CN109184174A - Climbing frame for outer-wall and its application method - Google Patents

Climbing frame for outer-wall and its application method Download PDF

Info

Publication number
CN109184174A
CN109184174A CN201811149197.XA CN201811149197A CN109184174A CN 109184174 A CN109184174 A CN 109184174A CN 201811149197 A CN201811149197 A CN 201811149197A CN 109184174 A CN109184174 A CN 109184174A
Authority
CN
China
Prior art keywords
climbing frame
wall
frame
building body
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811149197.XA
Other languages
Chinese (zh)
Other versions
CN109184174B (en
Inventor
孙军
杨泓斌
陈祥祥
胡中铭
李缙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Robot Co Ltd
Original Assignee
Building Dream High Tech Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Building Dream High Tech Construction Co Ltd filed Critical Building Dream High Tech Construction Co Ltd
Priority to CN201811149197.XA priority Critical patent/CN109184174B/en
Publication of CN109184174A publication Critical patent/CN109184174A/en
Application granted granted Critical
Publication of CN109184174B publication Critical patent/CN109184174B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of Climbing frame for outer-wall, comprising: frame body, anti-fall support, lower extension platform and the component that climbs;The anti-fall support is mounted on the side of the frame body;The lower extension platform is connect with the frame body backwards to the side of the anti-fall support, and the lower setting position for hanging platform is corresponding with the setting position of the anti-fall support;The lower peripheral frame for hanging platform and including the platen connecting with the frame body and being connect with the platen;The component that climbs is mounted on the frame body.Above-mentioned Climbing frame for outer-wall, by the way that lower extension platform corresponding with anti-fall support is arranged, guarantee installation of the operating personnel to anti-fall support, and then keep the installation of anti-fall support and frame body more stable, improve the safety of Climbing frame for outer-wall, the volume for reducing Climbing frame for outer-wall instead of the complicated connection structure of traditional climbing frame by extension platform under being arranged simultaneously, effectively reduces construction cost.The invention further relates to a kind of application methods of Climbing frame for outer-wall.

Description

Climbing frame for outer-wall and its application method
Technical field
The present invention relates to architectural furnitures, more particularly to a kind of Climbing frame for outer-wall and its application method.
Background technique
Climbing frame is called hoisting frame, and it is main several to be divided into fluid pressure type, electrodynamic type, manpower hand pulling type etc. according to its power resources Class.It is the new type scaffold system developed in recent years, is mainly used in high-layer shear force wall formula building body.It can be past along building Upper soaring or decline.This system makes Construction Formwork & Scaffold Technology take on a new look completely not limited by depth of building, be greatly saved people Power and material, the great advantages for development in skyscraper.
Traditional Lifting and lowering for scaffold is inflexible, after needing to rise to the completion of building body top to the construction work of main body, It can just begin to decline and finishing work is carried out to the exterior wall of building body, whole project duration be influenced very big;Or it completes to build It builds to remove climbing frame after main body is built and decoration construction is carried out using exterior wall of the hanging basket to building body, carried out using hanging basket External Wall Finishing stability is poor, not can be well protected to operating personnel and is easy to happen danger.
Summary of the invention
Based on this, the present invention provides a kind of Climbing frame for outer-wall and its application method for exterior wall finishing, can provide more stable The External Wall of safety fit up and can effectively shorten construction period.
A kind of Climbing frame for outer-wall, comprising:
Frame body;
Anti-fall support, the anti-fall support are mounted on the side of the frame body;
At least one lower extension platform, the lower extension platform are connect with the frame body backwards to the side of the anti-fall support, institute It is corresponding with the setting position of the anti-fall support to state the lower setting position for hanging platform;The lower extension platform includes and the frame body The platen of connection and the peripheral frame being connect with the platen;And
Climb component, and the component that climbs is mounted on the frame body.
Above-mentioned Climbing frame for outer-wall guarantees operating personnel to anti-fall support by the way that lower extension platform corresponding with anti-fall support is arranged Installation, and then keep the installation of anti-fall support and frame body more stable, improve the safety of Climbing frame for outer-wall, while by under setting Platform is hung instead of the complicated connection structure of traditional climbing frame and then reduces the volume of Climbing frame for outer-wall, is guaranteeing the same of safety and steady When effectively reduce construction cost.
The Climbing frame for outer-wall further includes overhead gage in one of the embodiments,;The overhead gage and the frame body top It is connected and fixed.It is protected by the operating personnel in setting overhead gage External Wall climbing frame, prevents the top of Climbing frame for outer-wall from occurring Object is fallen, while the building body exterior wall of finishing is protected from and is damaged by pendant object.
In one of the embodiments, the frame body include stringer, one end connect with the stringer walkway board, with it is described Centre keel that walkway board is connected backwards to one end of stringer, the protective net that is mounted on the centre keel and respectively with the stringer And the reinforcing beam of centre keel connection.Effectively operating personnel is protected by the way that protective net is arranged, is improved by setting reinforcing beam The bonding strength of stringer and centre keel, and then improve the security performance of Climbing frame for outer-wall.
The component that climbs includes the promotion for promoting hanging seat, connecting with the promotion hanging seat in one of the embodiments, Part and the hanging piece being connect with the frame body.Hanging piece is played simultaneously and is fixed with frame body by promoting hanging seat and building body fixation, into And move frame body along building body direction by lifting member.
The stringer is three and half settings in one of the embodiments, and the centre keel is one layer of half structure setting;Institute The setting quantity for stating anti-fall support is three, and the lower setting quantity for hanging platform is two;Three anti-fall supports are wherein One correspondence walkway board, other two respectively corresponds two lower extension platforms;The promotion hanging seat is correspondingly arranged at described At the second layer position of stringer, described hanging piece is correspondingly arranged at the bottom end of the stringer.Pass through the centre keel of setting one and half The construction requirement to building body exterior wall finishing can be met, guaranteed and three anti-fall branch by the stringer of setting three and half Seat connection, improves the volume that the reliability that Climbing frame for outer-wall is connect with building body reduces Climbing frame for outer-wall simultaneously, thereby reduces Construction cost.
In one of the embodiments, the anti-fall support include mounting base, with the mounting base pivot joint limit valve and It is separately connected the elastic element of the mounting base and limit valve connection;The stringer is slidably installed in the mounting base, the stringer On be provided with support block, the limit valve is provided with arrival slot close to one end of the stringer, and the support block is corresponding to be connected to described support In slot.By setting limit valve realize frame body is unidirectionally limited, and then effectively prevent during use frame body fall, improve The safety of Climbing frame for outer-wall.
Inclination indicator is provided on the frame body in one of the embodiments,;The inclination indicator include socket, And it is mounted on two instructions pipe on the socket;The two instruction pipes are in be mutually perpendicular to shape structure setting;It is set on the socket Two standard cells are equipped with, the setting position of two standard cells respectively corresponds the middle position of two instruction pipes.Referred to by being arranged to roll Show horizontality when part can show erection of frames, and then effectively prevent occurring frame body side in use process or lifting process The case where inclining further improves the safety of Climbing frame for outer-wall.
The two instruction pipes are in sealing hollow columnar pipe structure setting, the two instruction pipes in one of the embodiments, It is inside provided with liquid and is preset with bubble;L-shape structure setting, the two L-shape structure settings of standard cell are managed in two instructions. The horizontality of frame body in the horizontal plane in both directions is shown by two instruction pipes of L-shape setting, and then effectively prevent frame The flare and inclination of body.
A kind of application method of Climbing frame for outer-wall, based on above-mentioned Climbing frame for outer-wall, the application method of the Climbing frame for outer-wall includes Following steps:
Step S1: being arranged preformed hole on building body, and the construction climbing frame is disposed around the building by the preformed hole The outside of main body build and apply with to building body height by main structure of the construction climbing frame to building body Work progress and promoted;The construction climbing frame does not block the preformed hole during being promoted;
Step S2: the preformed hole left after being promoted using the construction climbing frame installs the Climbing frame for outer-wall, passes through institute Climbing frame for outer-wall is stated to fit up the exterior wall of building body;During the Climbing frame for outer-wall is promoted the construction climbing frame continue to On main structure is carried out to building body construction construct, the Climbing frame for outer-wall blocked during being promoted passed through it is described Preformed hole;
Step S3: after the building body binds, being hung oneself from the building body by the construction climbing frame using tower crane and removed, Complete the construction of building body;And
Step S4: the Climbing frame for outer-wall continues to rise by the preformed hole not blocked in the construction climbing frame lifting process, Until rising to the top of building body, the Climbing frame for outer-wall is hung oneself from the building body using tower crane and is removed, completes building The finishing of main body.
The application method of above-mentioned Climbing frame for outer-wall, being guaranteed by setting Climbing frame for outer-wall and construction climbing frame can be right simultaneously The main body mechanism of building body is synchronous with exterior wall finishing to carry out, and then effectively shortens construction period.
In one of the embodiments, between the step S2 and step S3 further include:
Step S21: providing the component that climbs, and the top of the component that climbs is connect together by lower extension platform with building body When the bottom end for the component that climbs is connected and fixed with frame body, Climbing frame for outer-wall is promoted by preset height by lifting assembly, then will be most lower The anti-fall support of side is removed while being connect on the top of frame body, and then by frame body top with building body by lower extension stage+module It is fixed;Again the top of lifting assembly is separated to be lifted up simultaneously after preset height with building body and be connect again with building body It is fixed, prepared with being promoted for the Climbing frame for outer-wall of next time.
A kind of application method of Climbing frame for outer-wall, based on above-mentioned Climbing frame for outer-wall, the application method of the Climbing frame for outer-wall includes Following steps:
Step S1: being arranged preformed hole on building body, and the construction climbing frame is disposed around the building by the preformed hole The outside of main body build and apply with to building body height by main structure of the construction climbing frame to building body Work progress and promoted;The construction climbing frame does not block the preformed hole during being promoted;
Step S2: the preformed hole left after being promoted using the construction climbing frame installs the Climbing frame for outer-wall, passes through institute Climbing frame for outer-wall is stated to fit up the exterior wall of building body;During the Climbing frame for outer-wall is promoted the construction climbing frame continue to On main structure is carried out to building body construction construct, the Climbing frame for outer-wall blocked during being promoted passed through it is described pre- It boxes out;
Step S3: after the building body binds, the construction climbing frame being begun to decline, at the same the construction climbing frame from upper and Under the exterior wall of the building body is fitted up, the preformed hole that it has passed through is sealed during building climbing frame decline Stifled, the Climbing frame for outer-wall continuation from bottom to top fits up the exterior wall of the building body at this time, until the construction climbing frame It merges with Climbing frame for outer-wall;
Step S4: the construction climbing frame and Climbing frame for outer-wall can and after, using tower crane by the construction climbing frame and Climbing frame for outer-wall It hangs oneself and removes from the building body, complete the construction that building body is built and fitted up.
In one of the embodiments, between the step S2 and step S3 further include:
Step S21: providing the component that climbs, and the top of the component that climbs is connect together by lower extension platform with building body When the bottom end for the component that climbs is connected and fixed with frame body, Climbing frame for outer-wall is promoted by preset height by lifting assembly, then will be most lower The anti-fall support of side is removed while being connect on the top of frame body, and then by frame body top with building body by lower extension stage+module It is fixed;Again the top of lifting assembly is separated to be lifted up simultaneously after preset height with building body and be connect again with building body It is fixed, prepared with being promoted for the Climbing frame for outer-wall of next time.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the Climbing frame for outer-wall of first embodiment of the invention;
Fig. 2 is the structural schematic diagram in the application of Climbing frame for outer-wall described in Fig. 1;
Fig. 3 is the enlarged diagram of Fig. 1 circle part A;
Fig. 4 is confined explosion's schematic diagram of the Climbing frame for outer-wall of second embodiment of the invention;
Fig. 5 is the partial structure diagram of the Climbing frame for outer-wall of third embodiment of the invention.
The meaning of numbering in the drawing are as follows:
100- Climbing frame for outer-wall;
10- frame body, 11- stringer, 12- walkway board, 13- centre keel, 14- protective net, 15- reinforcing beam, 16- turnover panel;
The anti-fall support of 20-, 21- mounting base, 22- limit valve, 220- arrival slot, 23- elastic element;
Platform, 31- platen, the periphery 35- frame are hung under 30-;
40- climb component, 41- promoted hanging seat, 42- lifting member, 43- rise hanging pieces;
50- overhead gage;
90- builds climbing frame;95- building body;
200- Climbing frame for outer-wall;
12a- walkway board;
60- rolls indicator, 61- socket, 62- instruction pipe, 65- standard cell;
300- Climbing frame for outer-wall;
10b- frame body;
70- video component, 71- control cabinet, 72- display panel.
Specific embodiment
It to facilitate the understanding of the present invention, below will be to invention is more fully described.But the present invention can be to be permitted Mostly different form is realized, however it is not limited to embodiment described herein.On the contrary, purpose of providing these embodiments is makes It is more thorough and comprehensive to the understanding of the disclosure.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.
Fig. 1 to Fig. 5 is please referred to, is the Climbing frame for outer-wall 100 of first embodiment of the invention, including frame body 10 and frame body 10 Extension platform 30, the component that climbs being mounted on frame body 10 under the anti-fall support 20 of connection, at least one being mounted on frame body 10 40 and the overhead gage 50 at the top of frame body 10 is set;The Climbing frame for outer-wall 100 is used to carry out the exterior wall of building body 95 finishing to apply Work.
The frame body 10 is extended along the vertical direction, and vertical direction is the setting side of 95 exterior wall of building body in this programme To the frame body 10 is detachable structure;Frame body 10 includes the walkway board 12 and walkway board that stringer 11, one end and stringer 11 connect 12 centre keels 13 connected backwards to one end of stringer 11, the protective net 14 that is mounted on centre keel 13 and respectively with stringer 11 and The reinforcing beam 15 that centre keel 13 connects.
Stringer 11 is in long strip is extended along the vertical direction for this, which is correspondingly arranged at frame body 10 close to building master The side of body 95, the stringer 11 correspondence are connect with anti-fall support 20;The walkway board 12 is in the horizontally extending setting of straight panel shape, The walkway board 12 carries out decoration construction for carrying operating personnel;Centre keel 13 is in long strip is extended along the vertical direction for this, The correspondence of walkway board 12 is folded between centre keel 13 and stringer 11;The protective net 14 is arranged vertically at perpendicular dragon in straight panel shape Bone 13 is backwards to the side of stringer 11, which is used for shading wind and rain and sunlight, and then protects the safety of operating personnel, simultaneously Operating personnel can be effectively prevented to look out in high altitude operation and dizzy fear occur and cause danger;The reinforcing beam 15 is in strip Shape is obliquely installed along the vertical direction, which is correspondingly arranged between stringer 11 and centre keel 13, and reinforcing beam 15 is for mentioning The reliability of high frame body 10.In the present embodiment, which further includes turnover panel 16;The turnover panel 16 is arranged in straight panel shape in frame body 10 bottom end, the side of the turnover panel 16 and the bottom end of stringer 11 are articulated, which can be around the rotation of 11 bottom end of stringer in turn It can be overlapped on building body 95, prevent operating personnel when moving between Climbing frame for outer-wall 100 and building body 95 due to stepping on It is empty and cause danger.
Specifically, which is three and half shape structure settings and then the joint face for improving frame body 10 and building body 95 Product, and then guarantee the connection reliability of Climbing frame for outer-wall 100 and building body 95;The centre keel 13 is one and half shape structure settings, The protective net 14 and centre keel 13 should be one and half shape structure settings relatively, and then surround empty to the exterior wall finishing of building body 95 Between be one layer of half structure, since the exterior wall finishing to building body 95 does not need huge space and then one and half can meet pair The decoration construction of exterior wall, is effectively saved construction cost;There are two the settings of walkway board 12, and two walkway boards 12 are from bottom to top It is arranged along 13 direction interval of centre keel.It is to be appreciated that the stringer 11 can be structure as a whole or more sectional material connection structures;It should Centre keel 13 or integral structure or more sectional material connection structures.
The anti-fall correspondence of support 20 is mounted on frame body 10 close to the side of building body 95, and the anti-fall support 20 is triangular in shape Shape structure is arranged along the vertical direction, and the side of the anti-fall support 20 on building body 95 by being arranged preformed hole and building body 95 are connected and fixed, and anti-fall support 20 is set backwards to one end of building body 95 with the cunning of stringer 11, and then is risen and led to the movement of frame body 10 To effect.In the present embodiment, it is three which, which is arranged quantity,;Three anti-fall supports 20 are along 11 direction interval of stringer Setting, the bonding strength of stringer 11 Yu building body 95 can be effectively ensured in three anti-fall supports 20, while guaranteeing by bottom end It is still reliable that anti-fall support 20 moves on to frame body 10 and the connection of building body 95 during 10 top of frame body, three anti-fall supports 20 respectively correspond each layer junction that three and half stringers 11 are arranged in.
The anti-fall support 20 include mounting base 21, with mounting base 21 be pivotally connected limit valve 22 and respectively with mounting base 21 and The elastic element 23 that limit valve 22 connects;21 triangular shape of mounting base extends from building body 95 to 10 direction of frame body to be set It sets, which is slidably installed in one end of mounting base 21;Limit valve 22 is in long strip is arranged along the vertical direction for this, the limit valve 22 Bottom end and mounting base 21 are pivotally connected, and the top self installation seat 21 of the limit valve 22 obliquely extends to 10 direction of frame body upwards to be set It sets, the limit valve 22 correspondence is abutted against with frame body 10, and then realizes unidirectional limit to frame body 10;The elastic element 23 is used for limit Position valve 22 is resetted, and the bottom end of the elastic element 23 is connect with mounting base 21, and the top of elastic element 23 and limit valve 22 connect It connects.In the present embodiment, which is provided with arrival slot 220 close to one end of stringer 11;The arrival slot 220 is arc-shaped groove Shape structure setting;Support block (not shown) is provided on the stringer 11;The horizontally extending setting of the support block, the shape of the support block Corresponding with the shape of arrival slot 220, support block is arranged along 11 direction uniform intervals of stringer, which, which can correspond to, is connected to arrival slot 220 It is interior.
The lower extension platform 30 is connect with frame body 10 backwards to the side of anti-fall support 20, which sets in the horizontal direction It sets, the lower setting position for hanging platform 30 is corresponding with the setting position of anti-fall support 20;The lower extension platform 30 includes and frame body 10 The platen 31 of connection and the peripheral frame 35 being connect with platen 31;The platen 31 is in the horizontally extending setting of straight panel shape, this Plate 31 is for carrying operating personnel;The periphery frame 35 upwardly extends setting from 31 peripheral region of platen, and the periphery frame 35 is for protecting Operating personnel prevents operating personnel's accidental falling.In the present embodiment, which is two;Under two It hangs platform 30 to be correspondingly arranged between three and half stringers 11 from bottom to top two layers and three layers and between three layers and three and half, indulge Anti-fall support 20 is correspondingly arranged at the position of the lower extension platform 30 of the installation of beam 11 two, three anti-fall supports 20 are one of to be corresponded to Guidance tape 12, other two respectively corresponds two lower extension platforms 30.
The component 40 that climbs is arranged along the vertical direction, and the component 40 that climbs is for being promoted or being fallen to frame body 10;It should The component 40 that climbs includes promoting hanging seat 41, the lifting member 42 connecting with promotion hanging seat 41 and the hanging piece 43 connecting with frame body 10; 41 triangular shape of promotion hanging seat is arranged along the vertical direction, which is connected and fixed with building body 95;The promotion 42 top of part is connected and fixed with hanging seat 41 is promoted, and the low side of the lifting member 42 is connected and fixed with hanging piece 43 is played;It is right that this plays hanging piece 43 It should be arranged on stringer 11 and be connected and fixed with stringer 11, this plays the correspondence of hanging piece 43 and is set on stringer 11.In the present embodiment, The lifting member 42 is electric hoist;The promotion hanging seat 41 is correspondingly arranged at the second layer of three and half stringers 11 from bottom to top, this Hanging piece 43 is correspondingly arranged at the bottom end of stringer 11.
The overhead gage 50 is in T-shaped structure setting, and the overhead gage 50 and the top of frame body 10 are connected and fixed, the overhead gage 50 Bottom is extended along 11 direction of stringer and is connected and fixed with stringer 11, and the top of the overhead gage 50 is horizontally extending to be set It sets, operating personnel of the overhead gage 50 in External Wall climbing frame 100 protects, and prevents the top of Climbing frame for outer-wall 100 from occurring Object is fallen, while 95 exterior wall of the building body of finishing is protected from and is damaged by pendant object.
The present invention provides a kind of application method of Climbing frame for outer-wall 100, and based on above-mentioned Climbing frame for outer-wall 100, the exterior wall is climbed The application method of frame 100 includes the following steps:
Step S1: being arranged preformed hole on building body 95, and the construction climbing frame 90 is disposed around described by the preformed hole The outside of building body 95 build by main structure of the construction climbing frame 90 to building body 95 and lead with to building The construction speed of 95 height of body and promoted;The construction climbing frame 90 does not block the preformed hole during being promoted;
Step S2: the preformed hole left after being promoted using the construction climbing frame 90 installs the Climbing frame for outer-wall 100, leads to The Climbing frame for outer-wall 100 is crossed to fit up the exterior wall of building body 95;The Climbing frame for outer-wall 100 is described during being promoted to be built It makes climbing frame 90 and continues up the construction construction for carrying out main structure to building body 95, the process that the Climbing frame for outer-wall 100 is promoted It is middle to block the preformed hole passed through;
Step S21: providing the component 40 that climbs, and the top of the component 40 that climbs is passed through lower extension platform 30 and building body The bottom end for the component 40 that climbs is connected and fixed by 95 connections with frame body 10 simultaneously, is promoted Climbing frame for outer-wall 100 by lifting assembly pre- If height, then the anti-fall support 20 of bottom is removed to while being passed through the top that lower extension platform 30 is mounted on frame body 10, and then will 10 top of frame body is connected and fixed with building body 95;The top of lifting assembly is separated with building body 95 again and is lifted up simultaneously It is connected and fixed with building body 95 after preset height, is prepared with being promoted for the Climbing frame for outer-wall 100 of next time again.
Step S3: after the building body 95 binds, using tower crane by the construction climbing frame 90 from the building body 95 It hangs oneself and removes, complete the construction of building body 95;And
Step S4: the Climbing frame for outer-wall 100 is continued by the preformed hole not blocked in construction 90 lifting process of climbing frame Rise, until rising to the top of building body 95, the Climbing frame for outer-wall 100 is hung oneself from the building body 95 using tower crane It removes, completes the finishing of building body 95.
Specifically, above-mentioned construction climbing frame 90 is for building the structure of building body 95, it is possible to understand that ground, this is built Making climbing frame 90 can correspond to using four and half shape structure settings, can by setting Climbing frame for outer-wall 100 and the construction guarantee of climbing frame 90 With progress synchronous with exterior wall finishing to the main body mechanism of building body 95 simultaneously, and then effectively shorten construction period.
The present invention provides the application method of another Climbing frame for outer-wall 100, based on above-mentioned Climbing frame for outer-wall 100, the exterior wall The application method of climbing frame 100 includes the following steps:
Step S1: being arranged preformed hole on building body 95, and the construction climbing frame 90 is disposed around described by the preformed hole The outside of building body 95 build by main structure of the construction climbing frame 90 to building body 95 and lead with to building The construction speed of 95 height of body and promoted;The construction climbing frame 90 does not block the preformed hole during being promoted;
Step S2: the preformed hole left after being promoted using the construction climbing frame 90 installs the Climbing frame for outer-wall 100, leads to The Climbing frame for outer-wall 100 is crossed to fit up the exterior wall of building body 95;The Climbing frame for outer-wall 100 is described during being promoted to be built It makes climbing frame 90 and continues up the construction construction for carrying out main structure to building body 95, the process that the Climbing frame for outer-wall 100 is promoted It is middle to block the preformed hole passed through;
Step S21: providing the component 40 that climbs, and the top of the component 40 that climbs is passed through lower extension platform 30 and building body The bottom end for the component 40 that climbs is connected and fixed by 95 connections with frame body 10 simultaneously, is promoted Climbing frame for outer-wall 100 by lifting assembly pre- If height, then the anti-fall support 20 of bottom is removed to while being passed through the top that lower extension platform 30 is mounted on frame body 10, and then will 10 top of frame body is connected and fixed with building body 95;The top of lifting assembly is separated with building body 95 again and is lifted up simultaneously It is connected and fixed with building body 95 after preset height, is prepared with being promoted for the Climbing frame for outer-wall 100 of next time again.
Step S3: after the building body 95 binds, the construction climbing frame 90 is begun to decline, while the construction climbing frame 90 The exterior wall of the building body 95 is fitted up from top to bottom, it has been passed through during the building climbing frame decline reserved Hole is blocked, and the continuation of Climbing frame for outer-wall 100 from bottom to top fits up the exterior wall of the building body 95 at this time, until The construction climbing frame 90 merges with Climbing frame for outer-wall 100;
Step S4: the construction climbing frame 90 and Climbing frame for outer-wall 100 can and after, construction climbing frame 90 is climbed with exterior wall using tower crane Frame 100 is hung oneself from building body 95 and is removed, and the construction of building body 95 and the construction of finishing are completed.
The working principle of Climbing frame for outer-wall 100 in the present embodiment are as follows: when frame body 10 moves up, pass through the component 40 that climbs It pulls frame body 10 to move up along the guide direction of anti-fall support 20, and then the support block being arranged on stringer 11 is made to drive limit valve 22 are rotated up while tensile elasticity element 23, make elastic element 23 that elastic deformation occur, limit after support block leaves limit valve 22 Position valve 22 resets under the action of elastic element 23, and abuts with next support block, and then guarantees that frame body 10 moves up the time limit Position valve 22 does not carry out locking to frame body 10;After frame body 10 is promoted to designated position, by the anti-fall support 20 of bottom from building It is removed in main body 95, while being reinstalled on building body 95 and connecting with the top of frame body 10 by the lower extension platform 30 of top It connects, and the corresponding pendant that will be promoted is separated with building body 95 and lifting member 42 respectively, while will by the lower extension platform 30 of lower section It promotes pendant and moves up preset height, pendant will be promoted again and be mounted on building body 95 and connect with lifting member 42, under Secondary promotion operation prepares.
When frame body 10 declines downwards, the lower extension platform 30 for first passing through top removes the anti-fall support 20 of the top, together When connect respectively with building body 95 and frame body 10 by the walkway board 12 of bottom, then pass through climb component 40 drive frame body 10 Decline specified altitude assignment, promoted at this time after frame body 10 drops to specified altitude assignment at the lower extension platform 30 that hanging seat 41 is located above, is led to The lower extension platform 30 for crossing top will promote hanging seat 41 and separate with building body 95, and will be promoted and hung by the lower extension platform 30 of lower section Seat 41 is fixed with building body 95 again after moving down specified altitude assignment, to prepare for decline next time.
When frame body 10 is unexpected to fall off, frame body 10 is moved down under the effect of gravity, be arranged in support block on stringer 11 to Lower mobile correspondence is connected in arrival slot 220, and then generates the trend for driving limit valve 22 to rotate down, due to stringer 11 and installation One end connection of the seat 21 far from building body 95, and then mounting base 21, stringer 11 and limit valve 22 constitute the mutual of triangle Connection relationship, and then prevent moving down for frame body 10 anti-fall to play the role of;Elder generation is needed when needing and landing to frame body 10 Limit valve 22 is pulled into 95 direction of building body, limit valve 22 is made to separate the normal decline that can guarantee frame body 10 with frame body 10.
Referring to Fig. 4, being the Climbing frame for outer-wall 200 of second embodiment of the invention, the Climbing frame for outer-wall 200 and first embodiment In Climbing frame for outer-wall 100 difference in place of be, be provided with inclination indicator on the frame body of the Climbing frame for outer-wall 200 in the present embodiment 60;The horizontally extending setting of inclination indicator 60, the inclination indicator 60 include socket 61 and are mounted on socket 61 Two instruction pipes 62;The 61 rectangular block shape structure setting of socket, the socket 61 is for installing instruction pipe 62;Two indicate that pipes 62 are in It is mutually perpendicular to shape structure setting, in sealing hollow columnar pipe structure setting, two indicate to be provided with liquid in pipes 62 two instruction pipes 62 And it is preset with bubble, the two instruction horizontally extending settings of pipe 62, and then can be corresponded to by the position of bubble in instruction pipe 62 The levelness for adjusting frame body indicates the bubble in pipe 62 all in the middle position of instruction pipe 62 until two;On the socket 61 There are two standard cells 65 for setting;The setting position of two standard cells 65 respectively corresponds the middle position of two instruction pipes 62.In this reality It applies in example, which is connected and fixed on walkway board 12a and with walkway board 12a;Two instruction pipes 62 are in L Shape structure setting, the L-shape structure setting of two standard cell 65;Two instruction pipes 62 one of them set along the extension of building body wall face It sets, another is extended along vertical building body wall face.
It is horizontal when can show erection of frames that Climbing frame for outer-wall 200 in the present embodiment rolls indicator 60 by setting State, and by adjusting the position of anti-fall support can the levelness of External Wall climbing frame be adjusted, and then effectively prevent using Occur the case where frame body inclination or flare in journey or lifting process, further improves the safety of Climbing frame for outer-wall 200;By being in Two instruction pipes 62 of L shape setting show the horizontality of frame body in the horizontal plane in both directions, and then effectively to the outer of frame body Incline and is detected with rolling condition.
Referring to Fig. 5, being the Climbing frame for outer-wall 300 of third embodiment of the invention, the Climbing frame for outer-wall 300 and first embodiment In Climbing frame for outer-wall 100 difference place be, video component is installed on the frame body 10b of the Climbing frame for outer-wall 300 in the present embodiment 70, the control cabinet 71 being connect with the video component 70 and the display panel 72 being arranged on the control cabinet 71;It is described Video component 70 is arranged from the frame body 10b to building body direction, and the video component 70 is electrically connected with the control cabinet 71 It connects, which is used to shoot the condition of construction to building body exterior wall finishing and then passes information as electronic signals Give control cabinet 71;The control cabinet 71 is extended on the bottom end of frame body 10b along the vertical direction, the control cabinet 71 and frame Body 10b is connected and fixed, which is internally provided with wireless communication module, can be led to information by the wireless communication module It crosses cloud platform and passes to long-range mobile terminal, long-range mobile terminal can look into video information by specific software It sees, while assignment instructions, and the display surface by being arranged on hollow cabinet can be sent to wireless communication module by cloud platform Plate 72 carries out text importing to assignment instructions, for notifying operating personnel's directives for construction information.
Climbing frame for outer-wall 300 in the present embodiment, by control cabinet 71 realize can long distance wireless check that exterior wall finishing is applied Work situation, while can receive the assignment instructions remotely sent and corresponding to and being shown on display panel 72 by way of text, into And it realizes and remotely transmits directives for construction information to operating personnel, and then can greatly improve construction speed and can realize timely biography Up to the requirement of assignment instructions.
Above-mentioned Climbing frame for outer-wall guarantees operating personnel to anti-fall support by the way that lower extension platform corresponding with anti-fall support is arranged Installation, and then keep the installation of anti-fall support and frame body more stable, improve the safety of Climbing frame for outer-wall, while by under setting Platform is hung instead of the complicated connection structure of traditional climbing frame and then reduces the volume of Climbing frame for outer-wall, is guaranteeing the same of safety and steady When effectively reduce construction cost.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (12)

1. a kind of Climbing frame for outer-wall characterized by comprising
Frame body;
Anti-fall support, the anti-fall support are mounted on the side of the frame body;
At least one lower extension platform, the lower extension platform is connect with the frame body backwards to the side of the anti-fall support, under described The setting position for hanging platform is corresponding with the setting position of the anti-fall support;The lower extension platform includes connecting with the frame body Platen and the peripheral frame that is connect with the platen;And
Climb component, and the component that climbs is mounted on the frame body.
2. Climbing frame for outer-wall according to claim 1, which is characterized in that the Climbing frame for outer-wall further includes overhead gage;On described Baffle is connected and fixed with the frame body top.
3. Climbing frame for outer-wall according to claim 1, which is characterized in that the frame body includes stringer, one end and the stringer The walkway board of connection, with the walkway board backwards to the centre keel that one end of stringer is connect, the protection being mounted on the centre keel Net and the reinforcing beam being connect respectively with the stringer and centre keel.
4. Climbing frame for outer-wall according to claim 3, which is characterized in that it is described climb component include promoted hanging seat, with it is described The hanging piece for promoting the lifting member of hanging seat connection and being connect with the frame body.
5. Climbing frame for outer-wall according to claim 4, which is characterized in that the stringer is three and half settings, the centre keel It is arranged for one layer of half structure;The setting quantity of the anti-fall support is three, and the lower setting quantity for hanging platform is two;Three The one of corresponding walkway board of a anti-fall support, other two respectively corresponds two lower extension platforms;The promotion Hanging seat is correspondingly arranged at the second layer position of the stringer, and described hanging piece is correspondingly arranged at the bottom end of the stringer.
6. Climbing frame for outer-wall according to claim 3, which is characterized in that the anti-fall support includes mounting base and the peace The limit valve of dress seat pivot joint and the elastic element for being separately connected the mounting base and limit valve connection;The stringer is slidably installed in institute It states in mounting base, support block is provided on the stringer, the limit valve is provided with arrival slot close to one end of the stringer, described to support Block correspondence is connected in the arrival slot.
7. Climbing frame for outer-wall according to claim 1, which is characterized in that be provided with inclination indicator on the frame body;It is described Rolling indicator includes socket and two instructions being mounted on socket pipe;The two instruction pipes are in be mutually perpendicular to shape knot Structure setting;Two standard cells are provided on the socket, the setting position of two standard cells respectively corresponds the centre of two instruction pipes Position.
8. Climbing frame for outer-wall according to claim 7, which is characterized in that the two instruction pipes are in sealing hollow columnar pipe structure It is arranged, be provided with liquid in the two instruction pipes and is preset with bubble;L-shape structure setting, two marks are managed in two instructions The quasi- L-shape structure setting of slot.
9. a kind of application method of Climbing frame for outer-wall, based on the Climbing frame for outer-wall described in claim 1, which is characterized in that described outer The application method of wall climbing frame includes the following steps:
Step S1: being arranged preformed hole on building body, and the construction climbing frame is disposed around the building body by the preformed hole Outside, by main structure of the construction climbing frame to building body carry out build and with the construction to building body height into It spends and is promoted;The construction climbing frame does not block the preformed hole during being promoted;
Step S2: the preformed hole left after being promoted using the construction climbing frame installs the Climbing frame for outer-wall, by described outer Wall climbing frame fits up the exterior wall of building body;The construction climbing frame continues up pair during the Climbing frame for outer-wall is promoted Building body carries out the construction construction of main structure, the Climbing frame for outer-wall blocked during being promoted passed through it is described reserved Hole;
Step S3: after the building body binds, being hung oneself from the building body by the construction climbing frame using tower crane and removed, and is completed The construction of building body;And
Step S4: the Climbing frame for outer-wall continues to rise by the preformed hole not blocked in the construction climbing frame lifting process, until The Climbing frame for outer-wall is hung oneself from the building body using tower crane and is removed by the top for rising to building body, completes building body Finishing.
10. the application method of Climbing frame for outer-wall according to claim 9, which is characterized in that the step S2 and step S3 it Between further include:
Step S21: providing the component that climbs, and the top of the component that climbs is connect by lower extension platform with building body and simultaneously will It climbs the bottom end of component and frame body is connected and fixed, Climbing frame for outer-wall is promoted by preset height by lifting assembly, then by bottom Anti-fall support is removed while by lower extension stage+module on the top of frame body, and then frame body top is connect admittedly with building body It is fixed;The top of lifting assembly is separated again to be lifted up simultaneously after preset height with building body and is connect again with building body admittedly It is fixed, prepared with being promoted for the Climbing frame for outer-wall of next time.
11. a kind of application method of Climbing frame for outer-wall, based on the Climbing frame for outer-wall described in claim 1, which is characterized in that described outer The application method of wall climbing frame includes the following steps:
Step S1: being arranged preformed hole on building body, and the construction climbing frame is disposed around the building body by the preformed hole Outside, by main structure of the construction climbing frame to building body carry out build and with the construction to building body height into It spends and is promoted;The construction climbing frame does not block the preformed hole during being promoted;
Step S2: the preformed hole left after being promoted using the construction climbing frame installs the Climbing frame for outer-wall, by described outer Wall climbing frame fits up the exterior wall of building body;The construction climbing frame continues up pair during the Climbing frame for outer-wall is promoted Building body carries out the construction construction of main structure, the Climbing frame for outer-wall blocked during being promoted passed through it is described reserved Hole;
Step S3: after the building body binds, the construction climbing frame is begun to decline, while the construction climbing frame is right from top to bottom The exterior wall of the building body is fitted up, and is blocked during the building climbing frame decline to the preformed hole that it has passed through, The Climbing frame for outer-wall continuation from bottom to top fits up the exterior wall of the building body at this time, up to the construction climbing frame and outside Wall climbing frame merges;
Step S4: the construction climbing frame and Climbing frame for outer-wall can and after, using tower crane by the construction climbing frame and Climbing frame for outer-wall from institute It states building body and hangs oneself and remove, complete building body and build and the construction of finishing.
12. the application method of Climbing frame for outer-wall according to claim 11, which is characterized in that the step S2 and step S3 it Between further include:
Step S21: providing the component that climbs, and the top of the component that climbs is connect by lower extension platform with building body and simultaneously will It climbs the bottom end of component and frame body is connected and fixed, Climbing frame for outer-wall is promoted by preset height by lifting assembly, then by bottom Anti-fall support is removed while by lower extension stage+module on the top of frame body, and then frame body top is connect admittedly with building body It is fixed;The top of lifting assembly is separated again to be lifted up simultaneously after preset height with building body and is connect again with building body admittedly It is fixed, prepared with being promoted for the Climbing frame for outer-wall of next time.
CN201811149197.XA 2018-09-29 2018-09-29 Outer wall climbing frame and application method thereof Active CN109184174B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811149197.XA CN109184174B (en) 2018-09-29 2018-09-29 Outer wall climbing frame and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811149197.XA CN109184174B (en) 2018-09-29 2018-09-29 Outer wall climbing frame and application method thereof

Publications (2)

Publication Number Publication Date
CN109184174A true CN109184174A (en) 2019-01-11
CN109184174B CN109184174B (en) 2021-06-04

Family

ID=64907014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811149197.XA Active CN109184174B (en) 2018-09-29 2018-09-29 Outer wall climbing frame and application method thereof

Country Status (1)

Country Link
CN (1) CN109184174B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914602A (en) * 2021-11-16 2022-01-11 中交一公局集团有限公司 Anti-falling device for lifting type climbing frame

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2276046Y (en) * 1996-05-07 1998-03-11 李府仙 Divided multistage automatic climbing external scaffold
CN102011486A (en) * 2010-12-21 2011-04-13 青岛安装建设股份有限公司 Ring-shaped lifting operating platform for vertical storage tank
CN202882378U (en) * 2012-09-26 2013-04-17 中国建筑第八工程局有限公司 Attached type lifting scaffold
CN103821341A (en) * 2014-03-10 2014-05-28 成都嘉泽正达科技有限公司 Attached automatic lifting multilayer construction platform
CN203810695U (en) * 2014-03-12 2014-09-03 滁州市百扬信息技术有限公司 Split air conditioner outdoor machine support installation template
CN104110124A (en) * 2014-07-25 2014-10-22 广东信海建筑有限公司 Inserted lift scaffold with video security monitoring system
CN203924661U (en) * 2014-07-03 2014-11-05 武汉天蝎建筑装备有限公司 Automatic lifting steel platform
CN204212442U (en) * 2014-11-12 2015-03-18 山东三箭建设工程股份有限公司 A kind of hi-Fix guiding device
CN205742982U (en) * 2016-06-17 2016-11-30 江苏建筑职业技术学院 A kind of printing opacity template for building
CN107268971A (en) * 2017-07-05 2017-10-20 中国建筑第二工程局有限公司 A kind of super high rise building it is dual from hoisting type outer climbing frame and application process
CN207348430U (en) * 2017-09-24 2018-05-11 中铁四局集团建筑工程有限公司 High-building intelligent elevating safety operating platform
CN207583296U (en) * 2017-09-30 2018-07-06 泉州市鹏龙装饰工程有限公司 A kind of maintenance suspension ladder for municipal science of bridge building

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2276046Y (en) * 1996-05-07 1998-03-11 李府仙 Divided multistage automatic climbing external scaffold
CN102011486A (en) * 2010-12-21 2011-04-13 青岛安装建设股份有限公司 Ring-shaped lifting operating platform for vertical storage tank
CN202882378U (en) * 2012-09-26 2013-04-17 中国建筑第八工程局有限公司 Attached type lifting scaffold
CN103821341A (en) * 2014-03-10 2014-05-28 成都嘉泽正达科技有限公司 Attached automatic lifting multilayer construction platform
CN203810695U (en) * 2014-03-12 2014-09-03 滁州市百扬信息技术有限公司 Split air conditioner outdoor machine support installation template
CN203924661U (en) * 2014-07-03 2014-11-05 武汉天蝎建筑装备有限公司 Automatic lifting steel platform
CN104110124A (en) * 2014-07-25 2014-10-22 广东信海建筑有限公司 Inserted lift scaffold with video security monitoring system
CN204212442U (en) * 2014-11-12 2015-03-18 山东三箭建设工程股份有限公司 A kind of hi-Fix guiding device
CN205742982U (en) * 2016-06-17 2016-11-30 江苏建筑职业技术学院 A kind of printing opacity template for building
CN107268971A (en) * 2017-07-05 2017-10-20 中国建筑第二工程局有限公司 A kind of super high rise building it is dual from hoisting type outer climbing frame and application process
CN207348430U (en) * 2017-09-24 2018-05-11 中铁四局集团建筑工程有限公司 High-building intelligent elevating safety operating platform
CN207583296U (en) * 2017-09-30 2018-07-06 泉州市鹏龙装饰工程有限公司 A kind of maintenance suspension ladder for municipal science of bridge building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914602A (en) * 2021-11-16 2022-01-11 中交一公局集团有限公司 Anti-falling device for lifting type climbing frame
CN113914602B (en) * 2021-11-16 2023-01-06 中交一公局集团有限公司 Anti-falling device for lifting type climbing frame

Also Published As

Publication number Publication date
CN109184174B (en) 2021-06-04

Similar Documents

Publication Publication Date Title
CN107355067B (en) The automatic lifting purlin crane system construction operation platform of Steel Structure Installation
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN111424952B (en) Climb a corner connecting device and climb a assembly
CN104895335B (en) Method for mounting hanging pillar
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN109779244A (en) A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN104929353A (en) Detachable stepwise automatic climbing operating platform for elevator shafts
CN109184174A (en) Climbing frame for outer-wall and its application method
CN106013453B (en) Long-span Cantilever transfinites structure construction engineering method
CN208103685U (en) The detachable multilayer hanging-basket of high altitude operation
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN206368527U (en) Operating platform and operation platform system
JP5105146B2 (en) Gondola device and method for constructing exterior of building using gondola device
CN105239804B (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN108331326A (en) Monoblock type mould bases and its construction method for Super High fission conjoined composite structure
CN208734045U (en) Monoblock type mould bases for Super High fission conjoined composite structure
CN113756503B (en) Construction method of Z-shaped streamer hall
CN213297070U (en) Large-span ultrahigh-degree steel structure net rack construction work platform
CN209651673U (en) A kind of construction elevator attaching structure of lifting platform
CN111155754A (en) Automatic elevator shaft jacking platform and using method thereof
CN202913705U (en) Large curtain wall unit plate track lifting device
CN220723383U (en) Adjusting mechanism for tower crane wall-attached supporting platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190618

Address after: 528300 East Office, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Bozhilin Robot Co., Ltd.

Address before: 519031 Room 105-44144, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Applicant before: Building dream high tech Construction Company Limited

GR01 Patent grant
GR01 Patent grant