CN105971628A - Temporary supporting method for tunneled roadway - Google Patents
Temporary supporting method for tunneled roadway Download PDFInfo
- Publication number
- CN105971628A CN105971628A CN201610197049.XA CN201610197049A CN105971628A CN 105971628 A CN105971628 A CN 105971628A CN 201610197049 A CN201610197049 A CN 201610197049A CN 105971628 A CN105971628 A CN 105971628A
- Authority
- CN
- China
- Prior art keywords
- support
- supporting
- development machine
- tunneled
- digging laneway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 230000008602 contraction Effects 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 5
- 230000032258 transport Effects 0.000 claims 1
- 239000003245 coal Substances 0.000 abstract description 6
- 230000005641 tunneling Effects 0.000 abstract description 5
- 238000005065 mining Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000033228 biological regulation Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D19/00—Provisional protective covers for working space
- E21D19/02—Provisional protective covers for working space for use in longwall working
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a temporary supporting method for a tunneled roadway. The problems that a coal seam roof is broken and the working efficiency is low due to the fact that the operation is conducted when the coal seam roof is not supported, and supporting is conducted repeatedly during existing tunneled roadway operating are solved. The temporary supporting method comprises the steps that temporary supporting of an exposed coal seam roof newly tunneled by a tunnel boring machine is conducted when a tunneled roadway retractable temporary bracket and the tunnel boring machine work cooperatively; and roadway permanent supporting operation is conducted with the assistance of the tunneled roadway retractable temporary bracket. According to the temporary supporting method for the tunneled roadway, the design is reasonable, the process is mature and reliable, and supporting equipment is stable and safe; traditional tunneling and anchor supporting staggered operating modes are replaced with continuous tunneling and continuous anchor supporting operating modes, the wasted preparation time for alternation of the tunneling process and the anchor supporting process is shortened, and the tunneling efficiency and the anchor supporting efficiency are remarkably improved; and thus, the newly-exposed coal seam roof of a tunneled working surface is temporarily supported, and the safety of the tunneled working surface is improved.
Description
Technical field
The present invention relates to a kind of digging laneway temporary support method.The gib of pick exposure top board new to development machine when a kind of digging laneway telescopic type falsework and development machine coordinating operation, the method utilizing digging laneway telescopic type falsework adit permanent support operation, it is mainly used in down-hole driving face, the top board that development machine excavation operation has just been exposed and the temporal mechanical supporting of lateral wall, auxiliary permanent supporting operation, provides effective safety guarantee for operating personnel.Belong to lane digging laneway support process technical field.
Background technology
In the pit mining of current mining, especially colliery, the excavation operation of underworkings is the prerequisite of every other mining operations.China's fully mechanized workface does not the most use temporary support facility; the present situation of major part down-hole piercing technique is shut down after being generally tunneling machine cutting one cutter coal; development machine is withdrawn from; workman takes the material equipment such as anchor net, anchor pole, anchor cable and jumbolter and enters front end, carries out lapping, plays the permanent support operation such as anchor pole, anchor cable.The development machine working time only needs 5-10 minute among these, and the permanent support activity duration is even more long-time up to 20-30 minute, and the Homes Using TV of development machine only has about 25%, and this just becomes restriction development machine production efficiency and the main cause of development end fltting speed." safety regulations in coal mine " specifies, " development end forbids sky to be set for industry ", temporary supporting device of driving working face is mandatory equipment, traditional temporary support device can not support empty top in time, top board can not be effectively prevented from repeatedly support, cannot fundamentally solve laneway temporary support problem, it is impossible to provide help for permanent support operation.
This poses and improve drivage efficiency and ensure this two large problems of safety of driving face.Pick exposure top board new to development machine carries out gib with during development machine coordinating operation to make full use of above-mentioned " digging laneway telescopic type falsework ", the top board the most just exposed can be carried out supporting, development machine operation and gib are carried out simultaneously, development machine can tunnel continuously, reaches to promote the purpose of drivage efficiency;The method utilizing digging laneway telescopic type falsework adit permanent support operation, driving, Anchor Care process is made to be carried out continuously, decrease tradition driving, the time of Anchor Care alternately operating, accelerate Anchor Care efficiency, while realizing mechanization gib, significant for improving drivage efficiency.
Summary of the invention
1. a digging laneway temporary support method, the gib of top board is exposed including pick new to development machine with development machine coordinating operation, utilize digging laneway telescopic type falsework adit permanent support operation, it is characterised in that: the concrete operation step of digging laneway temporary support is as follows:
Step one: one group of digging laneway telescopic type falsework is arranged sequentially in the tunnel completing permanent support by tunnelling end;Development machine is in the front end of whole support group, and support group, across on development machine, is launched to support back and lateral wall, provided supporting for driving face;
Step 2: operation support hydraulic system is by the stent collapses of support group rearmost end, it is delivered to support group front end by the monorail crane below support, anchor net, steel band are placed on the back timber shrinking support, meanwhile development machine normally tunnels, forward after one step pitch of cut, the support of contraction is moved to the new top board exposed by monorail crane immediately, the support of contraction is launched to be supported on top board and the lateral wall of new exposure by operation support hydraulic system, and anchor net, steel band are also scheduled at back with set cap;
Step 3: development machine continues to work continuously, repeats step 2 until whole support group all moves to the top board of new pick, completes continuous excavation operation;Development machine is moveed backward, and withdraws from below support group completely, uses roof-bolter etc. to pierce in back by anchor pole, anchor cable by the armature boring that support is reserved, completes permanent support operation;
Step 4: repeat to appeal step and complete the headwork in whole piece tunnel.
Digging laneway temporary support method the most according to claim 1, it is characterized in that: described digging laneway telescopic type falsework is made up of multisection type back timber, face guard, all kinds of hydraulic jack, across above development machine during expansion supporting, back timber, hydraulic cylinder are collapsible, can be transported by the monorail crane of lower section in the middle part of set cap.
Digging laneway temporary support method the most according to claim 1, it is characterised in that: the length of single support is identical with development machine step pitch, and the particular number of support group is determined by length during heading driver;
The present invention has the advantage that and good effect is: use digging laneway telescopic type falsework, development machine is coordinated to carry out cut operation, the new top board exposed can be carried out supporting in time, do not affect working continuously of development machine simultaneously, accelerate drivage efficiency, digging laneway telescopic type falsework adit is utilized to carry out permanent support operation, Anchor Care process is made to be carried out continuously, decrease tradition driving, the time of Anchor Care alternately operating, accelerate Anchor Care efficiency, while realizing mechanization gib, significant for improving drivage efficiency.
The present invention is compared with current laneway temporary support, it is achieved that development machine work separates with permanent support operation, has liberated the constraint that pick, anchor are alternately brought to drivage efficiency largely.The composite can be widely applied in the large section tunnel advance work of colliery, to ensureing that colliery is highly efficient and productive and safety in production is significant.
Accompanying drawing explanation
Fig. 1 is digging laneway telescopic type falsework and development machine auxiliary work schematic diagram in this method
Fig. 2 is digging laneway telescopic type falsework and development machine auxiliary work side view in this method
Fig. 3 is digging laneway telescopic type falsework and development machine auxiliary work front view in this method
Fig. 4 is that in this method, digging laneway telescopic type falsework launches supporting state and contraction state schematic diagram
Detailed description of the invention
Referring to figure, the movable falsework of digging laneway overlength of the present invention includes support welding assembly and supporting hydraulic system
1. a digging laneway temporary support method, the gib of top board is exposed including pick new to development machine with development machine coordinating operation, utilize digging laneway telescopic type falsework adit permanent support operation, it is characterised in that: the concrete operation step of digging laneway temporary support is as follows:
Step one: one group of digging laneway telescopic type falsework is arranged sequentially in the tunnel completing permanent support by tunnelling end;Development machine is in the front end of whole support group, and support group, across on development machine, is launched to support back and lateral wall, provided supporting for driving face, and this state is support group original state, and in gib working group, all carrier units are in expansion supporting state;
Step 2: the telescopic oil cylinder in support group rearmost end support auxiliary back timber is shunk by operation support hydraulic system completely, drives auxiliary back timber move to internal stent with moving stand and minimize width.Sprag ram release, support post shrinks, until moving stand contact base plate supporting frame.After support post is liftoff, sprag ram shrinks with the telescopic oil cylinder in telescopic top beam simultaneously completely, drives telescopic top beam and face guard to tunnel contract, completes the contraction process of carrier unit;By monorail crane rail forward end sliding, stagger working group's end support, is delivered to support group front end by the monorail crane below support;Anchor net, steel band are laid on the back timber of contraction state lower carriage, meanwhile development machine normally tunnels, forward after one step pitch of cut, by monorail crane rail terminad sliding, after track lower sheave moves to above the end support after shrinking, end support is sling, along track, the support of contraction is pushed under the top board newly exposed immediately, after arriving front end, support is unloaded, track terminad sliding, the top of the front-end bracket that staggers;Arriving the support of front end, sprag ram release, the telescopic oil cylinder in telescopic top beam protrudes outwardly to face guard and contacts with roadway's sides.Sprag ram stretches out with support post simultaneously, until back timber supports top board, face guard supports roadway's sides.Telescopic oil cylinder in auxiliary back timber stretches out, and drives auxiliary back timber to be displaced outwardly with moving stand, until auxiliary back timber contacts with telescopic top beam, completes the expansion process of support;Launching support to be supported on top board and the lateral wall of new exposure, anchor net, steel band are also scheduled at back with set cap;
Step 3: development machine continues to work continuously, repeats step 2 until whole support group all moves to the top board of new pick, completes continuous excavation operation;Development machine is moveed backward, and withdraws from completely below support group;Workman carries out permanent support operation under falsework, uses roof-bolter etc. to pierce in back by anchor pole, anchor cable by the armature boring that support is reserved, completes permanent support operation;
Step 4: after completing permanent support, development machine restarts work, circulates above-mentioned steps.
Digging laneway temporary support method the most according to claim 1, it is characterized in that: described digging laneway telescopic type falsework is made up of multisection type back timber, face guard, all kinds of hydraulic jack, across above development machine during expansion supporting, back timber, hydraulic cylinder are collapsible, can be transported by the monorail crane of lower section in the middle part of set cap.
Digging laneway temporary support method the most according to claim 1, it is characterised in that: the length of single support is identical with development machine step pitch, and the particular number of support group is determined by length during heading driver.
Claims (3)
1. a digging laneway temporary support method, including digging laneway telescopic type falsework (the most separately applying for a patent) with development machine coordinating operation to pick
Enter machine and newly dig the gib exposing top board, utilize digging laneway telescopic type falsework adit permanent support operation, it is characterised in that: pick
The concrete operation step entering laneway temporary support is as follows:
Step one: digging laneway telescopic type falsework (1) under one group of deployed condition is arranged sequentially by tunnelling end and completes permanent support
Tunnel in;Development machine (3) is in the front end of whole support group, and support group, across on development machine, is launched to support back and lateral wall, for
Driving face provides supporting;
Step 2: operation support hydraulic system, by the stent collapses (2) of support group rearmost end, is delivered to support group front end by the monorail crane below support,
Anchor net, steel band being placed on the back timber shrinking support, meanwhile development machine normally tunnels, forward after one step pitch of cut, and the support that will shrink
Being moved to the new top board exposed by monorail crane immediately, the support of contraction is launched to be supported on top board and the lateral wall of new exposure by operation support hydraulic system
On, anchor net, steel band are also scheduled at back with set cap;
Step 3: development machine continues to work continuously, repeats step 2 until whole support group all moves to the top board of new pick, completes continuous excavation operation;
Development machine is moveed backward, and withdraws from below support group completely, uses roof-bolter etc. to pierce in back by anchor pole, anchor cable by the armature boring that support is reserved,
Complete permanent support operation.
Step 4: repeat to appeal step and complete the headwork in whole piece tunnel.
Digging laneway temporary support method the most according to claim 1, it is characterised in that: described digging laneway telescopic type falsework is by multistage
Formula back timber, face guard, all kinds of hydraulic jack form, and across above development machine during expansion supporting, back timber, hydraulic cylinder are collapsible, can pass through support
In the middle part of back timber, the monorail crane of lower section transports.
Digging laneway temporary support method the most according to claim 1, it is characterised in that: the length of single support is identical with development machine step pitch,
The particular number of frame group is determined by length during heading driver.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610197049.XA CN105971628A (en) | 2016-03-31 | 2016-03-31 | Temporary supporting method for tunneled roadway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610197049.XA CN105971628A (en) | 2016-03-31 | 2016-03-31 | Temporary supporting method for tunneled roadway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105971628A true CN105971628A (en) | 2016-09-28 |
Family
ID=56989390
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610197049.XA Pending CN105971628A (en) | 2016-03-31 | 2016-03-31 | Temporary supporting method for tunneled roadway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105971628A (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108005665A (en) * | 2017-12-28 | 2018-05-08 | 石家庄煤矿机械有限责任公司 | A kind of rapid integrated driving system in tunnel |
CN108691545A (en) * | 2018-03-30 | 2018-10-23 | 张卫东 | A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape |
CN109139074A (en) * | 2018-10-10 | 2019-01-04 | 中国矿业大学(北京) | A kind of tunnelling shield support and method for protecting support |
CN109681246A (en) * | 2018-12-26 | 2019-04-26 | 天地科技股份有限公司 | Laneway temporary support device |
CN109838261A (en) * | 2017-11-24 | 2019-06-04 | 中国矿业大学(北京) | A kind of novel full-mechanized roadway advance support rack |
CN110118097A (en) * | 2019-06-22 | 2019-08-13 | 山东科技大学 | A kind of backpack full-mechanized roadway gib equipment and its application |
CN110206574A (en) * | 2019-05-07 | 2019-09-06 | 鲁中锦 | The alternately interim shield support of mobile automatic digging laneway |
WO2020052015A1 (en) * | 2018-09-11 | 2020-03-19 | 中国矿业大学 | Steel belt conveying device for anchor conveyor and anchor conveyor |
CN111188643A (en) * | 2020-01-15 | 2020-05-22 | 陕西陕煤铜川矿业有限公司 | Supporting device applied to coal mining face and driving face operation |
CN111411990A (en) * | 2020-03-30 | 2020-07-14 | 安徽理工大学 | Quick excavation roadway support equipment |
CN112253204A (en) * | 2020-10-30 | 2021-01-22 | 中国矿业大学 | Roadway temporary supporting device utilizing mine pressure and installation construction method |
CN112593961A (en) * | 2020-12-04 | 2021-04-02 | 煤炭科学研究总院 | Roadway driving method |
CN113279793A (en) * | 2021-07-09 | 2021-08-20 | 中国矿业大学(北京) | Temporary supporting device for roadway |
CN113685213A (en) * | 2021-08-18 | 2021-11-23 | 山东东安云矿业科技有限公司 | Continuous mining and continuous filling system without permanent support filling and implementation method |
CN113847073A (en) * | 2021-09-14 | 2021-12-28 | 辽宁工程技术大学 | Anchoring system, tunneling device with anchoring system and tunneling and anchoring method |
CN113882889A (en) * | 2021-11-01 | 2022-01-04 | 安徽理工大学 | Head-tail interactive sliding type anchor support integrated equipment and control method |
CN113882888A (en) * | 2021-11-01 | 2022-01-04 | 安徽理工大学 | Double-door efficient and rapid circulating self-moving anchor support integrated equipment and control method |
CN114060065A (en) * | 2021-11-08 | 2022-02-18 | 中南大学 | Method for parallel rapid tunneling and supporting in weak rock mass |
CN114087004A (en) * | 2021-11-17 | 2022-02-25 | 中国矿业大学 | Temporary support carrying device for realizing parallel digging and branch operation and working method |
-
2016
- 2016-03-31 CN CN201610197049.XA patent/CN105971628A/en active Pending
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109838261A (en) * | 2017-11-24 | 2019-06-04 | 中国矿业大学(北京) | A kind of novel full-mechanized roadway advance support rack |
CN108005665A (en) * | 2017-12-28 | 2018-05-08 | 石家庄煤矿机械有限责任公司 | A kind of rapid integrated driving system in tunnel |
CN108691545A (en) * | 2018-03-30 | 2018-10-23 | 张卫东 | A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape |
CN108691545B (en) * | 2018-03-30 | 2019-06-28 | 张卫东 | A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape |
WO2020052015A1 (en) * | 2018-09-11 | 2020-03-19 | 中国矿业大学 | Steel belt conveying device for anchor conveyor and anchor conveyor |
US11078021B2 (en) | 2018-09-11 | 2021-08-03 | China University Of Mining And Technology | Steel belt conveying apparatus for transporting and bolting machine and transporting and bolting machine |
CN109139074A (en) * | 2018-10-10 | 2019-01-04 | 中国矿业大学(北京) | A kind of tunnelling shield support and method for protecting support |
CN109681246A (en) * | 2018-12-26 | 2019-04-26 | 天地科技股份有限公司 | Laneway temporary support device |
CN110206574A (en) * | 2019-05-07 | 2019-09-06 | 鲁中锦 | The alternately interim shield support of mobile automatic digging laneway |
CN110118097A (en) * | 2019-06-22 | 2019-08-13 | 山东科技大学 | A kind of backpack full-mechanized roadway gib equipment and its application |
CN110118097B (en) * | 2019-06-22 | 2024-04-19 | 山东科技大学 | Backpack type fully-mechanized roadway temporary support equipment and application thereof |
CN111188643A (en) * | 2020-01-15 | 2020-05-22 | 陕西陕煤铜川矿业有限公司 | Supporting device applied to coal mining face and driving face operation |
CN111188643B (en) * | 2020-01-15 | 2021-09-07 | 陕西陕煤铜川矿业有限公司 | Supporting device applied to coal mining face and driving face operation |
CN111411990A (en) * | 2020-03-30 | 2020-07-14 | 安徽理工大学 | Quick excavation roadway support equipment |
CN112253204A (en) * | 2020-10-30 | 2021-01-22 | 中国矿业大学 | Roadway temporary supporting device utilizing mine pressure and installation construction method |
WO2022116482A1 (en) * | 2020-12-04 | 2022-06-09 | 煤炭科学研究总院 | Tunnel heading method |
CN112593961A (en) * | 2020-12-04 | 2021-04-02 | 煤炭科学研究总院 | Roadway driving method |
CN113279793A (en) * | 2021-07-09 | 2021-08-20 | 中国矿业大学(北京) | Temporary supporting device for roadway |
CN113685213A (en) * | 2021-08-18 | 2021-11-23 | 山东东安云矿业科技有限公司 | Continuous mining and continuous filling system without permanent support filling and implementation method |
CN113685213B (en) * | 2021-08-18 | 2024-05-31 | 山东科技大学 | Continuous mining continuous filling system without permanent support filling and implementation method |
CN113847073A (en) * | 2021-09-14 | 2021-12-28 | 辽宁工程技术大学 | Anchoring system, tunneling device with anchoring system and tunneling and anchoring method |
CN113882889A (en) * | 2021-11-01 | 2022-01-04 | 安徽理工大学 | Head-tail interactive sliding type anchor support integrated equipment and control method |
CN113882888A (en) * | 2021-11-01 | 2022-01-04 | 安徽理工大学 | Double-door efficient and rapid circulating self-moving anchor support integrated equipment and control method |
CN113882889B (en) * | 2021-11-01 | 2024-02-27 | 安徽理工大学 | Head-tail interactive sliding type anchor support integrated equipment and control method |
CN113882888B (en) * | 2021-11-01 | 2024-04-19 | 安徽理工大学 | Double-door type efficient and rapid circulation self-moving anchor supporting integrated equipment and control method |
CN114060065A (en) * | 2021-11-08 | 2022-02-18 | 中南大学 | Method for parallel rapid tunneling and supporting in weak rock mass |
CN114087004A (en) * | 2021-11-17 | 2022-02-25 | 中国矿业大学 | Temporary support carrying device for realizing parallel digging and branch operation and working method |
CN114087004B (en) * | 2021-11-17 | 2024-01-30 | 中国矿业大学 | Temporary support carrying device for realizing parallel operation of digging and supporting and working method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105971628A (en) | Temporary supporting method for tunneled roadway | |
CN101769158B (en) | Excavating, supporting and bolting integrated self-contained machine | |
CN110593870B (en) | Coal mine digging and anchor protecting integrated machine and parallel operation method | |
CN201344032Y (en) | Complete device integrating the tunneling, protection and anchoring | |
CN102410017B (en) | Supporting type integrated tunneling-anchoring machine | |
CN109931066B (en) | Strip mine side wall mining system | |
CN105697013A (en) | Contractible temporary support for tunneling tunnel | |
CN104675422B (en) | The hydraulic means of coal mine roadway temporary support for drivage face | |
CN202500562U (en) | Excavating, supporting and anchoring parallel operating system | |
CN203796297U (en) | Temporary supporting device of driving working face | |
CN202023559U (en) | Comprehensive dig-anchor machine | |
CN205743901U (en) | Digging laneway telescopic type falsework | |
CN103382844B (en) | A kind of tracked hydraulic sectional shelf-unit temporary lining and permanent support parallel operations piercing technique and equipment | |
CN205578001U (en) | Advance support formula integral unit suitable for soft rock tunnelling | |
CN103195457A (en) | Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader | |
CN103758522A (en) | Temporary support method of tunneling working face and equipment thereof | |
CN102536229A (en) | Tunneling, protecting and anchoring parallel work system and construction technology | |
CN110056356B (en) | Stepping type walking platform | |
CN109882175B (en) | Cooperative operation method for realizing one-lane three-purpose working face mining and stoping equipment withdrawal | |
CN110778320A (en) | Synchronous excavation supporting construction method for three-step inverted arch of weak surrounding rock tunnel | |
CN112343617A (en) | Automatic mine roadway tunneling system | |
CN209892217U (en) | Rapid tunneling system | |
CN104373147A (en) | Folding extension type roadway hydraulic bracket and application method thereof | |
CN105569671A (en) | System and method for conveying residual soil in T-shaped underground excavation tunnel shield construction | |
CN105134212A (en) | Method for ensuring fully-mechanized top coal caving recovery rate of three-soft thick coal seam roadway tunneling along top |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160928 |
|
WD01 | Invention patent application deemed withdrawn after publication |