CN108622784A - RS or BS discharge lines deduster electric field combined hanging methods - Google Patents

RS or BS discharge lines deduster electric field combined hanging methods Download PDF

Info

Publication number
CN108622784A
CN108622784A CN201710181292.7A CN201710181292A CN108622784A CN 108622784 A CN108622784 A CN 108622784A CN 201710181292 A CN201710181292 A CN 201710181292A CN 108622784 A CN108622784 A CN 108622784A
Authority
CN
China
Prior art keywords
electric field
frame body
suspender
anode
suspender frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710181292.7A
Other languages
Chinese (zh)
Inventor
明浩
魏尚起
李宁
刘海龙
孙剑
徐冰
王银武
王珂慧
韩建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710181292.7A priority Critical patent/CN108622784A/en
Publication of CN108622784A publication Critical patent/CN108622784A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of RS discharge lines deduster electric field combined hanging methods, include the following steps:One:Splice suspender frame body according to installation drawing parameter;Two:It is laid with and fixes sliding rail;Three:The tiling of suspender frame body is placed on track;Four:First assembled one group of anode is arranged on the frame body of horizontal, and then one group of cathode combination is placed on anode row again, is bundled the two together with iron wire;Five:Using lifting machine suspender frame body is moved to vertical from level together with anode row, cathode combination and hangs in electric field, suspender frame body first slightly rotates an angle in electric field, move suspender frame body of becoming a full member when anode is discharged to electric field side, anode row is hung on deduster top beam in place, then it moves down suspender dropout slightly rotation suspender and takes electric field out of rapidly, continue to lift next group.The equipment that the present invention can effectively reduce construction machinery uses, and significantly improves construction efficiency while reducing pole plate deformation caused by the construction limitation of weather conditions, misoperation.

Description

RS or BS discharge lines deduster electric field combined hanging methods
Technical field
The present invention relates to a kind of hanging methods, specifically RS or BS discharge lines deduster electric field combined hanging method.
Background technology
When the electric field installation of RS or BS discharge lines electric precipitators, since the cathode of composition electric field is generally up to ten with anode lengths Several meters and structure it is very soft, it is all to be hung in electric field by suspender.Traditional construction method is first by suspender handle Cathode is erected with anode, then individually hangs in electric field, and when operation needs two lifting equipments or a lifting equipment and volume Raise machine cooperation.Hang in since anode row is slab construction during electric field, slightly gentle breeze pole plate will whipping, be easily deformed also not It is easy to hang in electric field, be influenced by weather very big.
Existing electric field hanging method, not more using only mechanical one-shift, Electrode also improper deformation easy to operate, by day Gas influence is very big, thus results in waste of resources, cost increases, construction delay.
Invention content
The present invention is directed to overcome the deficiencies of existing technologies, a kind of RS or BS discharge lines deduster electric field combined hanging side is provided Method, can effectively reduce construction machinery equipment use, significantly improve construction efficiency and meanwhile reduce weather conditions construction limit, Pole plate caused by misoperation deforms.
In order to solve the above-mentioned technical problem, the invention is realized in this way:
A kind of RS or BS discharge lines deduster electric field combined hanging method, it is characterised in that it includes the following steps:
Step 1:Using I-steel, channel steel and angle splice joint at a suspender frame body;
Step 2:It is laid with simultaneously fixed spreader sliding rail;
Step 3:By in suspender frame body placing flat to track, lifting machine is in place, tries to hang in electric field repeatedly, determines that suspender is hung Entering in electric field cannot collide with interference such as electric field hanger, shells;
Step 4:The tiling of suspender frame body is in orbit, and first assembled one group of anode is arranged on suspender frame body, then again one group of the moon Pole combination is placed on anode row, is bundled the two together with iron wire, whether the vibrating rod for the hanging beam and lower part that inspection anode is arranged Securely and whether it is stuck in the upper lower bayonet slot of suspender frame body;
Step 5:Suspender frame body is hung in into electric field from level to vertical together with anode row, cathode combination using lifting machine, is hung Have frame body and first slightly rotate angle in electric field, mobile anode is become a full member suspender frame body when being discharged to electric field side, just by anode row Position is hung on deduster top beam, is then moved down suspender dropout slightly rotation suspender and is taken electric field out of rapidly, continues to lift next group.
RS the or BS discharge lines deduster electric field combined hanging methods, it is characterised in that:The track uses I-shaped Steel or channel steel.
The beneficial effects of the invention are as follows:The use that construction machinery and machine-team can be effectively reduced, avoids due to misoperation Caused pole plate deformation, damage, while being influenced the following equal Liftable operation of weather of reduction fresh breeze speed by weather;With previous construction Method Integrated comparative improves efficiency 20% ~ 30%, reduces device resource and uses, saves construction cost, accelerate construction progress.The present invention No particular/special requirement simple in structure, material are easily obtained, and suspender construction site can design and produce, and general job personnel can be real It is existing, using rear material can again using or engineering use will not cause to waste.
Description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the structural schematic diagram of suspender frame body.
Fig. 2 is the structural schematic diagram of Fig. 1 side-looking directions.
Fig. 3 is the structural schematic diagram of anode row.
Fig. 4 is the structural schematic diagram of cathode combination.
Fig. 5 is the lifting operation schematic diagram of the present invention.
Specific implementation mode
As shown in Figs 1-4:A kind of RS or BS discharge lines deduster electric field combined hanging method,
In electric field installs hoisting process, the cathode in every group of electric field is fixed on anode combination on suspender frame body this suspender, with Suspender frame body hangs in electric field together, and electrode is linked into after electric field suspender dropout immediately and removes electric field next group of lifting of progress, using this Method saves mechanical one-shift, is influenced to reduce effectively reduction construction cost by weather, saves working sources and time, in hoisting process Pole plate does not allow deformation to improve installation quality yet.
Before implementation starts:According to deduster construction drawing, by size after the anode and cathode assembling of electric field and in electric field Interior installation site space determines the structure and size of suspender frame body.The structure size design of suspender frame body will be considered to be convenient for Anode is assembled and fixed on frame body with cathode, and hanging in electric field cannot collide with interference such as electric field hanger, shells, can be flexible It threads off and removes electric field.Suspender frame body skeleton makes (identical size shaped steel I-steel deformation deflection is minimum) using I-steel, according to The minimum model I-steel that the effects that cathode and anode plate, the selection of load calculating support body amount of deflection was met the requirements on frame body, to mitigate Suspender weight reasonable selection lifting equipment.Finally determine that track, track are equal using I-steel or channel steel according to suspender frame body size Can, it is laid with first smooth location before track and reserves gutter, reserves enough lifting operating spaces and ensure that sight is unaffected.
Step 1:Using I-steel, channel steel and angle splice joint at a suspender frame body 2;
Step 2:According to frame body roller size, frame body running length is laid with simultaneously trapped orbit 1 in Hoisting Position;The track is adopted With I-steel or channel steel;
Step 3:By in suspender frame body placing flat to track, lifting machine is in place, tries to hang in electric field repeatedly, determines that suspender is hung Enter to relate to electric field hanger frame soma in electric field and collide;
Step 4:Horizontal assembly a;
The tiling of suspender frame body is in orbit, and first assembled one group of anode arranges 6 on suspender frame body(See Figure 3), then again one Group cathode combination 7 is placed on anode row(See Figure 4), cathode anode row combination 3 is bundled together with iron wire, checks anode row's Whether whether the vibrating rod of hanging beam and lower part securely and under the hanging beam card slot 5 and suspender frame body that are stuck on suspender frame body 4 card slot of vibrating rod in;
Step 5:C in electric field is hung in after integral lifting sliding b-is vertical;
Suspender frame body and anode row, cathode combination are hung together from horizontal sliding to electric field is hung in after vertical using lifting machine Have frame body and first slightly rotate angle in electric field, mobile anode is become a full member suspender frame body when being discharged to electric field side, just by anode row Position is hung on deduster top beam, is then moved down suspender dropout slightly rotation suspender and is taken electric field out of rapidly, continues to lift next group.
After the completion of implementation:Suspender after use, cuts open the welding position of suspender, and suspender is not damaged substantially using rear proximate matter And deformation, installation making suspender again can be continuing with or retained in engineering.

Claims (2)

1. a kind of RS or BS discharge lines deduster electric field combined hanging method, it is characterised in that it includes the following steps:
Step 1:Using I-steel, channel steel and angle splice joint at a suspender frame body;
Step 2:It is laid with simultaneously fixed spreader sliding rail;
Step 3:By in suspender frame body placing flat to track, lifting machine is in place, tries to hang in electric field repeatedly, determines that suspender is hung Entering in electric field cannot collide with interference such as electric field hanger, shells;
Step 4:The tiling of suspender frame body is in orbit, and first assembled one group of anode is arranged on suspender frame body, then again one group of the moon Pole combination is placed on anode row, is bundled the two together with iron wire, whether the vibrating rod for the hanging beam and lower part that inspection anode is arranged Securely and whether it is stuck in the upper lower bayonet slot of suspender frame body;
Step 5:Using lifting machine suspender frame body is moved to vertical from level together with anode row, cathode combination and hangs in electricity , suspender frame body first slightly rotates an angle in electric field, and mobile anode is become a full member suspender frame body when being discharged to electric field side, by anode Row hangs on deduster top beam in place, then moves down suspender dropout slightly rotation suspender and takes electric field out of rapidly, continues to lift next group.
2. RS or BS discharge lines deduster electric field combined hanging method according to claim 1, it is characterised in that:The rail Road uses I-steel or channel steel.
CN201710181292.7A 2017-03-24 2017-03-24 RS or BS discharge lines deduster electric field combined hanging methods Pending CN108622784A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710181292.7A CN108622784A (en) 2017-03-24 2017-03-24 RS or BS discharge lines deduster electric field combined hanging methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710181292.7A CN108622784A (en) 2017-03-24 2017-03-24 RS or BS discharge lines deduster electric field combined hanging methods

Publications (1)

Publication Number Publication Date
CN108622784A true CN108622784A (en) 2018-10-09

Family

ID=63707615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710181292.7A Pending CN108622784A (en) 2017-03-24 2017-03-24 RS or BS discharge lines deduster electric field combined hanging methods

Country Status (1)

Country Link
CN (1) CN108622784A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110142595A (en) * 2019-05-16 2019-08-20 中国能源建设集团山西电力建设第三有限公司 The combination of electric precipitator cathode-anode plate and lifting integrated platform and combination hoisting method
CN112871454A (en) * 2021-01-04 2021-06-01 中国神华能源股份有限公司国华电力分公司 Cathode and anode installation method of electric dust collector

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07187563A (en) * 1993-12-24 1995-07-25 Sumitomo Metal Mining Co Ltd Suspension beam swing stopping device of crane
CN201272657Y (en) * 2008-09-25 2009-07-15 上海宝钢设备检修有限公司 Special apparatus for anode framework assembly and swinging of revolving furnace flue gas cleaning equipment
CN101885448A (en) * 2010-07-06 2010-11-17 中冶宝钢技术服务有限公司 Electric precipitator positive plate lifting tool and process
CN202379578U (en) * 2011-12-02 2012-08-15 江苏中泰桥梁钢构股份有限公司 Overall turn-over bracket for funnel of duster
CN203359755U (en) * 2013-06-26 2013-12-25 中国二十冶集团有限公司 Assembly and lifting integrated device for anode plate
CN103991787A (en) * 2014-06-05 2014-08-20 山东电力建设第一工程公司 Electric precipitation anode plate installing and lifting device for power plants

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07187563A (en) * 1993-12-24 1995-07-25 Sumitomo Metal Mining Co Ltd Suspension beam swing stopping device of crane
CN201272657Y (en) * 2008-09-25 2009-07-15 上海宝钢设备检修有限公司 Special apparatus for anode framework assembly and swinging of revolving furnace flue gas cleaning equipment
CN101885448A (en) * 2010-07-06 2010-11-17 中冶宝钢技术服务有限公司 Electric precipitator positive plate lifting tool and process
CN202379578U (en) * 2011-12-02 2012-08-15 江苏中泰桥梁钢构股份有限公司 Overall turn-over bracket for funnel of duster
CN203359755U (en) * 2013-06-26 2013-12-25 中国二十冶集团有限公司 Assembly and lifting integrated device for anode plate
CN103991787A (en) * 2014-06-05 2014-08-20 山东电力建设第一工程公司 Electric precipitation anode plate installing and lifting device for power plants

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110142595A (en) * 2019-05-16 2019-08-20 中国能源建设集团山西电力建设第三有限公司 The combination of electric precipitator cathode-anode plate and lifting integrated platform and combination hoisting method
CN112871454A (en) * 2021-01-04 2021-06-01 中国神华能源股份有限公司国华电力分公司 Cathode and anode installation method of electric dust collector

Similar Documents

Publication Publication Date Title
CN105780925B (en) A kind of truss-hanging combined system construction method of installation
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN106245919B (en) A kind of assembled architecture Automated assembly platform
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN109184189A (en) A kind of diameter Silo conical shell silo roof construction method
CN108622784A (en) RS or BS discharge lines deduster electric field combined hanging methods
CN212926981U (en) I-steel support of encorbelmenting bears hanging flower basket device
CN202299574U (en) Plug-in type communication base station lifting tower
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN208455637U (en) The installation system of bracing members in a kind of foundation pit
CN109881587A (en) King-tower upper beam bracket integral installation method under a kind of strong wind atmosphere
CN208456087U (en) A kind of construction of lift well operating platform
CN105952129B (en) A kind of elevator combined type entirety lifting operation platform and its construction method
CN105715028A (en) Successive lifting device and lifting scaffold with same
CN209353734U (en) For installing the double-track device of curtain wall
CN207177305U (en) Prefabricated beam stretching jack suspension door frame
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN210685441U (en) Horizontal sliding equipment for spiral cyclone pipe in steel structure truss
CN205387447U (en) A device that equipment hoisted on was used for overhead power line pole and mounting tool thereof
CN104847090B (en) A kind of small cross-sectional size ventilation shaft construction method
CN202369932U (en) Bridge curtain board installation trolley
CN207608234U (en) A kind of assembly type curtain wall hanging apparatus
CN208830168U (en) The wet seam reinforcing bar penetrating device of T-type beam
CN203080988U (en) Umbrella-shaped standard processing shed
CN206860218U (en) A kind of shield machine integrally originates the interim station support frame in space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181009