CN204530492U - A kind of hydraulic climbing mould construction platform - Google Patents

A kind of hydraulic climbing mould construction platform Download PDF

Info

Publication number
CN204530492U
CN204530492U CN201520091953.3U CN201520091953U CN204530492U CN 204530492 U CN204530492 U CN 204530492U CN 201520091953 U CN201520091953 U CN 201520091953U CN 204530492 U CN204530492 U CN 204530492U
Authority
CN
China
Prior art keywords
platform
lift
hydraulic
lift platform
landing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520091953.3U
Other languages
Chinese (zh)
Inventor
张原军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Original Assignee
ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd filed Critical ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Priority to CN201520091953.3U priority Critical patent/CN204530492U/en
Application granted granted Critical
Publication of CN204530492U publication Critical patent/CN204530492U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of hydraulic climbing mould construction platform, comprise annular base, described annular base is equidistantly provided with 4 hydraulic lifts, described hydraulic lift upper end connects the lift platform of ring-type, also build landing platform between described lift platform and annular base, described landing platform has been provided with the ladder connecting ground; Described lift platform is provided with pedestal, described pedestal is horizontally installed with hydraulically extensible bar; One end and the pedestal of described hydraulically extensible bar are fixedly linked, and the other end is provided with template.A kind of hydraulic climbing mould construction platform of the present utility model, carries out platform lifting by hydraulic lift, can control the height be elevated; The dismounting of template is undertaken by horizontal hydraulically extensible bar, makes model sheetinstallat more accurate, and saves manpower.

Description

A kind of hydraulic climbing mould construction platform
technical field:
The utility model relates to a kind of hydraulic climbing mould construction platform.
background technology:
Along with the develop rapidly of traffic and being showing improvement or progress day by day of bridge technology, modern bridge gradually to large span future development, in bridge design more than the bridge pier of hundred meters and the high Sarasota of hundreds of rice no longer rare.At present, bridge pier is built and is mainly adopted over-form construction.The traditional over-form construction method continued to use for a long time has the following disadvantages:
(1) operating platform must utilize and land scaffold or the climbing frame that makes separately and formed, and after pier stud construction reach a certain height, human users is absolutely unsafe, and similar security incident occurs now and then in practice of construction.
(2) handling of template need to rely on crane gear, and crane gear hangs secondary many, and efficiency is low, and model sheetinstallat error is comparatively large simultaneously, rectifies a deviation more difficult, constrains the quality of pier stud construction.
(3) often rising sections all must first with manually connecing high scaffold or promoting climbing frame in pier stud construction, and operating efficiency is low, also increases security risk simultaneously.
(4) wind loading rating is lower, and for ensureing safety, the actual job time will have a greatly reduced quality.
summary of the invention:
The purpose of this utility model is to solve the problems of the prior art, provides a kind of Stability Analysis of Structures, safety factor high, is carried out the high pier over-form construction platform of platform lifting by hydraulic lift.
In order to achieve the above object, the technical solution of the utility model is:
A kind of hydraulic climbing mould construction platform, comprise annular base, described annular base is equidistantly provided with 4 hydraulic lifts, described hydraulic lift upper end connects the lift platform of ring-type, also build landing platform between described lift platform and annular base, described landing platform has been provided with the ladder connecting ground; Described lift platform is provided with pedestal, described pedestal is horizontally installed with hydraulically extensible bar; One end and the pedestal of described hydraulically extensible bar are fixedly linked, and the other end is provided with template.
Lift platform between described pedestal and template is provided with bracing frame, and support frame as described above is connected with hydraulically extensible bar.
The edge of described lift platform is provided with guardrail.
Be provided with the extendable platform of ring-type under described lift platform, extendable platform and described lift platform are fixedly linked; Between described extendable platform and lift platform, staircase is installed.
Described annular base comprises the first base and the second base, and described first base and the second base are fixedly linked by the first connector; Described landing platform comprises the first landing platform and the second landing platform, and described first landing platform and the second landing platform are fixedly linked by the second connector, and described ladder is arranged on described first landing platform; Described lift platform comprises the first lift platform and the second lift platform, and described first lift platform and the second lift platform are fixedly linked by the 3rd connector.
The beneficial effects of the utility model are: a kind of hydraulic climbing mould construction platform of the present utility model, carry out platform lifting by hydraulic lift, can control the height be elevated; The dismounting of template is undertaken by horizontal hydraulically extensible bar, makes model sheetinstallat more accurate, and saves manpower.
accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural representation of annular base.
detailed description of the invention:
Embodiment 1
A kind of hydraulic climbing mould construction platform as Figure 1-3, comprise annular base 1, described annular base 1 is equidistantly provided with 4 hydraulic lifts 2, described hydraulic lift 2 upper end connects the lift platform 3 of ring-type, and lift platform 3 can be elevated by described hydraulic lift 2.Also build landing platform 4 between described lift platform 3 and annular base 1, described landing platform 4 has been provided with the ladder 41 connecting ground; First user climbs up described landing platform 4 by ladder 41, and then enters described lift platform 3 from landing platform 4.The edge of described lift platform 3 is provided with guardrail 8.
Described lift platform 3 is provided with pedestal 31, described pedestal 31 is horizontally installed with hydraulically extensible bar 5; One end and the pedestal 31 of described hydraulically extensible bar 5 are fixedly linked, and the other end are provided with template 6.Lift platform 3 between described pedestal 31 and template 6 is provided with bracing frame 7, and support frame as described above 7 is connected with hydraulically extensible bar 5.User can complete installation and the dismounting of template 6 by manipulation hydraulically extensible bar 5, by with the coordinating of lift platform 3, the pouring of pier stud can be completed from the bottom up.Support frame as described above 7, for supporting described hydraulically extensible bar 5, makes it more firm.
Described lift platform is provided with the extendable platform 9 of ring-type for 3 times, and extendable platform 9 and described lift platform 3 are fixedly linked; Between described extendable platform 9 and lift platform 3, staircase 10 is installed.User can enter in extendable platform 9 by staircase 10, the quality of the pier stud of pouring before can checking in extendable platform 9, also can between hydraulic lift 2 and pier stud mounting and fixing support, increase stability and the wind loading rating of scaffold.
Described annular base 1 comprises the first base 11 and the second base 12, and described first base 11 and the second base 12 are fixedly linked by the first connector 13; Described landing platform 4 comprises the first landing platform 42 and the second landing platform 43, and described first landing platform 42 and the second landing platform 43 are fixedly linked by the second connector 44, and described ladder 41 is arranged on described first landing platform 42; Described lift platform 3 comprises the first lift platform 32 and the second lift platform 33, and described first lift platform 32 and the second lift platform 33 are fixedly linked by the 3rd connector 34.Described annular base 1, landing platform 4 and lift platform 3 are all detachable, when completing high pier and building, and dismountable corresponding connector, thus very easily dismounting transfer is carried out to platform.
A kind of hydraulic climbing mould construction platform of the present embodiment, carries out platform lifting by hydraulic lift, can control the height be elevated; The dismounting of template is undertaken by horizontal hydraulically extensible bar, makes model sheetinstallat more accurate, and saves manpower.

Claims (5)

1. a hydraulic climbing mould construction platform, it is characterized in that: comprise annular base (1), described annular base (1) is equidistantly provided with 4 hydraulic lifts (2), described hydraulic lift (2) upper end connects the lift platform (3) of ring-type, also build landing platform (4) between described lift platform (3) and annular base (1), described landing platform (4) has been provided with the ladder (41) connecting ground; Described lift platform (3) is provided with pedestal (31), described pedestal (31) is horizontally installed with hydraulically extensible bar (5); One end and the pedestal (31) of described hydraulically extensible bar (5) are fixedly linked, and the other end are provided with template (6).
2. a kind of hydraulic climbing mould construction platform according to claim 1, is characterized in that: the lift platform (3) between described pedestal (31) and template (6) is provided with bracing frame (7), and support frame as described above (7) is connected with hydraulically extensible bar (5).
3. a kind of hydraulic climbing mould construction platform according to claim 1, is characterized in that: the edge of described lift platform (3) is provided with guardrail (8).
4. a kind of hydraulic climbing mould construction platform according to claim 1, is characterized in that: the extendable platform (9) being provided with ring-type under described lift platform (3), and described extendable platform (9) and described lift platform (3) are fixedly linked; Staircase (10) is installed between described extendable platform (9) and lift platform (3).
5. a kind of hydraulic climbing mould construction platform according to claim 1, it is characterized in that: described annular base (1) comprises the first base (11) and the second base (12), described first base (11) and the second base (12) are fixedly linked by the first connector (13); Described landing platform (4) comprises the first landing platform (42) and the second landing platform (43), described first landing platform (42) and the second landing platform (43) are fixedly linked by the second connector (44), and described ladder (41) is arranged on described first landing platform (42); Described lift platform (3) comprises the first lift platform (32) and the second lift platform (33), and described first lift platform (32) and the second lift platform (33) are fixedly linked by the 3rd connector (34).
CN201520091953.3U 2015-02-10 2015-02-10 A kind of hydraulic climbing mould construction platform Expired - Fee Related CN204530492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520091953.3U CN204530492U (en) 2015-02-10 2015-02-10 A kind of hydraulic climbing mould construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520091953.3U CN204530492U (en) 2015-02-10 2015-02-10 A kind of hydraulic climbing mould construction platform

Publications (1)

Publication Number Publication Date
CN204530492U true CN204530492U (en) 2015-08-05

Family

ID=53744514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520091953.3U Expired - Fee Related CN204530492U (en) 2015-02-10 2015-02-10 A kind of hydraulic climbing mould construction platform

Country Status (1)

Country Link
CN (1) CN204530492U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331338A (en) * 2018-04-04 2018-07-27 中交第三公路工程局有限公司 A kind of hydraulic climbing formwork device and construction method
CN113356078A (en) * 2021-07-07 2021-09-07 甘肃路桥建设集团有限公司 Bridge pier column reinforcement rack

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331338A (en) * 2018-04-04 2018-07-27 中交第三公路工程局有限公司 A kind of hydraulic climbing formwork device and construction method
CN113356078A (en) * 2021-07-07 2021-09-07 甘肃路桥建设集团有限公司 Bridge pier column reinforcement rack

Similar Documents

Publication Publication Date Title
CN101435276B (en) Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof
CN102359302B (en) UHV long-span iron tower assembly method
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN104695337A (en) Self-lifting sliding and turnover construction system and construction method
CN102996062A (en) Maintenance lifting platform and application method thereof
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN110526153B (en) A jack-assisted pile foundation steel cage lifting structure and construction method thereof
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
MX2021010866A (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith.
CN204530493U (en) A kind of high pier over-form construction platform
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN104895335A (en) Method for mounting hanging pillar
CN204530492U (en) A kind of hydraulic climbing mould construction platform
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN204401995U (en) Encorbelment support system in a kind of center of installing for dome structure
CN204530491U (en) A kind of high pier hydraulic climbing mould construction frame
CN107795185A (en) Chimney reinforces pylon high-altitude installation node security construction method
CN208152583U (en) A kind of high-building construction ancillary equipment
CN111017696A (en) Hoisting method of integrally assembled prefabricated part
CN105239804A (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN202718385U (en) Jack-raising formwork mechanism
CN204530490U (en) A kind of hydraulic climbing mould construction frame
CN205369948U (en) Lifting device for daylighting top is used for installing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

Termination date: 20160210

CF01 Termination of patent right due to non-payment of annual fee