CN108691545A - A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape - Google Patents

A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape Download PDF

Info

Publication number
CN108691545A
CN108691545A CN201810293865.XA CN201810293865A CN108691545A CN 108691545 A CN108691545 A CN 108691545A CN 201810293865 A CN201810293865 A CN 201810293865A CN 108691545 A CN108691545 A CN 108691545A
Authority
CN
China
Prior art keywords
top plate
rack beams
hydraulic support
hydraulic
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810293865.XA
Other languages
Chinese (zh)
Other versions
CN108691545B (en
Inventor
张旻昊
张颖琳
张卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810293865.XA priority Critical patent/CN108691545B/en
Publication of CN108691545A publication Critical patent/CN108691545A/en
Application granted granted Critical
Publication of CN108691545B publication Critical patent/CN108691545B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/03Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor having protective means, e.g. shields, for preventing or impeding entry of loose material into the working space or support
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0418Positioning devices and stabilizing means for the props
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0427Shield operating devices; Hinges therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of continuous tunneling construction methods of bolting with wire mesh adapting to Complex Roof shape.Top plate metal mesh is joined after broken coal petrography to be placed in and is sticked up on the forestope of top, when going out clean coal, cash, the supporting power provided roof timbering, leg hydraulic jack and rack beams using the hydraulic support for adapting to top plate shape is uniformly supplied to top plate by small hydraulic jack;Simple to install is driven a vehicle, when driving face, which is tunneled, is more than fully-mechanized digging machine tail portion to supporting region, anchor pole permanent support is utilized to top plate, portion of side under the hydraulic support, hydraulic support at Demolition Construction permanent support position, it is put on the Simple traveling crane that do not dismantle and transports at roadway head, continuation sets up forward hydraulic support.The application actively gives complex-shaped top plate to provide uniform and stable supporting power everywhere, real-time supporting is carried out at the rear of driving face using transitional hydraulic bracket in tunneling process, broken rock and permanent support two procedures are separated and are constructed in different location, construction efficiency is improved.

Description

A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape
Technical field
The present invention relates to a kind of tunnelling construction technology, specifically a kind of bolting with wire mesh for adapting to Complex Roof shape connects Continuous tunneling construction method, belongs to roadway construction technical field.
Background technology
Underground coal mine, Tunnel Engineering roadway construction in, traditional driving method is broken coal petrography → gib → forever Long supporting → enter back into subsequent cycle, using such construction method, broken in same section of tunnel coal petrography and permanent support this two Procedure is that needs sequence carries out, and the wherein permanent support time is longer, accounts for about the 60~70% of whole process total times, then Broken rock activity time will be very short, typically less than 30%, be equivalent to it is shorter at the time in lane forward, caused by the result is that final whole The speed of application of body tunnelling supporting is slower, less efficient;And the fully-mechanized digging machine for breaking coal petrography needs interval to be for a long time just switched on Once, it is prodigious cost and the wasting of resources for large-scale ground, tunnel construction.On the other hand, in tunneling process In, since the lithology of construction rock stratum has prodigious uncertain and variation, the top plate shape after driving is usually extremely complex, does not have Rule, common hydraulic support can not provide uniform and stable supporting power everywhere to top plate, can not ensure the safety of roof timbering, Worker constructs under the top plate prodigious psychological burden.
Invention content
In view of the above-mentioned problems of the prior art, the object of the present invention is to provide a kind of anchors adapting to Complex Roof shape The continuous tunneling construction method of net supporting is ensureing that the while of breaking the coal time can improve the construction speed of whole tunnelling supporting Degree, can promote fully-mechanized digging machine Homes Using TV, and can everywhere be provided to complex-shaped top plate in tunneling process uniform and stable Supporting power ensures the safety of roof timbering.
To achieve the above object, the technical solution adopted by the present invention is:A kind of bolting with wire mesh adapting to Complex Roof shape Continuous tunneling construction method, which is characterized in that include the following steps:
Step 1:Broken coal petrography:It is close in tunnel using explosion or fully-mechanized digging machine after tunneling direction breaks coal, cash in tunnel The position of top plate rearward extend from driving face set up more it is parallel stick up top forestope, and top plate metal mesh is joined and is set It pushes up on forestope, and is altered forward to the front end for sticking up top forestope in sticking up;The front end of top plate metal mesh is using wooden unit and top plate wedge Tightly, when going out clean coal, cash, supporting is carried out to top plate using the hydraulic support for adapting to top plate shape, and will be after top plate metal mesh End is placed on the hydraulic support set up;
Step 2:Set up transitional hydraulic bracket:After head-room reaches antenna height, since driving face backward The parallel erection hydraulic supports of Fang Yici, unload the hydraulic support shipped from tunnel rear from Simple traveling crane, in each holder Vertically-mounted leg hydraulic jack is distinguished at beam lower surface both ends, and distribution setting is multiple small between rack beams upper surface and top plate Hydraulic jack first carries out fluid injection to leg hydraulic jack and jacks up rack beams, until the small hydraulic jack above rack beams Apical grafting contacts top plate, then to not carrying out fluid injection boosting with the small hydraulic jack of top plate contact due to top plate injustice, makes top plate not The small hydraulic jack top elongation at flat place and top plate contact, each small hydraulic jack put forward arch supporting power to top plate jointly, this When leg hydraulic jack and rack beams provide supporting power be uniformly supplied to also by the small hydraulic jack in rack beams Top plate ensure that the safety of roof timbering;
Step 3:Simple to install is driven a vehicle:Simple to install driving, the rack beams and crane beam used after hydraulic support has been set up It is all i-beam structure, when installation, component Fast Installation crane beam is dismantled using connection Fast Installation in rack beams lower surface; When specific operation, connection is first dismantled component with Fast Installation to be placed between rack beams and crane beam, and makes the length of crane beam Direction is perpendicular with rack beams, and the lower flange of rack beams is placed in the upper surface of upper location-plate, and makes closing for upper location-plate surface Lock tooth bites the side of lower flange, and movable pressing board is made to push down the other side of lower flange, and lock pin passes through the limit of movable pressing board both sides Position ring, to make movable pressing board fix the other side of rack beams lower flange;Then the top flange of crane beam is placed in lower positioning The lower surface of plate, and the locking tooth of lower positioning plate surface is made to bite the side of crane beam top flange, so that movable pressing board is pushed down upper limb The other side of edge, lock pin passes through the spacing ring of movable pressing board both sides, to make movable pressing board fix the another of crane beam top flange Side;After rack beams are connected with crane beam, the simple to install crane on crane beam, simple crane can be moved along crane beam It is dynamic;
Step 4:Anchor shaft anchor cable permanent support:According to each cyclic advance of the general driving face of the lithology of top plate be 1~ 3 hydraulic supports often tunnel a cyclic advance, accordingly set up 1~3 hydraulic support;When tunnel headwork towards Preceding driving is to the erection supporting region of hydraulic support when being more than the reprinting drive end unit of fully-mechanized digging machine, the hydraulic pressure branch set up at first at this time Erection supporting zone length between frame and the hydraulic support finally set up reaches 30~50m, is reprinting drive end unit rear at this time Hydraulic support lower section to top plate, portion of side using anchor pole carry out permanent support, the permanent support in fully-mechanized digging machine tail portion will not be right The driving of front driving face impacts, and realizes the synchronous parallel operation of permanent support and broken rock process;
Step 5:Dismantle Simple traveling crane and hydraulic support:After permanent support anchor bolt construction is good, dismountable construction is good permanent Simple traveling crane, the hydraulic support of supporting position first remove the crane beam of permanent support position, due to crane beam when specific operation Coupling between rack beams can be rapidly assembled and disassembled, and knock out the lock pin on lower positioning plate, start corresponding activity pressure Plate can be such that crane beam is separated with Fast Installation dismounting component with coupling, then knock out the lock pin of upper location-plate, start corresponding work Dynamic pressure plate can be such that connection Fast Installation dismounting component is separated with rack beams beam;Then the hydraulic pressure of permanent support position is removed again Holder unloads small hydraulic jack and leg hydraulic jack at rack beams successively, and rack beams are put into what front was not dismantled Transported on Simple traveling crane it is for use at the driving face position of tunnel front end, until be further continued for after driving face broken rock to side arm If hydraulic support and Simple traveling crane;
Step 6:One is repeated the above steps to step 5, and so on, repeatedly until completing the height in entire tunnel after cycle Fast tunneling construction.
The present invention can design the spacing of different hydraulic supports according to the different lithology of top plate when designing.Preferably, institute It is 500mm~1000mm to state the spacing between each hydraulic support.
Preferably, the supporting power of the hydraulic support is the 80% of suspension roof support power.When the small hydraulic jack in rack beams After top is by the enough pressure of above-mentioned requirements note, sufficient strength can be connect with top plate, ensure that the safety of top plate.
Preferably, the small hydraulic jack that the present invention uses is made of oil cylinder and the spring being sleeved on oil cylinder, the spring Upper part and the top of oil cylinder tight fit and spring be higher than the top of oil cylinder;Small hydraulic jack is placed in rack beams and top plate Between, when the fluctuating of top plate is little, oil cylinder need not extend, and the spring being sleeved at this time on oil cylinder directly bears the pressure of top plate Power, spring, which is pressurized, provides reversed supporting power to top plate;When the big rise and fall of top plate, oil cylinder fluid injection is given, is pushed up after oil cylinder elongation End directly and top plate contact, supporting power is provided for top plate, and spring, can in step 5 dismounting hydraulic support integrally by tension at this time To provide power-assisted, for the retraction of oil cylinder convenient for the unloading of oil cylinder, when specific operation, the feather valve unloading high pressure of oil cylinder can be opened Emulsion, oil cylinder bounce back to initial length under the drive of spring.Therefore the spring on oil cylinder can not only be used for supporting roof use, But also as the retraction power of oil cylinder, and structure design is also fairly simple.
As a preferred scheme of the above method, when simple to install is driven a vehicle in step 3, rack beams and crane beam After being connected, when top plate is unstable causes crane beam that cannot keep level, by adjusting between upper location-plate and lower positioning plate Screw connection can adjust crane beam to horizontal position.Screw connection facilitates leveling and the normal use of Simple traveling crane.
Compared with the existing technology, the present invention has following advantage:
(1) broken coal process of the invention can be carried out at the same time from permanent support in the different sections in same tunnel, originally this Two procedures are same place sequence constructions, and the previous process of construction that is in the same localities cannot construct another process, two Person interacts, and can not be carried out at the same time, leverage speed of application;The application uses transient liquid simultaneously in tunneling process Holder carries out real-time supporting at the rear of driving face, is separated by transition supporting broken rock and permanent support two procedures, two A process is not constructed in same place, and each process individually arranges one group of construction personnel to construct, the heading driver in front end Make face position and save more times for breaking coal petrography, broken rock can be continued, the fully-mechanized digging machine Homes Using TV of coal petrography is made brokenly to reach 80% or more, the different parts in tunnel and multigroup worker's synchronous construction ensure that increasing substantially for roadway construction work efficiency, pass through Experiment, construction efficiency totally improve 40% or more.
(2) rack beams are first jacked up the progress fluid injection of leg hydraulic jack by the present invention, until the small liquid above rack beams Pressure jack touch top plate give top plate provide supporting power, then to due to top plate injustice not with the small hydraulic jack of top plate contact Fluid injection boosting is carried out, small hydraulic jack top at top plate injustice is made to extend and top plate contact, it is equally distributed each on top plate A small hydraulic jack is cooperateed with puies forward arch supporting power to top plate, and the supporting power that at this moment leg hydraulic jack and rack beams provide also may be used To be uniformly supplied to top plate by the small hydraulic jack on beam, three-dimensional supporting is formd from top to bottom, can adapt to prop up The top plate for protecting complicated shape, the supporting power of active is provided for top plate, it is ensured that the safety of roof timbering eliminates construction personnel's Psychological burden;
(3) present invention dismantles the installing and dismounting that component carries out crane beam using connection with Fast Installation, easy to operate quick And connection is stablized, and more has compressed the construction time into one while ensuring safety;Top plate metal mesh, which joins to be placed in, sticks up the preceding spy in top It avoids the rubble on top plate to inadvertently fall off on beam, alters forward to the front end for sticking up top forestope and using wooden unit and top plate wedge Tightly, rear end is placed on the holder set up, and fixed form is firm, be ensure that the safety of the personnel in erect bracket, is not had Rubble is fallen from top plate.
Description of the drawings
Fig. 1 is the schematic diagram of the present invention;
Fig. 2 is the sectional view along A-A in Fig. 1;
Fig. 3 is the schematic diagram of the small hydraulic jack in the present invention;
Fig. 4 is that the coupled situation figure (omitting crane beam) of component is dismantled in the connection of the present invention with Fast Installation;
Fig. 5 is the left view (omitting rack beams) of Fig. 4;
Fig. 6 is that the stereogram of component is dismantled in the connection of the present invention with Fast Installation;
In figure, 1. tunnels, 11. top plates, 12. driving faces, 2. stick up top forestope, 3. hydraulic supports, 31. rack beams, 32. leg hydraulic jack, 33. small hydraulic jacks, 33a. oil cylinders, 33b. springs, 4. Simple traveling cranes, 41. crane beams, 42. Connection dismantles component with Fast Installation, 42-1. upper location-plates, positioning plate under 42-2., and 42a. is latched tooth, 42b. movable pressing boards, 42c. lock pins, 42d. pressing plate shafts, 42e. screw connections, 42f. spacing rings, 5. anchor poles, 6. fully-mechanized digging machines, 7. elevating conveyors, 8. is portable Pneumatic pumping plant.
Specific implementation mode
Invention is further described in detail with reference to the accompanying drawings and examples.
As shown, a kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape, includes the following steps:
Step 1:Broken coal petrography:In tunnel 1, using explosion or fully-mechanized digging machine after tunneling direction breaks coal, cash, leaned in tunnel 1 The position of nearly top plate 11 rearward extends from driving face 12 to be set up more parallel sticking up and pushes up forestope 2, and by top plate metal Net, which joins to be placed in, to stick up on the forestope 2 of top, and alters forward to the front end for sticking up top forestope 2;The front end of top plate metal mesh is using wood Block and 11 wedging of top plate carry out supporting using the hydraulic support 3 for adapting to 11 shape of top plate when going out clean coal, cash to top plate 11, and The rear end of top plate metal mesh is placed on the hydraulic support 3 set up, ensures not having rubble in erection construction from top plate 11 fall, ensure the safety of personnel;
Step 2:Set up transitional hydraulic bracket:After when tunnel, 1 height reaches antenna height, since driving face 12 Rearward parallel erection hydraulic support 3 successively, unloads the hydraulic support 3 shipped from 1 rear of tunnel from Simple traveling crane 4, Vertically-mounted leg hydraulic jack 32 is distinguished at each 31 lower surface both ends of rack beams, 31 upper surface of rack beams and top plate 11 it Between distribution multiple small hydraulic jacks 33 are set, first carrying out fluid injection to leg hydraulic jack 32 jacks up rack beams 31, until The small hydraulic jack 33 of 31 top of rack beams touches top plate 11 and provides supporting power to top plate 11, then to due to 11 injustice of top plate The small hydraulic jack 33 not contacted with top plate 11 carries out fluid injection boosting, makes 33 top of small hydraulic jack at the injustice of top plate 11 Elongation is contacted with top plate 11, and each collaboration of small hydraulic jack 33 puies forward arch supporting power to top plate 11, at this moment leg hydraulic jack 32 and rack beams 31 provide supporting power be uniformly supplied to top plate 11 also by the small hydraulic jack 33 in rack beams 31, protect The safety of 11 supporting of top plate is demonstrate,proved;
Step 3:Simple to install is driven a vehicle:Simple to install driving 4, the rack beams that the present invention uses after hydraulic support 3 has been set up 31 and crane beam 41 be all i-beam structure, when installation, component is dismantled using connection Fast Installation in 31 lower surface of rack beams 42 Fast Installation crane beams 41;It includes upper location-plate disposed in parallel that the connection that the present invention uses dismantles component 42 with Fast Installation 42-1 and lower positioning plate 42-2, the upper location-plate 42-1 is connected with lower positioning plate 42-2 by screw connection 42e, and upper positioning The length direction of plate 42-1 and lower positioning plate 42-2 are mutually perpendicular to, under the upper surface of upper location-plate 42-1 and lower positioning plate 42-2 Surface is respectively equipped with fixing and locking mechanism, and the fixation on the fixing and locking mechanism and lower positioning plate 42-2 on upper location-plate 42-1 Retaining mechanism intersects setting, and the fixing and locking mechanism includes the locking tooth 42a being oppositely arranged and movable pressing board 42b, institute It states movable pressing board 42b to be hinged on upper location-plate 42-1 or lower positioning plates 42-2 by pressing plate shaft 42d, a lock pin 42c, which is passed through, to live Movable pressing board 42b is pressed on upper location-plate 42-1 or lower positioning plates 42-2 by the spacing ring 42f of the both sides dynamic pressure plate 42b.Specific behaviour When making, first connection Fast Installation dismounting component 42 is placed between rack beams 31 and crane beam 41, and make the length of crane beam 41 It spends direction and rack beams 31 is perpendicular, the lower flange of rack beams 31 is placed in the upper surface of upper location-plate 42-1, and make positioning The locking tooth 42a on the surfaces plate 42-1 bites the side of lower flange, and movable pressing board 42b is made to push down the other side of lower flange, lock pin 42c passes through the spacing ring 42f of the both sides movable pressing board 42b, to make movable pressing board 42b fix the another of 31 lower flange of rack beams Side;Then the top flange of crane beam 41 is placed in the lower surface of lower positioning plate 42-2, and make the locking on the surfaces lower positioning plate 42-2 Tooth 42a bites the side of 41 top flange of crane beam, and movable pressing board 42b is made to push down the other side of top flange, and lock pin 42c passes through activity The spacing ring 42f of the both sides pressing plate 42b, to make movable pressing board 42b fix the other side of 41 top flange of crane beam;Rack beams 31 After being connected with crane beam 41, the simple to install crane 43 on crane beam 41, simple crane 43 can be moved along crane beam 41;
Step 4:Anchor shaft anchor cable permanent support:According to the lithology of top plate 11,12 each cyclic advance of general driving face (broken coal petrography length every time) is 1~3 hydraulic support, i.e., often tunnels a cyclic advance, accordingly set up 1~3 hydraulic support 3;When the erection supporting region that the driving face 12 in tunnel 1 tunnels forward to hydraulic support 3 has been more than the elevating conveyor of fully-mechanized digging machine 6 When 7 tail portion (there are enough installation spaces when anchor pole is constructed in the position more than 7 tail portion of elevating conveyor, will not be influenced by fully-mechanized digging machine, Nor affect on the headwork of fully-mechanized digging machine), between the hydraulic support 3 set up at first at this time and the hydraulic support finally set up 3 It sets up supporting zone length and reaches 30~50m, at this time in the lower section of the hydraulic support 3 at 7 tail portion rear of elevating conveyor to top plate 11, side Portion carries out permanent support using anchor pole 5, and the permanent support in fully-mechanized digging machine tail portion will not be to the pick of 12 position of front driving face Into impacting, the synchronous parallel operation of permanent support and broken rock process is realized, working efficiency is improved;
Step 5:Dismantle Simple traveling crane and hydraulic support:After the construction of permanent support anchor pole 5 is good, dismountable construction is good forever Simple traveling crane 4, the hydraulic support 3 of long supporting position first remove the crane beam 41 of permanent support position when specific operation, due to Coupling between crane beam 41 and rack beams 31 can be rapidly assembled and disassembled, and knock out the lock pin 42c on lower positioning plate 42-2, Start corresponding movable pressing board 42b can make crane beam 41 with couple with Fast Installation dismounting component 42 separate, then knock out it is fixed The lock pin 42c of position plate 42-1, connection Fast Installation dismounting component 42 and rack beams can be made by starting corresponding movable pressing board 42b 31 beams separate;Then the hydraulic support 3 of permanent support position is removed again, unloads the small hydraulic jack 33 at rack beams 31 successively With leg hydraulic jack 32, rack beams 31 are put into the heading driver that 1 front end of tunnel is transported on the Simple traveling crane 4 that front is not dismantled Make it is for use at 12 position of face, until be further continued for setting up hydraulic support 3 and Simple traveling crane 4 forward after 12 broken rock of driving face;
Step 6:One is repeated the above steps to step 5, and so on, repeatedly until completing entire tunnel 1 after cycle High speed tunneling construction.
Portable pneumatic pumping plant 8 in the present invention on fully-mechanized digging machine 6 can be the small hydraulic jack 33 in rack beams 31, leg Portion's hydraulic jack 32 provides power, and the emulsion hydraulic which provides is up to 28MPa.
Preferably, the small hydraulic jack 33 that the present invention uses can be by oil cylinder 33a and the spring being sleeved on oil cylinder 33a 33b is formed, and the upper part of the spring 33b is higher than the top of oil cylinder 33a with the top of oil cylinder 33a tight fits and spring 33b.It will Small hydraulic jack 33 is placed between rack beams 31 and top plate 11, and when the fluctuating of top plate 11 is little, oil cylinder 33a need not stretch Long, the spring 33b being sleeved at this time on oil cylinder 33a directly bears the pressure of top plate 11, and spring 33b is pressurized to be provided reversely to top plate 11 Supporting power;When the big rise and fall of top plate 11, oil cylinder 33a fluid injections are given, top directly connects with top plate 11 after oil cylinder 33a elongations It touches, supporting power is provided for top plate 11, spring 33b can be oil cylinder when step 5 dismantles hydraulic support integrally by tension at this time The retraction of 33a provides power-assisted, convenient for the unloading of oil cylinder 33a, and when specific operation, the feather valve unloading that can open oil cylinder 33a is high Emulsion, oil cylinder 33a is pressed to bounce back to initial length under the drive of spring 33b.Therefore the spring 33b on oil cylinder 33a both may be used It is used as supporting roof, but also as the retraction power of oil cylinder 33a, and structure design is also fairly simple.
As a preferred scheme of the above method, in step 3 when simple to install driving 4, rack beams 31 and driving After beam 41 is connected, when top plate 11 is unstable causes crane beam 41 that cannot keep level, by adjust upper location-plate 42-1 and Screw connection 42e between lower positioning plate 42-2 can adjust crane beam 41 to horizontal position, and screw connection 42e is facilitated simply The leveling of driving 4 and normal use.

Claims (5)

1. a kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape, which is characterized in that include the following steps:
Step 1:Broken coal petrography:In tunnel (1), using explosion or fully-mechanized digging machine after tunneling direction breaks coal, cash, leaned in tunnel (1) The position of nearly top plate (11) rearward extends parallel the sticking up of more of erection from driving face (12) and pushes up forestope (2), and will top Sheetmetal net, which joins to be placed in, to stick up on top forestope (2), and alters forward to the front end for sticking up top forestope (2);Top plate metal mesh Front end is using wooden unit and top plate (11) wedging, right using the hydraulic support (3) for adapting to top plate (11) shape when going out clean coal, cash Top plate (11) carries out supporting, and the rear end of top plate metal mesh is placed on the hydraulic support (3) set up;
Step 2:Set up transitional hydraulic bracket:After tunnel (1) highly reaches antenna height, since driving face (12) Rearward parallel erection hydraulic support (3) successively, the hydraulic support (3) shipped from tunnel (1) rear from Simple traveling crane (4) It unloads, vertically-mounted leg hydraulic jack (32) is distinguished at each rack beams (31) lower surface both ends, in rack beams (31) Multiple small hydraulic jacks (33) are arranged in distribution between surface and top plate (11), first carry out fluid injection to leg hydraulic jack (32) Rack beams (31) are jacked up, until the small hydraulic jack (33) above rack beams (31) touches top plate (11), then to due to The small hydraulic jack (33) that top plate (11) injustice is not contacted with top plate (11) carries out fluid injection boosting, makes at top plate (11) injustice Small hydraulic jack (33) top elongation is contacted with top plate (11), and each small hydraulic jack (33) carries arch to top plate (11) jointly Supporting power, the supporting power that at this moment leg hydraulic jack (32) and rack beams (31) provide is also by the small liquid in rack beams (31) Pressure jack (33) is uniformly supplied to top plate (11), ensure that the safety of top plate (11) supporting;
Step 3:Simple to install is driven a vehicle:Hydraulic support (3) set up after simple to install driving (4), the rack beams used (31) and Crane beam (41) is all i-beam structure, and when installation, component is dismantled using connection Fast Installation in rack beams (31) lower surface (42) Fast Installation crane beam (41);When specific operation, connection is first dismantled into component (42) with Fast Installation and is placed in rack beams (31) between crane beam (41), and keep the length direction of crane beam (41) and rack beams (31) perpendicular, by rack beams (31) Lower flange be placed in the upper surface of upper location-plate (42-1), and the locking tooth (42a) on the surface upper location-plate (42-1) is made to bite down The side on the edge of a wing, and movable pressing board (42b) is made to push down the other side of lower flange, lock pin (42c) is across the both sides movable pressing board (42b) Spacing ring (42f), to make movable pressing board (42b) fix the other side of rack beams (31) lower flange;Then by crane beam (41) top flange is placed in the lower surface of lower positioning plate (42-2), and the locking tooth (42a) on the surface lower positioning plate (42-2) is made to sting The firmly side of crane beam (41) top flange, makes movable pressing board (42b) push down the other side of top flange, and lock pin (42c) passes through activity The spacing ring (42f) of the both sides pressing plate (42b), to make movable pressing board (42b) fix the other side of crane beam (41) top flange; After rack beams (31) are connected with crane beam (41), the simple to install crane (43) on crane beam (41), simple crane (43) is i.e. It can be mobile along crane beam (41);
Step 4:Anchor shaft anchor cable permanent support:According to the general driving face of lithology (12) each cyclic advance of top plate (11) For 1~3 hydraulic support, i.e., a cyclic advance is often tunneled, accordingly sets up 1~3 hydraulic support (3);When the pick of tunnel (1) The erection supporting region tunneled forward to hydraulic support (3) into working face (12) has been more than elevating conveyor (7) tail portion of fully-mechanized digging machine (6) When, the erection supporting zone length between the hydraulic support (3) set up at first at this time and the hydraulic support (3) finally set up reaches 30~50m utilizes anchor pole (5) in the lower section of the hydraulic support (3) at elevating conveyor (7) tail portion rear to top plate (11), portion of side at this time Permanent support is carried out, the permanent support in fully-mechanized digging machine tail portion will not impact the driving of front driving face (12), real The synchronous parallel operation of permanent support and broken rock process is showed;
Step 5:Dismantle Simple traveling crane and hydraulic support:After permanent support anchor pole (5) construction is good, dismountable construction is good permanent Simple traveling crane (4), the hydraulic support (3) of supporting position first remove the crane beam (41) of permanent support position when specific operation, Since coupling between crane beam (41) and rack beams (31) can be rapidly assembled and disassembled, knock out on lower positioning plate (42-2) Lock pin (42c), start corresponding movable pressing board (42b) can make crane beam (41) and couple with Fast Installation dismantle component (42) it separates, then knocks out the lock pin (42c) of upper location-plate (42-1), starting corresponding movable pressing board (42b) can be such that connection uses Fast Installation dismounting component (42) is separated with rack beams (31) beam;Then the hydraulic support (3) for removing permanent support position again, according to Rack beams (31) are put into front by the small hydraulic jack (33) at secondary unloading rack beams (31) and leg hydraulic jack (32) Transported on the Simple traveling crane (4) that do not dismantle it is for use at driving face (12) position of tunnel (1) front end, until driving face (12) it is further continued for setting up hydraulic support (3) and Simple traveling crane (4) forward after broken rock;
Step 6:One is repeated the above steps to step 5, and so on, repeatedly until completing the height of entire tunnel (1) after cycle Fast tunneling construction.
2. the bolting with wire mesh continuous tunneling construction method according to claim 1 for adapting to Complex Roof shape, feature exist In the spacing between each hydraulic support (3) is 500mm~1000mm.
3. the bolting with wire mesh continuous tunneling construction method according to claim 1 for adapting to Complex Roof shape, feature exist In the supporting power of the hydraulic support (3) is the 80% of anchor pole (5) supporting power.
4. the bolting with wire mesh continuous tunneling construction method according to claim 1 for adapting to Complex Roof shape, feature exist In the small hydraulic jack (33) is made of oil cylinder (33a) and the spring (33b) being sleeved on oil cylinder (33a), the spring The upper part of 33b is higher than the top of oil cylinder (33a) with the top of oil cylinder (33a) tight fit and spring 33b;By small hydraulic jack (33) after being placed between rack beams (31) and top plate (11), when the fluctuating of top plate (11) is little, oil cylinder 33a need not extend, The spring (33b) being sleeved at this time on oil cylinder (33a) directly bears the pressure of top plate 11, and spring 33b is pressurized to be provided instead to top plate 11 To supporting power;When the big rise and fall of top plate 11, give oil cylinder 33a fluid injections, after oil cylinder 33a elongation top directly with top plate (11) Contact provides supporting power for top plate 11, and spring 33b can be oil when step 5 dismantles hydraulic support integrally by tension at this time The retraction of cylinder (33a) provides power-assisted, convenient for the unloading of oil cylinder 33a, when specific operation, can open the feather valve of oil cylinder (33a) High-pressure emulsion is unloaded, oil cylinder (33a) bounces back to initial length under the drive of spring (33b).
5. the bolting with wire mesh continuous tunneling construction method according to claim 1 for adapting to Complex Roof shape, feature exist In in step 3 when simple to install driving (4), after rack beams (31) are connected with crane beam (41), when top plate (11) injustice When surely causing crane beam (41) that level cannot be kept, pass through the connection adjusted between upper location-plate (42-1) and lower positioning plate (42-2) Crane beam (41) can be adjusted to horizontal position by connecing screw rod (42e).
CN201810293865.XA 2018-03-30 2018-03-30 A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape Expired - Fee Related CN108691545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810293865.XA CN108691545B (en) 2018-03-30 2018-03-30 A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810293865.XA CN108691545B (en) 2018-03-30 2018-03-30 A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape

Publications (2)

Publication Number Publication Date
CN108691545A true CN108691545A (en) 2018-10-23
CN108691545B CN108691545B (en) 2019-06-28

Family

ID=63845218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810293865.XA Expired - Fee Related CN108691545B (en) 2018-03-30 2018-03-30 A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape

Country Status (1)

Country Link
CN (1) CN108691545B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113266367A (en) * 2021-05-31 2021-08-17 太原理工大学 Automatic hard roof roadway hydraulic rod roof cutting method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1838620C (en) * 1991-12-06 1993-08-30 Potapenko Vyacheslav A Powered drift support
CN103195457A (en) * 2013-04-15 2013-07-10 辽宁天安矿山科技有限公司 Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
CN103382844A (en) * 2013-07-15 2013-11-06 郑东风 Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN103758522A (en) * 2014-01-23 2014-04-30 郑东风 Temporary support method of tunneling working face and equipment thereof
CN104179517A (en) * 2014-09-03 2014-12-03 兖矿集团有限公司 Tunneling support system and roadway support method
CN104564050A (en) * 2015-01-19 2015-04-29 郑东风 Process method and equipment for heading and anchoring parallel operation construction
CN105971628A (en) * 2016-03-31 2016-09-28 中国矿业大学(北京) Temporary supporting method for tunneled roadway
CN108194114A (en) * 2018-02-06 2018-06-22 中煤能源研究院有限责任公司 Roadway head protects top and anchor bolt construction integrated apparatus temporarily

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1838620C (en) * 1991-12-06 1993-08-30 Potapenko Vyacheslav A Powered drift support
CN103195457A (en) * 2013-04-15 2013-07-10 辽宁天安矿山科技有限公司 Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
CN103382844A (en) * 2013-07-15 2013-11-06 郑东风 Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN103758522A (en) * 2014-01-23 2014-04-30 郑东风 Temporary support method of tunneling working face and equipment thereof
CN104179517A (en) * 2014-09-03 2014-12-03 兖矿集团有限公司 Tunneling support system and roadway support method
CN104564050A (en) * 2015-01-19 2015-04-29 郑东风 Process method and equipment for heading and anchoring parallel operation construction
CN105971628A (en) * 2016-03-31 2016-09-28 中国矿业大学(北京) Temporary supporting method for tunneled roadway
CN108194114A (en) * 2018-02-06 2018-06-22 中煤能源研究院有限责任公司 Roadway head protects top and anchor bolt construction integrated apparatus temporarily

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113266367A (en) * 2021-05-31 2021-08-17 太原理工大学 Automatic hard roof roadway hydraulic rod roof cutting method
CN113266367B (en) * 2021-05-31 2024-05-14 太原理工大学 Automatic roof cutting method for hydraulic rod of hard roof roadway

Also Published As

Publication number Publication date
CN108691545B (en) 2019-06-28

Similar Documents

Publication Publication Date Title
CN101251022B (en) Immediate support device for digging machine
CN102654060B (en) Tunnel excavation staggered type supporting device
WO2021103533A1 (en) Operation-controllable, roof-cutting, pressure-relief, gob-side entry retaining method
CN106593437A (en) Digging, supporting, anchoring and drilling all-in-one fully-mechanized excavating machine
CN103899319A (en) Continuous automation speedy driving technology for driving and anchoring
CN201170107Y (en) Immediate support device for digging machine
CN103485795B (en) Method for quickly tunneling mine roadway and consecutively timbering mine roadway
CN109184733A (en) Soft rock chamber pucking based on prefabricated assembled bottom arc plate administers supporting construction and method
CN201953390U (en) Hydraulic walking advance support equipment
CN1702300A (en) Arrangement for quickly shifting sublevel caving hydraulic support series for fully-mechanized mining of three-soft coal bed
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN102121390A (en) Telescopic tunneling immediate support device
CN108691545B (en) A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape
CN109057820A (en) A kind of rich water weak broken formation tunnel method for protecting support
CN102322281B (en) Tunnel quick-tunneling advance support integrated device
CN104863599B (en) Fully-mechanized mining working synchronously expands side installation method and support system
CN104265344A (en) Conveyor unloading part rear-mounted end hydraulic support
CN202090874U (en) Integrated advance support device for mine speedy drivage
CN111828073A (en) Novel roadway support device
CN203905988U (en) Slip type temporary supporting bracket
CN114320323B (en) Three-support shoe tightening shield for double-shield coal roadway heading machine
CN104832172B (en) A kind of fast and safely driving system and method
CN105840236A (en) Method using pilot tunnel to process tilting and dumping hydraulic support
CN213478375U (en) Temporary supporting structure for underground coal mine roadway
CN2758486Y (en) Fast supporter moving device of 'three soft' coal layer composite mining top coal supporter series

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190628