CN206368527U - Operating platform and operation platform system - Google Patents
Operating platform and operation platform system Download PDFInfo
- Publication number
- CN206368527U CN206368527U CN201621352830.1U CN201621352830U CN206368527U CN 206368527 U CN206368527 U CN 206368527U CN 201621352830 U CN201621352830 U CN 201621352830U CN 206368527 U CN206368527 U CN 206368527U
- Authority
- CN
- China
- Prior art keywords
- support body
- platform
- operating platform
- building
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model is related to technical field of building construction, more particularly, to a kind of operating platform and operation platform system.Operating platform includes the first support body and the second support body;Second support body is fixedly installed on the top of first support body, and some or all of of second support body protrudes from first support body;Carrying platform is set on second support body, and some or all of of the carrying platform protrudes from first support body.Operation platform system includes above-mentioned operating platform, includes the traveling wheel of multiple bottoms for being arranged at first support body.The purpose of this utility model is to provide a kind of operating platform and operation platform system, to solve present in prior art using hanging basket or set up scaffold and carry out the poor technical problem of construction applicability.
Description
Technical field
The utility model is related to technical field of building construction, more particularly, to a kind of operating platform and operation platform system.
Background technology
Construction industry is fast-developing in recent years, and the square-folded building of tradition is fewer and fewer, the substitute is and occurs in that
The complicated building of a large amount of high-rise, moulding.Meanwhile, with the complicated of building structure, the change of facade shape, particularly exist
In commercial building, for the aesthetic property of building, building outside cornice shows diversified moulding.
Using hanging basket or set up scaffold often being constructed to this position decorative panel in the past and construct, for
Upper two kinds of construction methods, there is its limitation.Hanging basket needs ceaselessly to carry out the movement of hanging basket position in use, and such as
The length of cornice ledge is inconsistent on the outside of really each floor, then can not use hanging basket;If setting up scaffold to be constructed, take
If scaffold frame structure is complicated, the amount of setting up is larger, and be both needed to expend during assembling and dismantling scaffold
Many is artificial, and floor it is higher when be also not suitable for setting up scaffold.It is therefore apparent that traditional construction method, instrument are gradually
It is not in step with the times, is necessarily faced with superseded, this is accomplished by new method, instrument to solve this problem, and this is to engineering
Construction causes great challenge.
Therefore, the application provides a kind of new operating platform and operation platform system regarding to the issue above.
Utility model content
The purpose of this utility model is to provide a kind of operating platform, to solve present in prior art using hanging basket or
Person sets up scaffold and carries out the poor technical problem of construction applicability.
The purpose of this utility model also resides in a kind of operation platform system of offer, to solve to use present in prior art
Hanging basket sets up the poor technical problem of scaffold progress construction applicability.
The operating platform provided based on above-mentioned first purpose, the utility model, including the first support body and the second support body;
Second support body is fixedly installed on the top of first support body, and second support body is some or all of
Protrude from first support body;
Carrying platform is provided with second support body, some or all of of the carrying platform protrudes from described first
Support body.
Further, the first support body described in the utility model includes the fixed knot for being used to be fixedly connected with the inside of building
Structure;
Or, side of first support body away from second support body is provided with balance weight body.
Further, the first support body described in the utility model is connected with for making the balance weight body be fixed on the first
Connector on body.
Further, it is additionally provided with cat ladder on the first support body described in the utility model;
One end of the cat ladder connects the carrying platform, and the other end connects the bottom of first support body.
Further, the second support body described in the utility model also includes guardrail;The guardrail is arranged on the carrying platform
One side away from first support body, and the guardrail is provided with the cat ladder entrance corresponding with the cat ladder;
And/or, it is provided with safety belt on second support body.
Further, the first support body described in the utility model includes being fixed by crossbeam and vertical beam connecting with second support body
The frame side connect;
The diagonal cant beam for being fixedly connected with the frame side is provided with the frame side;
Wherein, length direction of the length direction of the crossbeam perpendicular to the vertical beam.
Further, it is provided with A-frame between crossbeam described in the utility model and the vertical beam.
Based on above-mentioned second purpose, the operation platform system that the utility model is provided, including above-mentioned operating platform and many
The traveling wheel of the individual bottom for being arranged at first support body.
Further, traveling wheel described in the utility model includes universal wheel and/or the wheel with brake.
Further, the bottom of the first support body described in the utility model is provided with adjustable support pin.
In summary, when being constructed using operating platform described in the utility model, operating platform, which is moved to, needs construction
The inside of next floor at position, specifically, the first support body is arranged at the inside of building, due to holding on the second support body
The some or all of of carrying platform protrudes from the first support body, therefore, and some or all of by carrying platform is arranged at building
Outside so that carrying platform protrudes this floor, then first body phase is fixed for building, and it is flat that workmen stands on carrying
On platform, you can carry out constructing operation to the position for needing to construct.
, can be by causing the second frame when operating platform described in the utility model is applied to the building with outside cornice
Carrying platform on the body extended length overhanging relative to building, constructing operation, example are carried out to the outside cornice of building
It can such as be realized by the way that first body phase is moved for building to the outside of building;Operation described in the utility model
, can be by changing on the second support body during the inconsistent building of the length of platform application cornice ledge on the outside of each floor
The carrying platform length overhanging relative to building, for example can be by by to adapt to the different outside cornices of building
One support body is realized relative to outside from building to building or medial movement;Certainly, operation described in the utility model
Platform can also apply to the building of story height, will not can not be used because of the story height of building.
To sum up, operating platform described in the utility model can be suitably used for the regular building of profile, the building with outside cornice,
The inconsistent building of the length of cornice ledge and the building of story height on the outside of each floor.For hanging basket is used, energy
The inconsistent building of length suitable for cornice ledge on the outside of each floor;For scaffold is set up, this practicality is new
The operating platform overall structure of type is simple, small volume, low-cost, it is not necessary to the big amount of setting up, and can be suitably used for building for story height
Build, solve present in prior art using hanging basket or set up scaffold and carry out the poor technical problem of construction applicability.
The operation platform system that the utility model is provided, including above-mentioned operating platform, solve and exist in the prior art
Use hanging basket or set up scaffold and carry out the poor technical problem of construction applicability.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the utility model embodiment, it will use below required in embodiment
Accompanying drawing be briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore should not be by
Regard the restriction to scope as, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also
To obtain other related accompanying drawings according to these accompanying drawings.
The structural representation at the first visual angle of the operating platform that Fig. 1 provides for the utility model embodiment;
The structural representation at the second visual angle of the operating platform that Fig. 2 provides for the utility model embodiment;
The structural representation at the 3rd visual angle of the operating platform that Fig. 3 provides for the utility model embodiment;
The structural representation at the 4th visual angle of the operating platform that Fig. 4 provides for the utility model embodiment.
Icon:The support bodys of 1- first;The support bodys of 2- second;3- carrying platforms;4- balance weight bodies;5- cat ladders;6- guardrails;71- crossbeams;
72- vertical beams;73- cant beams;8- traveling wheels.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described
Embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on the embodiment in the utility model, sheet
The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality
Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular
Directly ", the orientation or position relationship of the instruction such as " level ", " interior ", " outer " are, based on orientation shown in the drawings or position relationship, to be only
Described for the ease of description the utility model and simplifying, rather than to indicate or imply that signified device or element must have specific
Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the
One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model
Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly
Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
Concrete meaning of the language in the utility model.
The structural representation at the first visual angle of the operating platform that Fig. 1 provides for the utility model embodiment;Fig. 2 is this practicality
The structural representation at the second visual angle of the operating platform that new embodiment is provided;The behaviour that Fig. 3 provides for the utility model embodiment
Make the structural representation at the 3rd visual angle of platform;4th visual angle of the operating platform that Fig. 4 provides for the utility model embodiment
Structural representation.
Embodiment one
Referring to shown in Fig. 1-Fig. 4, the present embodiment provides a kind of operating platform, including the first support body 1 and the second support body 2;
Second support body 2 is fixedly installed on the top of first support body 1, and the part of second support body 2 or
All protrude from first support body 1;
Be provided with carrying platform 3 on second support body 2, the carrying platform 3 it is some or all of protrude from it is described
First support body 1.
Alternatively, carrying platform 3 is by mounting, snapping or is welded to connect on the second support body 2, it is preferable that carrying is flat
Platform 3 is by being welded to connect on the second support body 2, to improve the bonding strength of the support body 2 of carrying platform 3 and second, prevents carrying flat
Platform 3 is moved relative to the second support body 2, with potential safety hazard.
In summary, when being constructed using the operating platform described in the present embodiment, operating platform, which is moved to, needs construction portion
The inside of next floor of position, specifically, the first support body is arranged at the inside of building, due to the carrying on the second support body
The some or all of of platform protrudes from the first support body, therefore, by some or all of building that is arranged at of carrying platform
It is outside so that carrying platform 3 protrudes this floor, then the first support body 1 is fixed relative to building, and it is flat that workmen stands on carrying
On platform 3, you can carry out constructing operation to the position for needing to construct.
, can be by causing the second support body when operating platform described in the present embodiment is applied to the building with outside cornice
Carrying platform 3 on 2 extended length overhanging relative to building, constructing operation, example are carried out to the outside cornice of building
It can such as be realized by the way that the first support body 1 is moved relative to building to the outside of building;Operation described in the present embodiment
, can be by changing on the second support body 2 during the inconsistent building of the length of platform application cornice ledge on the outside of each floor
The length overhanging relative to building of carrying platform 3, to adapt to the different outside cornices of building, can for example pass through will
First support body 1 is realized relative to outside from building to building or medial movement;Certainly, the operation described in the present embodiment
Platform can also apply to the building of story height, will not can not be used because of the story height of building.
To sum up, the operating platform described in the present embodiment can be suitably used for profile rule building, building, respectively with outside cornice
The inconsistent building of the length of cornice ledge and the building of story height on the outside of floor.Compared to using for hanging basket, it can fit
The inconsistent building of length for cornice ledge on the outside of each floor;For scaffold is set up, the present embodiment
Operating platform overall structure is simple, small volume, low-cost, it is not necessary to the big amount of setting up, and can be suitably used for the building of story height, solves
Determine present in prior art using hanging basket or set up scaffold and carry out the poor technical problem of construction applicability.
Alternatively, first support body 1 includes the fixed structure for being used to be fixedly connected with the inside of building;Or, ginseng
As shown in Figure 1, side of first support body 1 away from second support body 2 is provided with balance weight body 4.
Specifically, the first support body 1 includes the fixed structure for being used to be fixedly connected with the inside of building;Or, first
Side of the support body 1 away from the second support body 2 is provided with balance weight body 4;Or, the first support body 1 includes being used for consolidating with the inside of building
Surely the fixed structure connected, and side of first support body 1 away from the second support body 2 is provided with balance weight body 4.
Wherein, fixed structure for example can be on the first support body 1 set fixing hole (not shown), by bolt with
Connected in building;The weight of workman in the weight and loading plate of balance weight body 4 matches;Using fixed structure mode it is excellent
Point is due to that the first support body 1 is fixedly connected with the inside of building, safe, but is not easy to the movement of operating platform;Cause
This, it is preferable that side of first support body 1 away from the second support body 2 is provided with balance weight body 4 so that operating platform conveniently moving, and warp
Calculating is crossed so that the weight of the workman in the weight and loading plate of balance weight body 4 matches, the safety of workman is also ensured that.
It is further preferred that balance weight body 4 is fixedly connected with the first support body 1, prevent balance weight body 4 from dropping or artificially moving and
With potential safety hazard, safety of workers is further ensured that.
Preferably, first support body is connected with the connector for making the balance weight body be fixed on first support body
(not shown).
That is, first support body 1 is connected with connector;The connector is used to make the balance weight body 4 be fixed on
On first support body 1.
Alternatively, connector can be chain, rope, clamp etc., it is preferable that connector is stainless steel chain, prevents gold
Category chain gets rusty or rope becomes grain so that balance weight body 4 and the connection of the first support body 1 are unreliable, and with potential safety hazard.
By setting connector further to connect the support body 1 of balance weight body 4 and first so that the support body 1 of balance weight body 4 and first can
It is dual to be fixedly connected, further prevent balance weight body 4 from dropping or artificially moving and there is potential safety hazard, it is ensured that safety of workers.
Preferably, it is shown in Figure 1, it is additionally provided with cat ladder 5 on first support body 1;
One end of the cat ladder 5 connects the carrying platform 3, and the other end connects the bottom of first support body 1.
Alternatively, cat ladder 5 is fixedly connected with the first support body 1, or cat ladder 5 is articulated on the first support body 1;It is fixedly connected with example
Such as realized by welding, bonding.
By setting cat ladder 5 to connect the bottom of carrying platform 3 and first support body 1, to facilitate workman from the first support body 1
Bottom climb to constructing operation carried out on carrying platform 3.
Preferably, shown in Figure 2, second support body 2 also includes guardrail 6;It is flat that the guardrail 6 is arranged on the carrying
One side of the platform 3 away from first support body 1, and the guardrail 6 is provided with cat ladder 5 entrance corresponding with the cat ladder 5;
And/or, it is provided with safety belt on second support body 2.
It should be noted that carrying platform includes platform upper surface and multiple platform side surfaces mutually enclosed and connect, the height of guardrail
Platform upper surface of the direction perpendicular to carrying platform is spent, and positioned at the upside of carrying platform, and guardrail 6 is arranged at carrying platform 3
On platform side surface away from the first support body 1.
Specifically, the second support body 2 also includes guardrail 6;Guardrail 6 is arranged on one of carrying platform 3 away from the first support body 1
Face, and guardrail 6 is provided with cat ladder 5 entrance corresponding with cat ladder 5;Or, it is provided with safety belt on the second support body 2;Or, the
Two support bodys 2 also include guardrail 6;Guardrail 6 is arranged on one side of the carrying platform 3 away from the first support body 1, and guardrail 6 is provided with and climbed
The terraced 5 corresponding entrances of cat ladder 5, and, it is provided with safety belt on the second support body 2.
Preferably, the second support body 2 also includes guardrail 6;Guardrail 6 is arranged on one side of the carrying platform 3 away from the first support body 1,
And guardrail 6 is provided with cat ladder 5 entrance corresponding with cat ladder 5, and, it is provided with safety belt on the second support body 2;With double shield work
People's safety, prevents workman from falling from carrying platform 3.
Preferably, carrying platform 3 is the platform in quadrangle, and three side surfaces of quadrangle are provided with guardrail 6, another
Side surface connects cat ladder 5, further to ensure safety of workers, prevents workman from falling from carrying platform 3.
Alternatively, shown in Figure 4, first support body 1 includes by crossbeam 71 and vertical beam 72 with second support body 2
The frame side being formed by fixedly connecting;The diagonal cant beam 73 for being fixedly connected with the frame side is provided with the frame side;Wherein, the horizontal stroke
Length direction of the length direction of beam 71 perpendicular to the vertical beam 72.
By being provided with the diagonal cant beam 73 of connection frame side in frame side, connected by crossbeam 71 and vertical beam 72 with to improve and
Into frame side support strength, cant beam causes frame side to form constant triangular structure, prevents frame side from deforming and hidden with safety
Suffer from, ensure safety of workers and ensure the accuracy and accuracy of construction, improve construction quality.
Alternatively, crossbeam 71, vertical beam 72 and cant beam 73 are bamboo trunk, waddy or steel pipe, it is preferable that crossbeam 71, vertical beam 72
It is steel pipe with cant beam 73, and the surface of steel pipe scribbles antirust agent, to prevent steel pipe from getting rusty with potential safety hazard;Alternatively, each
By being welded to connect between steel pipe, it is preferable that be welded as full weld between each steel pipe, improve bonding strength, prevent meaning
Outer accident.
Preferably, A-frame (not marked in figure) is provided between the crossbeam 71 and the vertical beam 72, to improve horizontal stroke
The bonding strength of beam 71 and vertical beam 72, further prevents frame side from deforming and has potential safety hazard.
In summary, the present embodiment provide operating platform is simple in construction, low-cost, safe and reliable, strong applicability, and
Workman's easy construction, can meet profile rule building, building with outside cornice, on the outside of each floor cornice ledge length
The construction demand of the inconsistent building of degree and the building of story height.
Embodiment two
Embodiment two provides a kind of operation platform system, and the operation platform system includes the operation described in embodiment one
Platform, the technical characteristic of the operating platform disclosed in embodiment one is also applied for the embodiment, the published operation of embodiment one
Description is not repeated in the technical characteristic of platform.The embodiment to the operation platform system is carried out further below in conjunction with the accompanying drawings
Detailed description.
To save length, the improvement feature of the embodiment is equally embodied in Figs. 1-4, therefore, with reference to Fig. 1-Fig. 4 to this
The scheme of embodiment is illustrated.
Referring to shown in Fig. 1-Fig. 4, the operation platform system that the present embodiment is provided, including above-mentioned operating platform and multiple set
The traveling wheel 8 of the bottom of first support body 1 is placed in, to be moved easily operating platform, to adapt to the outside cornice of building.
Preferably, shown in Figure 3, the traveling wheel 8 includes universal wheel and/or the wheel with brake.
Specifically, traveling wheel includes universal wheel;Or, traveling wheel includes the wheel with brake;Or, traveling wheel bag
Include universal wheel and the wheel with brake.
Preferably, traveling wheel includes universal wheel and the wheel with brake;Universal wheel is put down with further facilitating moving operation
Platform;Wheel with brake enables to operating platform fixed in certain position, prevents workman from being applied on carrying platform 3
Man-hour operating platform shakes, and has on the one hand ensured the safety of workman, has on the other hand improved the quality of construction.
Preferably, the bottom of first support body 1 is provided with adjustable support pin (not shown), to facilitate regulation to hold
The height of carrying platform 3, so as to adapt to the construction height of workman.
Operation platform system described in the present embodiment has the advantages that operating platform described in embodiment one, and the advantage is in reality
Apply in example one and describe in detail, be not repeated herein.
Finally it should be noted that:Various embodiments above is only limited to illustrate the technical solution of the utility model, rather than to it
System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should
Understand:It can still modify to the technical scheme described in foregoing embodiments, or to which part or whole
Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly
The scope of each embodiment technical scheme of type.
Claims (10)
1. a kind of operating platform, it is characterised in that including the first support body and the second support body;
Second support body is fixedly installed on the top of first support body, and some or all of protrusion of second support body
In first support body;
Carrying platform is provided with second support body, some or all of of the carrying platform protrudes from the first
Body.
2. operating platform according to claim 1, it is characterised in that first support body include being used for in building
The fixed structure that portion is fixedly connected;
Or, side of first support body away from second support body is provided with balance weight body.
3. operating platform according to claim 2, it is characterised in that first support body is connected with for making the counterweight
Body is fixed on the connector on first support body.
4. operating platform according to claim 1, it is characterised in that be additionally provided with cat ladder on first support body;
One end of the cat ladder connects the carrying platform, and the other end connects the bottom of first support body.
5. operating platform according to claim 4, it is characterised in that second support body also includes guardrail;The guardrail
One side of the carrying platform away from first support body is arranged on, and the guardrail is provided with corresponding with the cat ladder climb
Terraced entrance;
And/or, it is provided with safety belt on second support body.
6. the operating platform according to claim any one of 1-5, it is characterised in that first support body and second frame
Body includes the frame side being formed by fixedly connecting by crossbeam and vertical beam;
The diagonal cant beam for being fixedly connected with the frame side is provided with the frame side;
Wherein, length direction of the length direction of the crossbeam perpendicular to the vertical beam.
7. operating platform according to claim 6, it is characterised in that be provided with triangle between the crossbeam and the vertical beam
Support.
8. a kind of operation platform system, it is characterised in that including the operating platform as described in claim any one of 1-7 and multiple
It is arranged at the traveling wheel of the bottom of first support body.
9. operation platform system according to claim 8, it is characterised in that the traveling wheel includes universal wheel and/or tool
There is the wheel of brake.
10. operation platform system according to claim 8, it is characterised in that the bottom of first support body is provided with can
Adjust support feet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621352830.1U CN206368527U (en) | 2016-12-09 | 2016-12-09 | Operating platform and operation platform system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621352830.1U CN206368527U (en) | 2016-12-09 | 2016-12-09 | Operating platform and operation platform system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206368527U true CN206368527U (en) | 2017-08-01 |
Family
ID=59394051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621352830.1U Active CN206368527U (en) | 2016-12-09 | 2016-12-09 | Operating platform and operation platform system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206368527U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806235A (en) * | 2017-09-27 | 2018-03-16 | 中车广东轨道交通车辆有限公司 | A kind of construction platform for being used to install railcar front windshield |
CN108086667A (en) * | 2017-12-15 | 2018-05-29 | 中国二十冶集团有限公司 | A kind of hanging basket postposition arm bearing extends overturning-preventing method |
CN110528847A (en) * | 2019-07-19 | 2019-12-03 | 中国建筑第二工程局有限公司 | Floor edge construction operation platform |
-
2016
- 2016-12-09 CN CN201621352830.1U patent/CN206368527U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806235A (en) * | 2017-09-27 | 2018-03-16 | 中车广东轨道交通车辆有限公司 | A kind of construction platform for being used to install railcar front windshield |
CN107806235B (en) * | 2017-09-27 | 2024-01-16 | 中车广东轨道交通车辆有限公司 | Construction platform for installing front windshield of metro vehicle |
CN108086667A (en) * | 2017-12-15 | 2018-05-29 | 中国二十冶集团有限公司 | A kind of hanging basket postposition arm bearing extends overturning-preventing method |
CN110528847A (en) * | 2019-07-19 | 2019-12-03 | 中国建筑第二工程局有限公司 | Floor edge construction operation platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206368527U (en) | Operating platform and operation platform system | |
CN104763109B (en) | Quick construction method for pressed bottom tile of large-span steel structure factory building roof | |
CN106400951B (en) | A kind of level and vertical structure method for synchronously constructing of super high-rise building | |
CN206408920U (en) | A kind of collapsible operating platform for narrow space | |
CN105908960B (en) | Scaffold for large space construction | |
CN205822747U (en) | Architectural engineering scaffold | |
CN217175627U (en) | Large flower-stand beam-riding type hanging basket structure for outer vertical face of commercial skirt house building | |
CN206144124U (en) | A scaffold for construction of tall and big space | |
CN208701506U (en) | Bridge Thin-wall Hollow Pier safety climbing ladder adheres to attachment device | |
CN108589533B (en) | Application method of arch rib high-altitude folding type operation platform | |
CN207776470U (en) | A kind of building side column protective platform | |
CN106522541B (en) | A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system | |
CN205476420U (en) | Modular steel cat ladder | |
CN207582929U (en) | Adhesion type elevating construction platform | |
CN207620384U (en) | Jack device for discharging | |
CN107059641B (en) | Goods shelf type pier body outer scaffold | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN212176482U (en) | Scaffold for building construction | |
CN108708671A (en) | A kind of hanging ladder and its application method with shield cage and operating platform | |
CN211776076U (en) | Steel construction retractable cat ladder of going to people for elevator well | |
CN209443737U (en) | A kind of outer eaves scaffold for building | |
CN208310160U (en) | Steel moving platform for mounting suspended rail type daylighting roof | |
CN208718326U (en) | A kind of building construction scaffold | |
CN102817464B (en) | Construction device for painting anti-corrosion and fireproof paint of building | |
CN108612329B (en) | Protective structure for high-rise building internal core tube construction and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |