CN212926981U - I-steel support of encorbelmenting bears hanging flower basket device - Google Patents
I-steel support of encorbelmenting bears hanging flower basket device Download PDFInfo
- Publication number
- CN212926981U CN212926981U CN202021150352.2U CN202021150352U CN212926981U CN 212926981 U CN212926981 U CN 212926981U CN 202021150352 U CN202021150352 U CN 202021150352U CN 212926981 U CN212926981 U CN 212926981U
- Authority
- CN
- China
- Prior art keywords
- steel
- counterweight
- support
- hanging basket
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a hanging basket device carried by overhanging I-shaped steel bracket, which comprises steel brackets arranged at both sides of the top of a high-altitude corridor, wherein two steel brackets are provided with steel beams, namely hanging basket carrying beams, and the steel beams are I-shaped steel force arm rods; the steel beam is provided with a counterweight bracket, and the counterweight bracket is provided with a counterweight; two ends of the steel beam are respectively fixed with one end of a steel wire rope, the other end of the steel wire rope is connected with a hanging basket, and the hanging basket stretches across the bottom of the high-altitude corridor; the utility model has the advantages that: the condition that the ultrahigh large-span large-area overhead building bearing plate bottom decoration hanging basket cannot be hung on the bearing mechanism is greatly solved, and the hanging basket has the advantages of safety, reliability, high efficiency, short construction period, low cost, energy conservation, environmental friendliness and the like, is high in feasibility, worthy of popularization and wide in prospect.
Description
Technical Field
The utility model belongs to the technical field of hanging flower basket device, and specifically relates to a I-steel support of encorbelmenting who is used for high altitude vestibule bottom fitment bears hanging flower basket device belongs to hanging flower basket device field.
Background
When the bottoms of high-altitude galleries of large public buildings such as teaching buildings, science and technology halls, office buildings, hospitals and commercial squares are decorated at the present stage, all the conventional methods are to set up full framing scaffolds to set up an operation platform, so that the efficiency is low, the construction period is long, the cost is high, and the energy conservation and the environmental protection are not utilized.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model discloses an I-steel support of encorbelmenting bears hanging flower basket device, simple and easy can decorate the hanging flower basket at built on stilts building carrier plate upper portion and bear the mechanism that hangs, makes things convenient for built on stilts building carrier plate bottom to decorate.
The technical scheme of the utility model is that:
the hanging basket device comprises steel supports arranged on two sides of the top of a high-altitude corridor, steel cross beams, namely hanging basket bearing cross beams, are erected on the two steel supports and are I-shaped steel force arm rods, the steel supports are provided with bases, the bases are connected with cross beam fixing clamps through supporting beams, and the steel cross beams are fixed on the steel supports through the cross beam fixing clamps; the steel beam is provided with a counterweight bracket, and the counterweight bracket is provided with a counterweight; and two ends of the steel beam are respectively fixed with one end of a steel wire rope, the steel wire rope is provided with a safe upper limit stopper, the upper limit stopper is arranged at the highest working position of the hanging basket allowed to be lifted, and when the hanging basket rises to reach a limited height, the stopper cuts off the power supply. The other end of the steel wire rope is connected with a hanging basket, and the hanging basket stretches across the bottom of the high-altitude corridor.
The steel wire rope comprises a main steel wire rope and a safety steel wire rope.
The steel support is an isosceles trapezoid support, the length of the bottom edge of the isosceles trapezoid support is 600, the length of the top edge of the isosceles trapezoid support is 200mm, and the height of the isosceles trapezoid support is 1000 mm.
The beam fixing clamp is of a frame-shaped structure, and the steel beam penetrates through the frame-shaped structure. The steel beam is fixedly connected with the frame-shaped structure, such as welded.
The base is triangular, each corner is connected with one end of the supporting beam, and the other end of the supporting beam is fixedly connected with the beam fixing clamp.
The counterweight support comprises a top frame, the top frame is erected on the steel beam, the top frame is connected with the counterweight seat through a connecting rib, and the counterweight block is arranged on the counterweight seat. Still be equipped with fixed muscle on the counter weight seat, avoid the balancing weight to take place the displacement.
The utility model discloses a set up the steel support on the vestibule roof for fixed and supporting hanging flower basket bears the weight of the crossbeam, then wears main wire rope and safe wire rope at I-steel crossbeam both ends position, connects the hanging flower basket on ground after fixed through the snap ring.
During construction, the hanging baskets are manufactured in the field by adopting the existing complete set, a plurality of hanging baskets are installed, and the clear distance between the hanging baskets is kept about 1.5m so as to ensure that operators on the hanging baskets can operate conveniently. After finishing decorating one section of the bottom of the corridor, loosening the steel wire rope and the protection rope after the hanging basket falls to the ground, moving the hanging basket to the other end once, and repeating the steps until finishing decorating the bottom surface of the corridor. The steel support is erected on the roof of the corridor, and the steel wire rope is connected with a hanging basket and a limiter according to the specification after falling to the ground.
The utility model has the advantages that: the hanging basket hanging device solves the problem that the hanging basket cannot be hung on the bearing mechanism under the unconventional working condition of the high-altitude corridor, obtains good effect in production practice, has obvious economic benefit, social benefit and environmental protection benefit, is high in feasibility, is worthy of popularization, and has a wide prospect. The method is mainly used for exterior decoration construction of bottom decoration under unconventional working conditions of the high-altitude corridor, such as teaching buildings, science and technology halls, office buildings, hospitals, commercial squares and the like.
The present invention will be further explained with reference to the drawings and examples.
Drawings
FIG. 1 is an overall construction drawing of a hanging basket bearing device of an overhanging I-steel bracket of the embodiment of the utility model;
FIG. 2 is a schematic structural diagram of a steel bracket according to an embodiment of the present invention;
FIG. 3 is a top view of a bracket base according to an embodiment of the present invention;
FIG. 4 is a side view of a support beam according to an embodiment of the present invention;
fig. 5 is a schematic structural view of a counterweight bracket according to an embodiment of the present invention.
Detailed Description
The following description of the preferred embodiments of the present invention is provided for the purpose of illustration and description, and is not intended to limit the invention.
Example 1
As shown in fig. 1-5, an overhanging i-steel support basket carrying device comprises steel supports 2 arranged on two sides of the top of a high-altitude corridor 1, wherein two steel supports 2 are provided with steel beams 3, namely basket carrying beams, and the steel beams 3 are i-steel force arm rods, wherein each steel support 2 comprises a base 21, each base 21 is connected with a beam fixing clamp 23 through a support beam 22, and each steel beam 3 is fixed on the corresponding steel support 2 through the corresponding beam fixing clamp 23; a counterweight support 4 is arranged on the steel beam 3, and a counterweight 5 is arranged on the counterweight support 4; the both ends of steel crossbeam 3 are fixed with wire rope 6's one end respectively, wire rope 6's the other end is connected with hanging flower basket 7, hanging flower basket 7 span the bottom of high altitude vestibule 1.
And a safety upper limit stopper is arranged on the steel wire rope of the hanging basket 8 and is arranged at the highest working position which allows the hanging basket to be lifted, and when the hanging basket rises to reach the limited height, the stopper cuts off the power supply.
The steel wire rope 6 comprises a main steel wire rope and a safety steel wire rope.
The steel bracket 2 is an isosceles trapezoid bracket, the length of the bottom edge is 600, the length of the top edge is 200mm, and the height is 1000 mm.
The beam fixing clamps 23 are frame-shaped structures, and the steel beam 3 penetrates through the frame-shaped structures 23. The steel beam 3 is fixedly connected with the frame-shaped structure 23, such as welded.
The base 21 is triangular, each corner is connected with one end of a supporting beam (inclined strut) 22, and the other end of the supporting beam 22 is fixedly connected with the beam fixing clamp 23.
The counterweight support 4 comprises a top frame 41, the top frame 41 is erected on the steel beam 3, the top frame 41 is connected with a counterweight seat 43 through a connecting rib 42, and the counterweight 5 is arranged on the counterweight seat 43. The counterweight seat 43 is also provided with a fixing rib 44 to prevent the counterweight block from displacing.
The top surface of the high-altitude corridor 1 is provided with a roof panel 8, and two sides of the roof panel 8 are provided with parapet walls which are vertically arranged.
An I-steel cantilever mechanism (steel bracket) is erected on a roof of a corridor and used for fixing and supporting a hanging basket bearing beam, then a main steel wire rope and a safety steel wire rope penetrate through the two ends of the I-steel beam, and the hanging basket is connected to the ground after being fixed through a clamping ring.
During construction, the hanging basket is made of the existing hanging basket in a complete set on site, and the steel cross beam (roof force arm rod) is made of 18# I-shaped steel. The total number of the 6 hanging baskets is installed, the clear distance between the hanging baskets is kept about 1.5m so as to ensure that operators on the 6 hanging baskets can conveniently operate, and the 6 hanging baskets can form a working group to be pushed from one end. After finishing one section of the corridor bottom, after 6 hanging baskets fall to the ground, the steel wire rope and the protection rope are loosened, the hanging baskets move to the other end once, and the step is repeated until finishing the corridor bottom finishing.
A 'channel steel bracket (steel support/steel bracket) structure diagram' is drawn according to a drawing of structural safety calculation, 6 sets (2 sets each) of isosceles trapezoid brackets are welded by adopting 10# channel steel or square tubes, the length of the bottom edge is 600, the length of the top edge is 200mm, and the height is 1000 mm. And (4) checking and accepting each part of the entering hanging basket. The steel support is erected on the roof of the corridor, and the steel wire rope is connected with a hanging basket and a limiter according to the specification after falling to the ground.
Claims (7)
1. I-steel support of encorbelmenting bears hanging flower basket device, its characterized in that: the hanging basket support comprises steel supports arranged on two sides of the top of a high-altitude corridor, steel beams, namely hanging basket bearing beams, are erected on the two steel supports and are I-shaped steel force arm rods, the steel supports comprise bases, the bases are connected with beam fixing clamps through supporting beams, and the steel beams are fixed on the steel supports through the beam fixing clamps; the steel beam is provided with a counterweight bracket, and the counterweight bracket is provided with a counterweight; the two ends of the steel beam are respectively fixed with one end of a steel wire rope, the other end of the steel wire rope is connected with a hanging basket, and the hanging basket stretches across the bottom of the high-altitude corridor.
2. The overhanging i-steel support carrying basket device of claim 1, wherein: the steel wire rope comprises a main steel wire rope and a safety steel wire rope.
3. The overhanging i-steel support carrying basket device of claim 1, wherein: the steel support is an isosceles trapezoid support, the length of the bottom edge of the isosceles trapezoid support is 600, the length of the top edge of the isosceles trapezoid support is 200mm, and the height of the isosceles trapezoid support is 1000 mm.
4. The overhanging i-steel support carrying basket device of claim 1, wherein: the beam fixing clamp is of a frame-shaped structure, and the steel beam penetrates through the frame-shaped structure; the steel beam is fixedly connected with the frame-shaped structure.
5. The overhanging i-steel support carrying basket device of claim 1, wherein: the base is triangular, each corner is connected with one end of the supporting beam, and the other end of the supporting beam is fixedly connected with the beam fixing clamp.
6. The overhanging i-steel support carrying basket device of claim 1, wherein: the counterweight support comprises a top frame, the top frame is erected on the steel beam, the top frame is connected with the counterweight seat through a connecting rib, and the counterweight block is arranged on the counterweight seat.
7. The overhanging i-steel support carrying basket device of claim 6, wherein: the counterweight seat is also provided with a fixing rib.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021150352.2U CN212926981U (en) | 2020-06-19 | 2020-06-19 | I-steel support of encorbelmenting bears hanging flower basket device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021150352.2U CN212926981U (en) | 2020-06-19 | 2020-06-19 | I-steel support of encorbelmenting bears hanging flower basket device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212926981U true CN212926981U (en) | 2021-04-09 |
Family
ID=75323524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021150352.2U Active CN212926981U (en) | 2020-06-19 | 2020-06-19 | I-steel support of encorbelmenting bears hanging flower basket device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212926981U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114458001A (en) * | 2022-03-04 | 2022-05-10 | 中建一局集团第三建筑有限公司 | Portable hanging flower basket suspension that construction was used is decorated to outdoor vestibule in high altitude |
CN114961216A (en) * | 2022-06-17 | 2022-08-30 | 中冶建工集团有限公司 | Hanging basket installation device for corridor construction and hanging basket synchronous installation construction method |
CN115162695A (en) * | 2022-06-21 | 2022-10-11 | 中国五冶集团有限公司 | Suspension type work platform towards I-shaped steel beam |
-
2020
- 2020-06-19 CN CN202021150352.2U patent/CN212926981U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114458001A (en) * | 2022-03-04 | 2022-05-10 | 中建一局集团第三建筑有限公司 | Portable hanging flower basket suspension that construction was used is decorated to outdoor vestibule in high altitude |
CN114961216A (en) * | 2022-06-17 | 2022-08-30 | 中冶建工集团有限公司 | Hanging basket installation device for corridor construction and hanging basket synchronous installation construction method |
CN115162695A (en) * | 2022-06-21 | 2022-10-11 | 中国五冶集团有限公司 | Suspension type work platform towards I-shaped steel beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212926981U (en) | I-steel support of encorbelmenting bears hanging flower basket device | |
CN107902545B (en) | Horse way air pipe hoisting construction device and construction method | |
CN105484502B (en) | A kind of industrial premises steel structural roof purlin and support bar combined installation method | |
CN103643800A (en) | Lifting installation system for buckling restrained supporting member and construction method thereof | |
CN210013462U (en) | Elevator shaft lifting type construction operation platform | |
CN109138454A (en) | A kind of installation method of super high-rise building outline border bandy truss | |
CN111350359B (en) | Method and diamond device for integrally lifting large-span structure | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN110453836B (en) | Oblique glass curtain wall mounting system and mounting method | |
CN212583196U (en) | Floor drilling steel pipe fixed bolster bears hanging flower basket device | |
CN115807532A (en) | Device for attaching suspension bracket and construction method | |
CN213509662U (en) | Diamond device for integral lifting of large-span structure | |
CN115306137A (en) | Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof | |
CN214302804U (en) | Double-layer hanging basket of riding horse type | |
CN111305433B (en) | Construction structure and construction method of roof steel structure platform inclined glass curtain wall | |
CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
CN203531413U (en) | Auxiliary structure hoisting whole steel structure wire frame | |
CN209723565U (en) | Attached tower crane attachment construction operation platform outside a kind of steel-core wall structure | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
CN215889310U (en) | Connecting component and platform for mounting and constructing ceiling decorative plate | |
CN113202280A (en) | Conversion bracket type steel structure for steel structure high-altitude construction and construction method thereof | |
CN208684250U (en) | One kind being based on the quick detachable boom hoisting of major structure of construction | |
CN207484991U (en) | A kind of glass curtain wall monorail hoisting structure | |
CN110748140A (en) | Track beam hanging basket special for stepped curtain wall | |
CN219638442U (en) | Building glass curtain wall installs overhead hoist |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |