CN102654060A - Tunnel excavation staggered type supporting device - Google Patents

Tunnel excavation staggered type supporting device Download PDF

Info

Publication number
CN102654060A
CN102654060A CN2012101618591A CN201210161859A CN102654060A CN 102654060 A CN102654060 A CN 102654060A CN 2012101618591 A CN2012101618591 A CN 2012101618591A CN 201210161859 A CN201210161859 A CN 201210161859A CN 102654060 A CN102654060 A CN 102654060A
Authority
CN
China
Prior art keywords
auxilliary
hinged
roof
connecting rod
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101618591A
Other languages
Chinese (zh)
Other versions
CN102654060B (en
Inventor
曹树祥
曹伟
胡宇
符大利
杨宏光
王荣亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Tian'an Special Robot Co ltd
Original Assignee
LIAONING TIAN'AN MINING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING TIAN'AN MINING TECHNOLOGY Co Ltd filed Critical LIAONING TIAN'AN MINING TECHNOLOGY Co Ltd
Priority to CN201210161859.1A priority Critical patent/CN102654060B/en
Publication of CN102654060A publication Critical patent/CN102654060A/en
Application granted granted Critical
Publication of CN102654060B publication Critical patent/CN102654060B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a tunnel excavation staggered type supporting device, which solves the problems in prior art of lagging supporting means, difficulty in moving, operation at a halt state, low efficiency and the like. The tunnel excavation staggered type supporting device comprises a hydraulic stand column as a support and a beam frame consisting of transverse beams and vertical beams. According to the technical main points, the beam frame comprises a girder frame and a secondary beam frame; auxiliary anchoring rod devices are arranged at the side parts of an auxiliary front beam and an auxiliary back beam; the front end of a main front vertical beam is hinged with a front beam assembly; a moving hydraulic cylinder is hinged between the main front beam and the auxiliary back beam; and the hydraulic stand column moves synchronously by means of assembling with a connecting rod together. The tunnel excavation staggered type supporting device provided by the invention has the advantages of reasonable structural design, stable supporting and moving, convenience in dismounting and maintenance, and high security and reliability. The tunnel excavation staggered type supporting device is entirely suitable for field and in-time support using conditions, can mechanically support an ejector plate which is just exposed to a tunnel excavation working face in time, can assist tunnel permanent supporting operations, such as an auxiliary screen, an anchoring rod and the like, and cover the continuous operation through a comprehensive mechanical excavator, so that the supporting quality and the excavation operation efficiency of the ejector plate of a tunnel can be obviously improved.

Description

Tunnelling alternating expression suspension device
Technical field
The present invention relates to the suspension device of tunnel excavation operation in a kind of mining; The particularly a kind of means of mechanization and tunnelling alternating expression suspension device that the fully-mechanized digging machine coordinating operation carries out on-the-spot immediate support of adopting; Be mainly used in the top board that has just exposed of tunnelling operation and auxiliary lapping and the timely mechanization supporting of beating anchor pole etc., the shielding fully-mechanized digging machine is the operation of realization continuous supporting in certain zone, tunnel.Belong to mining machinery manufacturing and application.
Background technology
In the pit mining in present mining, especially colliery, the excavation operation in tunnel is the prerequisite of every other operation.Along with the comprehensive mechanized development machine generally use of (being called for short " fully-mechanized digging machine "), " drilling and blasting " operating type that the efficient of tunnelling is more traditional has had large increase.But, influenced by the back ROCK CONDITIONS, the driving technology that generally adopts is: just shut down when generally tunneling 1~2 meter, carry out artificial temporary lining with anchor pole, anchor cable or capplce etc., and then start is tunneled 1~2 meter, so cycle operation.This desultory cycle operation efficient is very low, makes excavation operation can't bring into play the advantage of fully-mechanized digging machine.Relevant data shows, even in, also less than 30% of the fully-mechanized digging machine Homes Using TV under the large-scale coal mine during tunnelling, that is have and surpass time of 2/3rds and all be used for artificial temporary lining.Its basic reason is exactly that existing tunnelling supporting means fall behind, and lacks and can screen fully-mechanized digging machine normally to tunnel, and the back that tunnels firm exposure is carried out the safety means of temporary lining simultaneously.Tunnelling has become the bottleneck that a lot of coal mining enterprises of restriction produce, and according to home and abroad related data report, does not still have the maturation of these type of safety means or technology at present and uses.Although China is since the last century the nineties; Some schemes of being devoted to address this problem have also appearred successively; But no matter on its design principle, still from application practice, reflect that all these schemes too theorize, far can not adapt to on-the-spot actual needs.
Existing excavation operation suspension device can roughly be divided three classes: the first kind is on existing development machine, to do some change; Temporary support device and fully-mechanized digging machine are integrated; Reaching the purpose of working continuously, is that " a kind of front-probe support of tunneling working face " of CN2204334Y, " advanced stand device of driving face ", notification number that publication number is CN101029570A are " dig, protect, anchoring integral heading equipment " of CN200964858Y etc. like patent announcement number for CN2782932Y " combining pick meets head on to visit temporary support device before the hydraulic pressure ", " supporting type continuous tunnelling machine ", notification number that publication number is CN1987046A.The suspension device that these and fully-mechanized digging machine are fixed together; Though solved the walking problem to a certain extent; But the huge vibrations that fully-mechanized digging machine produces in tunneling process also will directly act on the back of institute's supporting through suspension device; Quicken it and destroy, also produce various faults because of vibration easily with the fixing of fully-mechanized digging machine cut rocking arm or fuselage simultaneously; In addition, the supporting area and the effective support space of this structure are little, can not realize the full section supporting to digging laneway, still will rely on intermittent manual work, have certain potential safety hazard.
Second type is to adopt the capplce of parallel interval setting to add supporting leg (being mostly hydraulic prop), and mobile employing takes a step to move the structure of frame from moving or circulating: is that " driving is with flexible back timber temporary lining ", the notification number of CN2142883Y is " the heading end temporary lining special type hydraulic support " of CN2189645Y, " compressibile support that is used for roadway head " that notification number is CN2851578Y etc. like patent announcement number for " driving face falsework ", the notification number of CN2133672Y.Above patent all belongs to the structure of employing " slippage " back timber, and the support of this structure all is applied in the common fully mechanized workface as a kind of simple rack, presses little, the better simply coal seam of geological conditions that certain applicability is arranged for the ore deposit.This structure links together the auxiliary connection of two back timbers that are arranged in juxtaposition through the side usually side by side, links to each other with individual prop under the back timber, and individual prop acts directly on the base plate.The support of this form of structure relies on the passing jack that is arranged between two back timbers arranged side by side or is positioned at the back timber bottom, and the push-and-pull back timber moves ahead each other, but moving of it must be by adjacent supports back timber or other transversing gears carry out slippage with it.The problem that these suspension devices mainly exist: the one, can not solve the support stability problem when moving behind the frame supporting again well; The 2nd, meet that the tunnel rises and falls or base plate when softer, it is difficult that this class formation tends to move the frame supporting, the problem of supporting leg " at the bottom of the bundle "; The 3rd, can't solve development machine immediate support problem foremost, be difficult to the top board that heading end has just exposed is carried out effective immediate support.
The 3rd type then is the form of structure that adopts a plurality of unit racks; Be the grafting form that " hydraulic support that is used for roadway head " of CN100365244C proposes like patent announcement number, be the stable and supporting of support and move advantage is provided, but the form of structure of this grafting; Make the whole broad of support; The layout that is unfavorable for fully-mechanized digging machine between frame, the two coordinating operation and walking also receive certain influence, and of this patent; Permanent support still needs to carry out at the front end of support, does not fundamentally change the work pattern of fully-mechanized digging machine.And patent announcement number designs for solving " big gun pick " work plane for the technical scheme of CN2890341Y " driving hydraulic prop support ", can't carry out supporting operation with fully-mechanized digging machine.Patent announcement number be propose in " necessary support frame before heading face " of CN1035025C by splicing before and after a plurality of unit racks; The form of structure of forming a whole set of support; Attempt back and two is helped to realize totally enclosed supporting; But find that in practical application this supporting structure exists supporting and can't guarantee with the stability that moves, deficiencies such as installation in the narrow lane space in down-hole, dismounting and inconvenient maintenance.
Summary of the invention
The purpose of this invention is to provide a kind of tunnelling alternating expression suspension device, problems such as having solved supporting means backwardnesss, moving difficulty that prior art exists, need the shutdown operation, efficient is low, its reasonable in design; Supporting is stablized with moving; Loading and unloading and easy to maintenance, safe and reliable meet the service condition of on-the-spot immediate support fully; Satisfy the requirement that underworkings supporting and fully-mechanized digging machine carry out supporting operation preferably; Realization has just exposed the timely mechanization supporting of top board to roadway head, can assist lapping and play tunnel permanent support operation such as anchor pole, and the realization of shielding fully-mechanized digging machine is worked continuously.Significantly improve the supporting quality and the excavation operation efficient of back.
The technical scheme that the present invention adopted is: this tunnelling alternating expression suspension device comprises through bearing pin and is hinged on hydraulic vertical prop that the conduct of crossbeam bottom supports and by crossbeam and the roof beam structure formed along beam; Its technical essential is: said roof beam structure comprises girder frame and auxilliary roof beam structure; The girder frame reaches the forward and backward framework that links together and form along beam with the master who is hinged, the auxilliary forward and backward framework that links together and form along beam that auxilliary roof beam structure is reached and is hinged by auxilliary forward and backward crossbeam by the forward and backward crossbeam of master; The sidepiece of auxilliary forward and backward crossbeam is provided with the auxiliary anchor pole device of beating; Suitable beam front end and the front-axle beam member hinges of carrying out lapping work before the master of girder frame; And utilization is hinged on the rotational of the preceding beam assembly of the front-axle beam Driven by Hydraulic Cylinder jointed shaft of suitable beam front end before main between main Qian Shunliang and the preceding beam assembly; The hinged frame hydraulic cylinder that moves between the main front beam of girder frame and the auxilliary rear cross beam of auxilliary roof beam structure according to the order of girder frame, auxilliary roof beam structure, will be hinged on the hydraulic vertical prop of main forward and backward crossbeam and auxilliary forward and backward crossbeam bottom respectively through connecting rod; One group links together in twos, utilizes and moves staggered respectively girder frame or the same moved further of auxilliary roof beam structure of driving of frame hydraulic cylinder.
The sidepiece of said auxilliary forward and backward crossbeam is provided with the auxiliary anchor pole device of beating; The auxiliary slide rail of beating the anchor pole device is fixedly connected with auxilliary front beam or auxilliary rear cross beam; The tailpiece of the piston rod that is hinged on the lifting hydraulic cylinder on the slide rail is assembled with slide block; The connecting rod slew gear that is assembled with the top roof-bolter is hinged on the slide block, and slide block is the slide rail lifting moving in the drive lower edge of lifting hydraulic cylinder.
Be assembled in assisting of said auxilliary forward and backward crossbeam sidepiece and make the top roof-bolter on the anchor pole device; Move or jointed shaft around connecting rod slew gear middle part rotates along the length direction of connecting rod slew gear front link, or rotate with the jointed shaft of connecting rod slew gear monolithic linkage around slide block.
Group's roof-bolter is set on the connecting rod of synchronization-moving said hydraulic vertical prop.
The two ends of forward and backward crossbeam of said master and auxilliary forward and backward crossbeam are provided with side direction regulation mechanism respectively.
Distinguishing feature and advantage that the present invention has are: because the present invention is the alternating expression supporting and protection structure that adopts group box to be configured to; Promptly form the girder frame by main forward and backward crossbeam and with forward and backward the linking together of the master who is hinged along beam; Forms auxilliary roof beam structure by auxilliary forward and backward crossbeam and with auxilliary forward and backward the linking together along beam that is hinged, so its reasonable in design, supporting is stablized with mobile; In the tunnelling process, support each other; Walk through moving the mutual push-and-pull of frame hydraulic cylinder, and guarantee in the moving process of main and auxiliary roof beam structure, to have a framing to be in the top state that connects all the time, realize continuous support supporting top board; Significantly improve the supporting quality of back, eliminated the directly risk of high-risk operations under the top board that exposes of traditional driving face workman.Because of the mechanization supporting of adopting said structure with move mode certainly, match with fully-mechanized digging machine or other excavation operation modes, loading and unloading in the supporting of realization sufficient intensity, do not influence normal excavation operation with easy to maintenance, safe and reliable.This and fully-mechanized digging machine be operating type independently mutually; Can improve time and step pitch that fully-mechanized digging machine is once started shooting and tunneled continuously; With partial circulating, the frequent exchange operation work post of original excavation operation, change into long distance, systemic circulation, reduce different operations and replace time; And utilize the assisting of sidepiece setting of auxilliary forward and backward crossbeam to beat the anchor pole device; The preceding preceding beam assembly along the beam front end of master that is hinged on the girder frame carries out lapping work; Can assist lapping and play tunnel permanent support operation such as anchor pole, its adaptation angle excursion is big, and flexibility is strong; Driving face has been implemented effectively leading temporary lining, and the shielding fully-mechanized digging machine is realized working continuously.Therefore; Problems such as the invention solves supporting means backwardnesss, moving difficulty that prior art exists, need the shutdown operation, efficient is low; The service condition that meets on-the-spot immediate support fully satisfies the requirement that underworkings supporting and fully-mechanized digging machine carry out supporting operation preferably, realizes roadway head has just been exposed the timely mechanization supporting of top board; Avoid the carrying that repeats of apparatus for work, improved excavation operation efficient.
Description of drawings
Fig. 1 is a kind of concrete structure sketch map of the present invention;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the sectional view of Fig. 2 along the A-A line;
Fig. 4 is the local structure for amplifying sketch map of the side direction regulation mechanism among Fig. 3;
Fig. 5 is the auxiliary structure for amplifying sketch map of beating the anchor pole device among Fig. 3;
Fig. 6 is the vertical view of Fig. 5.
Sequence number explanation among the figure: beam assembly before 1,2 auxilliary front beams, 3 move frame hydraulic cylinder, 12 hydraulic vertical props, 13 connecting rods, 14 along beam, 7 auxilliary backs along beam, 8 auxilliary rear cross beams, 9 main rear cross beams, 10 front-axle beam hydraulic cylinders, 11 along beams, 5 main front beams, 6 main backs along beams, 4 before auxilliary before main and help roof-bolter, 15 auxiliary anchor pole device, 16 top roof-bolters, 17 side direction regulation mechanisms, 18 thruster hydraulic cylinders, 19 side plates, 20 connecting rod slew gears, 21 lifting hydraulic cylinders, 22 slide rails, 23 slide blocks, 24 rollers of arranging net of beating.
The specific embodiment
Specify concrete structure of the present invention according to Fig. 1~6.This tunnelling alternating expression suspension device comprises through bearing pin and is hinged on hydraulic vertical prop 12 that the conduct of crossbeam bottom supports and by a plurality of crossbeams and the parts such as roof beam structure formed along beam.Wherein roof beam structure comprises girder frame and auxilliary roof beam structure.The girder frame by main front beam 5, main rear cross beam 9 and with the master who is hinged before the framework that links together and form along beam 6 along beam 3, main back.Auxilliary roof beam structure is by the framework of assisting front beam 2, assisting rear cross beam 8 and linking together and form along beam 7 with the auxilliary preceding suitable beam 4 that is hinged, auxilliary back.Sidepiece at auxilliary front beam 2, auxilliary rear cross beam 8 is provided with the auxiliary anchor pole device 15 of beating; The master of girder frame is preceding hinged with the preceding beam assembly 1 that carries out lapping work along beam 3 front ends, and utilization is hinged on the main preceding rotational that drives preceding beam assembly 1 jointed shaft of suitable beam 3 front ends before main along the front-axle beam hydraulic cylinder between beam 3 and the preceding beam assembly 1 10.The hinged frame hydraulic cylinder 11 that moves between the main front beam 5 of girder frame and the auxilliary rear cross beam 8 of auxilliary roof beam structure; Order according to girder frame, auxilliary roof beam structure; To be hinged on hydraulic vertical prop 12 and the auxilliary front beam 2 of main front beam 5, main rear cross beam 9 bottoms, the hydraulic vertical prop 12 of auxilliary rear cross beam 8 bottoms respectively through connecting rod 13; One group links together in twos, utilizes and moves the staggered respectively girder frame that drives 12 supports of every group of hydraulic vertical prop of frame hydraulic cylinder 11 with moved further or the same moved further of auxilliary roof beam structure.
In order can to assist lapping better and to play tunnel permanent support operation such as anchor pole, be provided with to assist at the sidepiece of auxilliary front beam 2, auxilliary rear cross beam 8 and beat anchor pole device 15.The slide rail 22 that should auxiliary beat anchor pole device 15 is fixedly connected with auxilliary front beam 2 or auxilliary rear cross beam 8; The tailpiece of the piston rod that is hinged on the lifting hydraulic cylinder 21 on the slide rail 22 is assembled with slide block 23; The connecting rod slew gear 20 that is assembled with top roof-bolter 16 is hinged on the slide block 23, and slide block 23 is slide rail 22 lifting moving in the drive lower edge of lifting hydraulic cylinder 21.
Be assembled in assisting of auxilliary forward and backward crossbeam 2,8 sidepieces and make the top roof-bolter 16 on the anchor pole device 15; Can move along the length direction of connecting rod slew gear front link; Can rotate around the jointed shaft at connecting rod slew gear 20 middle parts, also can rotate with the jointed shaft of connecting rod slew gear 20 monolithic linkage around slide block 23.
Group's roof-bolter 14 is set on the connecting rod 13 of synchronization-moving hydraulic vertical prop 12.
The two ends of main forward and backward crossbeam 5,9 and auxilliary forward and backward crossbeam 2,8 are provided with side direction regulation mechanism 17 respectively.
Because of hinged before each master on beam assembly before above-mentioned 1 and the girder frame, so can assist the lapping operation along beam 3.Connecting rod 13 connects the hydraulic vertical prop 12 that supports auxilliary front beam 2 and auxilliary rear cross beam 8 respectively; And the hydraulic vertical prop 12 that supports main front beam 5 and main rear cross beam 9; Make hydraulic vertical prop 12 form one group form in twos by the order of main and auxiliary roof beam structure; Utilization moves the staggered respectively girder frame that drives 12 supports of every group of hydraulic vertical prop of frame hydraulic cylinder 11 with moved further or the same moved further of auxilliary roof beam structure, conveniently to move frame.
In order to assist operations such as beating anchor pole; Improve digging laneway permanent support efficient; Through the auxiliary top roof-bolter 16 of making the connecting rod slew gear 20 on the anchor pole device 15; Installing of anchor pole carried out in a plurality of positions on the back, and the up-down of connecting rod slew gear 20 and top roof-bolter 16 is then realized by lifting hydraulic cylinder 21.The structure of depositing group's roof-bolter 14 is set on connecting rod 13, and group's roof-bolter 14 is in the carrying that repeats of work plane when having avoided operation.Steadily move frame, the tuningout when moving forward for what guarantee main and auxiliary roof beam structure through the thruster hydraulic cylinder on the side direction regulation mechanism 17 18 and 19 pairs of main and auxiliary roof beams structure of side plate.
Because the action of hydraulic vertical prop 12 and each hydraulic cylinder is by emulsion power pack power to be provided, for ease of roadway arrangement and simplify the operation, it is the mode of power that top roof-bolter 16 and group's roof-bolter 14 also adopt with the emulsion.
During this tunnelling alternating expression suspension device work; After both allocations is good according to said structure connected mode and description of drawings mounting arrangements; The acquiescence original state is that hydraulic vertical prop 12 rises; Support girder frame and auxilliary roof beam structure respectively, front-axle beam hydraulic cylinder 10 moves frame hydraulic cylinder 11, lifting hydraulic cylinder 21 and thruster hydraulic cylinder 18 and all is in retracted state for stretching out state.Adjustment hydraulic vertical prop 12 makes each connect reality along beam and back, and fully-mechanized digging machine sails in the suspension device, begins to carry out the tunnelling operation.
Fully-mechanized digging machine tunnels after the segment distance; The hydraulic vertical prop 12 that withdrawal and main front beam 5 link to each other with main rear cross beam 9; Make whole girder frame be separated from (assist roof beam structure and still supporting top board this moment), regain front-axle beam hydraulic cylinder 10, hang on the preceding beam assembly 1 through the roller 24 of arranging net joining good net from top board; Move frame hydraulic cylinder 11 and stretch out, promote whole girder frame reach, in the reach process, stretch out front-axle beam hydraulic cylinder 10, with beam assembly 1 before lifting, so that carry out automatic lapping operation; After moving on to the position, rise the hydraulic vertical prop 12 that links to each other with the girder frame, make the girder frame support top board.
Fully-mechanized digging machine is regained and auxilliary front beam 2 and the hydraulic vertical prop 12 that auxilliary rear cross beam 8 links to each other after continuing driving one segment distance, makes whole auxilliary roof beam structure be separated from (this moment, the girder frame still supported top board) from top board; Move frame hydraulic cylinder 11 and regain, spur whole auxilliary roof beam structure to reach; After moving on to the position, rise the hydraulic vertical prop 12 that links to each other with auxilliary roof beam structure, make auxilliary roof beam structure and top board connect reality.
The repetition above-mentioned steps after tunneling several meters is continuously retreated fully-mechanized digging machine, makes the top roof-bolter 16 on the anchor pole device 15 through being installed in to assist, and is installed in the group's roof-bolter 14 on the connecting rod 13, begins top board and tunnel two are helped to carry out permanent support; After the permanent support operation finished, fully-mechanized digging machine pulled belt and moves ahead, and prepared to carry out next operation cycle.

Claims (5)

1. tunnelling alternating expression suspension device; Comprise through bearing pin and be hinged on hydraulic vertical prop that the conduct of crossbeam bottom supports and by crossbeam and the roof beam structure formed along beam; It is characterized in that: said roof beam structure comprises girder frame and auxilliary roof beam structure; The girder frame reaches the forward and backward framework that links together and form along beam with the master who is hinged, the auxilliary forward and backward framework that links together and form along beam that auxilliary roof beam structure is reached and is hinged by auxilliary forward and backward crossbeam by the forward and backward crossbeam of master; The sidepiece of auxilliary forward and backward crossbeam is provided with the auxiliary anchor pole device of beating; Suitable beam front end and the front-axle beam member hinges of carrying out lapping work before the master of girder frame; And utilization is hinged on the rotational of the preceding beam assembly of the front-axle beam Driven by Hydraulic Cylinder jointed shaft of suitable beam front end before main between main Qian Shunliang and the preceding beam assembly; The hinged frame hydraulic cylinder that moves between the main front beam of girder frame and the auxilliary rear cross beam of auxilliary roof beam structure according to the order of girder frame, auxilliary roof beam structure, will be hinged on the hydraulic vertical prop of main forward and backward crossbeam and auxilliary forward and backward crossbeam bottom respectively through connecting rod; One group links together in twos, utilizes and moves staggered respectively girder frame or the same moved further of auxilliary roof beam structure of driving of frame hydraulic cylinder.
2. tunnelling alternating expression suspension device according to claim 1; It is characterized in that: the sidepiece of said auxilliary forward and backward crossbeam is provided with the auxiliary anchor pole device of beating; The auxiliary slide rail of beating the anchor pole device is fixedly connected with auxilliary front beam or auxilliary rear cross beam; The tailpiece of the piston rod that is hinged on the lifting hydraulic cylinder on the slide rail is assembled with slide block, and the connecting rod slew gear that is assembled with the top roof-bolter is hinged on the slide block, and slide block is the slide rail lifting moving in the drive lower edge of lifting hydraulic cylinder.
3. tunnelling alternating expression suspension device according to claim 1 and 2; It is characterized in that: be assembled in assisting of said auxilliary forward and backward crossbeam sidepiece and make the top roof-bolter on the anchor pole device; Move or jointed shaft around connecting rod slew gear middle part rotates along the length direction of connecting rod slew gear front link, or rotate with the jointed shaft of connecting rod slew gear monolithic linkage around slide block.
4. tunnelling alternating expression suspension device according to claim 1 is characterized in that: group's roof-bolter is set on the connecting rod of synchronization-moving said hydraulic vertical prop.
5. tunnelling alternating expression suspension device according to claim 1 is characterized in that: the two ends of forward and backward crossbeam of said master and auxilliary forward and backward crossbeam are provided with side direction regulation mechanism respectively.
CN201210161859.1A 2012-05-23 2012-05-23 Tunnel excavation staggered type supporting device Active CN102654060B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210161859.1A CN102654060B (en) 2012-05-23 2012-05-23 Tunnel excavation staggered type supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210161859.1A CN102654060B (en) 2012-05-23 2012-05-23 Tunnel excavation staggered type supporting device

Publications (2)

Publication Number Publication Date
CN102654060A true CN102654060A (en) 2012-09-05
CN102654060B CN102654060B (en) 2014-04-09

Family

ID=46729775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210161859.1A Active CN102654060B (en) 2012-05-23 2012-05-23 Tunnel excavation staggered type supporting device

Country Status (1)

Country Link
CN (1) CN102654060B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174448A (en) * 2013-04-15 2013-06-26 辽宁天安矿山科技有限公司 In-time supporting method for roadway fully-mechanized excavating operation
CN103195457A (en) * 2013-04-15 2013-07-10 辽宁天安矿山科技有限公司 Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
CN103233756A (en) * 2013-04-26 2013-08-07 山西潞安机械有限责任公司 Fully-mechanized excavating staggering type advance support device
CN104047627A (en) * 2014-07-15 2014-09-17 沈阳天安矿山机械股份有限公司 Mining roadway frame style advanced support bracket
CN104278999A (en) * 2014-09-18 2015-01-14 中国煤炭科工集团太原研究院有限公司 Automatic bolt mesh laying step type temporary support for fully mechanized excavation faces
CN106703856A (en) * 2017-03-20 2017-05-24 张路征 Shed-style step forward combination support with multi-drill
CN107448152A (en) * 2017-07-20 2017-12-08 陕西陕煤韩城矿业有限公司 Combined hydraulic jumbolter workbench
CN107542482A (en) * 2017-10-27 2018-01-05 沈阳天安科技股份有限公司 Cherry coal tunnels U-shaped canopy mechanization installation shield ejection device
CN108425690A (en) * 2018-05-11 2018-08-21 梁林生 Automatic moving type net, anchor, shield integral support
CN109707430A (en) * 2019-03-12 2019-05-03 辽宁工程技术大学 A kind of roadway head gib equipment and application method
CN110080811A (en) * 2019-06-13 2019-08-02 河南理工大学 A kind of advance support rack and application method of adjustable rapid integrated mechanical drivage
CN110388224A (en) * 2019-08-22 2019-10-29 国家能源集团宁夏煤业有限责任公司梅花井煤矿 A kind of step type support system for arched tunnel driving
CN111456790A (en) * 2020-04-09 2020-07-28 山东建筑大学 Self-moving type roof protection and anchor support integrated device and roof protection and support method
WO2020155104A1 (en) * 2019-02-01 2020-08-06 河南理工大学 Anchoring device and working method thereof
CN113279791A (en) * 2021-07-05 2021-08-20 杜志峰 Asymmetric anchor beam structure for supporting gob-side roadway roof
CN117108331A (en) * 2023-10-23 2023-11-24 山西新龙重工高分子科技有限公司 Unit type hydraulic support

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2093102A (en) * 1981-01-27 1982-08-25 Fletcher Sutcliffe Wild Ltd Mine roof support
CN101560884A (en) * 2009-05-31 2009-10-21 北京诚田恒业煤矿设备有限公司 Pull-type suspension hydraulic support system
CN201460945U (en) * 2009-06-09 2010-05-12 北京诚田恒业煤矿设备有限公司 Traction type slipping hydraulic bracket system
CN202001043U (en) * 2011-04-29 2011-10-05 北京宇田世纪矿山设备有限公司 Split top beam combined suspended hydraulic support
CN202215270U (en) * 2011-08-04 2012-05-09 郑州四维机电设备制造有限公司 Circulating self-moving forepoling hydraulic support
CN202578740U (en) * 2012-05-23 2012-12-05 辽宁天安矿山科技有限公司 Drivage staggered type support device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2093102A (en) * 1981-01-27 1982-08-25 Fletcher Sutcliffe Wild Ltd Mine roof support
CN101560884A (en) * 2009-05-31 2009-10-21 北京诚田恒业煤矿设备有限公司 Pull-type suspension hydraulic support system
CN201460945U (en) * 2009-06-09 2010-05-12 北京诚田恒业煤矿设备有限公司 Traction type slipping hydraulic bracket system
CN202001043U (en) * 2011-04-29 2011-10-05 北京宇田世纪矿山设备有限公司 Split top beam combined suspended hydraulic support
CN202215270U (en) * 2011-08-04 2012-05-09 郑州四维机电设备制造有限公司 Circulating self-moving forepoling hydraulic support
CN202578740U (en) * 2012-05-23 2012-12-05 辽宁天安矿山科技有限公司 Drivage staggered type support device

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174448A (en) * 2013-04-15 2013-06-26 辽宁天安矿山科技有限公司 In-time supporting method for roadway fully-mechanized excavating operation
CN103195457A (en) * 2013-04-15 2013-07-10 辽宁天安矿山科技有限公司 Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
CN103233756A (en) * 2013-04-26 2013-08-07 山西潞安机械有限责任公司 Fully-mechanized excavating staggering type advance support device
CN104047627A (en) * 2014-07-15 2014-09-17 沈阳天安矿山机械股份有限公司 Mining roadway frame style advanced support bracket
CN104278999A (en) * 2014-09-18 2015-01-14 中国煤炭科工集团太原研究院有限公司 Automatic bolt mesh laying step type temporary support for fully mechanized excavation faces
CN106703856A (en) * 2017-03-20 2017-05-24 张路征 Shed-style step forward combination support with multi-drill
CN107448152B (en) * 2017-07-20 2023-05-12 陕西陕煤韩城矿业有限公司 Hydraulic combined jumbolter working platform
CN107448152A (en) * 2017-07-20 2017-12-08 陕西陕煤韩城矿业有限公司 Combined hydraulic jumbolter workbench
CN107542482A (en) * 2017-10-27 2018-01-05 沈阳天安科技股份有限公司 Cherry coal tunnels U-shaped canopy mechanization installation shield ejection device
CN108425690A (en) * 2018-05-11 2018-08-21 梁林生 Automatic moving type net, anchor, shield integral support
CN108425690B (en) * 2018-05-11 2023-08-29 梁林生 Self-moving net, anchor and protection integrated support
US11162362B2 (en) 2019-02-01 2021-11-02 Henan Polytechnic University Anchoring apparatus and operation method thereof
WO2020155104A1 (en) * 2019-02-01 2020-08-06 河南理工大学 Anchoring device and working method thereof
CN109707430A (en) * 2019-03-12 2019-05-03 辽宁工程技术大学 A kind of roadway head gib equipment and application method
CN109707430B (en) * 2019-03-12 2024-03-19 辽宁工程技术大学 Temporary support equipment for tunnel excavation working face and use method
CN110080811A (en) * 2019-06-13 2019-08-02 河南理工大学 A kind of advance support rack and application method of adjustable rapid integrated mechanical drivage
CN110080811B (en) * 2019-06-13 2020-12-01 河南理工大学 Adjustable type advanced support bracket for rapid comprehensive mechanized excavation and use method
CN110388224A (en) * 2019-08-22 2019-10-29 国家能源集团宁夏煤业有限责任公司梅花井煤矿 A kind of step type support system for arched tunnel driving
CN111456790B (en) * 2020-04-09 2021-07-20 山东建筑大学 Self-moving type roof protection and anchor support integrated device and roof protection and support method
CN111456790A (en) * 2020-04-09 2020-07-28 山东建筑大学 Self-moving type roof protection and anchor support integrated device and roof protection and support method
CN113279791A (en) * 2021-07-05 2021-08-20 杜志峰 Asymmetric anchor beam structure for supporting gob-side roadway roof
CN113279791B (en) * 2021-07-05 2023-11-21 华晋焦煤有限责任公司 Asymmetric anchor beam structure for supporting roof of gob-side entry
CN117108331A (en) * 2023-10-23 2023-11-24 山西新龙重工高分子科技有限公司 Unit type hydraulic support
CN117108331B (en) * 2023-10-23 2024-01-02 山西新龙重工高分子科技有限公司 Unit type hydraulic support

Also Published As

Publication number Publication date
CN102654060B (en) 2014-04-09

Similar Documents

Publication Publication Date Title
CN102654060B (en) Tunnel excavation staggered type supporting device
CN101251022B (en) Immediate support device for digging machine
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN102128040B (en) Hydraulic striding-type advanced-support equipment
CN101832103B (en) Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN103195457A (en) Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
CN105569701B (en) Suspension device is tunneled suitable for the step type that hard-rock tunnel is tunneled
CN104278999B (en) The automatic lapping in comprehensive pick face is taken a step temporary shoring bracket
CN105604558B (en) The forward supporting type Unit erriger tunneled suitable for soft rock
CN208106466U (en) Pick shield windlass
CN105386771A (en) Shield type digging and anchoring machine
CN102410017A (en) Supporting type integrated tunneling-anchoring machine
CN201170107Y (en) Immediate support device for digging machine
CN102121390B (en) Telescopic tunneling immediate support device
CN110410118B (en) Novel tunneling process
CN105041357A (en) Monorail hoisting tail-to-head-type advance support system
CN202578740U (en) Drivage staggered type support device
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN104279000A (en) Automatic bolt mesh laying and connection excavation temporary support device
CN202391424U (en) Supporting type comprehensive bolter miner
CN103174448A (en) In-time supporting method for roadway fully-mechanized excavating operation
CN203362198U (en) Track walking type immediate support device of fully-mechanized drivage roadway
CN110344863A (en) Pick shield windlass
CN104047627A (en) Mining roadway frame style advanced support bracket
CN2613592Y (en) Machine carried temporary support for coal mine tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 113122 Liaoning Province, Fushun City Binhe Road Economic Development Zone No. 15

Applicant after: Liaoning Tian'an Mining Technology Co., Ltd.

Address before: Senior officials of Taiwan Street in Dongling District of Shenyang city of Liaoning Province, No. 11 110161

Applicant before: Liaoning Tian'an Mining Technology Co., Ltd.

C14 Grant of patent or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 113122 Liaoning Province, Fushun City Binhe Road Economic Development Zone No. 15

Applicant after: Liaoning Tian'an Technology Co., Ltd.

Address before: 113122 Liaoning Province, Fushun City Binhe Road Economic Development Zone No. 15

Applicant before: Liaoning Tian'an Mining Technology Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: LIAONING TIAN'AN MINING TECHNOLOGY CO., LTD. TO: LIAONING TIAN'AN TECHNOLOGY CO., LTD.

GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201117

Address after: No.15 Binhe Road, Shenfu New District, Shenyang, Liaoning Province 110000

Patentee after: Shenyang Tian'an special robot Co.,Ltd.

Address before: 113122 Binhe Road, Fushun Economic Development Zone, Liaoning 15, China

Patentee before: LIAONING TIANAN TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right