CN109236295A - A kind of three step stoping methods suitable for Deep Thick large ore deposit - Google Patents

A kind of three step stoping methods suitable for Deep Thick large ore deposit Download PDF

Info

Publication number
CN109236295A
CN109236295A CN201811350417.5A CN201811350417A CN109236295A CN 109236295 A CN109236295 A CN 109236295A CN 201811350417 A CN201811350417 A CN 201811350417A CN 109236295 A CN109236295 A CN 109236295A
Authority
CN
China
Prior art keywords
hole
stope
panel
ore
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811350417.5A
Other languages
Chinese (zh)
Other versions
CN109236295B (en
Inventor
潘长良
过江
谢学斌
戴兴国
姚道春
董世华
桂旺华
苏卫宏
汪令辉
郑攻关
古绪球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Nonferrous Metals Group Co Ltd
Original Assignee
DONGGUASHAN COPPER MINE OF TONGLING NONFERROUS METALS GROUP HOLDING Co Ltd
Tongling Nonferrous Metals Group Holdings Co Technology Center
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGGUASHAN COPPER MINE OF TONGLING NONFERROUS METALS GROUP HOLDING Co Ltd, Tongling Nonferrous Metals Group Holdings Co Technology Center, Central South University filed Critical DONGGUASHAN COPPER MINE OF TONGLING NONFERROUS METALS GROUP HOLDING Co Ltd
Priority to CN201811350417.5A priority Critical patent/CN109236295B/en
Publication of CN109236295A publication Critical patent/CN109236295A/en
Application granted granted Critical
Publication of CN109236295B publication Critical patent/CN109236295B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a kind of three step stoping methods suitable for Deep Thick large ore deposit, include the following steps: to arrange panel along orebody trend, curtain wall is persisted between panel, and vertical orebody trend divides mineral building and ore pillar in panel;One step rooming, afterwards all-tailing cemented filling;Two step stooping pillarings, the afterwards weak consolidated fill of crude tailings;Three step back production panel barrier pillars, afterwards tailing filling.One step is the back production under the primary ore rock supporting condition of two sides, and two steps are the back production under the conditions of cemented fill of two sides, and three steps are back production under the conditions of three face obturations.The present invention has the advantage that making full use of stress sustained release and principle of mobile equilibrium, the safety condition of panel stope back production is improved, region Earth pres-sure control is conducive to;Can be with the back production simultaneously of polydisc area, production capacity is big;Stope mining mode is flexible, is conducive to that production is maintained to stablize.

Description

A kind of three step stoping methods suitable for Deep Thick large ore deposit
Technical field
The invention belongs to mining field of engineering technology more particularly to a kind of three steps suitable for Deep Thick large ore deposit Stoping method.
Background technique
With the increasingly exhaustion of superficial part mineral resources, deep mining has become inexorable trend.Deep mining faces high temperature, highland The particular surroundings of pressure and high well depth, process for stoping, back production safety and back production efficiency etc. all suffer from severe challenge, and traditional method is It is more difficult to adapt to the special mining environment in deep, it need to pioneer and invent, form a series of mining side of new adaptation deeps particular surroundings Method.Patent 201310674053.7 discloses a kind of mining placement method, and this method with the filling slurry containing cementitious matter by being filled Fill out the goaf of the second step stope fill area adjacent with the third step stope of ore body, and with the filling for being free of cementitious matter Other regions in the goaf of ground paste filling second step stope, so that present invention can ensure that goaf reasonably fills intensity Distribution, reduce second step stope consolidated fill ratio, filling cost is low, at the same can maximum exploitated ore, mention High resource utilization, increases economic efficiency.But the patent lays particular emphasis on filling, makees to panel arrangement, mining methods and back production The problem of industry etc. is without being related to, and still having exploitation complex procedures.It is slow that patent 201310605791.6 discloses a kind of multilayer Tilting thin-middle thick mineral deposit filling mining method, panel uses three step back production, a step rooming, two step stooping pillarings, Three step back production are gone up a hill ore pillar;After the completion of mineral building or pillar recovery, divulged information by the filling of higher slice gone up a hill through being connected to stope The downward bashing in hole is finally gone up a hill ore pillar as unit of panel along three step back production from the bottom to top of going up a hill, back production after filling The ore pillar of going up a hill in next panel has the characteristics that mining rate is high, ore recovery ratio is high, the rate of dilution is low low with mining cost.But Above-mentioned patent suitable for multilayer low-angle dip it is thin-thick mineral deposit exploitation, those skilled in the art know that different ore bodies are opened It adopts, adopts quasi- cutting technique and differ greatly, therefore above-mentioned patent cannot be adapted to the exploitation of Deep Thick large ore deposit.
Summary of the invention
The application aims to solve at least one of the technical problems existing in the prior art.For this purpose, an object of the present invention It is to provide a kind of three step stoping methods suitable for Deep Thick large ore deposit, this method is pressed in which can be effectively controlled region, is ensured Back production general safety improves resource comprehensive utilization rate, realizes the safe and efficient large scale mining in deep.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
A kind of three step stoping methods suitable for Deep Thick large ore deposit, include the following steps:
Panel is arranged along orebody trend, curtain wall is persisted between panel, and vertical orebody trend divides mineral building and mine in panel Column;
One step rooming, afterwards all-tailing cemented filling;
Two step stooping pillarings, the afterwards weak consolidated fill of crude tailings;
Three step back production panel barrier pillars, afterwards tailing filling.
Further, it comprises the following specific steps that:
(1) panel is arranged
Panel arranges that extent length is the horizontal breadth of ore body along orebody trend, and width is determined by ore and rock stability, panel Between persist curtain wall, curtain wall is regarded as individual special panel, the i.e. consideration back production when setting up;The curtain wall one persisted It presses with can be effectively controlled, two, which can be such that panel and stope produces, becomes flexible, third is that the tunnel Chuan Mai arranged in curtain wall It can play a role in the exploitation process of three steps with connecting taxiway;
(2) stopping sequence
The stopping sequence in panel is promoted along orebody trend, and the stopping sequence of each stope is by the big position of central thick in panel It is promoted to both wings.Under the premise of safety, to guarantee yield and tissue production, 2~3 panels can be arranged while being produced.Three steps Curtain wall back production again after adjacent two panel stopes back production sand off of rapid back production, stopping sequence is also big from ore body thickness Part is promoted to relatively thin both wings;
(3) mining methods
Mining methods use large diameter, deep borehole stage open stope afterwards filling method, and a step, two steps and three step stopes are equal It is divided by standardization, mining methods are identical, and rock drilling and ore removal equipment are identical, and stoping operation link is identical;Standardized work helps In improving production efficiency, wide scale security back production is realized;
(4) quasi- cutting engineering is adopted
Including rock drilling connecting taxiway, drilling chamber, filling return aircourse, discharging tunnel, ore drawing route, trenching tunnel, drop shaft, Rock drilling level wears arteries and veins and ore removal level wears arteries and veins engineering, wherein rock drilling level wears arteries and veins and ore removal level wears arteries and veins and is arranged in curtain wall Interior is used as back production channel;
(5) stoping operation
It falls mine: when orebody thickness is greater than 30m, mine being fallen using major diameter vertical long hole;When orebody thickness is less than 30m, Mine is fallen using fan shaped medium length hole;
Ore removal: a step, two step stopes use moat ditch bottom structure ore removal, and three step curtain wall stopes are using big straight The ore electric LHD loading of diameter funnel ore removal, explosion is discharged into panel drop shaft;
Stope ventilation: it is fresh it is distinguished and admirable enter discharging tunnel from back production middle section intake, slope connecting taxiway, rinse ore removal lane Earth's surface is discharged through return aircourse behind road;
Filling: being closed after ore removal, afterwards cementing, the weak cementing or non-glue filling using high concentration crude tailings.
Further, a step stope, that is, mineral building stope uses high concentration all-tailing cemented filling, two step stopes, that is, mine Column stope uses weak consolidated fill, and weak cementing or non-glue filling can be used in three step stopes, that is, curtain wall stope.
Further, stoping operation falls mine detailed process is as follows: when orebody thickness is greater than 30m, being hung down using major diameter Straight deep hole falls mine;When orebody thickness is less than 30m, mine is fallen using fan shaped medium length hole, deep hole blasting uses T-150 or Simba261 Down-the-hole drill carries out lower to borehole drilling, blasthole diameter 165mm, by VCR method formation cutting groove, with cutting in drilling drift Slot is scope of freedom lateral caving, and long and medium hole drilling is using, to fan shaped medium length hole, blasthole is straight on SimbaH1354 drill jumbo Drilling Diameter Φ 76mm forms cutting groove using upper centripetal deep hole driling explosion, with cutting groove using stope end cut courtyard as the scope of freedom For scope of freedom lateral caving.
Further, stoping operation falls mine and includes the following steps:
Rock drilling: when orebody thickness is greater than 30m, mine is fallen using major diameter vertical long hole;When orebody thickness is less than 30m, Mine is fallen using fan shaped medium length hole, Large diameter long-hole drilling uses under Simba261 high pneumatic dth drill Drilling to vertical long hole, Blasthole diameter Φ 165mm, the cloth hole of mineral building are determined as middle part blasthole and take 3.0m (array pitch) × 3.3m (pitch of holes), and side row hole is carried out Photoface exploision, Hole pattern parameters take 2.5m (array pitch) × 2.4m (pitch of holes), ore pillar stope interstitial hole using 3.0m (array pitch) × The Hole pattern parameters of 3.5m (pitch of holes), side row hole press heavy blasting blasting principle, and Hole pattern parameters use 2.0m (array pitch) × 2.0m (pitch of holes), side row hole use SimbaH1354 electric hydaulic drill jumbo Drilling away from obturation boundary 1.8m, long and medium hole drilling On to fan shaped medium length hole, blasthole diameter Φ 76mm, 2.5~3.0m of bottom hole pitch, row's spacing is 1.6m~1.8m, and rock drill once bores Whole blastholes an of stope are dug, stope data boundary is obtained by the dead zone CMS scanning system;
Explosion: borehole drilling chamber arranges that stopping sequence is from one or both sides to notched blasting along orebody trend;Kerve is adopted With light section VCR method kerve, kerve range 5.6m × 6m, kerve hole charge constitution blocks 1.5m-2.0m, single layer medicine using lower part 54kg is wrapped, top blocks 2.5m-3.0m stemming, and each quick-fried a height of 5.0m draws progress twice is primary to expand slot, and so on, until Broken heights of roofs 6.5-7.5m carries out disposable broken top, or in the middle part of stope or end is formed at well by the explosion of VCR method and cuts day Well forms cutting groove, after cutting groove is formed, onepull 2- using slot raise and the layer that undercuts as the scope of freedom lateral caving of falling bench 3 artillery salvo holes, lateral caving hole use the onepull of complete opening depth, using cutting groove and undercut layer as the scope of freedom lateral caving of falling bench;
On to fan shaped medium length hole use gradation charge explosion, using stope end cut courtyard as the scope of freedom, in Borehole drilling explosion forms cutting groove, using cutting groove as scope of freedom lateral caving, when Multi-layer chambers explosion, higher slice should in advance under Layering is not less than 2-5 round;The method of ignition is using non-electric shock conducting tube detonator millisecond detonating systems double in hole, double explosive fuse network connection Knot.
Further, borehole drilling and explosion ventilation are aerated by the ventilation of upper middle section level, return aircourse;Middle depth Sublevel drilling and explosion ventilation on the stope of hole, it is fresh distinguished and admirable by back production middle section level progress tunnel air inlet, pass through cutting well, filling After drilling, waste air enters upper middle section return aircourse.
Further, a step is the back production under the primary ore rock supporting condition of two sides, and two steps are in two sides consolidated fill Back production under concrete conditions in the establishment of a specific crime, three steps are back production under the conditions of three face obturations.The present invention makes full use of stress sustained release and dynamic equilibrium Principle.
Compared with prior art, advantages of the present invention is as follows: (1) improving the safety condition of panel stope back production, favorably In region Earth pres-sure control;(2) can be with the back production simultaneously of polydisc area, production capacity is big;(3) stope mining mode is flexible, is conducive to tie up Production is held to stablize;(4) all types of stope standardization, can effectively improve utilization rate of equipment and installations, and reduction, which is adopted, cuts project amount;(5) simplify back Excavating technology process reduces operation cross influence between stope, convenient for large-scale production organization and administration;(6) curtain wall is when setting up It has contemplated that recycling, using identical mining methods, and original engineering can be made full use of;(7) by mining methods, return The optimization of sequence and structural parameters etc. is adopted, so that this method resource comprehensive utilization rate can reach 85%, takes full advantage of preciousness Mineral resources.
Detailed description of the invention
Fig. 1 is panel layout drawing of the invention;
Fig. 2 is that rock drilling of the invention is horizontal;
Fig. 3 is that ore removal of the invention is horizontal;
Fig. 4 be in Fig. 2 and 3 A-A to sectional view;
Fig. 5 is B-B direction sectional view in Fig. 2 and 3.
Wherein: 1- mineral building stope;2- ore pillar stope;3- curtain wall stope;4- rock drilling level wears arteries and veins;5- rock drilling contact Road;6- drilling chamber;7- stowboard;8- ore removal level wears arteries and veins;9- discharging tunnel;10- ore removal route;11- trenching tunnel; 12- drop shaft;13- cemented fill;14- large diameter, deep borehole;15- fan shaped medium length hole;16- filling borehole;17- curtain wall.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to FIG. 1 to FIG. 5, the three step stoping methods of the present invention suitable for Deep Thick large ore deposit, including it is following Step:
(1) panel arrange: panel along orebody trend arrange, extent length be ore body horizontal breadth, about 300~400m, Panel width is 100m, persists 18m curtain wall 17 between panel.Divided in panel several long 82m, wide 18m mineral building stope 1 with The ore pillar stope 2 of several long 78m, wide 18m.3 length of curtain wall stope determines that single stope mine amount is about by mine amount homeostatic principle 100000 t, corresponding Large Size Stope take small, and short stope then takes greatly, and back production width is 14m, and there are 2~4m mine walls for two sides.Mine is isolated Column is regarded as individual special panel, carries out back production after two adjacent Panel stopings and filling whole.The curtain wall persisted Press, ensure the effect of back production safety with playing control, the rock drilling level in curtain wall wears arteries and veins 4 and ore removal level wears 8 conduct of arteries and veins Back production channel plays a role during Panel stoping.
(2) stopping sequence: the stopping sequence in panel is promoted along orebody trend, along panel the stopping sequence of each stope be by The big position of central thick is promoted to both wings.Under the premise of safety, to guarantee yield and tissue production, 2~3 panels can be arranged same When produce.The back production again after adjacent two panel stopes back production sand off of the curtain wall of three step back production, stopping sequence It is to be promoted from ore body thickness is most of to relatively thin both wings.
(3) mining methods: mining methods use large diameter, deep borehole stage open stope afterwards filling method, a step, two steps and Three step stopes are pressed standardization and are divided, and mining methods are identical, and rock drilling and ore removal equipment are identical, the basic phase of stoping operation link Together, standardized work helps to improve production efficiency, realizes wide scale security back production.
(4) it adopts quasi- cutting engineering: mainly including rock drilling connecting taxiway 5, drilling chamber 6, filling return aircourse 7, discharging tunnel 9, the engineerings such as ore drawing route 10, trenching tunnel 11, drop shaft 12.
(5) stoping operation
It falls mine: when orebody thickness is greater than 30m, mine being fallen using major diameter vertical long hole;When orebody thickness is less than 30m, Mine is fallen using fan shaped medium length hole.Deep hole blasting is carried out using T-150 or Simba261 down-the-hole drill in drilling drift lower to deep hole Rock drilling, blasthole diameter 165mm form cutting groove by VCR method, using cutting groove as scope of freedom lateral caving.Long and medium hole drilling Using, to fan shaped medium length hole, blasthole diameter Φ 76mm is with stope end cut courtyard on SimbaH1354 drill jumbo Drilling The scope of freedom forms cutting groove using upper centripetal deep hole driling explosion, using cutting groove as scope of freedom lateral caving.
It is divided into specifically, falling mine in actual production:
Rock drilling: when orebody thickness is greater than 30m, mine is fallen using major diameter vertical long hole 14;When orebody thickness is less than 30m When, mine is fallen using fan shaped medium length hole 15.Large diameter long-hole drilling uses under Simba261 high pneumatic dth drill Drilling to vertical Deep hole, blasthole diameter Φ 165mm.The cloth hole of mineral building is determined as middle part blasthole and takes 3.0m (array pitch) × 3.3m (pitch of holes).In order to Stope boundary is efficiently controlled, side row hole carries out photoface exploision, and Hole pattern parameters take 2.5m (array pitch) × 2.4m (pitch of holes).Ore pillar Stope two sides are cemented fills 13, should minimize blasting scale, obturation is prevented to be caving.Ore pillar stope interstitial hole uses 3.0m (array pitch) × 3.5m (pitch of holes) Hole pattern parameters, side row hole press heavy blasting blasting principle, and Hole pattern parameters use 2.0m (array pitch) × 2.0m (pitch of holes), side row hole is away from obturation boundary 1.8m.Long and medium hole drilling uses SimbaH1354 electric hydaulic To fan shaped medium length hole on drill jumbo Drilling, blasthole diameter Φ 76mm, 2.5~3.0m of bottom hole pitch, row's spacing is 1.6m~1.8m. Whole blastholes of the complete stope of Drilling of rock drill.Stope data boundary is obtained by the dead zone CMS scanning system.
Explosion:
Borehole drilling chamber arranges that stopping sequence is from one or both sides to notched blasting along orebody trend;Kerve is using small Section VCR method kerve, kerve range 5.6m × 6m, kerve hole charge constitution block 1.5m~2.0m, single layer pack using lower part 54kg, top block 2.5m~3.0m stemming.Each quick-fried a height of 5.0m draws and carries out primary expansion slot twice, and so on, until broken 6.5~7.5m of heights of roofs carries out disposable broken top.Can also in the middle part of stope or end by the explosion of VCR method at well formed cutting day Well forms cutting groove using slot raise and the layer that undercuts as the scope of freedom lateral caving of falling bench.After cutting groove is formed, onepull 2 ~3 artillery salvo holes, lateral caving hole use the onepull of complete opening depth, are fallen bench using cutting groove and the layer that undercuts as the scope of freedom and are laterally collapsed Mine.
On to fan shaped medium length hole use gradation charge explosion, using stope end cut courtyard as the scope of freedom, in Borehole drilling explosion forms cutting groove.Using cutting groove as scope of freedom lateral caving.When Multi-layer chambers explosion, higher slice should it is advanced under Layering is not less than 2~5 rounds;The method of ignition is using non-electric shock conducting tube detonator millisecond detonating systems double in hole, double explosive fuse networks It is coupled.
Ore removal: a step, two step stopes use moat ditch bottom structure ore removal, and three step curtain wall stopes are using big straight The ore electric LHD loading of diameter funnel ore removal, explosion is discharged into panel drop shaft.
Stope ventilation: it is fresh it is distinguished and admirable enter discharging tunnel from back production middle section intake, slope connecting taxiway, rinse ore removal lane Earth's surface is discharged through return aircourse behind road.
It is envisioned that borehole drilling and explosion ventilation are aerated by the ventilation of upper middle section level, return aircourse. Sublevel drilling and explosion ventilation on mesoporous stope, it is fresh distinguished and admirable by back production middle section level progress tunnel air inlet, by cutting well, fill After filling out drilling, waste air enters upper middle section return aircourse.
Filling: being closed after ore removal, afterwards by complete using high concentration by filling borehole 16 by stowboard 7 Tailings is cementing, weak cementing or non-glue filling.
It should be noted that in practical applications, a step stope, that is, mineral building stope can use high concentration crude tailings glue Knot filling, two step stopes, that is, ore pillar stope can use weak consolidated fill, and three step stopes, that is, curtain wall stope can be used Weak cementing or non-glue filling.
The present invention by the optimum option to mining methods, structural parameters (parameters such as rock drilling, explosion), stopping sequence etc., So that this method resource comprehensive utilization rate can reach 85%, valuable mineral resources are taken full advantage of.
Above-described embodiment is only to clearly demonstrate examples made by the present invention, rather than the restriction to embodiment.For For those of ordinary skill in the art, other various forms of variations or change can also be made on the basis of the above description It is dynamic.Here without can not be also exhaustive to all embodiments.And the obvious variation or change thus amplified out It is dynamic to be still in the protection scope of this invention.

Claims (6)

1. a kind of three step stoping methods suitable for Deep Thick large ore deposit, which comprises the steps of:
Panel is arranged along orebody trend, curtain wall is persisted between panel, and vertical orebody trend divides mineral building and ore pillar in panel;
One step rooming, afterwards all-tailing cemented filling;
Two step stooping pillarings, the afterwards weak consolidated fill of crude tailings;
Three step back production panel barrier pillars, afterwards tailing filling.
2. the three step stoping methods according to claim 1 suitable for Deep Thick large ore deposit, which is characterized in that including such as Lower specific steps:
(1) panel is arranged
Panel arranges that extent length is the horizontal breadth of ore body along orebody trend, and width is determined by ore and rock stability, between panel temporarily Curtain wall is stayed, curtain wall is regarded as individual special panel, back production is considered when setting up;
(2) stopping sequence
The stopping sequence in panel is promoted along orebody trend, and the stopping sequence of each stope is from the big position of central thick to two along panel The wing promotes, and under the premise of safety, to guarantee yield and tissue production, can arrange 2~3 panels while produce, three steps are returned The curtain wall adopted back production again after adjacent two panel stopes back production sand off, stopping sequence are also from ore body thickness major part It is promoted to relatively thin both wings;
(3) mining methods
Mining methods use large diameter, deep borehole stage open stope afterwards filling method, and a step, two steps and three step stopes press mark Standardization divides, and mining methods are identical, and rock drilling and ore removal equipment are identical, and stoping operation link is identical;
(4) quasi- cutting engineering is adopted
Including rock drilling connecting taxiway, drilling chamber, filling return aircourse, discharging tunnel, ore drawing route, trenching tunnel, drop shaft, rock drilling Level wears arteries and veins and ore removal level wears arteries and veins engineering, wherein rock drilling level wears arteries and veins and ore removal level is worn arteries and veins and is arranged in curtain wall As back production channel;
(5) stoping operation
It falls mine: when orebody thickness is greater than 30m, mine being fallen using major diameter vertical long hole;When orebody thickness is less than 30m, use Fan shaped medium length hole falls mine;
Ore removal: a step, two step stopes use moat ditch bottom structure ore removal, and three step curtain wall stopes are leaked using major diameter Struggle against ore removal, and the ore electric LHD loading of explosion is discharged into panel drop shaft;
Stope ventilation: it is fresh it is distinguished and admirable enter discharging tunnel from back production middle section intake, slope connecting taxiway, after rinsing discharging tunnel Earth's surface is discharged through return aircourse;
Filling: being closed after ore removal, afterwards cementing, the weak cementing or non-glue filling using high concentration crude tailings.
3. the three step stoping methods according to claim 2 suitable for Deep Thick large ore deposit, it is characterised in that: a step Stope, that is, mineral building stope use high concentration all-tailing cemented filling, two step stopes, that is, ore pillar stope use weak consolidated fill, three Weak cementing or non-glue filling can be used in step stope, that is, curtain wall stope.
4. the three step stoping methods according to claim 2 or 3 suitable for Deep Thick large ore deposit, it is characterised in that: return It adopts operation to fall mine detailed process is as follows: when orebody thickness is greater than 30m, mine being fallen using major diameter vertical long hole;Work as ore body thickness When degree is less than 30m, mine is fallen using fan shaped medium length hole, deep hole blasting is using T-150 or Simba261 down-the-hole drill in drilling drift Lower to borehole drilling, blasthole diameter 165mm is carried out, cutting groove is formed by VCR method, is laterally collapsed using cutting groove as the scope of freedom Mine, long and medium hole drilling use on SimbaH1354 drill jumbo Drilling to fan shaped medium length hole, blasthole diameter Φ 76mm, with stope end Portion's slot raise is the scope of freedom, cutting groove is formed using upper centripetal deep hole driling explosion, using cutting groove as scope of freedom lateral caving.
5. the three step stoping methods according to claim 4 suitable for Deep Thick large ore deposit, it is characterised in that: back production is made Industry falls mine and includes the following steps:
Rock drilling: when orebody thickness is greater than 30m, mine is fallen using major diameter vertical long hole;When orebody thickness is less than 30m, use Fan shaped medium length hole falls mine, and Large diameter long-hole drilling uses under Simba261 high pneumatic dth drill Drilling to vertical long hole, blasthole Diameter of phi 165mm, the cloth hole of mineral building are determined as middle part blasthole and take 3.0m (array pitch) × 3.3m (pitch of holes), and side row hole carries out smooth surface Explosion, Hole pattern parameters take 2.5m (array pitch) × 2.4m (pitch of holes), and ore pillar stope interstitial hole uses 3.0m (array pitch) × (hole 3.5m Spacing) Hole pattern parameters, side row hole presses heavy blasting blasting principle, and Hole pattern parameters are using 2.0m (array pitch) × 2.0m (between hole Away from), away from obturation boundary 1.8m, long and medium hole drilling uses on SimbaH1354 electric hydaulic drill jumbo Drilling to fan side row hole Shape medium-length hole, blasthole diameter Φ 76mm, 2.5~3.0m of bottom hole pitch, row's spacing is 1.6m~1.8m, Drilling of rock drill complete one Whole blastholes of a stope, stope data boundary are obtained by the dead zone CMS scanning system;
Explosion: borehole drilling chamber arranges that stopping sequence is from one or both sides to notched blasting along orebody trend;Kerve is using small Section VCR method kerve, kerve range 5.6m × 6m, kerve hole charge constitution block 1.5m-2.0m, single layer pack using lower part 54kg, top block 2.5m-3.0m stemming, and each quick-fried a height of 5.0m draws and carries out once expanding slot twice, and so on, until broken Heights of roofs 6.5-7.5m carries out disposable broken top, or in the middle part of stope or end by VCR method explosion forms slot raise at well, Cutting groove is formed using slot raise and the layer that undercuts as the scope of freedom lateral caving of falling bench, after cutting groove is formed, onepull 2-3 row Blasthole, lateral caving hole use the onepull of complete opening depth, using cutting groove and undercut layer as the scope of freedom lateral caving of falling bench;
On to fan shaped medium length hole use gradation charge explosion, using stope end cut courtyard as the scope of freedom, using upper centripetal deep hole Driling explosion forms cutting groove, and using cutting groove as scope of freedom lateral caving, when Multi-layer chambers explosion, higher slice answers advanced lower leaf Not less than 2-5 round;The method of ignition is coupled using non-electric shock conducting tube detonator millisecond detonating systems double in hole, double explosive fuse networks.
6. the three step stoping methods according to claim 5 suitable for Deep Thick large ore deposit, it is characterised in that: deep hole chisel Rock and explosion ventilation are aerated by the ventilation of upper middle section level, return aircourse;Sublevel drilling and explosion on medium-length hole stope Ventilation, fresh distinguished and admirable by back production middle section level progress tunnel air inlet, after cutting well, filling borehole, waste air enters upper middle section Return aircourse.
CN201811350417.5A 2018-11-14 2018-11-14 Three-step stoping method suitable for deep thick and large ore deposit Active CN109236295B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811350417.5A CN109236295B (en) 2018-11-14 2018-11-14 Three-step stoping method suitable for deep thick and large ore deposit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811350417.5A CN109236295B (en) 2018-11-14 2018-11-14 Three-step stoping method suitable for deep thick and large ore deposit

Publications (2)

Publication Number Publication Date
CN109236295A true CN109236295A (en) 2019-01-18
CN109236295B CN109236295B (en) 2020-05-22

Family

ID=65074549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811350417.5A Active CN109236295B (en) 2018-11-14 2018-11-14 Three-step stoping method suitable for deep thick and large ore deposit

Country Status (1)

Country Link
CN (1) CN109236295B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058847A (en) * 2019-12-13 2020-04-24 中南大学 Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN111520141A (en) * 2020-03-19 2020-08-11 安徽金日晟矿业有限责任公司 Deep hole arrangement process for stope recovery in two-step stope
CN111677507A (en) * 2020-05-25 2020-09-18 阿勒泰正元国际矿业有限公司 Mining method suitable for deep metal mine
CN111677509A (en) * 2020-06-01 2020-09-18 南华大学 Cooperative mining method for inclined thick and large ore body
CN111963175A (en) * 2020-07-28 2020-11-20 广西大学 Thick ore body mining method
CN112412455A (en) * 2020-11-24 2021-02-26 武汉理工大学 One-step roadway filling mining method for precast concrete
CN113202472A (en) * 2021-05-21 2021-08-03 中煤第七十一工程处有限责任公司 Underground mine subsection layering and stripping upward layering mining method
CN113700481A (en) * 2021-09-16 2021-11-26 铜陵有色金属集团股份有限公司 Zonal control filling continuous mining method for isolating ore pillars in underground goaf panel area
CN113944465A (en) * 2021-09-13 2022-01-18 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Twice-slot-drawing high-layering stoping mining method
CN114086959A (en) * 2021-11-16 2022-02-25 铜陵有色金属集团股份有限公司 Bottom structure of large-diameter high-neck funnel, construction method and stoping method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871347A (en) * 2010-07-08 2010-10-27 中南大学 Mining environment reconstruction layering and striping medium-length hole ore removal mining method
RU2495238C1 (en) * 2012-02-29 2013-10-10 Открытое акционерное общество "Учалинский горно-обогатительный комбинат" Method to prepare ore bodies in place of bedding to leaching of useful components
CN103967494A (en) * 2014-04-21 2014-08-06 安徽大昌矿业集团有限公司 Mining method for filling after shallow hole shrinkage
CN106939788A (en) * 2017-03-15 2017-07-11 广西大学 Truck cooperates with ore removal sublevel drilling block chambering method
CN107762506A (en) * 2016-08-17 2018-03-06 黄鸣 Based on falling ore deposit stage mineral building afterwards filling mining method
CN107762513A (en) * 2016-08-17 2018-03-06 黄鸣 Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871347A (en) * 2010-07-08 2010-10-27 中南大学 Mining environment reconstruction layering and striping medium-length hole ore removal mining method
RU2495238C1 (en) * 2012-02-29 2013-10-10 Открытое акционерное общество "Учалинский горно-обогатительный комбинат" Method to prepare ore bodies in place of bedding to leaching of useful components
CN103967494A (en) * 2014-04-21 2014-08-06 安徽大昌矿业集团有限公司 Mining method for filling after shallow hole shrinkage
CN107762506A (en) * 2016-08-17 2018-03-06 黄鸣 Based on falling ore deposit stage mineral building afterwards filling mining method
CN107762513A (en) * 2016-08-17 2018-03-06 黄鸣 Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling
CN106939788A (en) * 2017-03-15 2017-07-11 广西大学 Truck cooperates with ore removal sublevel drilling block chambering method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
安龙: "一种适用于深部厚大矿床的三步骤回采方法", 《东北大学学报(自然科学版)》 *
安龙: "深部厚大矿体回采顺序设计及优化研究", 《东北大学学报(自然科学版)》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058847A (en) * 2019-12-13 2020-04-24 中南大学 Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN111058847B (en) * 2019-12-13 2021-10-26 中南大学 Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN111520141A (en) * 2020-03-19 2020-08-11 安徽金日晟矿业有限责任公司 Deep hole arrangement process for stope recovery in two-step stope
CN111677507A (en) * 2020-05-25 2020-09-18 阿勒泰正元国际矿业有限公司 Mining method suitable for deep metal mine
CN111677509A (en) * 2020-06-01 2020-09-18 南华大学 Cooperative mining method for inclined thick and large ore body
CN111963175A (en) * 2020-07-28 2020-11-20 广西大学 Thick ore body mining method
CN112412455B (en) * 2020-11-24 2022-11-18 武汉理工大学 One-step roadway filling mining method for precast concrete
CN112412455A (en) * 2020-11-24 2021-02-26 武汉理工大学 One-step roadway filling mining method for precast concrete
CN113202472A (en) * 2021-05-21 2021-08-03 中煤第七十一工程处有限责任公司 Underground mine subsection layering and stripping upward layering mining method
CN113202472B (en) * 2021-05-21 2024-01-23 中煤第七十一工程处有限责任公司 Underground mine sectioning, layering, striping and upward layering mining method
CN113944465A (en) * 2021-09-13 2022-01-18 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Twice-slot-drawing high-layering stoping mining method
CN113944465B (en) * 2021-09-13 2024-02-23 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Two-time slot pulling high-layering stoping mining method
CN113700481A (en) * 2021-09-16 2021-11-26 铜陵有色金属集团股份有限公司 Zonal control filling continuous mining method for isolating ore pillars in underground goaf panel area
CN113700481B (en) * 2021-09-16 2024-01-05 安徽铜冠产业技术研究院有限责任公司 Zone control filling continuous mining method for underground goaf tray zone isolated ore pillar
CN114086959A (en) * 2021-11-16 2022-02-25 铜陵有色金属集团股份有限公司 Bottom structure of large-diameter high-neck funnel, construction method and stoping method

Also Published As

Publication number Publication date
CN109236295B (en) 2020-05-22

Similar Documents

Publication Publication Date Title
CN109236295A (en) A kind of three step stoping methods suitable for Deep Thick large ore deposit
CN106223958B (en) The slant middle thick orebody subregion rock drilling stage falls ore deposit afterwards filling collaboration mining codes
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN105041314B (en) A kind of combined mining method of deep afterwards rooming-slicing ore pillar
CN105587318B (en) A kind of method of mining by the way of filling of the parallel middle thickness orebody group continuous stoping of low-angle dip
CN102619513B (en) Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
CN106121643B (en) Reserved two step nesting of retaining wall mine combines the method for mining by the way of filling
CN109252862A (en) Ultra-large stope large diameter, deep borehole high-stage open stope afterwards filling mining method
CN105952450B (en) A kind of new method of the double stope collaboration exploitations in underground mine underground
CN104806244A (en) Filling mining method for slant middle-thick ore body
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN105626073B (en) A kind of mining methods for reserving cutting groove based on the method for mining by the way of filling
CN110656939B (en) Large-stage efficient mining method for steeply inclined medium-thickness ore body meeting water argillization surrounding rock
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN108798672B (en) A kind of mining methods for the area's ore high-efficiency mining that collapses greatly
CN110714760B (en) Mining method for coal-aluminum symbiotic layered induction collaborative mining
CN112796758A (en) High-segmentation non-cutting raise broaching and medium-length hole stage open stoping subsequent filling mining method
CN103437768A (en) Pre-set space filling mining method without top column and bottom column
CN110173238A (en) The anti-reflection extraction of high seam three-dimensional roadway layout networking explosion thick gas method entirely
CN103437766B (en) In-situ fragmentation mining method
CN108625855A (en) Safe and efficient mining methods under a kind of obturation
CN105298493B (en) Underground low-angle dip lamelliform jade ore deposit nondestructive blasting mining methods
CN105370280B (en) A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip
CN104948190A (en) Method for caving top surrounding rock to form covering layer recovery stud
CN108316927B (en) A kind of stage Contining ore removal filling mining method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190716

Address after: Yuelu District City, Hunan province 410083 Changsha Lushan Road No. 932

Applicant after: Central South University

Applicant after: Tongling Nonferrous Metals Group Co., Ltd.

Applicant after: Tongling Nonferrous Metals Group Holdings Co Technology Center

Address before: Yuelu District City, Hunan province 410083 Changsha Lushan Road No. 932

Applicant before: Central South University

Applicant before: DONGGUASHAN COPPER MINE OF TONGLING NONFERROUS METALS GROUP HOLDING CO., LTD.

Applicant before: Tongling Nonferrous Metals Group Holdings Co Technology Center

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant