise the elongation of spring 57 is long so that bullet After spring 57 exceeds its elastic limit, spring 57 can fail.
When hanging basket is located at ground, spring 57 is dismantled, and gag lever post 55 is taken out, now whole elastic anti-shaking device 5 It can rotate down, very easily can pack up elastic anti-shaking device 5 around cylindrical support axle 10.
Embodiment 2
A kind of annular hanging basket, as shown in figure 5, be mutually spliced by multiple circular arc hanging baskets, the guardrail of adjacent hanging basket body 1 The lateral surface of frame 12 mutually abuts, and passes through two divider frames 12 mutually abutted by bolt, by two adjacent hanging basket sheets Body 1 is fixed so that the hanging basket body 1 of multiple circular arcs forms an annular hanging basket body 1.
Quantity for forming annular hanging basket depends on the radian of the hanging basket body 1, hanging basket body 1 in the present embodiment Radian be 90 degree, therefore the quantity of hanging basket body 1 is preferably four.
The hanging basket of this annular increases the work area of hanging basket, improves the working space of worker so that Gong Renke Easily to be constructed to whole circular wall.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (10)

  1. A kind of 1. circular arc hanging basket, it is characterised in that:Including hanging basket body(1), be fixedly connected on hanging basket body(1)Interior two Elevator(2), be fixedly connected on hanging basket body(1)Interior electric cabinet(3), located at building(7)Top and it is used for hanging basket Body(1)Suspension arrangement(4)And located at suspension arrangement(4)With hanging basket body(1)Between steel wire rope(6);Steel wire rope (6)Upper end and suspension arrangement(4)It is connected, lower end and elevator(2)It is connected, hanging basket body(1)In circular arc frame-shaped, its arc Degree and building(7)Circular wall body phase adaptation;Electric cabinet(3)Control elevator(2)Along steel wire rope(6)Climb upwards, band Dynamic hanging basket body(1)Motion upwards.
  2. A kind of 2. circular arc hanging basket according to claim 1, it is characterised in that:Hanging basket body(1)Including curved plate (11), be vertically fixed in curved plate(11)Two divider frames of rear and front end(12), be fixedly connected on two divider frames(12) Between and be located at curved plate(11)The sill of the circular arc of upper surface(13), be fixedly connected on two divider frames(12)Between And it is located at sill(13)The middle cross beam of the circular arc of top(14)And it is fixedly connected on two divider frames(12)Between and position In middle cross beam(14)The entablature of the circular arc of top(15);Sill(13), middle cross beam(14)And entablature(15)It is respectively positioned on In same arc surface, and it is arranged in curved plate(11)Both sides.
  3. A kind of 3. circular arc hanging basket according to claim 2, it is characterised in that:Sill(13)And middle cross beam(14)Between It is fixedly connected with protection network(16), protection network(16)In curved plate(11)Both sides are symmetrical arranged.
  4. A kind of 4. circular arc hanging basket according to claim 3, it is characterised in that:Middle cross beam(14)With entablature(15)Between It is fixedly connected with multiple X-type support bars(17), adjacent X-type support bar(17)Between be connected with each other;The elevator(2)Respectively It is fixedly connected on two divider frames(12)On, the electric cabinet(3)It is fixedly connected on hanging basket body(1)The side of interior remote wall X-type support bar(17)On.
  5. A kind of 5. circular arc hanging basket according to claim 4, it is characterised in that:Curved plate(11)Four angles of lower surface On be respectively equipped with a universal wheel(18).
  6. A kind of 6. circular arc hanging basket according to claim 5, it is characterised in that:Suspension arrangement(4)Two are set to, it includes It is fixedly connected on building(7)Top and the first fixed mount at its top edge(41), be fixedly connected on building(7) The second fixed mount at top and its remote top edge(42)And it is fixedly connected on the first fixed mount(41)Fixed with second Frame(42)The inclined cross bar of top(43);First fixed mount(41)With the second fixed mount(42)Parallel arrangement, cross bar(43)Edge Building(7)Circular top radial direction arrangement, and cross bar(43)With divider frame(12)It is horizontal in same perpendicular Bar(43)Rear end and the second fixed mount(42)Affixed, building is stretched out in front end(7), cross bar(43)Rear end height be less than its before The height at end;The steel wire rope(6)Upper end and cross bar(43)Front end connection, lower end and elevator(2)Connection, and steel wire rope (6)Lower end passes through elevator(2)Incoming line(21)It is located at elevator afterwards(2)Lower section.
  7. A kind of 7. circular arc hanging basket according to claim 6, it is characterised in that:Divider frame(12)Upper surface is fixedly connected with Guide device(8), guide device(8)Including being fixedly connected on divider frame(12)The support base of upper surface(81)And the company of rotation It is connected to support base(81)On two parallel guide reels(82), guide reel(82)Axis and divider frame(12)Vertically;Two Guide reel(82)Between formed with gap, steel wire rope(6)Lower end enters elevator after passing through the gap(2)Incoming line (21), steel wire rope(6)With close building(7)Wall guide reel(82)Periphery CONTACT WITH FRICTION.
  8. A kind of 8. circular arc hanging basket according to claim 7, it is characterised in that:First fixed mount(41)Also include located at horizontal stroke Bar(43)The guider of lower section(9), guider(9)Including positioned at cross bar(43)The guide rod of lower section(91)And pulley (92), guide rod(91)One end be fixedly connected on the first fixed mount(41)On, the other end is connected with pulley(92)And stretch out and build Build thing(7)Outside;Pulley(92)With the first fixed mount(41)The distance between be less than cross bar(43)Front end and the first fixed mount (41)The distance between, steel wire rope(6)Upper end bypasses pulley(92)Afterwards with cross bar(43)Front end connection, steel wire rope(6)In cunning Wheel(92)With guide reel(82)Between part and vertical direction formed an acute angle.
  9. 9. according to a kind of any described circular arc hanging baskets of claim 1-8, it is characterised in that:Circular arc hanging basket also includes elasticity Anti-shaking device(5), elastic anti-shaking device(5)With hanging basket body(1)The side of close wall be fixedly connected;Elastic anti-shaking device (5)Including being fixedly connected on hanging basket body(1)Close wall side on horizontal cylindrical support axle(10), be sheathed on circle Post support shaft(10)On two sleeves(51), one end and one of sleeve(51)Two braces for connecting and being in tilted layout (52), located at the brace(52)The fixed seat of the other end(53)And and fixed seat(53)Rotation connection is vertically directed wheel (54), directive wheel(54)With building(7)Wall CONTACT WITH FRICTION;Cylindrical support axle(10)Positioned at hanging basket body(1)Middle part, Two sleeves(51)Along cylindrical support axle(10)Middle part be arranged symmetrically, brace(52)One end is articulated with sleeve(51)Outer peripheral face, The other end is articulated with fixed seat(53)Side, two braces(52)With cylindrical support axle(10)Be located at two sleeves(51)Between Part form an isosceles triangle;
    In cylindrical support axle(10)Middle part, along cylindrical support axle(10)Length direction offer and slide vertically groove(101), it is sliding Dynamic groove(101)By cylindrical support axle(10)Up/down perforation, and sliding groove(101)Length be less than cylindrical support axle(10)Length Degree;Sleeve(51)On radially direction offer vertical through hole(511), through hole(511)Positioned at sleeve(51)Medium position And and sliding groove(101)It is connected, through hole(511)Diameter and sliding groove(101)Groove width it is identical;Sleeve(51)Upper fixation is even It is connected to gag lever post(55), gag lever post(55)It is each passed through through hole(511)And sliding groove(101)And its both ends and sleeve(51)It is upper Lower surface is fixedly connected;
    Two braces(52)Inner side is respectively fixedly connected with horizontal cylindrical bar(56), two cylindrical bars(56)Axis positioned at same On straight line, and with cylindrical support axle(10)Diameter parallel;Brace(52)Between be provided with spring(57), spring(57)Two End is sheathed on two cylindrical bars respectively(56)On, and with two cylindrical bars(56)It is fixedly connected.
  10. 10. a kind of annular hanging basket, mutually it is spliced by multiple circular arc hanging baskets, it is characterised in that:Described circular arc is hung Basket be claim 1 or 9 described in circular arc hanging basket, the adjacent hanging basket body(1)Divider frame(12)Lateral surface phase Mutually abut, and the divider frame mutually abutted is passed through by bolt(12), by two adjacent hanging basket bodies(1)It is fixed.
CN201711072148.6A 2017-11-03 2017-11-03 Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket Pending CN107859315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711072148.6A CN107859315A (en) 2017-11-03 2017-11-03 Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711072148.6A CN107859315A (en) 2017-11-03 2017-11-03 Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket

Publications (1)

Publication Number Publication Date
CN107859315A true CN107859315A (en) 2018-03-30

Family

ID=61700759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711072148.6A Pending CN107859315A (en) 2017-11-03 2017-11-03 Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket

Country Status (1)

Country Link
CN (1) CN107859315A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108640055A (en) * 2018-05-18 2018-10-12 云南电网有限责任公司电力科学研究院 A kind of dress device for hoisting for sharing equipment applied to electric power tower
CN108708544A (en) * 2018-05-30 2018-10-26 田锋刚 A kind of intelligentized multi-use architecture construction hanging basket
CN109231025A (en) * 2018-09-20 2019-01-18 鸿厦建设有限公司 A kind of external wall aerial work platform
CN109267740A (en) * 2018-10-30 2019-01-25 北京市机械施工有限公司 Huge column modular is tilted from lifting operation platform
CN109707147A (en) * 2018-12-10 2019-05-03 筑梦高科建筑有限公司 Exterior wall carrying platform
CN109736625A (en) * 2019-03-01 2019-05-10 中国二十二冶集团有限公司 The bracing means and reinforcement means of tall and big concrete chimney outer tube wall
CN111648596A (en) * 2020-05-07 2020-09-11 五冶集团上海有限公司 Device and method for using outer platform of shallow circular bin slip form as outer wall coating construction platform
CN112012465A (en) * 2020-07-20 2020-12-01 中建三局集团有限公司 Integral hanging basket for decorating outer vertical surface of squat silo and construction method
CN113107179A (en) * 2021-04-23 2021-07-13 湖南汉坤实业有限公司 Hanging basket clamping device
CN113914620A (en) * 2021-11-11 2022-01-11 防城港中一重工有限公司 Method for integrally landing silo sliding-form platform
CN114249254A (en) * 2021-12-29 2022-03-29 中建海峡建设发展有限公司 Construction platform with protective structure for super high-rise construction
CN114775990A (en) * 2022-05-26 2022-07-22 广州城市职业学院 Safe type is external work platform for assembly type structure
CN115075539A (en) * 2022-07-07 2022-09-20 中建二局第三建筑工程有限公司 Hanging basket system suitable for building local convex structure
CN115288408A (en) * 2022-07-29 2022-11-04 江汉大学 Construction platform and construction method for blasting demolition of tall cylindrical structures
CN116892174A (en) * 2023-07-11 2023-10-17 中铁建大桥工程局集团第六工程有限公司 A bridge pier top fence installation equipment and method
CN117703047A (en) * 2023-11-27 2024-03-15 中海建筑有限公司 Wall-riding type hanging basket mechanism
CN117888705A (en) * 2023-02-21 2024-04-16 李亚飞 A construction platform
CN119352744A (en) * 2024-12-13 2025-01-24 中国一冶集团有限公司 A shallow round silo roof movable hanging basket system and its operation method
CN120518021A (en) * 2025-04-30 2025-08-22 中交第二航务工程局有限公司 A soft and hard connection structure suitable for a cable tower aerial work platform and its use method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201593299U (en) * 2009-12-08 2010-09-29 无锡华科机械设备有限公司 Hanging basket for construction engineering
CA2774002A1 (en) * 2011-06-14 2012-12-14 Haverfield International Incorporated Helicopter emplaceable cart for travel along electrical power lines
CN204311720U (en) * 2014-11-18 2015-05-06 中国建筑第四工程局有限公司 High-lift operation hanging cradle
CN204571259U (en) * 2015-04-30 2015-08-19 中国大唐集团新能源股份有限公司 A kind of annular inspection platform being applicable to blower fan tower barrel maintenance
CN205151692U (en) * 2015-11-12 2016-04-13 张澳 Hanging flower basket with self -interacting universal wheel
CN106989135A (en) * 2017-05-23 2017-07-28 江苏好运鸽机械有限公司 A kind of loom framework damping device
CN207469709U (en) * 2017-11-03 2018-06-08 北京中易房建筑工程有限公司 Arc-shaped hanging basket and the circular ring shape hanging basket being spliced with arc-shaped hanging basket

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201593299U (en) * 2009-12-08 2010-09-29 无锡华科机械设备有限公司 Hanging basket for construction engineering
CA2774002A1 (en) * 2011-06-14 2012-12-14 Haverfield International Incorporated Helicopter emplaceable cart for travel along electrical power lines
CN204311720U (en) * 2014-11-18 2015-05-06 中国建筑第四工程局有限公司 High-lift operation hanging cradle
CN204571259U (en) * 2015-04-30 2015-08-19 中国大唐集团新能源股份有限公司 A kind of annular inspection platform being applicable to blower fan tower barrel maintenance
CN205151692U (en) * 2015-11-12 2016-04-13 张澳 Hanging flower basket with self -interacting universal wheel
CN106989135A (en) * 2017-05-23 2017-07-28 江苏好运鸽机械有限公司 A kind of loom framework damping device
CN207469709U (en) * 2017-11-03 2018-06-08 北京中易房建筑工程有限公司 Arc-shaped hanging basket and the circular ring shape hanging basket being spliced with arc-shaped hanging basket

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李士瀛等, 人民交通出版社 *

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108640055A (en) * 2018-05-18 2018-10-12 云南电网有限责任公司电力科学研究院 A kind of dress device for hoisting for sharing equipment applied to electric power tower
CN108708544B (en) * 2018-05-30 2020-08-21 无锡市锡山三建实业有限公司 Intelligent multi-use architecture hanging flower basket for construction
CN108708544A (en) * 2018-05-30 2018-10-26 田锋刚 A kind of intelligentized multi-use architecture construction hanging basket
CN109231025A (en) * 2018-09-20 2019-01-18 鸿厦建设有限公司 A kind of external wall aerial work platform
CN109231025B (en) * 2018-09-20 2023-09-08 鸿厦建设有限公司 Building outer wall aerial working platform
CN109267740A (en) * 2018-10-30 2019-01-25 北京市机械施工有限公司 Huge column modular is tilted from lifting operation platform
CN109707147B (en) * 2018-12-10 2021-04-13 广东博智林机器人有限公司 External wall bearing platform
CN109707147A (en) * 2018-12-10 2019-05-03 筑梦高科建筑有限公司 Exterior wall carrying platform
CN109736625A (en) * 2019-03-01 2019-05-10 中国二十二冶集团有限公司 The bracing means and reinforcement means of tall and big concrete chimney outer tube wall
CN111648596A (en) * 2020-05-07 2020-09-11 五冶集团上海有限公司 Device and method for using outer platform of shallow circular bin slip form as outer wall coating construction platform
CN111648596B (en) * 2020-05-07 2021-12-07 五冶集团上海有限公司 Device and method for using outer platform of shallow circular bin slip form as outer wall coating construction platform
CN112012465A (en) * 2020-07-20 2020-12-01 中建三局集团有限公司 Integral hanging basket for decorating outer vertical surface of squat silo and construction method
CN113107179A (en) * 2021-04-23 2021-07-13 湖南汉坤实业有限公司 Hanging basket clamping device
CN113107179B (en) * 2021-04-23 2022-05-27 湖南汉坤实业有限公司 Hanging basket clamping device
CN113914620A (en) * 2021-11-11 2022-01-11 防城港中一重工有限公司 Method for integrally landing silo sliding-form platform
CN114249254A (en) * 2021-12-29 2022-03-29 中建海峡建设发展有限公司 Construction platform with protective structure for super high-rise construction
CN114775990A (en) * 2022-05-26 2022-07-22 广州城市职业学院 Safe type is external work platform for assembly type structure
CN114775990B (en) * 2022-05-26 2023-08-04 广州城市职业学院 Safety type externally hung operation platform for assembled building
CN115075539A (en) * 2022-07-07 2022-09-20 中建二局第三建筑工程有限公司 Hanging basket system suitable for building local convex structure
CN115288408A (en) * 2022-07-29 2022-11-04 江汉大学 Construction platform and construction method for blasting demolition of tall cylindrical structures
CN117888705A (en) * 2023-02-21 2024-04-16 李亚飞 A construction platform
CN116892174A (en) * 2023-07-11 2023-10-17 中铁建大桥工程局集团第六工程有限公司 A bridge pier top fence installation equipment and method
CN117703047A (en) * 2023-11-27 2024-03-15 中海建筑有限公司 Wall-riding type hanging basket mechanism
CN119352744A (en) * 2024-12-13 2025-01-24 中国一冶集团有限公司 A shallow round silo roof movable hanging basket system and its operation method
CN119352744B (en) * 2024-12-13 2025-10-24 中国一冶集团有限公司 A shallow silo roof movable hanging basket system and its operation method
CN120518021A (en) * 2025-04-30 2025-08-22 中交第二航务工程局有限公司 A soft and hard connection structure suitable for a cable tower aerial work platform and its use method

Similar Documents

Publication Publication Date Title
CN207469711U (en) A kind of construction hanging basket
CN207469709U (en) Arc-shaped hanging basket and the circular ring shape hanging basket being spliced with arc-shaped hanging basket
CN107128853A (en) A kind of inclined suspension type hanging basket
CN207048306U (en) Sliding formwork flexibility platform
CN209837642U (en) Safety hanging basket
CN207974504U (en) Climbing type hanging basket system for tilting decoration of exterior wall construction
CN104577876B (en) Plug-in hanging basket for live working of helicopter
CN204391605U (en) A kind of helicopter live line working plug-in type hanging basket
CN106522097A (en) Self-adaptive cable cranes for extra large space-cross cable face suspension bridge girder erection
CN211573582U (en) Coal mine underground rescue device
CN204531348U (en) Electronic independent-lifting discharging platform
CN206844431U (en) A kind of curtain wall construction support
CN212742234U (en) Aluminum alloy movable cross-bridge type hanging basket frame system
CN214034697U (en) Hanging flower basket for construction
CN203393628U (en) Ground basket device
CN111155754B (en) Automatic elevator shaft jacking platform and using method thereof
CN115075533B (en) But horizontal migration's construction hanging flower basket device
CN207469774U (en) A kind of dust-proof curtain component
CN212105033U (en) Assembled steel construction scaffold for high-rise building
CN109853930A (en) Double mast combination lifting and climbing frame
CN204001821U (en) Mobile lifting ladder
CN210194435U (en) A mobile trolley for transverse prestressing construction of continuous beams
CN114607129A (en) Construction is with superelevation removal scaffold frame
CN218562973U (en) Attached movable concrete guardrail construction operation platform
CN215174860U (en) A high-altitude lamp mounting bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180330

RJ01 Rejection of invention patent application after publication