CN108691545B - A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape - Google Patents
A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape Download PDFInfo
- Publication number
- CN108691545B CN108691545B CN201810293865.XA CN201810293865A CN108691545B CN 108691545 B CN108691545 B CN 108691545B CN 201810293865 A CN201810293865 A CN 201810293865A CN 108691545 B CN108691545 B CN 108691545B
- Authority
- CN
- China
- Prior art keywords
- top plate
- rack beams
- hydraulic
- hydraulic support
- oil cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 230000005641 tunneling Effects 0.000 title claims abstract description 22
- 238000000034 method Methods 0.000 claims abstract description 21
- 239000003245 coal Substances 0.000 claims abstract description 20
- 230000008569 process Effects 0.000 claims abstract description 13
- 239000011435 rock Substances 0.000 claims abstract description 11
- 239000002184 metal Substances 0.000 claims abstract description 10
- 238000009434 installation Methods 0.000 claims description 23
- 239000012530 fluid Substances 0.000 claims description 11
- 238000002347 injection Methods 0.000 claims description 11
- 239000007924 injection Substances 0.000 claims description 11
- 125000004122 cyclic group Chemical group 0.000 claims description 6
- 230000003028 elevating effect Effects 0.000 claims description 6
- 230000008878 coupling Effects 0.000 claims description 4
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 239000000839 emulsion Substances 0.000 claims description 4
- 239000007788 liquid Substances 0.000 claims description 4
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 230000000694 effects Effects 0.000 claims description 3
- 238000004880 explosion Methods 0.000 claims description 3
- 210000003746 feather Anatomy 0.000 claims description 3
- 230000032258 transport Effects 0.000 abstract 1
- 230000000875 corresponding effect Effects 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 210000001364 upper extremity Anatomy 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/03—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor having protective means, e.g. shields, for preventing or impeding entry of loose material into the working space or support
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
- E21D23/0418—Positioning devices and stabilizing means for the props
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
- E21D23/0427—Shield operating devices; Hinges therefor
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of continuous tunneling construction methods of bolting with wire mesh for adapting to Complex Roof shape.Top plate metal mesh is joined after broken coal petrography to be placed in and is sticked up on the forestope of top, when going out clean coal, cash, top plate is uniformly supplied to by small hydraulic jack using the supporting power that the hydraulic support for adapting to top plate shape provides roof timbering, leg hydraulic jack and rack beams;Simple to install driving, when driving face, which is tunneled, is more than fully-mechanized digging machine tail portion to supporting region, anchor pole permanent support is utilized to top plate, portion, side under the hydraulic support, hydraulic support at Demolition Construction permanent support position, it is put on the Simple traveling crane that do not dismantle and transports at roadway head, continuation sets up forward hydraulic support.The application actively gives complex-shaped top plate to provide uniform and stable supporting power everywhere, real-time supporting is carried out at the rear of driving face using transitional hydraulic bracket in tunneling process, broken rock and permanent support two procedures are separated and are constructed in different location, construction efficiency is improved.
Description
Technical field
The present invention relates to a kind of tunnelling construction technology, specifically a kind of bolting with wire mesh for adapting to Complex Roof shape connects
Continuous tunneling construction method, belongs to roadway construction technical field.
Background technique
Underground coal mine, Tunnel Engineering roadway construction in, traditional driving method is broken coal petrography → gib → forever
Long supporting → enter back into subsequent cycle, using such construction method, broken in same section of tunnel coal petrography and permanent support this two
Procedure is that needs sequence carries out, and wherein the permanent support time is longer, accounts for about the 60~70% of whole process total times, then
Broken rock activity time will be very short, typically less than 30%, be equivalent to it is shorter at the time in lane forward, caused by the result is that final whole
The speed of application of body tunnelling supporting is slower, and efficiency is lower;And the fully-mechanized digging machine for breaking coal petrography is needed to be spaced and is for a long time just switched on
It once, is very big cost and the wasting of resources for large-scale ground, tunnel construction.On the other hand, in tunneling process
In, since the lithology of construction rock stratum has very big uncertainty and variation, the top plate shape after driving is usually extremely complex, does not have
Rule, common hydraulic support can not provide everywhere uniform and stable supporting power to top plate, not can guarantee the safety of roof timbering,
Worker constructs under the top plate very big psychological burden.
Summary of the invention
In view of the above-mentioned problems of the prior art, the object of the present invention is to provide a kind of anchors for adapting to Complex Roof shape
The construction speed of whole tunnelling supporting can be improved in the continuous tunneling construction method of net supporting while guaranteeing the broken coal time
Degree, be able to ascend fully-mechanized digging machine Homes Using TV, and in tunneling process can to complex-shaped top plate provide everywhere it is uniform and stable
Supporting power guarantees the safety of roof timbering.
To achieve the above object, the technical solution adopted by the present invention is that: it is a kind of adapt to Complex Roof shape bolting with wire mesh
Continuous tunneling construction method, which comprises the following steps:
Step 1: broken coal petrography: close in tunnel after breaking coal, cash along tunneling direction using explosion or fully-mechanized digging machine in tunnel
The position of top plate rearward extend from driving face set up more it is parallel stick up top forestope, and top plate metal mesh is joined and is set
It pushes up on forestope, and is altered forward to the front end for sticking up top forestope in sticking up;The front end of top plate metal mesh is using wooden unit and top plate wedge
Tightly, when going out clean coal, cash, supporting is carried out to top plate using the hydraulic support for adapting to top plate shape, and will be after top plate metal mesh
End is placed on the hydraulic support set up;
Step 2: transitional hydraulic bracket is set up: after head-room reaches antenna height, since driving face backward
Fang Yici sets up hydraulic support in parallel, and the hydraulic support shipped from tunnel rear is unloaded from Simple traveling crane, in each bracket
Vertically-mounted leg hydraulic jack is distinguished at beam lower surface both ends, and distribution setting is multiple small between rack beams upper surface and top plate
Hydraulic jack first carries out fluid injection to leg hydraulic jack and jacks up rack beams, until the small hydraulic jack above rack beams
Apical grafting contacts top plate, then does not carry out fluid injection boosting with the small hydraulic jack of top plate contact to due to top plate injustice, makes top plate not
The small hydraulic jack top elongation at flat place and top plate contact, each small hydraulic jack propose arch supporting power to top plate jointly, this
When leg hydraulic jack and rack beams provide supporting power be uniformly supplied to also by the small hydraulic jack in rack beams
Top plate ensure that the safety of roof timbering;
Step 3: simple to install driving: simple to install driving, the rack beams and crane beam used after hydraulic support has been set up
It is all i-beam structure, when installation, dismantles component Fast Installation crane beam using connection Fast Installation in rack beams lower surface;
When specific operation, connection is first dismantled component with Fast Installation to be placed between rack beams and crane beam, and makes the length of crane beam
Direction is perpendicular with rack beams, and the lower flange of rack beams is placed in the upper surface of upper positioning plate, and makes to position closing for plate surface
Lock tooth bites the side of lower flange, and movable pressing board is made to push down the other side of lower flange, and lock pin passes through the limit of movable pressing board two sides
Position ring, so that movable pressing board be made to fix the other side of rack beams lower flange;Then the top flange of crane beam is placed in lower positioning
The lower surface of plate, and the locking tooth of lower positioning plate surface is made to bite the side of crane beam top flange, so that movable pressing board is pushed down upper limb
The other side of edge, lock pin passes through the stop collar of movable pressing board two sides, so that movable pressing board be made to fix the another of crane beam top flange
Side;After rack beams and crane beam are connected, the simple to install crane on crane beam, simple crane can be moved along crane beam
It is dynamic;
Step 4: anchor shaft anchor cable permanent support: according to each cyclic advance of the general driving face of the lithology of top plate be 1~
3 hydraulic supports, i.e. one cyclic advance of every driving accordingly set up 1~3 hydraulic support;When tunnel headwork towards
Preceding driving has been when being more than the reprinting drive end unit of fully-mechanized digging machine to the erection supporting region of hydraulic support, the hydraulic branch set up at first at this time
Erection supporting zone length between frame and the hydraulic support finally set up reaches 30~50m, is reprinting drive end unit rear at this time
Hydraulic support lower section to top plate, portion, side using anchor pole carry out permanent support, the permanent support in fully-mechanized digging machine tail portion will not be right
The driving of front driving face impacts, and realizes the synchronous parallel operation of permanent support Yu broken rock process;
Step 5: disassembly Simple traveling crane and hydraulic support: after permanent support anchor bolt construction is good, dismountable construction is good permanent
Simple traveling crane, the hydraulic support of supporting position first remove the crane beam of permanent support position, due to crane beam when specific operation
Coupling between rack beams can be rapidly assembled and disassembled, and knock out the lock pin on lower positioning plate, start corresponding activity pressure
Plate can be such that crane beam is separated with Fast Installation disassembly component with coupling, then knock out the lock pin of positioning plate, start corresponding work
Dynamic pressure plate can be such that connection Fast Installation disassembly component separates with rack beams beam;Then the hydraulic of permanent support position is removed again
Bracket successively unloads small hydraulic jack and leg hydraulic jack at rack beams, and rack beams are put into what front was not dismantled
Transported on Simple traveling crane it is stand-by at the driving face position of tunnel front end, until be further continued for after driving face broken rock to side arm
If hydraulic support and Simple traveling crane;
Step 6: repeating the above steps one to step 5, and so on, repeatedly until completing the height in entire tunnel after circulation
Fast tunneling construction.
The present invention can design the spacing of different hydraulic supports according to the different lithology of top plate when designing.Preferably, institute
Stating the spacing between each hydraulic support is 500mm~1000mm.
Preferably, the supporting power of the hydraulic support is the 80% of suspension roof support power.When the small hydraulic jack in rack beams
After enough pressure is infused by above-mentioned requirements in top, sufficient strength can be connect with top plate, ensure that the safety of top plate.
Preferably, the small hydraulic jack that the present invention uses is by oil cylinder and covers the spring on oil cylinder and forms, the spring
Upper part and the top of oil cylinder tight fit and spring be higher than the top of oil cylinder;Small hydraulic jack is placed in rack beams and top plate
Between, when the fluctuating of top plate is little, oil cylinder does not need to extend, and covers the pressure that the spring on oil cylinder directly bears top plate at this time
Power, spring, which is pressurized, provides reversed supporting power to top plate;When the big rise and fall of top plate, oil cylinder fluid injection is given, is pushed up after oil cylinder elongation
End directly and top plate contact, provides supporting power for top plate, and spring as a whole, can in step 5 disassembly hydraulic support by tension at this time
To provide power-assisted, for the retraction of oil cylinder convenient for the unloading of oil cylinder, when specific operation, the feather valve unloading high pressure of oil cylinder can be opened
Emulsion, oil cylinder bounce back to initial length under the drive of spring.Therefore the spring on oil cylinder can not only be used for supporting roof use,
But also as the retraction power of oil cylinder, and structure design is also fairly simple.
As a preferred scheme of the above method, when simple to install is driven a vehicle in step 3, rack beams and crane beam
After being connected, when top plate is unstable, and crane beam is caused not to be able to maintain level, by adjusting between upper positioning plate and lower positioning plate
The adjustable crane beam of screw connection to horizontal position.Screw connection facilitates the leveling and normal use of Simple traveling crane.
Compared with the existing technology, the present invention has the advantage that
(1) broken coal process of the invention can carry out simultaneously from permanent support in the different sections in same tunnel, originally this
Two procedures are same place sequence constructions, and the previous process of constructing of being in the same localities cannot construct another process, two
Person interacts, and can not carry out simultaneously, leverage speed of application;The application uses transient liquid simultaneously in tunneling process
Bracket carries out real-time supporting at the rear of driving face, is separated by transition supporting broken rock and permanent support two procedures, two
A process is not constructed in same place, and each process individually arranges one group of construction personnel to construct, the heading driver in front end
Make face position and save more times for breaking coal petrography, broken rock can be continued, reach the fully-mechanized digging machine Homes Using TV of coal petrography
80% or more, the different parts and multiple groups worker's synchronous construction in tunnel ensure that increasing substantially for roadway construction work efficiency, warp
Test, construction efficiency totally improve 40% or more.
(2) rack beams are first jacked up the progress fluid injection of leg hydraulic jack by the present invention, until the small liquid above rack beams
Pressure jack touch top plate give top plate provide supporting power, then to due to top plate injustice not with the small hydraulic jack of top plate contact
Fluid injection boosting is carried out, extends small hydraulic jack top at top plate injustice and top plate contact, it is equally distributed each on top plate
A small hydraulic jack, which is cooperateed with, proposes arch supporting power to top plate, and the supporting power that at this moment leg hydraulic jack and rack beams provide can also
To be uniformly supplied to top plate by the small hydraulic jack on beam, three-dimensional supporting is formd from top to bottom, can adapt to prop up
The top plate for protecting complicated shape, provides the supporting power of active for top plate, it is ensured that the safety of roof timbering eliminates construction personnel's
Psychological burden;
(3) present invention dismantles the installing and dismounting that component carries out crane beam with Fast Installation using connection, easy to operate quick
And connection is stablized, and more has compressed the construction time into one while ensuring safety;Top plate metal mesh, which joins to be placed in, sticks up the preceding spy in top
It avoids the rubble on top plate to inadvertently fall off on beam, alters forward to the front end for sticking up top forestope and using wooden unit and top plate wedge
Tightly, rear end is placed on the bracket set up, and fixed form is firm, be ensure that the safety of the personnel in erect bracket, is not had
Rubble is fallen from top plate.
Detailed description of the invention
Fig. 1 is schematic diagram of the invention;
Fig. 2 is the sectional view along A-A in Fig. 1;
Fig. 3 is the schematic diagram of the small hydraulic jack in the present invention;
Fig. 4 is the coupled situation figure (omitting crane beam) that component is dismantled in connection of the invention with Fast Installation;
Fig. 5 is the left view (omitting rack beams) of Fig. 4;
Fig. 6 is the perspective view that component is dismantled in connection of the invention with Fast Installation;
In figure, 1. tunnels, 11. top plates, 12. driving faces, 2. stick up top forestope, 3. hydraulic supports, 31. rack beams,
32. leg hydraulic jack, 33. small hydraulic jacks, 33a. oil cylinder, 33b. spring, 4. Simple traveling cranes, 41. crane beams, 42.
Connection dismantles component with Fast Installation, the upper positioning plate of 42-1., positioning plate under 42-2., 42a. locking tooth, 42b. movable pressing board,
42c. lock pin, 42d. pressing plate shaft, 42e. screw connection, 42f. stop collar, 5. anchor poles, 6. fully-mechanized digging machines, 7. elevating conveyors, 8. is portable
Pneumatic pumping plant.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and examples.
As shown, a kind of continuous tunneling construction method of bolting with wire mesh for adapting to Complex Roof shape, comprising the following steps:
Step 1: it broken coal petrography: in tunnel 1, after breaking coal, cash along tunneling direction using explosion or fully-mechanized digging machine, is leaned in tunnel 1
The position of nearly top plate 11 rearward extends from driving face 12 to be set up more parallel sticking up and pushes up forestope 2, and by top plate metal
Net, which joins to be placed in, to stick up on the forestope 2 of top, and alters forward to the front end for sticking up top forestope 2;The front end of top plate metal mesh is using wood
Block and 11 wedging of top plate carry out supporting to top plate 11 using the hydraulic support 3 for adapting to 11 shape of top plate when going out clean coal, cash, and
The rear end of top plate metal mesh is placed on the hydraulic support 3 set up, guarantees not having rubble in erection construction from top plate
11 fall, guarantee the safety of personnel;
Step 2: transitional hydraulic bracket is set up: after 1 height reaches antenna height when tunnel, since driving face 12
Hydraulic support 3 is rearward successively set up in parallel, and the hydraulic support 3 shipped from 1 rear of tunnel is unloaded from Simple traveling crane 4,
Vertically-mounted leg hydraulic jack 32 is distinguished at each 31 lower surface both ends of rack beams, 31 upper surface of rack beams and top plate 11 it
Between distribution multiple small hydraulic jacks 33 are set, fluid injection first is carried out to leg hydraulic jack 32 and jacks up rack beams 31, until
The small hydraulic jack 33 of 31 top of rack beams touches top plate 11 and provides supporting power to top plate 11, then to due to 11 injustice of top plate
The small hydraulic jack 33 not contacted with top plate 11 carries out fluid injection boosting, makes 33 top of small hydraulic jack at the injustice of top plate 11
Elongation is contacted with top plate 11, and each small collaboration of hydraulic jack 33 proposes arch supporting power to top plate 11, at this moment leg hydraulic jack
32 and rack beams 31 provide supporting power be uniformly supplied to top plate 11 also by the small hydraulic jack 33 in rack beams 31, protect
The safety of 11 supporting of top plate is demonstrate,proved;
Step 3: simple to install driving: simple to install driving 4, the rack beams that the present invention uses after hydraulic support 3 has been set up
31 and crane beam 41 be all i-beam structure, when installation, dismantle component using connection Fast Installation in 31 lower surface of rack beams
42 Fast Installation crane beams 41;It includes upper positioning plate disposed in parallel that the connection that the present invention uses, which dismantles component 42 with Fast Installation,
42-1 and lower positioning plate 42-2, the upper positioning plate 42-1 is connected with lower positioning plate 42-2 by screw connection 42e, and upper positioning
The length direction of plate 42-1 and lower positioning plate 42-2 are mutually perpendicular to, under the upper surface of upper positioning plate 42-1 and lower positioning plate 42-2
Surface is respectively equipped with fixing and locking mechanism, and the fixation on the fixing and locking mechanism and lower positioning plate 42-2 on upper positioning plate 42-1
Retaining mechanism intersects setting, and the fixing and locking mechanism includes the locking tooth 42a and movable pressing board 42b being oppositely arranged, institute
It states movable pressing board 42b to be hinged on upper positioning plate 42-1 or lower positioning plate 42-2 by pressing plate shaft 42d, a lock pin 42c, which is passed through, to live
Movable pressing board 42b is pressed on upper positioning plate 42-1 or lower positioning plate 42-2 by the stop collar 42f of the two sides dynamic pressure plate 42b.Specific behaviour
When making, first connection Fast Installation disassembly component 42 is placed between rack beams 31 and crane beam 41, and make the length of crane beam 41
It spends direction and rack beams 31 is perpendicular, the lower flange of rack beams 31 is placed in the upper surface of upper positioning plate 42-1, and make positioning
The locking tooth 42a on the surface plate 42-1 bites the side of lower flange, and movable pressing board 42b is made to push down the other side of lower flange, lock pin
42c passes through the stop collar 42f of the two sides movable pressing board 42b, so that movable pressing board 42b be made to fix the another of 31 lower flange of rack beams
Side;Then the top flange of crane beam 41 is placed in the lower surface of lower positioning plate 42-2, and make the locking on the surface lower positioning plate 42-2
Tooth 42a bites the side of 41 top flange of crane beam, and movable pressing board 42b is made to push down the other side of top flange, and lock pin 42c passes through activity
The stop collar 42f of the two sides pressing plate 42b, so that movable pressing board 42b be made to fix the other side of 41 top flange of crane beam;Rack beams 31
After being connected with crane beam 41, the simple to install crane 43 on crane beam 41, simple crane 43 can be moved along crane beam 41;
Step 4: anchor shaft anchor cable permanent support: according to the lithology of top plate 11, each cyclic advance of general driving face 12
(broken coal petrography length every time) is 1~3 hydraulic support, i.e. one cyclic advance of every driving, accordingly sets up 1~3 hydraulic support
3;When the erection supporting region that the driving face 12 in tunnel 1 tunnels forward to hydraulic support 3 has been more than the elevating conveyor of fully-mechanized digging machine 6
When 7 tail portion (there are enough installation spaces when being more than the position construction anchor pole of 7 tail portion of elevating conveyor, will not be influenced by fully-mechanized digging machine,
Nor affect on the headwork of fully-mechanized digging machine), between the hydraulic support 3 set up at first at this time and the hydraulic support finally set up 3
Set up supporting zone length reach 30~50m, at this time 7 tail portion rear of elevating conveyor hydraulic support 3 lower section to top plate 11, side
Portion carries out permanent support using anchor pole 5, and the permanent support in fully-mechanized digging machine tail portion will not be to the pick of 12 position of front driving face
Into impacting, the synchronous parallel operation of permanent support Yu broken rock process is realized, working efficiency is improved;
Step 5: disassembly Simple traveling crane and hydraulic support: after the construction of permanent support anchor pole 5 is good, dismountable construction is good forever
Simple traveling crane 4, the hydraulic support 3 of long supporting position first remove the crane beam 41 of permanent support position when specific operation, due to
Coupling between crane beam 41 and rack beams 31 can be rapidly assembled and disassembled, and knock out the lock pin 42c on lower positioning plate 42-2,
Start corresponding movable pressing board 42b can make crane beam 41 with couple with Fast Installation disassembly component 42 separate, then knock out it is fixed
The lock pin 42c of position plate 42-1, connection Fast Installation disassembly component 42 and rack beams can be made by starting corresponding movable pressing board 42b
31 beams separate;Then the hydraulic support 3 of permanent support position is removed again, successively unloads the small hydraulic jack 33 at rack beams 31
With leg hydraulic jack 32, rack beams 31 are put into the heading driver that 1 front end of tunnel is transported on the Simple traveling crane 4 that front is not dismantled
Make it is stand-by at 12 position of face, until be further continued for setting up hydraulic support 3 and Simple traveling crane 4 forward after 12 broken rock of driving face;
Step 6: repeating the above steps one to step 5, and so on, repeatedly until completing entire tunnel 1 after circulation
High speed tunneling construction.
Portable pneumatic pumping plant 8 in the present invention on fully-mechanized digging machine 6 can be the small hydraulic jack 33 in rack beams 31, leg
Portion's hydraulic jack 32 provides power, and the emulsion hydraulic which provides is up to 28MPa.
Preferably, the small hydraulic jack 33 that the present invention uses can be by oil cylinder 33a and covering the spring on oil cylinder 33a
33b composition, the upper part of the spring 33b are higher than the top of oil cylinder 33a with the top of oil cylinder 33a tight fit and spring 33b.It will
Small hydraulic jack 33 is placed between rack beams 31 and top plate 11, and when the fluctuating of top plate 11 is little, oil cylinder 33a does not need to stretch
It is long, the pressure that the spring 33b on oil cylinder 33a directly bears top plate 11 is covered at this time, and spring 33b is pressurized to be provided reversely to top plate 11
Supporting power;When the big rise and fall of top plate 11, oil cylinder 33a fluid injection is given, top directly connects with top plate 11 after oil cylinder 33a elongation
Touching provides supporting power for top plate 11, and spring 33b can be oil cylinder when step 5 dismantles hydraulic support integrally by tension at this time
The retraction of 33a provides power-assisted, convenient for the unloading of oil cylinder 33a, and when specific operation, the feather valve unloading that can open oil cylinder 33a is high
Emulsion is pressed, oil cylinder 33a bounces back to initial length under the drive of spring 33b.Therefore the spring 33b on oil cylinder 33a both may be used
It is used as supporting roof, but also as the retraction power of oil cylinder 33a, and structure design is also fairly simple.
As a preferred scheme of the above method, in step 3 when simple to install driving 4, rack beams 31 and driving
After beam 41 is connected, when top plate 11 is unstable, and crane beam 41 is caused not to be able to maintain level, by adjust upper positioning plate 42-1 and
To horizontal position, screw connection 42e is facilitated simply the adjustable crane beam 41 of screw connection 42e between lower positioning plate 42-2
The leveling and normal use of driving 4.
Claims (5)
1. a kind of continuous tunneling construction method of bolting with wire mesh for adapting to Complex Roof shape, which comprises the following steps:
Step 1: it broken coal petrography: in tunnel (1), after breaking coal, cash along tunneling direction using explosion or fully-mechanized digging machine, is leaned in tunnel (1)
The position of nearly top plate (11) rearward extends erection more parallel sticking up from driving face (12) and pushes up forestope (2), and will top
Sheetmetal net, which joins to be placed in, to stick up on top forestope (2), and alters forward to the front end for sticking up top forestope (2);Top plate metal mesh
Front end is using wooden unit and top plate (11) wedging, right using the hydraulic support (3) for adapting to top plate (11) shape when going out clean coal, cash
Top plate (11) carries out supporting;
Step 2: transitional hydraulic bracket is set up: after tunnel (1) highly reaches antenna height, since driving face (12)
Hydraulic support (3) successively rearward are set up in parallel, the hydraulic support (3) shipped from tunnel (1) rear from Simple traveling crane (4)
It unloads, vertically-mounted leg hydraulic jack (32) is distinguished at each rack beams (31) lower surface both ends, on rack beams (31)
Multiple small hydraulic jacks (33) are arranged in distribution between surface and top plate (11), first carry out fluid injection to leg hydraulic jack (32)
By rack beams (31) jack up, until rack beams (31) above small hydraulic jack (33) touch top plate (11), then to due to
The small hydraulic jack (33) that top plate (11) injustice is not contacted with top plate (11) carries out fluid injection boosting, makes at top plate (11) injustice
Small hydraulic jack (33) top elongation is contacted with top plate (11), and each small hydraulic jack (33) mentions arch to top plate (11) jointly
Supporting power, the supporting power that at this moment leg hydraulic jack (32) and rack beams (31) provide is also by the small liquid on rack beams (31)
Pressure jack (33) is uniformly supplied to top plate (11), ensure that the safety of top plate (11) supporting;And it will be after top plate metal mesh
End is placed on the hydraulic support (3) set up;
Step 3: simple to install driving: hydraulic support (3) has set up after simple to install drive a vehicle (4), the rack beams used (31) and
Crane beam (41) is all i-beam structure, when installation, dismantles component using connection Fast Installation in rack beams (31) lower surface
(42) Fast Installation crane beam (41);When specific operation, connection is first dismantled into component (42) with Fast Installation and is placed in rack beams
(31) between crane beam (41), and keep the length direction of crane beam (41) and rack beams (31) perpendicular, by rack beams (31)
Lower flange be placed in the upper surface of positioning plate (42-1), and bite down the locking tooth (42a) on the surface positioning plate (42-1)
The side on the edge of a wing, and movable pressing board (42b) is made to push down the other side of lower flange, lock pin (42c) is across the two sides movable pressing board (42b)
Stop collar (42f), so that movable pressing board (42b) be made to fix the other side of rack beams (31) lower flange;Then by crane beam
(41) top flange is placed in the lower surface of lower positioning plate (42-2), and stings the locking tooth (42a) on the surface lower positioning plate (42-2)
The firmly side of crane beam (41) top flange, makes movable pressing board (42b) push down the other side of top flange, and lock pin (42c) passes through activity
The stop collar (42f) of the two sides pressing plate (42b), so that movable pressing board (42b) be made to fix the other side of crane beam (41) top flange;
After rack beams (31) and crane beam (41) are connected, the simple to install crane (43) on crane beam (41), simple crane (43) is i.e.
It can be mobile along crane beam (41);
Step 4: anchor pole permanent support: being 1 ~ 3 liquid according to lithology driving face (12) each cyclic advance of top plate (11)
Bracket, i.e. one cyclic advance of every driving are pressed, 1 ~ 3 hydraulic support (3) is accordingly set up;When the driving face of tunnel (1)
(12) when the erection supporting region tunneled forward to hydraulic support (3) has been more than elevating conveyor (7) tail portion of fully-mechanized digging machine (6), at this time
Erection supporting zone length between the hydraulic support (3) set up at first and the hydraulic support (3) finally set up reaches 30 ~ 50m,
Top plate (11), portion, side are carried out using anchor pole (5) in the lower section of the hydraulic support (3) at elevating conveyor (7) tail portion rear at this time permanent
Supporting, the permanent support in fully-mechanized digging machine tail portion will not impact the driving of front driving face (12), realize permanent
The synchronous parallel operation of supporting and broken rock process;
Step 5: disassembly Simple traveling crane and hydraulic support: after permanent support anchor pole (5) construction is good, the good permanent branch of Demolition Construction
Simple traveling crane (4), the hydraulic support (3) of position are protected, when specific operation, first removes the crane beam (41) of permanent support position, by
Coupling between crane beam (41) and rack beams (31) can be rapidly assembled and disassembled, and knock out on lower positioning plate (42-2)
Lock pin (42c), start corresponding movable pressing board (42b) can make crane beam (41) with couple with Fast Installation dismantle component (42)
It separates, then knocks out the lock pin (42c) of positioning plate (42-1), starting corresponding movable pressing board (42b) can make connection with quickly
Installing and dismounting component (42) is separated with rack beams (31) beam;Then the hydraulic support (3) for removing permanent support position again, is successively unloaded
The small hydraulic jack (33) and leg hydraulic jack (32) at rack beams (31) are carried, rack beams (31) are put into front and are not torn open
Transported on the Simple traveling crane (4) unloaded it is stand-by at driving face (12) position of tunnel (1) front end, until driving face (12)
It is further continued for setting up hydraulic support (3) and Simple traveling crane (4) forward after broken rock;
Step 6: repeating the above steps one to step 5, and so on, repeatedly until completing the height of entire tunnel (1) after circulation
Fast tunneling construction.
2. the bolting with wire mesh continuous tunneling construction method according to claim 1 for adapting to Complex Roof shape, feature exist
In the spacing between each hydraulic support (3) is 500mm ~ 1000mm.
3. the bolting with wire mesh continuous tunneling construction method according to claim 1 for adapting to Complex Roof shape, feature exist
In the supporting power of the hydraulic support (3) is the 80% of anchor pole (5) supporting power.
4. the bolting with wire mesh continuous tunneling construction method according to claim 1 for adapting to Complex Roof shape, feature exist
It by oil cylinder (33a) and covers the spring (33b) on oil cylinder (33a) in, the small hydraulic jack (33) and forms, the spring
The upper part of (33b) is higher than the top of oil cylinder (33a) with the top of oil cylinder (33a) tight fit and spring (33b);It will be small by hydraulic thousand
After jin top (33) is placed between rack beams (31) and top plate (11), when the fluctuating of top plate (11) is little, oil cylinder (33a) is not needed
Elongation, covers the pressure that the spring (33b) on oil cylinder (33a) directly bears top plate (11) at this time, and spring (33b) is pressurized to top plate
(11) reversed supporting power is provided;When the big rise and fall of top plate (11), oil cylinder (33a) fluid injection is given, is pushed up after oil cylinder (33a) elongation
End is directly contacted with top plate (11), provides supporting power for top plate (11), and spring (33b) is whole by tension at this time, is torn open in step 5
The unloading that retraction when unloading hydraulic support for oil cylinder (33a) provides power-assisted, is convenient for oil cylinder (33a) opens oil cylinder when specific operation
The feather valve of (33a) unloads high-pressure emulsion, and oil cylinder (33a) bounces back to initial length under the drive of spring (33b).
5. the bolting with wire mesh continuous tunneling construction method according to claim 1 for adapting to Complex Roof shape, feature exist
In in step 3 when simple to install driving (4), after rack beams (31) are connected with crane beam (41), when top plate (11) injustice
When surely crane beam (41) being caused not to be able to maintain level, by adjusting the connection between upper positioning plate (42-1) and lower positioning plate (42-2)
It meets screw rod (42e) and adjusts crane beam (41) to horizontal position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810293865.XA CN108691545B (en) | 2018-03-30 | 2018-03-30 | A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810293865.XA CN108691545B (en) | 2018-03-30 | 2018-03-30 | A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108691545A CN108691545A (en) | 2018-10-23 |
CN108691545B true CN108691545B (en) | 2019-06-28 |
Family
ID=63845218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810293865.XA Expired - Fee Related CN108691545B (en) | 2018-03-30 | 2018-03-30 | A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108691545B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113266367B (en) * | 2021-05-31 | 2024-05-14 | 太原理工大学 | Automatic roof cutting method for hydraulic rod of hard roof roadway |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195457A (en) * | 2013-04-15 | 2013-07-10 | 辽宁天安矿山科技有限公司 | Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader |
CN103382844A (en) * | 2013-07-15 | 2013-11-06 | 郑东风 | Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support |
CN103758522A (en) * | 2014-01-23 | 2014-04-30 | 郑东风 | Temporary support method of tunneling working face and equipment thereof |
CN104179517A (en) * | 2014-09-03 | 2014-12-03 | 兖矿集团有限公司 | Tunneling support system and roadway support method |
CN104564050A (en) * | 2015-01-19 | 2015-04-29 | 郑东风 | Process method and equipment for heading and anchoring parallel operation construction |
CN105971628A (en) * | 2016-03-31 | 2016-09-28 | 中国矿业大学(北京) | Temporary supporting method for tunneled roadway |
CN108194114A (en) * | 2018-02-06 | 2018-06-22 | 中煤能源研究院有限责任公司 | Roadway head protects top and anchor bolt construction integrated apparatus temporarily |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU1838620C (en) * | 1991-12-06 | 1993-08-30 | Potapenko Vyacheslav A | Powered drift support |
-
2018
- 2018-03-30 CN CN201810293865.XA patent/CN108691545B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195457A (en) * | 2013-04-15 | 2013-07-10 | 辽宁天安矿山科技有限公司 | Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader |
CN103382844A (en) * | 2013-07-15 | 2013-11-06 | 郑东风 | Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support |
CN103758522A (en) * | 2014-01-23 | 2014-04-30 | 郑东风 | Temporary support method of tunneling working face and equipment thereof |
CN104179517A (en) * | 2014-09-03 | 2014-12-03 | 兖矿集团有限公司 | Tunneling support system and roadway support method |
CN104564050A (en) * | 2015-01-19 | 2015-04-29 | 郑东风 | Process method and equipment for heading and anchoring parallel operation construction |
CN105971628A (en) * | 2016-03-31 | 2016-09-28 | 中国矿业大学(北京) | Temporary supporting method for tunneled roadway |
CN108194114A (en) * | 2018-02-06 | 2018-06-22 | 中煤能源研究院有限责任公司 | Roadway head protects top and anchor bolt construction integrated apparatus temporarily |
Also Published As
Publication number | Publication date |
---|---|
CN108691545A (en) | 2018-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101251022B (en) | Immediate support device for digging machine | |
CN100577986C (en) | Surrounding rock support method for retaining roadway in goaf under three-soft geological conditions | |
CN102128040B (en) | Hydraulic striding-type advanced-support equipment | |
CN103899319B (en) | Pick anchor continuous and automatic fast digging technique | |
CN107965342A (en) | Arched tunnel driving moves into covering device certainly without support repeatedly | |
CN102654060A (en) | Tunnel excavation staggered type supporting device | |
CN110529144A (en) | A kind of hybrid advanced support method of light section stope drift active workings | |
CN108775252A (en) | The supporting construction and method for protecting support in Deep Soft Rock tunnel | |
CN111485913A (en) | Gob-side entry retaining system and method for roadway-side goaf gangue cementing wall forming | |
CN201170107Y (en) | Immediate support device for digging machine | |
CN108691545B (en) | A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape | |
CN201953390U (en) | Hydraulic walking advance support equipment | |
CN104895592A (en) | Fully-mechanized coal mining and caving face support retracement supporting method | |
CN1702300A (en) | Arrangement for quickly shifting sublevel caving hydraulic support series for fully-mechanized mining of three-soft coal bed | |
CN102121390A (en) | Telescopic tunneling immediate support device | |
CN104863599B (en) | Fully-mechanized mining working synchronously expands side installation method and support system | |
CN107859525B (en) | Surrounding rock control method for large-deformation mining roadway with anchor removal and expansion roadway replacement shed | |
CN108119173B (en) | Self-moving type telescopic front canopy and supporting method thereof | |
CN104265344A (en) | Conveyor unloading part rear-mounted end hydraulic support | |
CN208534512U (en) | The supporting construction in Deep Soft Rock tunnel | |
CN107654247B (en) | A kind of sliding structure area pole loose thick coal layer coal roadway tunneling is met head on anti-top coal leakage method for leakage | |
CN105840236A (en) | Method using pilot tunnel to process tilting and dumping hydraulic support | |
CN104832172B (en) | A kind of fast and safely driving system and method | |
CN202090874U (en) | Integrated advance support device for mine speedy drivage | |
RU2495247C1 (en) | Method for reinforcement of mines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190628 |
|
CF01 | Termination of patent right due to non-payment of annual fee |