CN204530492U - A kind of hydraulic climbing mould construction platform - Google Patents
A kind of hydraulic climbing mould construction platform Download PDFInfo
- Publication number
- CN204530492U CN204530492U CN201520091953.3U CN201520091953U CN204530492U CN 204530492 U CN204530492 U CN 204530492U CN 201520091953 U CN201520091953 U CN 201520091953U CN 204530492 U CN204530492 U CN 204530492U
- Authority
- CN
- China
- Prior art keywords
- platform
- lift
- hydraulic
- lift platform
- landing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 230000009194 climbing Effects 0.000 title claims abstract description 16
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 18
- 238000005516 engineering process Methods 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of hydraulic climbing mould construction platform, comprise annular base, described annular base is equidistantly provided with 4 hydraulic lifts, described hydraulic lift upper end connects the lift platform of ring-type, also build landing platform between described lift platform and annular base, described landing platform has been provided with the ladder connecting ground; Described lift platform is provided with pedestal, described pedestal is horizontally installed with hydraulically extensible bar; One end and the pedestal of described hydraulically extensible bar are fixedly linked, and the other end is provided with template.A kind of hydraulic climbing mould construction platform of the present utility model, carries out platform lifting by hydraulic lift, can control the height be elevated; The dismounting of template is undertaken by horizontal hydraulically extensible bar, makes model sheetinstallat more accurate, and saves manpower.
Description
technical field:
The utility model relates to a kind of hydraulic climbing mould construction platform.
background technology:
Along with the develop rapidly of traffic and being showing improvement or progress day by day of bridge technology, modern bridge gradually to large span future development, in bridge design more than the bridge pier of hundred meters and the high Sarasota of hundreds of rice no longer rare.At present, bridge pier is built and is mainly adopted over-form construction.The traditional over-form construction method continued to use for a long time has the following disadvantages:
(1) operating platform must utilize and land scaffold or the climbing frame that makes separately and formed, and after pier stud construction reach a certain height, human users is absolutely unsafe, and similar security incident occurs now and then in practice of construction.
(2) handling of template need to rely on crane gear, and crane gear hangs secondary many, and efficiency is low, and model sheetinstallat error is comparatively large simultaneously, rectifies a deviation more difficult, constrains the quality of pier stud construction.
(3) often rising sections all must first with manually connecing high scaffold or promoting climbing frame in pier stud construction, and operating efficiency is low, also increases security risk simultaneously.
(4) wind loading rating is lower, and for ensureing safety, the actual job time will have a greatly reduced quality.
summary of the invention:
The purpose of this utility model is to solve the problems of the prior art, provides a kind of Stability Analysis of Structures, safety factor high, is carried out the high pier over-form construction platform of platform lifting by hydraulic lift.
In order to achieve the above object, the technical solution of the utility model is:
A kind of hydraulic climbing mould construction platform, comprise annular base, described annular base is equidistantly provided with 4 hydraulic lifts, described hydraulic lift upper end connects the lift platform of ring-type, also build landing platform between described lift platform and annular base, described landing platform has been provided with the ladder connecting ground; Described lift platform is provided with pedestal, described pedestal is horizontally installed with hydraulically extensible bar; One end and the pedestal of described hydraulically extensible bar are fixedly linked, and the other end is provided with template.
Lift platform between described pedestal and template is provided with bracing frame, and support frame as described above is connected with hydraulically extensible bar.
The edge of described lift platform is provided with guardrail.
Be provided with the extendable platform of ring-type under described lift platform, extendable platform and described lift platform are fixedly linked; Between described extendable platform and lift platform, staircase is installed.
Described annular base comprises the first base and the second base, and described first base and the second base are fixedly linked by the first connector; Described landing platform comprises the first landing platform and the second landing platform, and described first landing platform and the second landing platform are fixedly linked by the second connector, and described ladder is arranged on described first landing platform; Described lift platform comprises the first lift platform and the second lift platform, and described first lift platform and the second lift platform are fixedly linked by the 3rd connector.
The beneficial effects of the utility model are: a kind of hydraulic climbing mould construction platform of the present utility model, carry out platform lifting by hydraulic lift, can control the height be elevated; The dismounting of template is undertaken by horizontal hydraulically extensible bar, makes model sheetinstallat more accurate, and saves manpower.
accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural representation of annular base.
detailed description of the invention:
Embodiment 1
A kind of hydraulic climbing mould construction platform as Figure 1-3, comprise annular base 1, described annular base 1 is equidistantly provided with 4 hydraulic lifts 2, described hydraulic lift 2 upper end connects the lift platform 3 of ring-type, and lift platform 3 can be elevated by described hydraulic lift 2.Also build landing platform 4 between described lift platform 3 and annular base 1, described landing platform 4 has been provided with the ladder 41 connecting ground; First user climbs up described landing platform 4 by ladder 41, and then enters described lift platform 3 from landing platform 4.The edge of described lift platform 3 is provided with guardrail 8.
Described lift platform 3 is provided with pedestal 31, described pedestal 31 is horizontally installed with hydraulically extensible bar 5; One end and the pedestal 31 of described hydraulically extensible bar 5 are fixedly linked, and the other end are provided with template 6.Lift platform 3 between described pedestal 31 and template 6 is provided with bracing frame 7, and support frame as described above 7 is connected with hydraulically extensible bar 5.User can complete installation and the dismounting of template 6 by manipulation hydraulically extensible bar 5, by with the coordinating of lift platform 3, the pouring of pier stud can be completed from the bottom up.Support frame as described above 7, for supporting described hydraulically extensible bar 5, makes it more firm.
Described lift platform is provided with the extendable platform 9 of ring-type for 3 times, and extendable platform 9 and described lift platform 3 are fixedly linked; Between described extendable platform 9 and lift platform 3, staircase 10 is installed.User can enter in extendable platform 9 by staircase 10, the quality of the pier stud of pouring before can checking in extendable platform 9, also can between hydraulic lift 2 and pier stud mounting and fixing support, increase stability and the wind loading rating of scaffold.
Described annular base 1 comprises the first base 11 and the second base 12, and described first base 11 and the second base 12 are fixedly linked by the first connector 13; Described landing platform 4 comprises the first landing platform 42 and the second landing platform 43, and described first landing platform 42 and the second landing platform 43 are fixedly linked by the second connector 44, and described ladder 41 is arranged on described first landing platform 42; Described lift platform 3 comprises the first lift platform 32 and the second lift platform 33, and described first lift platform 32 and the second lift platform 33 are fixedly linked by the 3rd connector 34.Described annular base 1, landing platform 4 and lift platform 3 are all detachable, when completing high pier and building, and dismountable corresponding connector, thus very easily dismounting transfer is carried out to platform.
A kind of hydraulic climbing mould construction platform of the present embodiment, carries out platform lifting by hydraulic lift, can control the height be elevated; The dismounting of template is undertaken by horizontal hydraulically extensible bar, makes model sheetinstallat more accurate, and saves manpower.
Claims (5)
1. a hydraulic climbing mould construction platform, it is characterized in that: comprise annular base (1), described annular base (1) is equidistantly provided with 4 hydraulic lifts (2), described hydraulic lift (2) upper end connects the lift platform (3) of ring-type, also build landing platform (4) between described lift platform (3) and annular base (1), described landing platform (4) has been provided with the ladder (41) connecting ground; Described lift platform (3) is provided with pedestal (31), described pedestal (31) is horizontally installed with hydraulically extensible bar (5); One end and the pedestal (31) of described hydraulically extensible bar (5) are fixedly linked, and the other end are provided with template (6).
2. a kind of hydraulic climbing mould construction platform according to claim 1, is characterized in that: the lift platform (3) between described pedestal (31) and template (6) is provided with bracing frame (7), and support frame as described above (7) is connected with hydraulically extensible bar (5).
3. a kind of hydraulic climbing mould construction platform according to claim 1, is characterized in that: the edge of described lift platform (3) is provided with guardrail (8).
4. a kind of hydraulic climbing mould construction platform according to claim 1, is characterized in that: the extendable platform (9) being provided with ring-type under described lift platform (3), and described extendable platform (9) and described lift platform (3) are fixedly linked; Staircase (10) is installed between described extendable platform (9) and lift platform (3).
5. a kind of hydraulic climbing mould construction platform according to claim 1, it is characterized in that: described annular base (1) comprises the first base (11) and the second base (12), described first base (11) and the second base (12) are fixedly linked by the first connector (13); Described landing platform (4) comprises the first landing platform (42) and the second landing platform (43), described first landing platform (42) and the second landing platform (43) are fixedly linked by the second connector (44), and described ladder (41) is arranged on described first landing platform (42); Described lift platform (3) comprises the first lift platform (32) and the second lift platform (33), and described first lift platform (32) and the second lift platform (33) are fixedly linked by the 3rd connector (34).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520091953.3U CN204530492U (en) | 2015-02-10 | 2015-02-10 | A kind of hydraulic climbing mould construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520091953.3U CN204530492U (en) | 2015-02-10 | 2015-02-10 | A kind of hydraulic climbing mould construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204530492U true CN204530492U (en) | 2015-08-05 |
Family
ID=53744514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520091953.3U Expired - Fee Related CN204530492U (en) | 2015-02-10 | 2015-02-10 | A kind of hydraulic climbing mould construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204530492U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331338A (en) * | 2018-04-04 | 2018-07-27 | 中交第三公路工程局有限公司 | A kind of hydraulic climbing formwork device and construction method |
CN113356078A (en) * | 2021-07-07 | 2021-09-07 | 甘肃路桥建设集团有限公司 | Bridge pier column reinforcement rack |
-
2015
- 2015-02-10 CN CN201520091953.3U patent/CN204530492U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331338A (en) * | 2018-04-04 | 2018-07-27 | 中交第三公路工程局有限公司 | A kind of hydraulic climbing formwork device and construction method |
CN113356078A (en) * | 2021-07-07 | 2021-09-07 | 甘肃路桥建设集团有限公司 | Bridge pier column reinforcement rack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101435276B (en) | Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof | |
CN102359302B (en) | UHV long-span iron tower assembly method | |
CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
CN104695337A (en) | Self-lifting sliding and turnover construction system and construction method | |
CN102996062A (en) | Maintenance lifting platform and application method thereof | |
CN105442839A (en) | Erecting method of cantilever structure formwork bent | |
CN110526153B (en) | A jack-assisted pile foundation steel cage lifting structure and construction method thereof | |
CN105780995A (en) | Curved surface space pipe truss structure and mounting method thereof | |
MX2021010866A (en) | Vertical slip form construction system with multi-function platform, and method of constructing a building therewith. | |
CN204530493U (en) | A kind of high pier over-form construction platform | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN104895335A (en) | Method for mounting hanging pillar | |
CN204530492U (en) | A kind of hydraulic climbing mould construction platform | |
CN102493666A (en) | High-altitude translation installation and construction method for super-large super-heavy member | |
CN104989111A (en) | Construction method for steel structure high-rise hoisting | |
CN101838986A (en) | Disassembling tool type lattice column and construction method thereof | |
CN204401995U (en) | Encorbelment support system in a kind of center of installing for dome structure | |
CN204530491U (en) | A kind of high pier hydraulic climbing mould construction frame | |
CN107795185A (en) | Chimney reinforces pylon high-altitude installation node security construction method | |
CN208152583U (en) | A kind of high-building construction ancillary equipment | |
CN111017696A (en) | Hoisting method of integrally assembled prefabricated part | |
CN105239804A (en) | Assembly and lift-erecting method of indirect air-cooling system stretching platforms | |
CN202718385U (en) | Jack-raising formwork mechanism | |
CN204530490U (en) | A kind of hydraulic climbing mould construction frame | |
CN205369948U (en) | Lifting device for daylighting top is used for installing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 Termination date: 20160210 |
|
CF01 | Termination of patent right due to non-payment of annual fee |