CN109779244A CN201910207729.9A CN201910207729A CN109779244A CN 109779244 A CN109779244 A CN 109779244A CN 201910207729 A CN201910207729 A CN 201910207729A CN 109779244 A CN109779244 A CN 109779244A
Authority
CN
China
Prior art keywords
platform
wall
elevator
top layer
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910207729.9A
Other languages
Chinese (zh)
Inventor
肖成斌
杨阳
陈永明
解祥辉
张建勇
顾柳
高翔
张严
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Seventh Construction And Installation Engineering Co Ltd
Original Assignee
Nantong Seventh Construction And Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Seventh Construction And Installation Engineering Co Ltd filed Critical Nantong Seventh Construction And Installation Engineering Co Ltd
Priority to CN201910207729.9A priority Critical patent/CN109779244A/en
Publication of CN109779244A publication Critical patent/CN109779244A/en
Pending legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform constructions, it is related to elevator external wall construction working skill field, it is simple to solve design mostly, safety coefficient is low, it is at high cost, it cannot achieve automatic lifting, need specific structure type, the problem of facade arrangement could use, the elevator wall is internally provided with underlying platform, mezzanine platforms are provided with above the underlying platform, and there are two mezzanine platforms settings, top layer platform is provided with above the mezzanine platforms, vertical guide is provided between the top layer platform and underlying platform, there are two mezzanine platforms settings, and mezzanine platforms are located between two vertical guides, anti-fall wall-attached supporting seat is mounted in two opposed inner walls of the elevator wall, electric block is provided with above the top layer platform, the lower end of the electric block is arranged There is wirerope hook, the side of the vertical guide is set with control cabinet, is provided with top layer template above the top layer platform.

Description

A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction
Technical field
The present invention relates to elevator external wall construction working skill field, specially a kind of self-elevating type elevator hoistway exterior wall creeping formwork behaviour Make platform construction engineering method.
Background technique
Elevator is the hoistway for installing elevator, and the size of hoistway is determined according to elevator selection, and electricity is installed on the borehole wall Terraced track and counterweight track, reserved door opening install elevator door, and well headroom has elevator(lift) machine room.With the continuous hair of building technology Exhibition, the different self-elevating type elevator hoistway exterior wall creeping formwork operating platform of form are widely used in construction projects.
But there is also certain in use for the self-elevating type elevator hoistway exterior wall creeping formwork operating platform of existing many forms Limitation, design is simple mostly, and safety coefficient is low, at high cost, cannot achieve automatic lifting, needs specific structure type, facade Arrangement could use, and cannot fully meet the needs of engineering construction, reduce the economic benefit and security protection of elevator platform Effect makes the superiority of elevator platform be not in full use, therefore is badly in need of a kind of self-elevating type elevator hoistway exterior wall in the market and climbs Modulo operation platform construction engineering method is a little to solve the problems, such as this people.
Summary of the invention
The purpose of the present invention is to provide a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform constructions, on solving It states and proposes that design is simple mostly in background technique, safety coefficient is low, and it is at high cost, it cannot achieve automatic lifting, need specific structure The problem of form, facade arrangement could use.
To achieve the above object, the invention provides the following technical scheme: a kind of operation of self-elevating type elevator hoistway exterior wall creeping formwork is flat Platform construction, including elevator wall, the elevator wall are internally provided with underlying platform, the underlying platform it is upper Side is provided with mezzanine platforms, and there are two mezzanine platforms settings, top layer platform, the top are provided with above the mezzanine platforms Vertical guide is provided between layer platform and underlying platform, there are two mezzanine platforms settings, and mezzanine platforms are located at two vertically Between guide rail, it is mounted on anti-fall wall-attached supporting seat in two opposed inner walls of the elevator wall, and anti-fall wall-attached supporting seat and perpendicular Direction guiding rail is fixedly connected, and electric block is provided with above the top layer platform, and there are four electric block settings, described electronic The lower end of cucurbit is provided with wirerope hook, and the side of the vertical guide is set with control cabinet, the control cabinet with vertically lead Rail is fixedly connected by screw, wirerope is provided with below the anti-fall wall-attached supporting seat, and one end of wirerope passes through steel wire Rope is linked up with, and is provided with top layer template above the top layer platform, the two sides of the top layer template are provided with fixed link, described Stair are provided with above underlying platform and mezzanine platforms.
Preferably, the lower end of the vertical guide is provided with fixing seat, and the fixing seat is internally provided with runner slot, institute The runner that is internally provided with of runner slot is stated, and there are two runner settings.
Preferably, the runner and fixing seat are rotatablely connected by shaft, the side of the runner be provided with positive stop hook with Reseting hook, and positive stop hook and runner be by shaft rotation connection, is provided with connecting rod between the positive stop hook and reseting hook, and described turn Race is internally provided with hook groove.
Preferably, the connecting rod and positive stop hook and reseting hook are rotatablely connected by shaft, and the side of the reseting hook is set It is equipped with spring lever, and spring lever and reseting hook and runner are rotatablely connected by shaft.
Preferably, the control cabinet is internally provided with wireless remote control module, control processing unit and wireless receiving module, Pressure sensor is installed on the electric block.
Preferably, the pressure sensor is unidirectionally electrically connected with wireless receiving module, the wireless receiving module and control Processing unit processed is unidirectionally electrically connected, and the control processing unit is unidirectionally electrically connected with wireless remote control module, the wireless remote Control module is unidirectionally electrically connected with electric block.
Preferably, a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction, comprising the following steps:
Step 1: being familiar with building, structure and relevant speciality construction drawing, elevator connection detail construction etc., accomplish comprehensively Key points for operation are grasped, technology for full preparation are carried out for climbing elevator well operating platform operations, according to the bill of materials, purchase Material, processing and fabricating.
Step 2: preformed hole embedded part is embedded with elevator concrete structure construction progress, started setting up from the top plate. Preformed hole embedded part and reinforcing bar binding and fixing are closed on, to ensure that built-in fitting position is accurate, the both ends of built-in fitting are sealed using adhesive tape, Prevent concrete from entering.
Step 3: the point of anti-fall wall-attached supporting seat is always ensured that and scales cun 600 millimeters away from while wall on one side being arranged, separately It is on one side side length center, two hole of embedded hole guarantees 150 millimeters of center away from highly with two floors towards upper fixed ruler cun six Hundred millimeters, upper and lower two spacing is story height, and every layer so.When review, theodolite Yan electricity Ti Jingqiang or more is used by builder Play control line, positive and negative 20 millimeters of pre-buried hole tolerance.
Step 4: installing bottom layer platform.
Step 5: anti-fall wall-attached supporting seat is installed, by anti-fall wall-attached supporting seat high-strength through-wall bolt and elevator concrete walls Body structure is fixed, and wall outer side cushioning block is fixed.When installation, because anti-fall wall-attached supporting seat can have positive and negative 20 millimeters of deviations can It adjusts, according to control line, anti-fall wall-attached supporting seat is adjusted into position to center.
Step 6: installation vertical guide.
Step 7: installation mezzanine platforms.
Step 8: stair above installation mezzanine platforms and underlying platform.
Step 9: power device can be installed after the completion of the lifting of elevator platform, electric block is hung under top layer platform On the electric hoist Drawknot hook in portion, electronic lifting means is connected and fixed with wirerope and anti-fall wall-attached supporting seat and vertical guide;
Step 10: sync control device is the safety monitoring mechanism for controlling lifting process, pressure sensor is mounted on electricity Between dynamic cucurbit and suspension hook, for monitoring the lifting process of crane;
Step 11: carrying out the installation of top layer template according to elevator drawing size.When installation, using hinge, it is fixed on On top layer platform, centre plus stull are fixed, and stull has fine adjustment function, control dimensional discrepancy;
Step 12: loading 1000kg weight on platform, the load time, load tried for 24 hours after operating platform is set up After testing, meet construction loads needs through observation non-displacement and deformation, operating platform.After self-test is qualified, commission has corresponding qualification Inspection testing agency carry out an acceptance inspection, inspect for acceptance qualified rear can be used.It often to be checked in use process, discovery is asked Topic rectification in time, prevents the generation of all safety accidents;
Step 13: reinforcing bar can be used by retrial detection qualification first, according to drawing when installation before reinforcing bar binding It is bound and is welded with code requirement.After the installation is completed, it carries out self-test and management is reported and submitted to carry out concealment acceptance, after acceptance(check) It can carry out next procedure construction;
Step 14: pouring elevator exterior wall concrete;
Step 15: removing top layer template.
Compared with prior art, the beneficial effects of the present invention are:
1. the present invention passes through electronic automatic climbing.When construction, steel form, steel platform, ladder, vertical guide, electronic promotion Equipment, electric-control system formed an integrated operation platform, using electronic lifting means vertically guide rail, anti-fall wall-attached supporting seat with floor Construction speed is electronic upwards to climb, and mechanization degree is high, and highly-safe, labor intensity is low, saves artificial, raising labour production Rate.
2. the present invention passes through elevator exterior wall creeping formwork operating platform.After whole operation stage+module, top layer steel form With operating platform automatic climbing.After one layer of elevator concreting, self-elevating type elevator hoistway exterior wall creeping formwork operating platform climbs To the layer, inner side template of the top layer steel form as elevator wall, then outboard template is installed, meets elevator exterior wall concrete Formwork bracing system.
3. the present invention makes full use of the hoistway space that completed.The climbing elevator well operating platform covers four floors, Support operating platform of the top layer as creeping formwork, below tri-level construction personnel using hoistway operation platform ladder up and down floor, Construction efficiency is improved, is saved artificial.
4. the present invention is by setting twice anti-drop function, securely and reliably.Anti-fall support has the function of automatic drop resistant, works as promotion To after specified altitude assignment, anti-fall support blocks vertical guide automatically, then installs second falling-prevention protecting device, has been effectively ensured whole Body stability, safety.
5. the present invention reduces tower crane vertical transport workload.When climbing elevator well operating platform only lifts, removes in place It needs tower crane to cooperate, no longer tower crane is needed to transport after in place, reduce tower crane workload
6. the distinctive design of the present invention, is easily installed, can be used in turn.When needing different construction of lift well, as long as Partial modification is carried out to platform board, story height guarantees in ± 400mm deviation, mountable.Former designing material remains hundred Divide 18 not need to modify, solve being used in turn between different elevators, there is high economic benefit.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the annexation figure of vertical guide and anti-fall wall-attached supporting seat of the invention;
Fig. 3 is the principle of the present invention schematic diagram;
Fig. 4 is flowage structure schematic diagram of the invention.
In figure: 1, elevator wall;2, underlying platform;3, vertical guide;4, mezzanine platforms;5, top layer platform;6, anti-fall Wall-attached supporting seat;7, electric block;8, control cabinet;9, stair;10, wirerope is linked up with;11, wirerope;12, top layer template;13, solid Fixed pole;14, fixing seat;15, runner slot;16, runner;17, positive stop hook;18, connecting rod;19, hook groove;20, wireless remote control module; 21, processing unit is controlled;22, wireless receiving module;23, pressure sensor;24, reseting hook;25, spring lever.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Please refer to Fig. 1-4, a kind of embodiment provided by the invention: a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform is applied Work engineering method, including elevator wall 1, elevator wall 1 are internally provided with underlying platform 2, and the top of underlying platform 2 is provided with Mezzanine platforms 4, and there are two the settings of mezzanine platforms 4, the top of mezzanine platforms 4 is provided with top layer platform 5, top layer platform 5 and bottom Be provided with vertical guide 3 between layer platform 2, there are two the settings of mezzanine platforms 4, and mezzanine platforms 4 be located at two vertical guides 3 it Between, anti-fall wall-attached supporting seat 6, and anti-fall wall-attached supporting seat 6 and vertical guide 3 are mounted in two opposed inner walls of elevator wall 1 It is fixedly connected, the top of top layer platform 5 is provided with electric block 7, and there are four the settings of electric block 7, the lower end of electric block 7 It is provided with wirerope hook 10, it is solid by screw that the side of vertical guide 3 is set with control cabinet 8, control cabinet 8 and vertical guide 3 Fixed connection, the lower section of anti-fall wall-attached supporting seat 6 is provided with wirerope 11, and one end of wirerope 11 passes through wirerope hook 10, top The top of layer platform 5 is provided with top layer template 12, and the two sides of top layer template 12 are provided with fixed link 13, underlying platform 2 and folder The top of layer platform 4 is provided with stair 9.
Further, the lower end of vertical guide 3 is provided with fixing seat 14, and fixing seat 14 is internally provided with runner slot 15, turns Race 15 is internally provided with runner 16, and there are two the settings of runner 16.
Further, runner 16 and fixing seat 14 are rotatablely connected by shaft, and the side of runner 16 is provided with 17 He of positive stop hook Reseting hook 24, and positive stop hook 17 and runner 16 are rotatablely connected by shaft, are provided with connecting rod between positive stop hook 17 and reseting hook 24 18, runner slot 15 is internally provided with hook groove 19.
Further, connecting rod 18 and positive stop hook 17 and reseting hook 24 are rotatablely connected by shaft, and the side of reseting hook 24 is set It is equipped with spring lever 25, and spring lever 25 and reseting hook 24 and runner 16 are rotatablely connected by shaft.
Further, control cabinet 8 is internally provided with wireless remote control module 20, control processing unit 21 and wireless receiving module 22, pressure sensor 23 is installed on electric block 7.
Further, pressure sensor 23 and wireless receiving module 22 are unidirectionally electrically connected, wireless receiving module 22 and control Processing unit 21 is unidirectionally electrically connected, and control processing unit 21 and wireless remote control module 20 are unidirectionally electrically connected, wireless remote control mould Block 20 and electric block 7 are unidirectionally electrically connected.
Further, a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction, comprising the following steps:
Step 1: being familiar with building, structure and relevant speciality construction drawing, elevator connection detail construction etc., accomplish comprehensively Key points for operation are grasped, technology for full preparation are carried out for climbing elevator well operating platform operations, according to the bill of materials, purchase Material, processing and fabricating.
Step 2: preformed hole embedded part is embedded with elevator concrete structure construction progress, from the 3rd layer of top plate set It sets.Preformed hole embedded part and reinforcing bar binding and fixing are closed on, to ensure that built-in fitting position is accurate, the both ends of built-in fitting are using adhesive tape envelope Firmly, prevent concrete from entering.
Step 3: the point of anti-fall wall-attached supporting seat 6 is always ensured that and scales cun 600 millimeters away from while wall on one side being arranged, separately It is on one side side length center, two hole of embedded hole guarantees 150 millimeters of center away from highly with two floors towards upper fixed ruler cun six Hundred millimeters, upper and lower two spacing is story height, and every layer so.When review, theodolite Yan electricity Ti Jingqiang or more is used by builder Play control line, positive and negative 20 millimeters of pre-buried hole tolerance.
Step 4: installing bottom layer platform 2.
Step 5: anti-fall wall-attached supporting seat 6 is installed, by anti-fall wall-attached supporting seat 6 high-strength through-wall bolt and elevator concrete Wall body structure is fixed, and wall outer side cushioning block is fixed.When installation, because anti-fall wall-attached supporting seat can have positive and negative 20 millimeters of deviations It is adjustable, according to control line, anti-fall wall-attached supporting seat is adjusted into position to center.
Step 6: installation vertical guide 3.
Step 7: installation mezzanine platforms 4.
Step 8: installation mezzanine platforms 4 and 2 top stair 9 of underlying platform.
Step 9: power device can be installed after the completion of the lifting of elevator platform, electric block 7 is hung over into top layer platform 5 On the electric hoist Drawknot hook of lower part, electronic lifting means is connect admittedly with wirerope 11 with anti-fall wall-attached supporting seat 6 and vertical guide 3 It is fixed;
Step 10: sync control device is the safety monitoring mechanism for controlling lifting process, pressure sensor is mounted on electricity Between dynamic cucurbit and suspension hook, for monitoring the lifting process of crane;
Step 11: carrying out the installation of top layer template 12 according to elevator drawing size.It is fixed using hinge when installation On top layer platform, centre plus stull are fixed, and stull has fine adjustment function, control dimensional discrepancy;
Step 12: loading 1000kg weight on platform, the load time, load tried for 24 hours after operating platform is set up After testing, meet construction loads needs through observation non-displacement and deformation, operating platform.After self-test is qualified, commission has corresponding qualification Inspection testing agency carry out an acceptance inspection, inspect for acceptance qualified rear can be used.It often to be checked in use process, discovery is asked Topic rectification in time, prevents the generation of all safety accidents;
Step 13: reinforcing bar can be used by retrial detection qualification first, according to drawing when installation before reinforcing bar binding It is bound and is welded with code requirement.After the installation is completed, it carries out self-test and management is reported and submitted to carry out concealment acceptance, after acceptance(check) It can carry out next procedure construction;
Step 14: pouring elevator exterior wall concrete;
Step 15: removing top layer template 12.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.

Claims (7)

1. a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction, including elevator wall (1), it is characterised in that: The elevator wall (1) is internally provided with underlying platform (2), is provided with mezzanine platforms above the underlying platform (2) (4), it and there are two mezzanine platforms (4) settings, is provided with top layer platform (5) above the mezzanine platforms (4), the top layer is flat It is provided between platform (5) and underlying platform (2) vertical guide (3), there are two mezzanine platforms (4) settings, and mezzanine platforms (4) position Between two vertical guides (3), anti-fall wall-attached supporting seat (6) are mounted in two opposed inner walls of the elevator wall (1), And anti-fall wall-attached supporting seat (6) is fixedly connected with vertical guide (3), is provided with electric block above the top layer platform (5) (7), and there are four electric block (7) settings, the lower end of the electric block (7) is provided with wirerope hook (10), described perpendicular The side of direction guiding rail (3) is set with control cabinet (8), and the control cabinet (8) is fixedly connected with vertical guide (3) by screw, institute It states and is provided with below anti-fall wall-attached supporting seat (6) wirerope (11), and one end of wirerope (11) passes through wirerope hook (10), It is provided with top layer template (12) above the top layer platform (5), the two sides of the top layer template (12) are provided with fixed link (13), stair (9) are provided with above the underlying platform (2) and mezzanine platforms (4).
2. a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction according to claim 1, it is characterised in that: The lower end of the vertical guide (3) is provided with fixing seat (14), and the fixing seat (14) is internally provided with runner slot (15), institute Being internally provided with runner (16) for runner slot (15) is stated, and there are two runner (16) settings.
3. a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction according to claim 2, it is characterised in that: The runner (16) and fixing seat (14) by shaft rotation connection, the side of the runner (16) be provided with positive stop hook (17) and Reseting hook (24), and positive stop hook (17) and runner (16) are rotatablely connected by shaft, the positive stop hook (17) and reseting hook (24) Between be provided with connecting rod (18), the runner slot (15) is internally provided with hook groove (19).
4. a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction according to claim 3, it is characterised in that: The connecting rod (18) and positive stop hook (17) and reseting hook (24) are rotatablely connected by shaft, and the side of the reseting hook (24) is set It is equipped with spring lever (25), and spring lever (25) and reseting hook (24) and runner (16) are rotatablely connected by shaft.
5. a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction according to claim 1, it is characterised in that: The control cabinet (8) is internally provided with wireless remote control module (20), control processing unit (21) and wireless receiving module (22), Pressure sensor (23) are installed on the electric block (7).
6. a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction according to claim 5, it is characterised in that: The pressure sensor (23) and wireless receiving module (22) are unidirectionally electrically connected, at the wireless receiving module (22) and control It manages unit (21) to be unidirectionally electrically connected, the control processing unit (21) and wireless remote control module (20) are unidirectionally electrically connected, institute Wireless remote control module (20) and electric block (7) are stated unidirectionally to be electrically connected.
7. a kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction according to claim 1, which is characterized in that The following steps are included:
Step 1: being familiar with building, structure and relevant speciality construction drawing, elevator connection detail construction etc., accomplish to grasp comprehensively Key points for operation carry out technology for full preparation for climbing elevator well operating platform operations, according to the bill of materials, buy material Material, processing and fabricating.
Step 2: preformed hole embedded part is embedded with elevator concrete structure construction progress, started setting up from the 3rd layer of top plate.In advance It boxes out and embedded part and closes on reinforcing bar binding and fixing, to ensure that built-in fitting position is accurate, the both ends of built-in fitting are sealed using adhesive tape, are prevented Only concrete enters.
Step 3: the point of anti-fall wall-attached supporting seat (6) is always ensured that and scales cun 600 millimeters away from while wall on one side being arranged, it is another Side is side length center, and two hole of embedded hole guarantees 150 millimeters of center away from highly with two floors towards upper fixed ruler cun 600 Millimeter, upper and lower two spacing are story height, and every layer so.When review, theodolite Yan electricity Ti Jingqiang or more bullet is used by builder Control line, positive and negative 20 millimeters of pre-buried hole tolerance.
Step 4: installing bottom layer platform (2).
Step 5: anti-fall wall-attached supporting seat (6) are installed, by anti-fall wall-attached supporting seat (6) high-strength through-wall bolt and elevator concrete Wall body structure is fixed, and wall outer side cushioning block is fixed.When installation, because anti-fall wall-attached supporting seat can have positive and negative 20 millimeters of deviations It is adjustable, according to control line, anti-fall wall-attached supporting seat is adjusted into position to center.
Step 6: installation vertical guide (3).
Step 7: installation mezzanine platforms (4).
Step 8: stair (9) above installation mezzanine platforms (4) and underlying platform (2).
Step 9: power device can be installed after the completion of the lifting of elevator platform, electric block (7) is hung over into top layer platform (5) On the electric hoist Drawknot hook of lower part, by electronic lifting means wirerope (11) and anti-fall wall-attached supporting seat (6) and vertical guide (3) It is connected and fixed;
Step 10: sync control device is the safety monitoring mechanism for controlling lifting process, pressure sensor is mounted on electronic calabash Between reed and suspension hook, for monitoring the lifting process of crane;
Step 11: carrying out the installation of top layer template (12) according to elevator drawing size.When installation, using hinge, it is fixed on On top layer platform, centre plus stull are fixed, and stull has fine adjustment function, control dimensional discrepancy;
Step 12: after operating platform is set up, load 1000kg weight on platform, the load time for 24 hours, load test Afterwards, meet construction loads needs through observation non-displacement and deformation, operating platform.After self-test is qualified, entrusting has corresponding qualification Testing agency is examined to carry out an acceptance inspection, qualified rear of inspecting for acceptance can be used.It often to be checked, be found the problem in use process Rectification in time, prevents the generation of all safety accidents;
Step 13: reinforcing bar can be used by retrial detection qualification first, according to drawing and rule when installation before reinforcing bar binding Model requires to be bound and welded.After the installation is completed, it carries out self-test and management is reported and submitted to carry out concealment acceptance, it can after acceptance(check) Carry out next procedure construction;
Step 14: pouring elevator exterior wall concrete;
Step 15: removing top layer template (12).
CN201910207729.9A 2019-03-19 2019-03-19 A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction Pending CN109779244A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910207729.9A CN109779244A (en) 2019-03-19 2019-03-19 A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910207729.9A CN109779244A (en) 2019-03-19 2019-03-19 A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction

Publications (1)

Publication Number Publication Date
CN109779244A true CN109779244A (en) 2019-05-21

Family

ID=66489652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910207729.9A Pending CN109779244A (en) 2019-03-19 2019-03-19 A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction

Country Status (1)

Country Link
CN (1) CN109779244A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241739A (en) * 2019-06-28 2019-09-17 中铁七局集团有限公司 Hydraulic climbing formwork digital intelligent control platform
CN110359694A (en) * 2019-06-05 2019-10-22 中天建设集团有限公司 A kind of adhesion type elevator well operating platform and its construction method
CN110821153A (en) * 2019-12-06 2020-02-21 荆门市佰思机械科技有限公司 A mold-turning formwork of a climbing formwork device
CN110821155A (en) * 2019-12-10 2020-02-21 荆门市佰思机械科技有限公司 Lifting and overturning mold overturning template
CN112177321A (en) * 2020-10-09 2021-01-05 浙大宁波理工学院 Creeping formwork construction equipment and method for building external wall and floor slab
CN113482329A (en) * 2021-07-14 2021-10-08 武汉建工集团股份有限公司 Elevator shaft platform creeping formwork combined system
CN114961220A (en) * 2022-06-29 2022-08-30 中国建筑一局(集团)有限公司 Electric overall climbing system for high-rise building alternate construction
CN119244168A (en) * 2024-12-04 2025-01-03 新疆腾捷机电设备有限责任公司 A kind of anti-fall column split oil drilling support frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202416829U (en) * 2011-10-08 2012-09-05 门晓红 Turnover-free electric block inserted lift scaffold
WO2013185277A1 (en) * 2012-06-11 2013-12-19 浙江省建工集团有限责任公司 Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN204081436U (en) * 2014-09-02 2015-01-07 武汉天蝎建筑装备有限公司 A kind of climbing frame and template integrated system
CN105908967A (en) * 2016-06-29 2016-08-31 江苏省苏中建设集团股份有限公司 Self-elevating elevator shaft shear wall creeping formwork operation platform and construction method thereof
US20160332845A1 (en) * 2015-05-12 2016-11-17 Kone Corporation Arrangement and a method for parallel transport and installation of elevator components
CN108483270A (en) * 2018-05-11 2018-09-04 河南省通用矿山起重机械有限公司 A kind of electric block single-beam crane
CN109264584A (en) * 2018-09-29 2019-01-25 江苏宇泰电器有限公司 A kind of electric block control cabinet with function of wireless remote control

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202416829U (en) * 2011-10-08 2012-09-05 门晓红 Turnover-free electric block inserted lift scaffold
WO2013185277A1 (en) * 2012-06-11 2013-12-19 浙江省建工集团有限责任公司 Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN204081436U (en) * 2014-09-02 2015-01-07 武汉天蝎建筑装备有限公司 A kind of climbing frame and template integrated system
US20160332845A1 (en) * 2015-05-12 2016-11-17 Kone Corporation Arrangement and a method for parallel transport and installation of elevator components
CN105908967A (en) * 2016-06-29 2016-08-31 江苏省苏中建设集团股份有限公司 Self-elevating elevator shaft shear wall creeping formwork operation platform and construction method thereof
CN108483270A (en) * 2018-05-11 2018-09-04 河南省通用矿山起重机械有限公司 A kind of electric block single-beam crane
CN109264584A (en) * 2018-09-29 2019-01-25 江苏宇泰电器有限公司 A kind of electric block control cabinet with function of wireless remote control

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359694A (en) * 2019-06-05 2019-10-22 中天建设集团有限公司 A kind of adhesion type elevator well operating platform and its construction method
CN110241739A (en) * 2019-06-28 2019-09-17 中铁七局集团有限公司 Hydraulic climbing formwork digital intelligent control platform
CN110821153A (en) * 2019-12-06 2020-02-21 荆门市佰思机械科技有限公司 A mold-turning formwork of a climbing formwork device
CN110821155A (en) * 2019-12-10 2020-02-21 荆门市佰思机械科技有限公司 Lifting and overturning mold overturning template
CN112177321A (en) * 2020-10-09 2021-01-05 浙大宁波理工学院 Creeping formwork construction equipment and method for building external wall and floor slab
CN113482329A (en) * 2021-07-14 2021-10-08 武汉建工集团股份有限公司 Elevator shaft platform creeping formwork combined system
CN114961220A (en) * 2022-06-29 2022-08-30 中国建筑一局(集团)有限公司 Electric overall climbing system for high-rise building alternate construction
CN119244168A (en) * 2024-12-04 2025-01-03 新疆腾捷机电设备有限责任公司 A kind of anti-fall column split oil drilling support frame

Similar Documents

Publication Publication Date Title
CN109779244A (en) A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction
US8485319B2 (en) Method and apparatus for installing an elevator without machine room during construction of a building, and use of a hoisting machine
CN201679222U (en) Double mast climbing work platform
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN205077845U (en) Hydraulic intelligent climbing operation scaffold for core barrel well of building
KR101923924B1 (en) Rope type elevator of high speed and heavy road and mast structure for constructing high-rise building
CN104477736A (en) Shaft elevator installation method
CN104929353A (en) Detachable stepwise automatic climbing operating platform for elevator shafts
JP5105146B2 (en) Gondola device and method for constructing exterior of building using gondola device
CN206753012U (en) A kind of attachment type raise scaffold just hangs hanging apparatus
CN203143872U (en) Mobile platform for elevator installation construction
CN209145256U (en) The dedicated climbing frame of assembled architecture
CN209704009U (en) A kind of construction of lift well safety protection structure
CN216810895U (en) Elevator shaft operation platform
CN216196742U (en) A wallboard installation device for position is striden to height
CN215101404U (en) Construction elevator mounting structure in well
CN104973515B (en) A multi-section safety operating room for a crane and its operating method
CN209760761U (en) Construction platform and elevator core section of thick bamboo construction structures in a core section of thick bamboo
CN114439213A (en) Shaft operation platform device and construction method thereof
JP2878936B2 (en) Elevator installation method
CN2435463Y (en) Integral climbing and split lowering scaffold
CN220264848U (en) Building internal construction elevator
CN216276806U (en) Novel integral lifting type operation platform for elevator shaft construction
CN211419276U (en) Construction platform assembly for construction elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521