CN210685441U - Horizontal sliding equipment for spiral cyclone pipe in steel structure truss - Google Patents

Horizontal sliding equipment for spiral cyclone pipe in steel structure truss Download PDF

Info

Publication number
CN210685441U
CN210685441U CN201921412521.2U CN201921412521U CN210685441U CN 210685441 U CN210685441 U CN 210685441U CN 201921412521 U CN201921412521 U CN 201921412521U CN 210685441 U CN210685441 U CN 210685441U
Authority
CN
China
Prior art keywords
steel
horizontal
bearing support
spiral
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921412521.2U
Other languages
Chinese (zh)
Inventor
陈立群
黄世林
郝冠男
钟华斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial and Energy Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial and Energy Engineering Group Co Ltd filed Critical China Construction Industrial and Energy Engineering Group Co Ltd
Priority to CN201921412521.2U priority Critical patent/CN210685441U/en
Application granted granted Critical
Publication of CN210685441U publication Critical patent/CN210685441U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an equipment that is used for steel construction truss internal spiral tuber pipe level to slide, it is fixed in the inverted triangle truss web frame, includes: horizontal bearing support, steel pipe, displacement device, horizontal bearing support are fixed in on the inverted-triangle truss both sides, and horizontal bearing support up end level vertical fixation has two steel pipes, and the equipment of sliding hangs on the horizontal steelframe in inverted-triangle truss top, the utility model relates to a rationally, the preparation is simple and convenient, can effectively solve high altitude installation spiral duct level and move a difficult problem, improves the efficiency, and the tuber pipe installation finishes simultaneously and can demolish reuse, practices thrift the cost with this device.

Description

Horizontal sliding equipment for spiral cyclone pipe in steel structure truss
Technical Field
The utility model relates to a be used for interior spiral wind pipe horizontal slip equipment of steel construction truss belongs to machine installation field.
Background
Large-scale exhibition halls and gymnasiums are generally steel structure grid structure, in order to effectively utilize the space of the grid, the shape design of the air pipe usually adopts a large-caliber circular air pipe, if the spiral air pipe is designed in a steel structure inverted triangular truss, the spiral air pipe is influenced by factors such as a complex steel truss, a web frame structure form and narrow and small internal space, operators are not easy to freely move along the horizontal direction of the air pipe, the air pipe needs to be locally moved in the splicing and installation process, especially the high-altitude large-scale spiral air pipe is more difficult to install and splice, and the air pipe can not be effectively moved; in order to solve the difficult problem of horizontal movement of the high-altitude spiral air duct and improve the effect, the invention particularly provides a horizontal sliding device for the spiral air duct.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a be used for steel construction truss internal spiral duct horizontal equipment of sliding realizes that the spiral duct can carry out the horizontal free movement in the truss, solves the unable effective horizontal migration problem of high altitude installation spiral duct.
The utility model discloses a following technical scheme realizes foretell purpose:
the utility model provides an equipment that is arranged in steel construction truss spiral duct level to slide, it is fixed in inverted triangle purlin steel web, and it includes: the horizontal bearing support is fixed on two side edges of the inverted triangular truss, two steel pipes are horizontally and vertically fixed on the upper end face of the horizontal bearing support, and the sliding device is hung on a horizontal steel frame at the top of the inverted triangular truss.
Furthermore, the horizontal bearing support and the two steel pipes are fixed by the P-shaped clamp, and the distance between the two steel pipes is 300-400 mm.
Furthermore, the sliding device comprises a pulley block and a rope, and the rope is vertically hung on the pulley block.
Wherein, as preferred scheme, horizontal bearing support is 62# C type channel-section steel.
Wherein, as the preferred scheme, the steel pipe is DN40 galvanized steel pipe.
Wherein, as preferred scheme, the assembly pulley is 1t manual assembly pulley.
Among them, the rope is preferably a 1t rope.
The utility model has the advantages that:
the utility model provides horizontal sliding equipment for an internal spiral cyclone pipe of a steel structure truss, which comprises a horizontal bearing device, steel pipes and a sliding device, wherein the spiral wind pipe horizontally moves between the two steel pipes, wherein, the horizontal bearing device is horizontally and vertically fixed with the steel pipes to ensure that the spiral air duct moves horizontally, the distance between the two steel pipes is 300-400mm to effectively ensure that the spiral steel pipes move smoothly and stably, the sliding device is hung on a horizontal steel frame at the top of the inverted triangular truss and comprises a pulley block and a rope, one end of the pulley block is connected with the rope, the other end of the pulley block is movably connected with the spiral air duct, the rope is vertically hung on the pulley block, when the spiral air pipe needs to slide, one end of the pulley block is fixed with the spiral air pipe, the spiral air pipe is moved to a required position through the traction rope, and the pulley block is removed when the spiral air pipe does not need to be moved. The spiral air duct moving device has the advantages that the spiral air duct can be flexibly moved, the whole device is reasonable in design and simple and convenient to manufacture, the problem that the spiral air duct installed at the high altitude is difficult to move horizontally can be effectively solved, the effect is improved, meanwhile, the device can be dismantled and reused after the air duct is installed, and the cost is saved.
Drawings
The drawings are only intended to illustrate and explain the present invention and do not limit the scope of the invention. Wherein:
fig. 1 is a schematic structural view of the horizontal sliding device for the spiral duct in the steel truss of the present invention;
FIG. 2 is a schematic structural view of the sliding device of the present invention;
fig. 3 is a schematic structural view of the P-shaped clamp of the present invention;
in the figure: 1-inverted triangular truss, 2-horizontal bearing support, 3-steel pipe, 4-P type hoop, 5-sliding device, 51-pulley block and 52-rope.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings. In the following detailed description, certain exemplary embodiments of the present invention have been described by way of illustration only. Needless to say, a person skilled in the art will recognize that the described embodiments can be modified in various different ways without departing from the spirit and scope of the invention. Accordingly, the drawings and description are illustrative in nature and not intended to limit the scope of the claims.
As shown in figure 1, horizontal sliding equipment for the spiral wind pipes in the steel structure truss comprises horizontal bearing supports (2), steel pipes (3) and sliding devices (5), wherein the horizontal bearing supports (2) are fixed on two side edges of the inverted triangular truss (1), the two steel pipes (3) are horizontally and vertically fixed on the upper end surface of each horizontal bearing support (2), and the sliding devices (5) are hung on a horizontal steel frame at the top of the inverted triangular truss (1).
As shown in fig. 2, the sliding device (5) comprises a pulley block (51), a rope (52) and a rope (52), wherein the rope (52) is vertically suspended on the pulley block (51), in actual work, the sliding device (5) is suspended on a horizontal steel frame at the top of the inverted triangular truss and comprises the pulley block (51) and the rope (52), one end of the pulley block is connected with the rope, one end of the pulley block can be movably connected with the spiral air pipe, the rope (52) is vertically suspended on the pulley block (51), when the spiral air pipe needs to be slid, one end of the pulley block is fixed with the spiral air pipe, the spiral air pipe is moved to a required position through a traction rope, and when.
As a preferred embodiment of the present invention, wherein:
the horizontal bearing bracket (2) is a 62# C-shaped channel steel.
The steel pipe is DN40 galvanized steel pipe.
The pulley block is a 1t manual pulley block.
The rope is a 1t rope.
When in use, firstly, according to the design of a support mounting scheme, a horizontal bearing support of the spiral air duct is mounted and fixed in an inverted triangular truss steel web, two DN40 galvanized steel pipes are arranged on the horizontal support, the horizontal bearing support is fixed on the horizontal support by a combined P-shaped hoop, the distance between the two steel pipes is 300 plus 400mmm, a pulley block is hung in a horizontal steel frame at the top of the inverted triangular truss, when the air duct is hoisted to the horizontal support, the air duct is slowly moved to a designated mounting position by a pulley, a horizontal bearing device is horizontally and vertically fixed with the steel pipes to ensure that the spiral air duct horizontally moves, the distance between the two steel pipes is 300 plus 400mm, the spiral steel pipes can be effectively ensured to smoothly and stably move, a sliding device is hung on the horizontal steel frame at the top of the inverted triangular truss and comprises the pulley block and the rope block, one end of the sliding device is connected with the, when the spiral air pipe needs to slide, one end of the pulley block is fixed with the spiral air pipe, the spiral air pipe is moved to a required position through the traction rope, and the pulley block is removed when the spiral air pipe does not need to be moved. The equipment can realize nimble removal spiral duct, the utility model discloses can effectively solve high altitude installation spiral duct level and move a difficult problem, improve the efficiency, the tuber pipe installation finishes simultaneously and can demolish reuse, practices thrift the cost with this device.
The above description is only exemplary of the present invention, and is not intended to limit the scope of the present invention. Any person skilled in the art should also realize that such equivalent changes and modifications can be made without departing from the spirit and principles of the present invention.

Claims (7)

1. The utility model provides an equipment that is arranged in steel construction truss spiral duct level to slide, it is fixed in inverted triangle purlin steel web, its characterized in that includes: horizontal bearing support (2), steel pipe (3), displacement device (5), horizontal bearing support (2) be fixed in inverted triangle truss (1) both sides edge, horizontal bearing support (2) up end level vertical fixation have two steel pipes (3), displacement device (5) hang on inverted triangle truss (1) top horizontal steel frame.
2. The horizontal sliding equipment for the spiral air pipes in the steel structure truss according to claim 1, is characterized in that: the horizontal bearing support (2) and the two steel pipes (3) are fixed by a P-shaped clamp (4), and the distance between the two steel pipes (3) is 300-400 mm.
3. The horizontal sliding equipment for the spiral air pipes in the steel structure truss according to claim 2, is characterized in that: the sliding device (5) comprises a pulley block (51) and a rope (52), wherein the rope (52) is vertically hung on the pulley block (51).
4. The horizontal sliding equipment for the spiral air pipes in the steel structure truss according to claim 3, is characterized in that: the horizontal bearing support (2) is a 62# C-shaped channel steel.
5. The horizontal sliding equipment for the spiral air pipes in the steel structure truss according to claim 4, is characterized in that: the steel pipe (3) is a DN40 galvanized steel pipe.
6. The horizontal sliding equipment for the spiral air pipes in the steel structure truss according to claim 5, is characterized in that: the pulley block (51) is a 1t manual pulley block.
7. The horizontal sliding equipment for the spiral air pipes in the steel structure truss according to claim 6, is characterized in that: the rope (52) is a 1t rope.
CN201921412521.2U 2019-08-28 2019-08-28 Horizontal sliding equipment for spiral cyclone pipe in steel structure truss Active CN210685441U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921412521.2U CN210685441U (en) 2019-08-28 2019-08-28 Horizontal sliding equipment for spiral cyclone pipe in steel structure truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921412521.2U CN210685441U (en) 2019-08-28 2019-08-28 Horizontal sliding equipment for spiral cyclone pipe in steel structure truss

Publications (1)

Publication Number Publication Date
CN210685441U true CN210685441U (en) 2020-06-05

Family

ID=70883621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921412521.2U Active CN210685441U (en) 2019-08-28 2019-08-28 Horizontal sliding equipment for spiral cyclone pipe in steel structure truss

Country Status (1)

Country Link
CN (1) CN210685441U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565332A (en) * 2021-09-08 2021-10-29 中建八局第二建设有限公司 Roof steel structure and air pipe synchronous sliding construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565332A (en) * 2021-09-08 2021-10-29 中建八局第二建设有限公司 Roof steel structure and air pipe synchronous sliding construction method

Similar Documents

Publication Publication Date Title
CN212926981U (en) I-steel support of encorbelmenting bears hanging flower basket device
CN210685441U (en) Horizontal sliding equipment for spiral cyclone pipe in steel structure truss
CN204899184U (en) Hanging flower basket equipment
CN202299574U (en) Plug-in type communication base station lifting tower
CN205276887U (en) Hot wall concrete pumping auxiliary assembly is prevented to large -scale steel form
CN205099769U (en) Non ferrous metal electrodeposition is acid mist collecting system for technology
CN212050293U (en) Slide rail type electric tool for moving cable
CN110282557A (en) Assist mounting platform and the method with high vacant duct in bridge crane installation workshop
CN108622784A (en) RS or BS discharge lines deduster electric field combined hanging methods
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN210237035U (en) Telescopic movable operation platform in heat absorption tower
CN203771959U (en) Water drainage device
CN210508434U (en) Roof steel skeleton light net rack cement composite board mounting system
CN211035035U (en) Indoor hoisting device
CN202187456U (en) Counteracting bearing suspended-ceiling suspension device
CN202936930U (en) Novel large-area suspended ceiling reverse supporting suspended ceiling
CN208200142U (en) A kind of architectural electricity equipment construction device
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN106826201B (en) A kind of hydraulic dismounting device and method being exclusively used in large size valve
CN205491501U (en) Device convenient to regulator cubicle removes
CN206014323U (en) Pipeline lift equipment
CN206353102U (en) A kind of Concrete and reinforced concrete drainage and sewer pipes external load test device
CN111056436A (en) Gantry crane for mounting equipment
CN204416937U (en) A kind of telescopic maintenance cage
CN217102814U (en) Pipeline lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant