CN203531413U - Auxiliary structure hoisting whole steel structure wire frame - Google Patents

Auxiliary structure hoisting whole steel structure wire frame Download PDF

Info

Publication number
CN203531413U
CN203531413U CN201320625492.4U CN201320625492U CN203531413U CN 203531413 U CN203531413 U CN 203531413U CN 201320625492 U CN201320625492 U CN 201320625492U CN 203531413 U CN203531413 U CN 203531413U
Authority
CN
China
Prior art keywords
auxiliary
hoisting
wire frame
rack
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320625492.4U
Other languages
Chinese (zh)
Inventor
扈朝阳
吴卫
李铁英
王洪昆
刘震
霍健
宋红智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co Ltd filed Critical TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201320625492.4U priority Critical patent/CN203531413U/en
Application granted granted Critical
Publication of CN203531413U publication Critical patent/CN203531413U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses an auxiliary structure hoisting a whole steel structure wire frame. The auxiliary structure improving the whole steel structure wire frame is composed of a lifting lug and an auxiliary lifting point, wherein the lifting lug is welded to an embedded part on the top face of a structure column bracket and used for hanging an upper lifting point of a chain hoist and the auxiliary lifting point is arranged below peripheral support balls of the wire frame, is 4m away from a lower chord ball in height and serves as a lower lifting point of the hoisting wire frame. The lifting lug is a 114mm*4mm steel tube upright in structure and the auxiliary lifting point is a single conic body in structural shape. The auxiliary structure hoisting the whole steel structure wire frame has the advantages of being simple in structure, practical, strong in operability for hoisting, capable of guaranteeing smooth implementation of engineering and convenient to popularize and further has the advantage that when a construction site is limited and a hoisting machine cannot be used or the overall wire frame lifting construction engineering with a support which cannot be erected is conducted, the auxiliary structure hoisting the whole steel structure wire frame is safe, reliable, feasible and simple in hoisting.

Description

The auxiliary construction of steel structure net rack Integral lifting
Technical field
The utility model relates to a kind of auxiliary construction of steel structure net rack Integral lifting, belongs to building engineering construction machinery.
Background technology
Space truss structure is a kind of space structures being linked by node according to certain grid configuration by many rod members, with its there is space-load, in the space structures of advantage is widely used in sports palace, cinema, exhibition hall and station the wait public building such as large such as lightweight, rigidity is large, anti-seismic performance is good.According to the difference of construction technology, the form of structure of rack has Corkscrews rack and the ball rack of welding.The mounting method of rack in rack engineering, have: high altitude bulk method, itemize or piecemeal Method for Installation, high-altitude sliding method, integral body are hung the method for liter, Integral Lifting and integrated lifting, wherein whole rack lift method refers to that lifting means is installed on structural column promotes rack.Common Integral Lifting has at present:
1, singly put forward rack method, be by rack after design attitude is always spelled on the spot, utilize the feed-through hydraulic jack mini-plant being arranged on pillar that rack is risen to design elevation, then decline in place, fixing.Described feed-through hydraulic jack is for promoting pulling equipment, specification: 40t, 100t, 200t.
2, the rack method of climbing, be by rack after design attitude is always spelled on the spot, utilize the feed-through hydraulic jack mini-plant being arranged on rack to promote anchor point and be fixed on post or on dead man, rack is risen to design elevation, then carry out in place, fixing.
3, Sheng Liang lifts net method, that rack is always spelled to the assembling collar tie beam that simultaneously installs grid frame supported on the spot at design attitude, net rack support is held on to this collar tie beam middle part, on each capital, installs lifting means, these lifting means are being lifted rack and are being risen to design elevation when rising beam.
4, rising net slip-form, is that rack is always spelled on the spot at design attitude, and it is to utilize the sliding formwork being arranged on the interior reinforcing bar of post to promote by hydraulic jack that rack promotes.
Above-mentioned existing rack Integral Lifting, does not need Large-scale Hoisting to establish and facility, but needs more elevator and the short steel column of temporary supporting, girder steel, and preparation amount is large.Wherein the short steel column of temporary supporting will, higher than capital more than 4 meters, could rise to the bearing on rack ground capital fixing.Above-mentioned rack Integral Lifting is applicable to span 50m~70m, and more than height 4m, the large and medium-sized perimeter support network frame house cap that weight is larger .described feed-through hydraulic jack, for the Special jack of the presstressed reinforcing steels such as stretch-draw steel hinge line, needs and stretching oil pump is used in conjunction with, and stretch-draw and the power that returns back to top provide by the hydraulic oil of stretching oil pump.
In the Integral lifting installation of the large area rack on the roof of Digital Television TV mansion, Tianjin studio centre attached building, and complete safely the Integral lifting installation engineering of large area rack.
The large area rack on the roof of Digital Television TV mansion, described Tianjin studio centre attached building, for adopting the dual-layer welding ball node rack of the space structures being formed by wind up layer, lower edge layer and web member layer, rack west and east span 44.2m, north and south span 33.2m, high 3.484 ㎡ of rack, the rack gross area 1468 ㎡, heavy 130t, net rack support height 18m.The top-bottom chord of steel structure net rack is the pipe of φ 219 * 20 to the maximum, and web member is the pipe of φ 114 * 4 to the maximum, is welded spherical node rack, and what connect ball maximum is the hollow ball of D600 * 30, and hollow ball total quantity is 413.8 degree are provided fortification against earthquakes.The periphery narrow space that steel structure net rack is installed, Elements of Space Grid Truss surrounding has end bay structure.
In the integral hoisting construction engineering of the Large Area Steel rack of the building that has end bay structure for roof and the surrounding thereof of Digital Television TV mansion, above-mentioned Tianjin studio centre attached building, how to select economy, safe and reliable a kind of lifting means that is different from prior art to implement the Integral lifting of Large Area Steel rack, becoming the problem that building industry engineers and technicians extremely pay close attention to, is also the urgently problem of R and D of construction engineering technician.
Utility model content
The purpose of this utility model, be to provide the auxiliary construction with safe and reliable, stability and workable a kind of steel structure net rack Integral lifting, it has lifting steadily, lifting difference is little, synchronism is good, and work efficiency is high, the characteristic of construction safety, and do not need to arrange the short steel column of temporary supporting, just the bearing of rack bottom surface can be risen to the fixed point of capital.
For realizing the purpose of this utility model, the technical scheme adopting is:
An auxiliary construction for steel structure net rack Integral lifting, is characterized in that: by the hanger of suspension centre on the extension bottle gouard moved by hands being welded on structural column bracket end face built-in fitting and be arranged on each periphery bearing ball of rack below, apart from the high 4m of lower edge ball place, as the auxiliary suspension centre of the lower suspension centre of hoisting grid, form.
Described hanger, its structure is 114mm * 4mm steel pipe post steel pipe post.
Described auxiliary suspension centre, its planform is the planform of the single cone in four sides .
Advantage of the present utility model and beneficial effect
compared with prior art, the auxiliary construction of the utility model rack Integral lifting, has the following advantages and beneficial effect:
Advantage: simple structure is practical, for the strong operability of rack Integral lifting, promotes difference little, and synchronism is good ,labour intensity is low, and work efficiency is high, and construction safety has guaranteed that engineering implements smoothly, is convenient to promote.
Beneficial effect:
1, do not need to arrange the short steel column of temporary supporting, just the bearing of rack bottom surface can be risen to the fixed point of capital.
2, auxiliary suspension centre is all located at the ball node place of net rack support, adopts bottle gouard moved by hands lifting means, does not change the stress of Space Truss Design, in whole rack lifting process, keeps rack strut and tie to be subject to force direction constant.
,the auxiliary construction of rack Integral lifting of the present utility model is that construction plant is limited, cannot use large scale hoisting machinery maybe cannot set up the Integral lifting Construction of The Grids engineering of bracing frame, and a kind of safe and reliable, feasible simple lifting means is provided.
Accompanying drawing explanation
Fig. 1 is the auxiliary construction schematic diagram of the utility model rack Integral lifting;
Fig. 2 is the utility model shackle structure schematic diagram;
Fig. 3 is the utility model auxiliary hanging dot structure shape schematic diagram;
Fig. 4 is rack Synchronous lifting control line schematic diagram.
In Fig. 1: 1 structural column; 2 bracket end face built-in fittings; 3 hangers; 4 auxiliary suspension centres; 5 racks; 6 bottle gouards moved by hands; 7 hoisting chains; 8 manual-chains .
In Fig. 2: 1 structural column; 2 bracket end face built-in fittings; 3 hangers.
In Fig. 3: 4 auxiliary hanging dot structure shape schematic diagrames.
In Fig. 4: 1 structural column; 5 racks ;7 hoisting chains; 9 scales.
The specific embodiment
In order to make those skilled in the art understand better the technical solution of the utility model, below in conjunction with accompanying drawing and most preferred embodiment, utility model is described in further detail.
Embodiment
A kind of auxiliary construction of steel structure net rack Integral lifting, by the hanger 3 of suspension centre on the extension bottle gouard moved by hands 6 being welded on structural column 1 bracket end face built-in fitting 2 and be arranged on each periphery bearing ball of rack 5 below, apart from the high 4m of lower edge ball place, as the auxiliary suspension centre 4 of the lower suspension centre of hoisting grid 5, form, as shown in Figure 1.
Described hanger 3, its structure is 114mm * 4mm steel pipe post steel pipe post, as shown in Figure 2.
Described auxiliary suspension centre 4, its planform is the planform of the single cone in four sides, as shown in Figure 3.
The operation of rack Integral lifting
1) lifting operation
Area is for be the rack of 44.2m * 33.2, at the scene on the spot total assembled after, first promote 4 meters of height, the auxiliary suspension centre 4 of the single cone in four sides is installed, utilize auxiliary suspension centre 4 and adopt 45 bottle gouards moved by hands, 6 lifting racks 5.By dropping manual-chain 8, hoisting chain 7 makes bottle gouard moved by hands 6 promote reposefully rack 5 to design elevation place, then in place and fixing.Rack lower edge bearing ball node rise to capital and fixing after, then cut away the auxiliary suspension centre 4 of the single cone in four sides.
2) control of rack lifting process
As shown in Figure 4, scale 9 is set on structural column 1, establishes special messenger's rack of looking over one's shoulder and promote synchronous situation, as found, promote the discrepancy in elevation and surpass 100mm and should stop immediately promoting, nonsynchronous bottle gouard moved by hands 6 is carried out to force bearing adjustment, rack 5 lower edge ball nodes are adjusted to after sustained height and adjusted and continue Integral lifting.After every lifting 200mm height, check once, bottle gouard moved by hands 6 devious is once adjusted, so repeatedly promote.
In the utility model, described bottle gouard moved by hands is commercially available prod.
The auxiliary construction of steel structure net rack Integral lifting of the present utility model, for limited because constructing workshop, and cannot use large scale hoisting machinery maybe cannot set up the integral hoisting construction engineering of the roof of Digital Television TV mansion, Tianjin studio centre attached building and the Large Area Steel rack of the building that surrounding has end bay structure thereof of bracing frame, a kind of safe and reliable, feasible simple lifting means is provided.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, do not departing under the prerequisite of the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (3)

1. onethe auxiliary construction of kind of steel structure net rack Integral lifting, is characterized in that: by be welded on the hanger (3) of the upper suspension centre of extension bottle gouard moved by hands (6) on structural column (1) bracket end face built-in fitting (2) and be arranged on each periphery bearing ball of rack (5) below, apart from the high 4m of lower edge ball place, as the auxiliary suspension centre (4) of the lower suspension centre of lifting net (5), form .
2. the auxiliary construction of steel structure net rack Integral lifting according to claim 1, is characterized in that: described hanger (3), its structure is 114mm * 4mm steel pipe post steel pipe post.
3. the auxiliary construction of steel structure net rack Integral lifting according to claim 1 ,it is characterized in that: described auxiliary suspension centre (4), its planform is the planform of the single cone in four sides .
CN201320625492.4U 2013-10-11 2013-10-11 Auxiliary structure hoisting whole steel structure wire frame Expired - Lifetime CN203531413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320625492.4U CN203531413U (en) 2013-10-11 2013-10-11 Auxiliary structure hoisting whole steel structure wire frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320625492.4U CN203531413U (en) 2013-10-11 2013-10-11 Auxiliary structure hoisting whole steel structure wire frame

Publications (1)

Publication Number Publication Date
CN203531413U true CN203531413U (en) 2014-04-09

Family

ID=50417637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320625492.4U Expired - Lifetime CN203531413U (en) 2013-10-11 2013-10-11 Auxiliary structure hoisting whole steel structure wire frame

Country Status (1)

Country Link
CN (1) CN203531413U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470062A (en) * 2013-10-11 2013-12-25 天津三建建筑工程有限公司 Auxiliary structure for integrally lifting steel structure grid
CN111335476A (en) * 2020-04-02 2020-06-26 山东天齐置业集团股份有限公司 Staggered floor steel mesh frame subsection lifting accumulative assembling construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470062A (en) * 2013-10-11 2013-12-25 天津三建建筑工程有限公司 Auxiliary structure for integrally lifting steel structure grid
CN111335476A (en) * 2020-04-02 2020-06-26 山东天齐置业集团股份有限公司 Staggered floor steel mesh frame subsection lifting accumulative assembling construction method
CN111335476B (en) * 2020-04-02 2021-06-08 山东天齐置业集团股份有限公司 Staggered floor steel mesh frame subsection lifting accumulative assembling construction method

Similar Documents

Publication Publication Date Title
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN203867181U (en) Supporting system for roof inclined beam and slab cantilever structure
CN212926981U (en) I-steel support of encorbelmenting bears hanging flower basket device
CN203334664U (en) Ultra-long cantilever truss structure high formwork supporting system
CN103352576A (en) Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN201665992U (en) Whole lifting platform of large steel net frame
CN202544468U (en) Drawbar-type electrical steel tubular rod
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN203531413U (en) Auxiliary structure hoisting whole steel structure wire frame
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN211736290U (en) Shell cross-section large-span cornice high-altitude formwork erecting operation platform
CN103470062A (en) Auxiliary structure for integrally lifting steel structure grid
CN105822066B (en) Underground large span large space superelevation is without post steel-structure tube truss construction engineering method
CN202785387U (en) Indoor cantilever crane
CN205369229U (en) But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid
CN104213707A (en) Attaching and climbing device of full steel climbing frame in structure retraction part and installation method thereof
CN104652853B (en) Quick lifting installation building structure
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN205575534U (en) Lattice formula groined type support body lifting means
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN214994020U (en) Combined tower crane foundation pre-embedded structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140409

CX01 Expiry of patent term